    Aim of presentation

    The aim of our presentation is to appraise t he Management what we have learned

    from the Dynagro as well as from Mr. Patrick. Those thing we are going to

    implement in the Texereurop (BD) Ltd.

    Sequence of Presentation:

    o What is productivity?

    o Problem you may face.

  • 7/28/2019 Industrial Enginering

    2/13

    o A simple operation

    o Work analysis t techniques.

    o Out commitment.

    o Question and answer season.

    What is productivity?

    In general ratio of output to input

    Productivity = Out pur/Input 100

    Problem you may ace in productivity :

    * Productivity

    - Low output, low labour utilisation

    - Targets not met, poor efficiency

    - Inefficient style change

    - Low moral, high labour turnover and excessive training costs

    - Low return on capital investment

  • 7/28/2019 Industrial Enginering

    3/13

    Communication buildup between dept.

    Meet the buyer requirements.

    Meet the buyer requirements.

    Function of I.E-

    Analysis of the work.

    Develop the method

    Measure the work

    Set the SMV & Target

    Cost per minute

    Develop system & Procedure

    Continuous follow-up

    What is method study?

    o Is the dystemic recoding & critical examination of existing of proposed of way doing

  • 7/28/2019 Industrial Enginering

    4/13

    o Designed to establish the time for a qualified worker.

    o Carry out a specified job at a defined level of performance.

    Purpose of work measurement:

    o Work measurement is concerned with investigating, redacting and subsequently

    elimination ineffective time.

    Work measurement techniques:

    Time Study.

    Production Study

    Potential Study

    PMTS

  • 7/28/2019 Industrial Enginering

    5/13

    What is production study?

    o To prove the capacity.

    o To find out non-productive time

    o To clear the bottle neck

    What is potential study?

    o To see current picture of the line quickly

    o Take the immediate decision about the line

    o To balance the line smoothly

  • 7/28/2019 Industrial Enginering

    6/13

  • 7/28/2019 Industrial Enginering

    7/13

  • 7/28/2019 Industrial Enginering

    8/13

    Shoulder joint

    Sleeve attach

    Neck attach

    Side seam

    Bottom hem

    50 100 150 200 250 300

    185

    140

    300

  • 7/28/2019 Industrial Enginering

    9/13

  • 7/28/2019 Industrial Enginering

    10/13

  • 7/28/2019 Industrial Enginering

    11/13

    A SIMPLE OPERATION

    Total 344 TMU

    SMV 0.189

    Note smv = TMU/ 2000+Allow%

    ACODE DESCRIPTION TMU

    MG2T Match & Get 2 Parts Together 76

    FOOT Position To Needle 38

    MS1A Sew To Hold 17

    AM2P Align Edges 61

    S34LA Sew 34cm IN 1 Burst 79

    TCUT Cut Threads with Scissors 50

    AS1H Put Aside with 1 Hand 23

  • 7/28/2019 Industrial Enginering

    12/13

    Work Study / E.E

    Work measurement Method Study

    Higher Productivity

  • 7/28/2019 Industrial Enginering

    13/13

    Our Commitment

    Implementing the method

    Increase the productivity

    Reduce the helper

    Set the line target

    Achieve the target with quality

    Ship the goods on time with full qty

    Ensure the maximum utilization of existing resources.