india plans

Upload: abhiyaan-bharat

Post on 03-Apr-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 India Plans

    1/9

  • 7/28/2019 India Plans

    2/9

    Period Plan Remarks 1969-70 to 1973-74 Fourth Plan It brought in a scientific temper to

    Indian agriculture and self reliance

    1974-75 to 1977-78 Fifth Plan Terminated a year earlier by the JantaGovt. which introduced the RollingPlan concept.

    1978-79 to 1979-80 Annual Plan Launched by the Janta Govt.

    1980-81 to 1984-85 Sixth Plan Originally launched by the Janta Govt.However, abandoned by the new Govtand revised plan for 1981-85subsequently approved

    1985-86 to 1989-90 SeventhPlan

    Food, work and productivity were thebasic priorities.

    1990-91 to 1991-92 AnnualPlans

    Basic thrust was on maximization of employment and social transformation

    1992-93 to 1996-97 Eighth Plan Faster economic growth, faster growth of manufacturing, agricultural and alliedsectors, significant growth rates in exports

  • 7/28/2019 India Plans

    3/9

    1997-98 to 2001-02 Ninth plan Priority to agriculture and ruraldevelopment; acceleratinggrowth rate of economy; foodand nutritional security for all;

    containing growth rate of population; empowerenment of women and sociallydisadvantaged groups such asSC/STs, backward classes and

    minorities etc.2002-2007 Tenth Plan Drastic pruning of unproductive

    and unnecessary expenditure;Downsizing government;Reduction in non-merit

    subsidies; Re-orienting strategyto raise food production;Reforming and rejuvenating thepower sector; Labour reforms;Speeding up reforms in thefinancial sector.

  • 7/28/2019 India Plans

    4/9

    Introduction and Objectives The economy of India is based in part onplanning through there five-year plans ,developed, executed and monitored by thePlanning Commission.

    Growth rate of approximately 10% by the end of plan period; growth of 4% inagriculture sector, faster employmentcreation, reducing disparities acrossregions and ensuring access to basicphysical infrastructure and health andeducation services to all.

  • 7/28/2019 India Plans

    5/9

    Allocation for major sectors Education sector :- Allocation of fundsfor education sector increased by 34.2%to Rs. 32,352 crores

    Means cum- merit scholarships :-Under this scheme selection throughnational test of student who have passed

    class VIII ; each student to be givenRs.6000 per year; 100,000 scholarshipsto be awarded every year.

  • 7/28/2019 India Plans

    6/9

    Drinking Water and Sanitation:- Allocationfor Rajiv Gandhi Drinking Water Mission to beincreased from Rs.4680 crores to Rs. 5850crores.

    Health Sector, National Rural HealthMission :- All districts to complete preparation of District Health Action Plan by march 2007

    HIV/AIDS :- Access to condoms to be expandedand universal access to blood screening and safeblood to be ensured; more hospitals to providetreatment to prevent transmission of HIV/AIDSfrom mother to child; provision for AIDS controlprogramme to be Rs.969 crore.

  • 7/28/2019 India Plans

    7/9

    Polio :- Number of polio rounds to beincreased , with intensive coverage in the20 high risk district of U.P. and 10 districtof Bihar.Integrated Child DevelopmentServices :- To cover all habitations andsettlements and to reach out to pregnantwomen, lactating mothers and all children

    below the age of six; allocation to beincreased from Rs.4,087 crore to Rs.4,761crore.

  • 7/28/2019 India Plans

    8/9

    Urban Unemployment :- Increase in allocationfor Swarna Jayanti Shahari Rojgar Yojana fromRs. 250 crore to Rs.344 crore.National Rural Employment GuranteeScheme :- Allocation of Rs.12,000 crore forNREGS; coverage to expand from 200 districtsto 330 districts.Scheduled Castes and Scheduled Tribes :-

    Allocation of Rs.3,271 crore in respect of schemes benefiting only SCs and STs andRs.17,691 crore in respect of schemes with atleast 20% of benefits earmarked for SCs andSTs.

  • 7/28/2019 India Plans

    9/9

    Women:- Outlay for 100% womenspecific programmes is Rs.8,795 crore andfor scheme where at least 30% allocationis for women specific programmes isRs.22,382 crore.

    North Eastern Region (NER):- Allocation increased from Rs. 12,041 croreto Rs. 14,365 crore.