index of drawings - ct.gov · vc 2 4 ' ' p v c 18 'p v c 4 8 ' ' p v c...
TRANSCRIPT
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40'
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
12/4/2018
BLOCK:
SIGNATURE/
...\ENV-01_ENV_SHEET_0138-0248.dgn
Border Version: 11/29/13
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
INDEX OF DRAWINGS
ENV-02
ENV-01
ENVIRONMENTAL SAMPLING LOCATIONS
ENV-03 ENVIRONMENTAL SAMPLING LOCATIONS
ENV-04
ENV-06 ENVIRONMENTAL SAMPLING LOCATIONS
ENV-07
ENV-08
ENV-10
ENV-09
ENV-05 ENVIRONMENTAL SAMPLING LOCATIONS
RAYMARK WASTE LOCATION PLAN
RAYMARK WASTE LOCATION PLAN
ENV-11
ENV-12
ENV-13
ENV-14
ENV-15
ENV-16
ENV-17
NUMBER
DRAWING
NUMBER
DRAWING
INDEX OF DRAWINGS
DRAWING TITLE DRAWING TITLE
RECONSTRUCTION OF INTERCHANGE 33
ON I-95
STRATFORD
ENV-01DM
INDEX OF DRAWINGS
0138-0248CL/KH
ENV-18 ASBESTOS COVER DETAILS
RAYMARK WASTE CROSS SECTION STA. 32+69 TO 32+79
RAYMARK WASTE CROSS SECTION STA. 32+89 TO 35+73
RAYMARK WASTE CROSS SECTION STA. 35+83 TO 35+93
RAYMARK WASTE CROSS SECTION STA. 38+39 TO 38+49
RAYMARK WASTE CROSS SECTION STA. 38+59 TO 38+74
RAYMARK WASTE CROSS SECTION STA. 39+27 TO 39+37
RAYMARK WASTE CROSS SECTION STA. 39+47
RAYMARK WASTE CROSS SECTION STA. 78+00 TO 78+10
RAYMARK WASTE CROSS SECTION STA. 78+20
ENV-19 TRUCK ROUTE - RAYMARK WASTE
ENV-20 WASTE STOCKPILE AREA (WSA) LOCATION AND DETAILS
ENVIRONMENTAL SAMPLING LOCATIONS
TRC ENVIRONMENTAL INC.DESIGNED BY:
10 - ENVIRONMENTAL
10.01
(FN
D)
MO
N
(FN
D)
REB
AR
#411 B
AR
NU
M
AVEN
UE C
UT
OFF
#500
#301
#54
VETER
ANS B
OULEV
AR
D
(FN
D)
CH
D
(FN
D)
CH
D
(FN
D)
CH
D
(FN
D)
RAN(D
AM
AGED)
RAN (F
ND)
(FN
D)
CH
D
(FN
D)
CH
D
#345
WO
ODS
WO
ODS
WO
ODS
WO
ODS
WO
ODS
WO
ODS
WO
ODS
WO
ODS
WO
ODS
BIR
CH
20"
BIR
CH
20"
ST-4
BIR
CH
24"
BIR
CH
12"
BIR
CH
36"
GR
ASS
PIN
E
10"
PEAR
10"
BIR
CH
12"
PEAR
3"
PEAR
3"
PEAR
3"
(FN
D)
CH
D
ST-3
ST-2
8'' PVC
4'' P
VC
15'' C
MP
15'' C
MP
48''SEWER
48''SEWER
4'' P
VC
8'' PVC
12'' CMP
15'' R
CP
48''S
EW
ER
15"C
AS
T IR
ON
APPROX LOC 16"WATER
APPROX LOC 8"WATER
APPR
OX LO
C 8"W
ATER
APPROX LOC 6"GAS
A
PP
RO
X
LO
C
2"
GA
S
A
PP
RO
X
LO
C
6"
GA
S
APPROX LOC 2"GAS
A
PP
RO
X
LO
C 4"
GA
S
APPR
OX LO
C ELEC
ST-6
6
APPROX LOC ELEC
R=17.15
MAN
HOLE
B.M.
53+
00
54+
00
55+
00
0+00
1+00 2+00
31+00
32+00
12.54
12.11
12.8113.11
13.80 14.19 14.61 15.03
15.45
90+00 91+00
83+00 84+0086+00 87+00 88+00 89+00 90+00 91+00
30+01
30+01
31+00
32+00
70+00
71+00
72+00
73+00
74+00 75+00
STRATFORD
ENVIRONMENTAL
RECONSTRUCTION OF INTERCHANGE 33
ON I-95
0138-0248
DM
CL/KH
FERRY BOULEVARD (ROUTE 130)
VETER
ANS B
OULE
VAR
D
I-95 S.B. EXIT 33 ON RAMP
I-95 S.B.
I-95 N.B.
83
CO
ORDIN
ATE GRID
AD
CO
NNECTIC
UT
POB
POB
MA
TC
H
MA
RK - S
EE
DR
AWIN
G
EN
V-03
SAMPLING LOCATIONS
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40'
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
12/4/2018
BLOCK:
SIGNATURE/
...\ENV-02_ENV_SHEET_0138-0248.dgn
Border Version: 11/29/13
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
INT-33-HS-4
INT-33-HS-5 INT-33-HS-6
INT-33-HS-2
INT-33-HS-32
INT-33-HS-33
INT-33-HS-34
INT33-SB1
INT33-SB4
INT33-SB5
INT33-SB22
INT-33-HS-3
INT-33-HS-2
INT-33-HS-1
INT33-SB6
INT33-SB7
INT33-SB8
INT33-SB2
INT33-SB3
INT33-SB10
MATCH MARK - SEE DRAWING ENV-06
MATCH M
ARK - SEE DRAWING
ENV-06
INT33-SB1
LEGEND
ENVIRONMENTAL SAMPLING LOCATION
ENV-02
The entire project area is a groundwater AOEC.
comply with appropriate contract specifications.
Site Control, Security and Health and Safety must
Soil (ACS) Area of Environmental Concern (AOEC).
The entire project area is an Asbestos Contaminated
Notes:
INT33-BE02
INT33-BE03
INT33-BE05
10.02
PV
MT.
UN
DER
CO
NC.
