indira gandhi international airport
TRANSCRIPT
PROJECT MANAGEMENTMMS Sem – IV
GROUP 3
GROUP MEMBERS
•Achala •Archana •Bhagyashree •Reshma •Siddhi•Swati
INDIRA GANDHI INTERNATIONAL AIRPORT
Introduction
• Located in New Delhi• Opened in July 2010• The busiest airport In South Asia • Current capacity - 34 Million Passengers• Planned expansion by 2030 – 100 Million Passengers• T3 has India's First Automated Parking
Management system• IGIA was built at a cost of INR128.5bn ($2.7bn)• 5.4 million square feet Area • Connected by Delhi Metro railway
Cont...
• The airport was operated by the Indian Air Force• Its management was transferred to the airports authority of
India. • In May 2006, the management of the airport was passed over
to Delhi International Airport Limited (DIAL), a public-private consortium led by GMR group.
• DIAL - a joint venture of Indian govt. and GMR group (PPP)
50%
10%10%
4%
26%
STAKEHOLDERS GMR GROUP FRAPORT AGMALAYSIA AIRPORT INDIA DEVELOPMENT FUNDAAI
Costing & Expenditure
• The original project cost approved by DIAL and communicated to AAI on 18 January 2008 was INR 8975 crores
• The actual project cost went up to INR 12857 crores
• The final project cost adopted by Airports Economic Regulatory Authority (AERA) for arriving at the Regulatory Asset Base (RAB) was 12502.86 crores
Total cost estimates during Financial closure - 2008
(Rs.Crores)
Cost as per estimates in Final cost in March 2010 CostJanuary 2008 adopted by AERA Escalation
Funding (2) (3) ( Percentage)
(1) 3(b) -2(b)Amount % of total Amount % of total
(a)Cost
(a)cost
(b) (b)
Equity 1202 13.39 2300 18.40 5.01
Loans 4986 55.55 5266 42.11 (-) 13.44
Security deposits 2738 30.51 1471.51 11.77 (-) 18.74
Internal accruals 49 0.55 50 0.40 (-) 0.15
DF - - 3415.35 27.32 27.32
Total 8975 100 12502.86 100
IGIA Technical Specifications & Comparison
INDIRA GANDHI INTERNATIONAL AIRPORT SPECIFICATIONS
FACTSHEET
Airport location 16km/10miles from city centres
Total Terminals Terminal 1 – Domestic ( T1D Dep, T1C Arrival) Terminal 3
Security 3000 CCTV cameras
Area T-3 5.4 Million sq.ft
Baggage handling system Capacity to handle 12800 bags per hour
6 Common check-in area 168 check-in counters
95 Immigration counters 49 Outbound and 46 Inbound Immigration counters
78 Passenger Boarding Bridges 3 Passenger Boarding Bridges for A380 or similar sized aircraft
100 room Transit Hotel Domestic and International passengers
Multi Level Car Park Accomodating 4300 cars
Comparison – Capacity & Construction Time
AIRPORT CAPACITY(Passengers)
TIME
Changi Airport – Singapore (T3) 22 Million 76 months
Heathrow T5 – London, UK 25 Million 60 months
Beijing Airport New terminal for Olympics – T3, China
45 Million 60 months
IGI Airport – T3, New Delhi, India 34 Million 37 months
Statistical Comparison of Construction - Time & Capacity of Terminal 3
Changi Airport
Singapore
Heathrow- London
Beijing airport
IGI T3 India0
10
20
30
40
50
60
70
80
Time(in months)Capacity(in million)
Resources
About 16,000 workmen and 1200 design and construction staff were employed.
Construction Area Materials used
Building 600000 of concrete & 200000 tonnes of reinforced steel
Roof 18000 tonnes of reinforced steel
Floor 110000 square meters of granite
Windows 95000 square meters of glass
Runway 650000 tonnes of asphalt, concrete treated base and special layer of glass grid
Suppliers SERVICES SUPPLIERS
Baggage Handling System Siemens
IT Infrastructure Wipro
Air Conditioners Carrier India
Electrical Products & Services ABB Group
Telephones & Mobile services Bharti Airtel
Carpet Material Brintons, UK developed in Pune
Engineering and development Consultancy
Mott Macdonald
Conveyor Belt Siemens; Crisplant and ARINC
Cont…
• Security Cameras and CCTV’s
• Airport Systems
• Travelators, Elevators &Escalators
• Information boards and Monitors
• Electrical Substations
Socio - Economic Issues
• Farm house weddings pose threat to flights landing at IGI airport
- Incidents of vision distraction due to laser beams
-The Air Traffic Control Report & Delhi Police Actions
• 4 international airports hub of 94% drug smuggling cases
-Narcotics Control Bureau (NCB) &airport security force CISF
-One held with six gold biscuits at IGIA Recently
Cont…
• Government must make Airport infrastructure more investor-friendly
-Prime Minister Narendra Modi-led NDA government
-Reforms in regulation and policy
- Make In India vs Real changes in this sector
CSR Initiatives of DIAL
• Children’s Creativity Centre (IBM)• Bridge Course Program for Girls• A full-fledged dispensary & Health camps• Residential vocational training facilities
Challenges
• L&T implemented the Aconex online collaboration system• Total external finance requirement for the project (Rs. 500
crore for T3)• IDFC’s ‘one firm’ solution IDFC – Capital, Project Finance
and Legal)• IT Challenges : Support of Wipro• Political Opposition :Such an expensive terminal building at
Delhi is absolutely not justified
List of Facilities
Medical Facilities
Left Luggage FacilityEntertainment Options
Sleeping PodsInternet Facilities
Conclusion
• Eco – Friendly
• Revenue Generator
• Prestigious National Asset
• Successful Project
Thank You