Aim of presentation
The aim of our presentation is to appraise t he Management what we have learned
from the Dynagro as well as from Mr. Patrick. Those thing we are going to
implement in the Texereurop (BD) Ltd.
Sequence of Presentation:
o What is productivity?
o Problem you may face.
-
7/28/2019 Industrial Enginering
2/13
o A simple operation
o Work analysis t techniques.
o Out commitment.
o Question and answer season.
What is productivity?
In general ratio of output to input
Productivity = Out pur/Input 100
Problem you may ace in productivity :
* Productivity
- Low output, low labour utilisation
- Targets not met, poor efficiency
- Inefficient style change
- Low moral, high labour turnover and excessive training costs
- Low return on capital investment
-
7/28/2019 Industrial Enginering
3/13
Communication buildup between dept.
Meet the buyer requirements.
Meet the buyer requirements.
Function of I.E-
Analysis of the work.
Develop the method
Measure the work
Set the SMV & Target
Cost per minute
Develop system & Procedure
Continuous follow-up
What is method study?
o Is the dystemic recoding & critical examination of existing of proposed of way doing
-
7/28/2019 Industrial Enginering
4/13
o Designed to establish the time for a qualified worker.
o Carry out a specified job at a defined level of performance.
Purpose of work measurement:
o Work measurement is concerned with investigating, redacting and subsequently
elimination ineffective time.
Work measurement techniques:
Time Study.
Production Study
Potential Study
PMTS
-
7/28/2019 Industrial Enginering
5/13
What is production study?
o To prove the capacity.
o To find out non-productive time
o To clear the bottle neck
What is potential study?
o To see current picture of the line quickly
o Take the immediate decision about the line
o To balance the line smoothly
-
7/28/2019 Industrial Enginering
6/13
-
7/28/2019 Industrial Enginering
7/13
-
7/28/2019 Industrial Enginering
8/13
Shoulder joint
Sleeve attach
Neck attach
Side seam
Bottom hem
50 100 150 200 250 300
185
140
300
-
7/28/2019 Industrial Enginering
9/13
-
7/28/2019 Industrial Enginering
10/13
-
7/28/2019 Industrial Enginering
11/13
A SIMPLE OPERATION
Total 344 TMU
SMV 0.189
Note smv = TMU/ 2000+Allow%
ACODE DESCRIPTION TMU
MG2T Match & Get 2 Parts Together 76
FOOT Position To Needle 38
MS1A Sew To Hold 17
AM2P Align Edges 61
S34LA Sew 34cm IN 1 Burst 79
TCUT Cut Threads with Scissors 50
AS1H Put Aside with 1 Hand 23
-
7/28/2019 Industrial Enginering
12/13
Work Study / E.E
Work measurement Method Study
Higher Productivity
-
7/28/2019 Industrial Enginering
13/13
Our Commitment
Implementing the method
Increase the productivity
Reduce the helper
Set the line target
Achieve the target with quality
Ship the goods on time with full qty
Ensure the maximum utilization of existing resources.
Ensure discipline at Texeurop (BD) Ltd.