W-4
W-2 W
-3
(DA
MAGED)
RAN (F
ND)
#44
BO
ULEV
AR
D
FERR
Y
#608
#570
#550
#540
#28
#375 B
AR
NU
M
AVEN
UE C
UT
OFF
#301
(FN
D)
CH
D
(FN
D)
REB
AR
CH
D
BIT DRIV
EWAY
BIT DRIV
EWAY
PAR
KIN
G
BIT
BIT DRIV
EWAY
BIT DRIV
EWAY
PAR
KIN
G
BIT
155
SAN
MH
PAR
KIN
G
BIT
154
SAN
MH
CONC WALKCONC WALK
CONC WALKCONC WALK
CONC WALK
PAR
KIN
G
BIT
I-95 NORTHBOUND
I-95 SOUTHBOUND
BARNUM AVENUE CUTOFF
MH 210
SAN
POLE
SP
AN
CO
NC
WALK
CO
NC
WAL
K
CO
NC
WALK
BO
X
CO
NTR
OL
TR
AFFIC
CO
NC C
URB
CONC CURB
CONC CURB
CONC CURB
CONC CURB
CO
NC
CURB
WELL'S
MO
N
CO
NC C
URB
(FN
D)
CH
D
156
BOLTED
SAN
MH
157
BOLTED
SAN
MH
MH 205
SAN
48'' P
VC
48'' P
VC
48''S
EWER
48''S
EW
ER
48''S
EW
ER
36'' P
VC
8''SEWER
3'' PVC
12'' P
VC 4"
PVC
P
VC
24''
48'' PVC
48'' PVC
18'' P
VC
18'' PVC
24'' P
VC
18'' PVC
48'' PVC
48'' PVC
36'' P
VC
48'' PVC
36'' PVC
CR
AC
KED
CO
VER
R=9.17
SAN
MH 15
6A
N/F
RAN
N/F
RAN
BIT
CO
NC
CU
RB
POSTS
WO
OD
CONC CURB
PAR
KIN
G
BIT
FERRY BOULEVARD (CT ROUTE 130)
B.M.
FF
OT
UC
EU
NE
VA
MU
NR
AB
EN
D
ANC
HO
R
10+00
3+00
4+005+00
6+008+00
9+00 9+829+82
0+00
1+00
2+00
59+50
59+50
60+00
61+00
62+00
63+00
64+00
65+00
66+00
67+00
67+19
32+00
33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+0041+00
92+00 93+00 94+00 95+00 96+0098+00
100+00
102+00
92+00 93+00 94+00 95+00 96+00 97+00 98+0099+00
100+00101+00
102+00
59+00
60+00
61+00
62+00
63+00
64+00
65+00
66+00
67+0067+19
32+00
33+00 34+00 35+00 36+00 37+00 38+00 39+00 40+0041+00
76+00 77+00
78+00
79+00
80+00
81+00 82+00 83+00
84+00
11+00
12+00
7+00
99+00
97+00
101+00
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40'
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
12/4/2018
BLOCK:
SIGNATURE/
...\ENV-03_ENV_SHEET_0138-0248.dgn
Border Version: 11/29/13
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
STRATFORD
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
DM
CL/KH 0138-0248
MA
TC
H
MA
RK - S
EE
DR
AWIN
G
NO.
EN
V-04
).B.S( 1 E
TUOR .S.U
U.S. ROUTE 1 (N.B.)
.B.N 59-I
MATCH MARK - SEE DRAWING NO. PLN-05
PT
PC
ENVIRONMENTAL
MA
TC
H
MA
RK - S
EE
DR
AWIN
G
FERRY BLVD. N.B. (ROUTE 130)
BA
RN
UM
AVE. C
UT
OFF
83
CO
ORDIN
ATE GRID
AD
CO
NNECTIC
UT
~
.B.S 59-I
SAMPLING LOCATIONS
INT33-SB10
INT33-SB23R
INT33-SB36 INT-33-HS-36
INT-33-HS-37
INT33-SB24
INT33-SB11
INT-33-HS-8
INT-33-HS-9
INT33-SB12
INT-33-HS-35
INT33-SB26
INT-33-HS-38
INT33-SB37
INT-33-HS-41
INT33-SB38
INT33-SB39
INT-33-HS-42
INT33-SB28
INT33-SB33INT33-SB30
INT33-SB27
INT33-SB32
INT33-SB31
INT-33-HS-43
INT-33-HS-11
INT-33-HS-12
INT-33-HS-13
INT33-SB16
INT-33-HS-14
INT33-SB20
INT-33-HS-10
INT33-SB14
INT33-SB13
INT33-SB17
INT33-SB19
INT33-SB18
INT33-SB15
INT33-SB35INT33-SB34
NO.
EN
V-02
CURBCONCRETE
LEGEND
INT33-SB34 ENVIRONMENTAL SAMPLING LOCATION
INT-33-HS-46
LOCATIONS
SAMPLING
ADDITIONAL
ENV-08 FOR
SEE DRAWING
LOCATIONS
SAMPLING
FOR ADDITIONAL
ENV-07 AND ENV-08
SEE DRAWINGS
ENV-03
The entire project area is a groundwater AOEC
comply with appropriate contract specifications.
Site Control, Security and Health and Safety must
Soil (ACS) Area of Environmental Concern (AOEC).
