German Tsunami Early-Warning Systrem
Jan 18, 2005
1
Indonesian-German
Tsunami Early-Warning System
Helmholtz-Association of German Research-Centres (HGF)
Components of an Early Warning System
Components(1) Real-Time Earthquake Monitoring
Location and magnitude in a few minutesDisplacement measurements by GPS
(2) Real-Time Sea Level MonitoringGPS-Buoys with ocean-bottom pressure sensorsGPS-controlled tide gauges
(3) Tsunami SimulationBathymetry
(4) Installation of national/local Data- and Early-Warning-Centres
(5) Capacity Building
German Tsunami Early-Warning Systrem
Jan 18, 2005
2
The GEOFON Network and its Partner Networks(GEVN - GEOFON Extended Virtual Network )
Real-Time Earthquake Monitoring
Proposed Station Distribution for an Earthquake Monitoring Network for the Indian Ocean Region (Locations to be discussed)
Real-Time Earthquake Monitoring
German Tsunami Early-Warning Systrem
Jan 18, 2005
3
Proposed Real-Time Earthquake Monitoring Network in Indonesia(Locations to be discussed)
Real-Time Earthquake Monitoring
Displacements after the Sumatra Quake
German Tsunami Early-Warning Systrem
Jan 18, 2005
4
Displacements after the Sumatra Quake
GPS-Buoy with Ocean-bottom Pressure Sensor
Real time measurement of Sea Level by- Ocean-bottom Pressure Sensor- High-precision GPS-Positioning of the Buoy
Real-Time Sea Level Monitoring
German Tsunami Early-Warning Systrem
Jan 18, 2005
5
Oceanbottom Pressure Sensor
GPS-Buoy
Real-Time Sea Level Monitoring
German Tsunami Early-Warning Systrem
Jan 18, 2005
6
Timeseries (1 hour) of the local sea level changes from GPS
Real-Time Sea Level Monitoring
IGS Tide Gauges
Provide highly accurate long-term time series for the vertical land motion at tide gauges for sea level studies
Chairman: Tilo Schöne, GFZ
Existing tide gauge/GPS stations
planned
German Tsunami Early-Warning Systrem
Jan 18, 2005
7
Bathymetric Model fromGEBCO 1‘ x 1‘ grid
Epicentres
200 m depth contour2000 m depth contour
200 m
2000 m
Tsunami Simulation
Trackcontrol form:IHO/IOC GEBCOIHO DCDBNGDC/GEODAS
Gapssparse data
German Tsunami Early-Warning Systrem
Jan 18, 2005
8
Multibeam Survey RV „Sonne“
Multibeam Survey
HMS Scott Jan 2005
The Concept
• Stepwise Realization: (1) Direct action(2) Longterm Support
• Modular ConceptCompatible with other systemsExpansion to other disasters (Volcanoes, land slides, meteorological hazards,....)
• Decentralized and open System (National/local Early-Warning-Centres)
• Transferable to other regions
• Recent technological developments
• Capacity Building