The entire project area is an Asbestos Contaminated
Notes:
INT33-BE06
INT33-BE08
INT33-BE09
INT33-BE10
INT33-BE11INT33-BE12
INT33-BE13
INT33-BE14
INT33-BE15
INT-33-HS-40
INT-33-HS-26
INT33-SB25
INT33-SB29
INT-33-HS-45INT-33-HS-44
10.03
APPROX LOC
6"GAS
APPROX LOC 6"GAS
15''RCP15''RCP
15''RCP
18''R
CP
18''R
CP
42''R
CP
#50 EAST
MAIN
(FN
D)
CH
D
BIL
LB
OA
RD
POLE
SP
AN
ST-7
POLE
SP
AN
POLE
SP
AN
POLE
SP
AN
ST-17
ST-18
12'' R
CP
12'' RCP
15'' RCP
15'' RCP
15'' RCP
15'' RCP
18'' RCP
12'' PVC
42''R
CP
18'' RCP
15'' R
CP
15'' RCP
15'' RCP
8"SEWER
8"S
EWER
8"SEWER
18'' R
CP
18'' RCP
24''
RCP
12'' RCP
24''PVC
24'' PVC
18'' P
VC
18'' PVC
PVC 18''
48'' PVC
PVC 18''
15'' PVC
48'' PVC
15'' R
CP
APP
RO
X LO
C 16"
WATER
APPR
OX LO
C 12"
WATER
APPR
OX LO
C 16"
WATER
APPROX LOC 16"WATER
A
PP
RO
X
LO
C
8"
WA
TE
R
APPROX LOC
8"WATER
APPR
OX LO
C 6"G
AS
CO
NSTR
UCTIO
N
UN
DER
SE
WE
R
SE
WE
R
30'' C
MP
SEWER
SEWER
30'' RCP
30''R
CP
18'' RCP
15'' RCP
30'' R
CP
15'' R
CP
15'' RCP
15'' RCP
SE
WE
R
18''
RCP
SP
UR-14
76
SEWER
24'' R
CP
24'' R
CP
18'' R
CP
SE
WE
R
SE
WE
R
N/F
RAN
N/F
RAN
N/F
RAN
APP
RO
X L
OC 6"G
AS
DELIN.
24'' R
CP
24''R
CP
24''R
CP
18'' RCP
18'' R
CP
BM
CGS
12''RCP
12''RCP
12''RCP
12''RCP
12''RCP
12''RCP
12''RCP
RAN13
89
RAN
RAN
APPR
OX LO
C 6"G
AS
FIL
L PIP
E
FIL
L PIP
EFIL
L PIP
E
15'' R
CP
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40'
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
12/4/2018
BLOCK:
SIGNATURE/
...\ENV-04_ENV_SHEET_0138-0248.dgn
Border Version: 11/29/13
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
DM
CL/KH
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD 0138-0248
I-95 S.B
.
I-95 N.B.
(R
OU
TE 110)
EA
ST
MAIN
ST.
MA
TC
H
MA
RK - S
EE
DR
AWIN
G
NO. E
NV-05
MA
TC
H
MA
RK - S
EE
DR
AWIN
G
NO.
EN
V-03
U.S. ROUTE 1 (N.B.)
U.S. R
OUTE 1 (S.B.)
U.S. ROUTE 1 (S.B.)
83
CO
ORDIN
ATE GRID
AD
CO
NNECTIC
UT
22'
4'
22'
22'
INT-33-HS-15
INT-33-HS-17
INT-33-HS-18
INT-33-HS-19
INT-33-HS-20
INT-33-HS-21
INT-33-HS-22
INT-33-HS-23
INT-33-HS-25
INT-33-HS-26
INT-33-HS-27
INT-33-HS-47
INT-33-HS-48
INT33-SB40 INT33-SB41
INT33-SB42
INT33-SB47
INT33-SB43
INT-33-HS-16
INT-33-HS-24
INT33-SB46
INT-33-HS-28
INT33-SB44
INT-33-HS-48 ENVIRONMENTAL SAMPLING LOCATION
LEGEND
ENV-04
The entire project area is a groundwater AOEC.
comply with appropriate contract specifications.
Site Control, Security and Health and Safety must
Soil (ACS) Area of Environmental Concern (AOEC).
The entire project area is an Asbestos Contaminated
Notes:
ENVIRONMENTALSAMPLING LOCATIONS
16+00
17+00
18+00
19+00
20+00
42+0043+00
44+00 45+00
46+0046+00
25
25
25
25
25
25
42+00
43+00
44+00
45+00
46+00
47+00
48+00
49+00
12+00
13+00
14+00
15+00
10.04
#45
#55
#65
#29
#27
#25
#94
#50
#28
#955 FERR
Y
BO
ULEV
AR
D
BIL
LB
OA
RD
ST-9
805
SP
UR
ST-8
ST-14
CH
AIN LIN
K FEN
CE
ST-10
12"PVC
10'' P
VC
10'' P
VC
18'' C
MP
18'' C
MP
15"RCP
APPROX LOC 8"WATER
APPROX LOC 4"GAS
THE D
OCK S
HOPPIN
G C
ENTE
R
10.6
12.6
13.6
15.8
16.2
16.5
17.4
17.7
18.2
18.3
18.5
18.6
23.2
26.1
48.2
53.0
C
1+700
1+800
21+00
22+00
23+00
24+00
25+00
26+00
27+00
50+00
51+00
52+00
53+00
54+00
55+00
56+0056+23
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40'
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
12/4/2018
BLOCK:
SIGNATURE/
...\ENV-05_ENV_SHEET_0138-0248.dgn
Border Version: 11/29/13
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
MA
TC
H
MA
RK - S
EE
DR
AWIN
G
NO. E
NV-04
0138-0248STRATFORD
ENVIRONMENTAL
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
DM
CL/KH
83
CO
ORDIN
ATE GRID
AD
CO
NNECTIC
UT
22'
10'
5'
SAMPLING LOCATIONS
INT-33-HS-29
INT-33-HS-30
INT-33-HS-31
INT33-SB48
INT33-SB51
MWB-SB21
MWB-SB20
MWB-SB19
INT33-SB52
INT33-SB50
INT33-SB49
INT-33-HS-48 ENVIRONMENTAL SAMPLING LOCATION
LEGEND
ENV-05
The entire project area is a groundwater AOEC.
comply with appropriate contract specifications.
Site Control, Security and Health and Safety must
Soil (ACS) Area of Environmental Concern (AOEC).
The entire project area is an Asbestos Contaminated
Notes:
10.05
E-7
TEST PI
TPROP
(FND)
MON
BOULEVARD
VETERANS
#100
47
SAN MH
124
SAN MH
ST-21
CP-18
ST-1
1138
SPUR
USACE-1
POLE
SPAN
POLE
SPAN
POLE
SPAN
POLE
SPAN
BOX
CONTROL
TRAFFIC
BOX
CONTROL
TRAFFICPOLE
SPAN
MBR
MB
R
MBR
MB
R
B.M.
MB
R
MB
R
MB
R
WELL'S
MON
WELL
MON
RE
TAININ
G
WA
LL
RETAINING WALL
1205
SPUR
125
STORM MH
24'' R
CP
12'' P
VC
12'' P
VC
18'' P
VC
18'' P
VC
15'' RCP
12'' RCP
12'' R
CP
12'' RCP
15'' RCP
12'' RCP
18'' RCP
48''S
EW
ER
24'' RCP
24'' PVC
48'' P
VC
48''S
EW
ER
15'' RCP
12'' R
CP
18'' RCP 18'' RCP
24'' RCP
24'' PVC
12'' P
VC
6" S
AN
12'' R
CP
18'' R
CP
12'' P
VC
18'' R
CP
24'' PVC
24'' P
VC
4" P
VC
48'' PVC
15'' R
CP
15'' RCP
15'' R
CP
15"C
AST IR
ON
APPR
OX LO
C 8"W
ATER
APPROX LOC 8"WATER
APPR
OX LO
C 6" G
AS
APPR
OX LO
C 4" G
AS
48'' PVC
12"CI
10"CI
APPROX LOC 345KV CONDUIT
APPROX LOC 345KV CONDUIT
APPROX LOC 345KV CONDUIT
12"R
CP
CONCRETE MONUMENT
NAVD 1988
13.0
13.4
14.3
15.9
16.2
17.0
17.4 18.3
18.3
19.2
19.8
20.520.7
21.2
21.3
21.4
22.0
22.2
22.5
23.1
23.3
23.3
23.3
23.5
23.9
24.1
24.2
25.4
26.1
26.2
26.3
26.3
26.5
26.6
26.8
30.4
32.1
50+
00
51+
00
52+00
53+2353+23 54+00 55+00 56+00 57+00 58+00
APPRO
XIMATE STR
EET LINE
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40'
40 800
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
12/4/2018
BLOCK:
SIGNATURE/
...\ENV-06_ENV_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
DM
CL/KH
ENVIRONMENTAL
0138-0248
MATCH MARK
- S
EE D
RAWING
ENV-02
MATCH MARK - SEE
DR
AWIN
G
NO. EN
V-0
2
MATCH
MARK
- SEE D
RAWIN
G NO. E
NV-03U.S. ROUTE 1 (S.B.)
VE
TE
RA
NS
BL
VD.
83
CO
OR
DIN
ATE
GRID
AD
CO
NN
EC
TIC
UT
21'R
'0
32
R
'5
8
R
'0
8
R
'8
4
R
26'
2'
SAMPLING LOCATIONS
INT33-SB9
INT-33-HS-48 ENVIRONMENTAL SAMPLING LOCATION
LEGEND
ENV-06
The entire project area is a groundwater AOEC.
comply with appropriate contract specifications.
Site Control, Security and Health and Safety must
Soil (ACS) Area of Environmental Concern (AOEC).
The entire project area is an Asbestos Contaminated
Notes:INT33-BE01
10.06
(D.O.T.)
CO
NNECTIC
UT
STATE OF
NON ACCESS HWY LINE
#7115
UI
48''SEWER
54'' RCP
18'' RCP
RC
P15''
54'' RCP
12'' R
CP
54'' RCP
APPROX LOC 2"GAS
18'' RCP
#4643
SNET
#7037
UI
#4642
SNET
NON ACCESS HWY LINE
48'' R
CP
VAULT
7'X15' C
ONC
APPR
OX LO
C FIB
ER
OPTIC
S C
ON
DUIT
10
UI7514
15
15
20
20
25
25
30
30
30
35
35
35
2+00
31+00
32+00
33+00 34+00 35+00
30+01
30+01
31+00
32+00
33+00 34+00 35+00
74+0075+00
76+0077+00
78+00
79+00
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD 0138-0248
PLAN
RAMP C
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=20'
20 400
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
12/4/2018
BLOCK:
SIGNATURE/
...\ENV-07_CNS_SHEET_0138-0248.dgn
Border Version: 07/19/16
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
83
CO
ORDIN
ATE GRID
AD
CO
NNECTIC
UT
FERRY BOULEVARD
E 897976.3482
N 632924.4182
$FILE$
E 897965.2918
N 632928.6008
E 897951.5330
N 632934.7080
SCALE: 1" = 20'
MA
TC
H
LI
NE
SE
E
DR
AW
IN
G
EN
V-08
ENV-07RAYMARK WASTELOCATION PLAN
DM
CL/KH
INT33-200
INT33-201
INT33-202
INT33-204
INT33-207INT33-206INT33-205
INT33-203
INT33-217
INT33-212
INT33-215
RMW RAYMARK WASTE
LEGEND
RAYMARK WASTE DELINEATION (SEE CROSS SECTIONS)
RMW AREA 2: SEE CROSS SECTIONS FOR ELEVATIONS
RMW AREA 1: SEE CROSS SECTIONS FOR ELEVATIONS
RMW AREA 3: SEE CROSS SECTIONS FOR ELEVATIONS
INT33-SB138 INT33-SB139
INT33-SB136
INT33-SB137
INT33-SB133 INT33-SB134
INT33-SB128 INT33-SB129
INT33-211
INT33-209INT33-208
INT33-210
INT33-SB125INT33-SB124
INT33-SB127
INT33-SB126
INT33-SB119 INT33-SB120 INT33-SB121 INT33-SB122 INT33-SB123
INT33-SB118
INT33-SB117INT33-SB116INT33-SB115INT33-SB114
INT33-SB110 INT33-SB111
INT33-SB105
INT33-SB106 INT33-SB107INT33-SB108
INT33-SB109
INT33-SB113
INT33-SB112INT33-SB23R
INT33-SB100 INT33-SB101
INT33-SB102INT33-SB103 INT33-SB104
ENVIRONMENTAL SAMPLING LOCATION
The entire project area is a groundwater AOEC.
NOTE:
10.07
15''RCP
18''R
CP
18''R
CP
#7422
UI
#6614
SNET
#2405
UI
POLE
SP
AN
CO
NC
WAL
K
BO
X
CO
NTR
OL
TR
AFFIC
#3041
UI
18'' RCP18'' RCP
18'' RCP
12'' R
CP
12'' RCP
12'' R
CP
18'' R
CP
12'' RCP
NON-ACCESS HIGHWAY LINE R.O.W MAP 138-15 SHEET 7 OF 8
15'' RCP
24'' R
CP
APPR
OX LO
C FIB
ER
OPTIC
S C
ON
DUIT
12''RCP
12''RCP
12''RCP
12''RCP
12''RCP
12''RCP
10
10
15
15
1520
20
20
20
20
25
25
25
25
25
30
30
30
30
3535
62+00
63+00
64+00
36+00 37+00 38+00 39+0040+00
41+00
42+00
62+00
63+00
64+00
36+00 37+00 38+00 39+0040+00
41+00
42+00
80+00
81+0082+00
83+00
16
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD 0138-0248
$FILE$
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=20'
20 400
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
12/4/2018
BLOCK:
SIGNATURE/
...\ENV-08_CNS_SHEET_0138-0248.dgn
Border Version: 07/19/16
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
INT33-213 INT33-214
INT33-218
INT33-219
INT33-216
RMW RAYMARK WASTE
LEGEND
ENV-08RAYMARK WASTELOCATION PLAN
DM
CL/KH
RAYMARK WASTE DELINEATION (SEE CROSS SECTIONS)
INT33-SB152INT33-SB151INT33-SB150
INT33-SB154INT33-SB153
INT33-230INT33-229INT33-228
INT33-231 INT33-232
INT33-233 INT33-234 INT33-235
INT33-SB155 INT33-SB156INT33-SB157
INT33-SB158INT33-SB159 INT33-SB160
INT33-SB143
INT33-SB146
INT33-SB149
INT33-SB145
INT33-SB144
INT33-222INT33-221INT33-220
INT33-223
INT33-225 INT33-226 INT33-227
INT33-SB148INT33-224INT33-SB147
INT33-SB161
INT33-SB162 INT33-SB163INT33-SB164
INT33-SB165 INT33-SB166
INT33-SB142INT33-SB141INT33-SB140
INT33-SB135
INT33-SB130 INT33-SB131 INT33-SB132
ELEVATIONS
CROSS SECTIONS FOR
RMW AREA 3: SEE
ELEVATIONS
CROSS SECTIONS FOR
RMW AREA 4: SEE
ELEVATIONS
CROSS SECTIONS FOR
RMW AREA 5: SEE
ENVIRONMENTAL SAMPLE LOCATION
The entire project area is a groundwater AOEC.
NOTE:
10.08
STA. 32+69
STA. 32+79
1
2
} RAMP C
} RAMP C
10
15
20
25
30
35
40
10
15
20
25
30
35
2010070 60 50 40 30 20 10
40
5040302010010203040
0 10 20 30 40 50 60
5040302010010203040
80 30 40 50 60
10203040506070
506070 60
70 60 50 6080
80
80
40
35
30
25
20
15
10
50
30
50
45
40
35
30
25
20
15
10
45
50 50
45
1
2
MA
TC
H
FE
RR
Y
BL
VD. (S.B.) } S
TA. 76+
09.8
0, 38.8
0' R
T.
MA
TC
H
FE
RR
Y
BL
VD. (S.B.) } S
TA. 76+
18.7
0, 39.6
0' R
T
SWALE
SWALE
PROPOSED GRADE
PROPOSED GRADEEXISTING GRADE
EXISTING GRADE
IN
T33-205
IN
T33-203
IN
T33-200
IN
T33-S
B116
IN
T33-201
IN
T33-S
B23
IN
T33-206
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=5'
5 100
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-09_CNS_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
ENV-09
STA. 32+69 TO 32+79
0138-0248
DM
CL/KH
IN
T33-S
B23
R
RAYMARK WASTE CROSS SECTION
NOT FOR CONSTRUCTION
RMW
RMW
RMW
RMW
RMW AREA 1
RMW AREA 1
18.59
3.4%18.93
3.4%19.34
3.4%
19.75
3.6%
19.67
19.14
3.4%19.48
3.4%19.88
3.4%
20.29
3.6%
20.15
10.09
STA. 32+89
STA. 35+73
} RAMP C
} RAMP C
10
15
20
25
30
35
40
10
15
20
25
30
35
2010070 60 50 40 30 20 10
40
5040302010010203040
0 10 20 30 40 50 60
5040302010010203040
80 30 40 50 60
10203040506070
506070 60
70 60 50 6080
80
80
SWALE
SWALE
PROPOSED GRADE
PROPOSED GRADE
EXISTING GRADE
EXISTING GRADE
40
35
30
25
20
15
10
50
30
50
45
40
35
30
25
20
15
10
45
50 50
45
1
2
MA
TC
H
FE
RR
Y
BL
VD. (S.B.) } S
TA. 76+
24.5
0, 40.5
0' R
T.
IN
T33-207
IN
T33-204
IN
T33-202
IN
T33-217
IN
T33-215
IN
T33-212
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=5'
5 100
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-10_CNS_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
ENV-10
STA. 32+89 TO 35+73
0138-0248
DM
CL/KH
RAYMARK WASTE CROSS SECTION
NOT FOR CONSTRUCTION
RMW AREA 3
RMW AREA 1
RMW AREA 1
RMW AREA 1
19.68
3.4%20.02
3.4%20.43
3.4%
20.84
3.6%
20.69
34.86
1.5%35.01
1.5%
35.17
4.0%
35.01
10.10
STA. 35+83
STA. 35+93
} RAMP C
} RAMP C
10
15
20
25
30
35
40
10
15
20
25
30
35
2010070 60 50 40 30 20 10
40
5040302010010203040
0 10 20 30 40 50 60
5040302010010203040
80 30 40 50 60
10203040506070
506070 60
70 60 50 6080
80
80
SWALE
SWALE PROPOSED GRADE
PROPOSED GRADE
EXISTING GRADE
EXISTING GRADE
40
35
30
25
20
15
10
50
30
50
45
40
35
30
25
20
15
10
45
50 50
45
IN
T33-218
IN
T33-S
B26
IN
T33-213
IN
T33-219
IN
T33-216
IN
T33-214
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=5'
5 100
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-11_CNS_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
ENV-11
STA. 35+83 TO 35+93
0138-0248
DM
CL/KH
RAYMARK WASTE CROSS SECTION
NOT FOR CONSTRUCTION
RMW AREA 3
RMW AREA 3
35.17
1.5%35.32
1.5%
35.49
4.0%
35.33
35.47
1.5%35.62
1.5%
35.79
4.0%
35.63
10.11
STA. 38+39
STA. 38+49
} RAMP C
} RAMP C
10
15
20
25
30
35
40
10
15
20
25
30
35
2010070 60 50 40 30 20 10
40
5040302010010203040
0 10 20 30 40 50 60
5040302010010203040
80 30 40 50 60
10203040506070
506070 60
70 60 50 6080
80
80
PROPOSED GRADE
EXISTING GRADE
PROPOSED GRADE
EXISTING GRADE
40
35
30
25
20
15
10
40
35
30
25
20
15
10
05
00
05
00
00
05
00
05
SWALE
SWALE
IN
T33-225
IN
T33-223
IN
T33-220
IN
T33-226
IN
T33-S
B32
IN
T33-221
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=5'
5 100
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-12_CNS_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
ENV-12
STA. 38+39 TO 38+49
0138-0248
DM
CL/KH
RAYMARK WASTE CROSS SECTION
NOT FOR CONSTRUCTION
RMW AREA 4
RMW AREA 4
36.01
3.6%36.38
3.6%
36.54
3.4%
35.74
4.0%36.14
4.0%
36.31
3.0%
10.12
STA. 38+59
STA. 38+74
} RAMP C
} RAMP C
10
15
20
25
30
35
40
10
15
20
25
30
35
2010070 60 50 40 30 20 10
40
5040302010010203040
0 10 20 30 40 50 60
5040302010010203040
80 30 40 50 60
10203040506070
506070 60
70 60 50 6080
80
80
PROPOSED GRADE
PROPOSED GRADE
EXISTING GRADE
EXISTING GRADE
40
35
30
25
20
15
10
40
35
30
25
20
15
10
05
00
05
00
00
05
00
05
SWALE
SWALE
IN
T33-227
IN
T33-224
IN
T33-222
IN
T33-222
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=5'
5 100
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-13_CNS_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
ENV-13
STA. 38+59 TO 38+74
0138-0248
DM
CL/KH
RAYMARK WASTE CROSS SECTION
NOT FOR CONSTRUCTION
RMW AREA 4
RMW AREA 4
35.45
4.3%35.88
4.3%
36.05
2.7%
35.03
4.3%35.46
4.3%
35.63
2.7%
10.13
STA. 39+27
STA. 39+37
} RAMP C
} RAMP C
10
15
20
25
30
35
40
10
15
20
25
30
35
2010070 60 50 40 30 20 10
40
5040302010010203040
0 10 20 30 40 50
5040302010010203040
80 30 40 50
10203040506070
506070
70 60 5080
80
80
EXISTING GRADE
EXISTING GRADE
40
35
30
25
20
15
10
40
35
30
25
20
15
10
05
00
05
00
00
05
00
05
PROPOSED GRADE
PROPOSED GRADE
SWALE
SWALE
IN
T33-233
90
90
90
90
IN
T33-231
IN
T33-228
IN
T33-234
IN
T33-S
B33
IN
T33-229
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=5'
5 100
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-14_CNS_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
ENV-14
STA. 39+27 TO 39+37
0138-0248
DM
CL/KH
RAYMARK WASTE CROSS SECTION
NOT FOR CONSTRUCTION
RMW AREA 5
RMW AREA 5
2.7%
34.23
4.3%34.06
4.3%33.63
2.7%
34.01
4.3%33.85
4.3%33.42
10.14
STA. 39+47
} RAMP C
10
15
20
25
30
35
2010070 60 50 40 30 20 10
40
0 10 20 30 40 50
80 30 40 50
1020304050607080
PROPOSED GRADE
EXISTING GRADE
40
35
30
25
20
15
10
00
05
00
05
SWALE
IN
T33-235
90
90
IN
T33-232
IN
T33-230
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=5'
5 100
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-15_CNS_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
ENV-15
0138-0248
DM
CL/KH
STA. 39+47
RAYMARK WASTE CROSS SECTION
NOT FOR CONSTRUCTIONRMW AREA 5
2.7%
33.81
4.3%33.65
4.3%33.22
10.15
70605040302010040 30 20 10
70605040302010040 30 20 10
STA. 78+00
STA. 78+10
506070
506070
RO
WR
OW
{ FERRY BLVD. (S.B.)
{ FERRY BLVD. (S.B.)
15
20
10
15
25
30
35
10
15
20
10
15
20
20
25
30
25
30
25
30
40
45
35
40
3535
45
50
10
4040
50
18.53
4.0%18.73
1.5%
18.89
1.5%
18.73
4.0%
18.53
0000
05 05
ST
A. 34+
72.0
0, 57.7
0' LT.
MA
TC
H
RA
MP
C }
18.49
4.0%18.67
1.5%
18.83
1.5%
18.67
4.0%
18.49
ST
A. 34+
62, 56.0
7' LT.
MA
TC
H
RA
MP
C }
IN
T33-210
IN
T33-208
IN
T33-S
B37
PROPOSED GRADE
EXISTING GRADE
EXISTING GRADE
PROPOSED GRADE
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=5'
5 100
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-16_CNS_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
ENV-16
0138-0248
DM
CL/KH
STA.78+00 TO STA. 78+10RAYMARK WASTE CROSS SECTIONS
NOT FOR CONSTRUCTION
RMW AREA 2
RMW AREA 2
10.16
70605040302010040 30 20 10
70605040302010040 30 20 10
STA. 78+20
506070
506070
RO
W{ FERRY BLVD. (S.B.)
15
20
10
15
25
30
35
10
15
20
10
15
20
20
25
30
25
30
25
30
40
45
35
40
3535
45
50
10
4040
50
0000
05 05
18.60
4.0%18.80
1.5%
18.96
1.5%
18.80
4.0%
18.60
ST
A. 34+
81.9, 58.6
0' LT.
MA
TC
H
RA
MP
C }
IN
T33-209
EXISTING GRADE
PROPOSED GRADE
IN
T33-211
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=5'
5 100
SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-17_CNS_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
ENV-17
0138-0248
DM
CL/KH
STA. 78+20
RAYMARK WASTE CROSS SECTIONS
NOT FOR CONSTRUCTION
RMW AREA 2
10.17
EXISTING GRADE
BEGIN EXCAVATION 1' ABOVE
TOP OF RMW LAYER SHOWN
ON CROSS-SECTIONS
RAYMARK WASTE
PROPOSED GRADE
RAYMARK WASTE
EXCAVATE RMW TO
DEPTH SHOWN ON
CROSS SECTIONS
ENGINEER TO COLLECT
SAMPLES TO CONFIRM RMW
REMOVAL IS COMPLETE
EXISTING GRADE
INSTALL ORANGE WARNING
LAYER ON TOP OF EXISTING
GRADE
RAYMARK WASTE
(NOT TO BE EXCAVATED AT
THESE LOCATIONS)
PROPOSED GRADE
EXISTING GRADE
WARNING LAYER INSTALLATION DETAIL
RMW-3 & RMW-4
N.T.S.
INSTALLATION DETAIL
EXCAVATION/WARNING LAYER
RMW-5
N.T.S.
EXCAVATION DETAIL
RMW-1
N.T.S.
EXCAVATION DETAIL
RMW-2
THE CROSS-SECTION PROPOSED GRADE SHOWN ON
LAYER 4' BELOW THEINSTALL ORANGE WARNING
1'
4'
1'
PROPOSED GRADE
BEGIN EXCAVATION 1' ABOVE
TOP OF RMW LAYER SHOWN
ON CROSS-SECTIONS
THE ORANGE WARNING LAYER MATERIAL CAN BE PLACED OVER
THAT A MIN. OF 4' OF NON-RMWEXCAVATE RMW AS NEEDED SUCH
RAYMARK WASTE
TYPICAL SECTION FOR VEGETATIVE COVER
OVER ASBESTOS CONTAMINATED SOILN.T.S
TYPICAL SECTION FOR ERODIBLE AREAS
OVER ASBESTOS CONTAMINATED SOILN.T.S
CONTAMINATED SOIL.
MAINTAIN A MIN. 24" THICK COVER OVER ASBESTOS
NON-ASBESTOS MATERIAL SHALL BE ADJUSTED TO
DEPENDING ON THE ROADWAY DESIGN, THE COMPACTED
TOTAL COVER THICKNESS SHALL BE NO LESS THAN 24".
NOTE 1:
TYPICAL SECTION FOR PAVEMENT
ROADWAY AREAS OVER ASBESTOS
CONTAMINATED SOILN.T.S
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
SCALE AS NOTED
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-18_CNS_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
6" NON-ASBESTOS
CONTAINING SOIL WITH
TURF ESTABLISHMENT
ASBESTOS
CONTAMINATED SOIL
3" WELL-GRADED, NON-ASBESTOS
CRUSHED STONE
6" COMPACTED NON-ASBESTOS
CONTAINING SOIL
ASBESTOS
CONTAMINATED SOIL
COMPACTED
NON-ASBESTOS MATERIAL
3 LAYERS OF HMA (PER
ROADWAY DESIGN)
(SEE NOTE 1)
24" MIN.
ASBESTOS
CONTAMINATED SOIL
DEMARCATION LAYER
DEMARCATION LAYER
DEMARCATION LAYER
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
ENV-18DM
0138-0248CL/KH
ASBESTOS COVERDETAILS
N.T.S.
10.18
311 590E
E095 1
12
RAILROAD
ST
REET
AVE.
BARNUM
RNUM
AVENUE
R.R.STA.
ST
RE
ET
ER
RY
BLV
D.
33
D. INW
OO
DRD.
BEERS
PL.
HURD
AVE.
RD.
CLIN
TO
NST.
PL.
OAKWOOD
OS
BO
RN
E
AVE.
PATT
FROG
POND
LA.
SIDNEY
ST.
BE
LVID
ER
E
DR.
POPLARST.
PATTERS
ON
CO
TT
AGE PL.JAMES
ST. #2
CURTIS
PL.ST.
AVE.
ED
MO
ND
ST.
AVE.
TEMPLE
CT.
CEMETERYDR.
PL.SELLECK
MEADOW
ST.
A
VE.
HOMESTEADAVE.
PL.
BU
RR
MINOR
AVE.
HO
US
AT
ONIC
AV
E. E
XT.
95
1
BR
YA
NT
PL.
PL.
TE
RR
Y
ELLIO
TT ST.
PRIM
ST.
PE
AR
D
TE
R.
ORCHARD ST.
RIVERVIEW PL.
WILLOW
AVE.
NI
C
PL
AK
EM
AN
PL.
WA
RWIC
K
AV
E.
SU
TT
ON
AV
E.
Stratford
113
113
110
130
AVE.
TURNPIK
E
GO
VERNO
R
JOHN
DAVISLODGE
NO.
PA
RA
D
E
X
VETERANSBLVD.
LONGBROOK
Bro
ok
Long
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
0
SCALE IN FEET
SCALE 1"=200'
200 400
OF WORK WHICH WILL BE REQUIRED.
THE CONDITIONS OF ACTUAL QUANTITIES
IN NO WAY WARRANTED TO INDICATE
INVESTIGATIONS BY THE STATE AND IS
SHEETS IS BASED ON LIMITED
QUANTITIES OF WORK, SHOWN ON THESE
THE INFORMATION, INCLUDING ESTIMATED
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-19_CNS_SHEET_0138-0248.dgnPlotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD
ENV-19DM
TRUCK ROUTERAYMARK WASTE
0138-0248CL/KH
CO
NN
EC
TIC
UT
CO
OR
DIN
AT
E
GRIDLANDFILL
EPA
10.19
APPROX LOC
6"GAS
APPROX LOC 6"GAS
15''RCP15''RCP
15''RCP
18''R
CP
18''R
CP
42''R
CP
#50 EAST
MAIN
(FN
D)
CH
D
BIL
LB
OA
RD
POLE
SP
AN
ST-7
POLE
SP
AN
POLE
SP
AN
POLE
SP
AN
ST-17
ST-18
12'' R
CP
12'' RCP
15'' RCP
15'' RCP
15'' RCP
15'' RCP
18'' RCP
12'' PVC
42''R
CP
18'' RCP
15'' R
CP
15'' RCP
15'' RCP
8"SEWER
8"S
EWER
8"SEWER
18'' R
CP
18'' RCP
24''
RCP
12'' RCP
24''PVC
24'' PVC
18'' P
VC
18'' PVC
PVC 18''
48'' PVC
PVC 18''
15'' PVC
48'' PVC
15'' R
CP
APP
RO
X LO
C 16"
WATER
APPR
OX LO
C 12"
WATER
APPR
OX LO
C 16"
WATER
APPROX LOC 16"WATER
A
PP
RO
X
LO
C
8"
WA
TE
R
APPROX LOC
8"WATER
APPR
OX LO
C 6"G
AS
CO
NSTR
UCTIO
N
UN
DER
SE
WE
R
SE
WE
R
30'' C
MP
SEWER
SEWER
30'' RCP
30''R
CP
18'' RCP
15'' RCP
30'' R
CP
15'' R
CP
15'' RCP
15'' RCP
SE
WE
R
18''
RCP
SP
UR-14
76
SEWER
24'' R
CP
24'' R
CP
18'' R
CP
SE
WE
R
SE
WE
R
N/F
RAN
N/F
RAN
N/F
RAN
APP
RO
X L
OC 6"G
AS
DELIN.
24'' R
CP
24''R
CP
24''R
CP
18'' RCP
18'' R
CP
12''RCP
12''RCP
12''RCP
12''RCP
12''RCP
12''RCP
12''RCP
RAN13
89
RAN
RAN
APPR
OX LO
C 6"G
AS
FIL
L PIP
E
FIL
L PIP
EFIL
L PIP
E15'' R
CP
DESIGNER/DRAFTER:
CHECKED BY:
PROJECT TITLE: TOWN:
DRAWING TITLE:
PROJECT NO.
DRAWING NO.
SHEET NO.
Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.
DEPARTMENT OF TRANSPORTATION
STATE OF CONNECTICUT
SCALE 1"=40'
40 800
SCALE IN FEET
10/29/2018
BLOCK:
SIGNATURE/
...\ENV-20_ENV_SHEET_0138-0248.dgn
Border Version: 11/29/13
Plotted Date:
CONNECTICU
T
DE
PA
RT
ME
NT
O F TRANS
PO
RT
ATI
ON
DM
CL/KH
RECONSTRUCTION OFINTERCHANGE 33
ON I-95
STRATFORD 0138-0248
I-95 S.B
.
I-95 N.B.
(R
OU
TE 110)
EA
ST
MAIN
ST.
MA
TC
H
MA
RK - S
EE
DR
AWIN
G
NO. E
NV-05
MA
TC
H
MA
RK - S
EE
DR
AWIN
G
NO.
EN
V-03
U.S. ROUTE 1 (N.B.)
U.S. R
OUTE 1 (S.B.)
U.S. ROUTE 1 (S.B.)
83
CO
ORDIN
ATE GRID
AD
CO
NNECTIC
UT
22'
4'
22'
22'
LOCATION AND DETAILS
ENV-20
1'-8"1
SECTION A-A
WASTE STOCKPILE AREA DETAIL1
1(MAXIMUM)
SECTION B-B
1(MAXIMUM)
1 1'-8"(
see n
ote 4)
MA
X.
5'
(see n
ote 4)
MIN.
6'
CONCRETE BLOCK (TYP.)
2' X 3' X 6' PRECAST
BCLC
GROUND
EXISTING
BLOCK (TYP.)
PRECAST CONCRETE
CONTROLLED MATERIAL
STOCKPILED
PILE (TYP.)
SHEETING TO COVER
10 MIL POLYETHYLENE
PILE (TYP.)
SHEETING TO COVER
10 MIL POLYETHYLENE
(TYP.)
SANDBAGS BOTH SIDES
GROUND
EXISTING CONCRETE BLOCK (TYP.)
2' X 3' X 6' PRECAST
CONTROLLED MATERIAL
STOCKPILED
BCLC
3" SUPERPAVE 0.5 IN.
3" SUPERPAVE 0.5 IN
BARRIER (BRB)
RUNOFF CONTROL
BITUMINOUS CONCRETE
PAD, SEE NOTE 2
ANTI-TRACKING
GENERAL NOTES:
AS SHOWN ON THE WSA PLAN.
CONSTRUCTED ON NEW OR EXISTING PAVEMENT, BEDDING SAND, OR OTHER MATERIAL
GROUND. THE WSA SURFACE WILL VARY BASED ON PROJECT SPECIFICS AND MAY BE
TRANSFER OR INFILTRATION OF CONTAMINANTS FROM THE STOCKPILES TO THE
THE WSA SURFACE SHALL BE SUFFICIENTLY IMPERVIOUS TO PREVENT OR MINIMIZE THE 5.
WSA PLAN OR AS DIRECTED BY THE ENGINEER.
CONFIGURATION OF THE BIN(S) MAY VARY BASED ON THE SIZE AS INDICATED ON THE
HEIGHT OF THE CONCRETE BLOCKS, STOCKPILED CONTROLLED MATERIAL AND 4.
TO PROVIDE ACCESS FOR MAINTENANCE.
OF THE WSA CONCRETE BLOCK WALLS SHALL REMAIN CLEAR AND FREE OF ANY OBJECT
WHERE FEASIBLE, A MINIMUM DISTANCE OF 5' IMMEDIATELY OUTSIDE THE PERIMETER 3.
CONTROL, 2002-SECTION 5-12."
ACCORDANCE WITH "CONNECTICUT GUIDELINES FOR SOIL EROSION AND SEDIMENT
ANTI-TRACKING PAD SHALL BE INSTALLED AS SHOWN ON THE WSA PLAN AND IN 2.
PLAN.
WSA INSTALLATION AND ALL REQUIRED MATERIALS ARE AS INDICATED ON THE WSA 1.
WASTE STOCKPILE AREA (WSA)
(3) 20' DEEP X 50' WIDE WASTE STOCKPILE AREA (WSA) BINS
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
42+00
43+00
44+00
45+00
46+0046+00
10.20