income tax presentation012 compat 2

Upload: boone-simpson

Post on 05-Apr-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 Income Tax Presentation012 Compat 2

    1/13

    Lorains Future and the

    City Income Tax

    June 25, 2012

  • 7/31/2019 Income Tax Presentation012 Compat 2

    2/13

    Overview of the Additional Income Tax

    Reduction in funding from State and in GrantReimbursement

    Expected operating shortfall for 2013

    Over the last several years, substantial cutshave been made to maintain status quo

    As evident, the status quo has not been

    maintained; without .5%income tax increase,the quality of services will continue todiminish

  • 7/31/2019 Income Tax Presentation012 Compat 2

    3/13

    State of the Parks

    Lorain has 56 parks, which totals about 600 acres

    compared to Elyrias 14 parks, which total 350 acres

    (2008 figures)

    In 2010, the Parks and Recreation Department wasmoved into the Street Department

    Parks in disrepair and not maintained; overgrown

    grass and shrubbery create safety concerns

    Parks are important to community value and quality

    of life

  • 7/31/2019 Income Tax Presentation012 Compat 2

    4/13

    Comparison of 2000 and Today

    2000 Figures

    Budget: $1,512,110

    Employees: 21 full-

    time employees*

    Management: 2

    2012 Figures

    Budget: $324,009

    Employees: 0 full-

    time employees*

    Management: 0

  • 7/31/2019 Income Tax Presentation012 Compat 2

    5/13

    State of the Roads

    Currently, $1.5M is spent from OPWC funds for road maintenance

    Currently, a 5 year/$5 license plate fee is used for Oberlin Avenue

    According to the Citys Engineering Dept., at least $5M in roadwayrehabilitation is needed each year to bring all roads to anacceptable level

    According to the Citys Engineering Dept., at least $35M would beneeded to bring all roads to an acceptable level

  • 7/31/2019 Income Tax Presentation012 Compat 2

    6/13

    Comparison of Lorain

    and Other Cities

    Elyria

    187 centerline miles

    Operating Budget: $2.39M

    Overall Budget: $2.93M

    About $12,801/mile

    Lorain

    236 centerline miles

    Operating Budget: $1.5M

    Overall Budget: $1.5M*

    About $6,356/mile*Does not include Oberlin Ave license plate fee

    Amherst

    67 centerline miles

    Operating Budget: $1.08M

    Street Improvement (levy): about $1M

    annually

    Total Budget: $2.08M

    About $31,045/mile

  • 7/31/2019 Income Tax Presentation012 Compat 2

    7/13

    State/County Cuts

    and Revenue Decreases

    Estimated total of $230,000 in cuts from Real &Public Utility and Homestead & Rollback (resulting inthe revaluing of real estate)

    Estimated $1.2M in cuts from Local GovernmentFund and Estate & Inheritance (State funds)

    Expiration of federal grants, which totalapproximately 1M in General Fund revenue

  • 7/31/2019 Income Tax Presentation012 Compat 2

    8/13

    Impact of Overall Budget

    With cuts from State and property valuation

    decrease, Lorain will lose about $1.4M

    For 2013, the estimated revenue will be about

    $26.4M For 2013, the estimated expenses will be about

    $28.4M

    These figures factor in the loss of federal grantrevenue and expenditures

    The above results in an expected shortfall of $2M

  • 7/31/2019 Income Tax Presentation012 Compat 2

    9/13

    Efficiencies and Cost Cutting

    Restructuring of Engineering Dept. to provide more services to Utilities inlieu of outside consultants

    Restructuring of Community Development Department to removereplication of duties thereby delivering more dollars to the community

    Property Maintenance Triage Proposal with Health, Building andCommunity Development

    Regionalization and Collaboration with other governmental entities (i.e.wastewater, health, etc.)

    Authorizing private contractors to cut high grass complaints for the firsttime ever, thereby freeing our employees to care for parks and roads

  • 7/31/2019 Income Tax Presentation012 Compat 2

    10/13

    Future of the City

    Concerns over the past 10 years of the conditions of thestreets and conditions of parks

    The status quo of 10 years ago has not been maintained dueto budget constraints

    With more cuts looming from the State and the end of grants,the quality of service will continue to decline

    The .5% ( of 1%) income tax proposal will cover the Stateshortfall and provide the ability to get things doneotheroptions do not provide this ability

    We cant compete with our neighbors unless we dosomething NOW

  • 7/31/2019 Income Tax Presentation012 Compat 2

    11/13

    The Plan for the Income Tax

    The of 1% is not a cure all

    Overall, an estimated $5.3M/year will be generated

    Of the $5.3M, the funds will be used the following ways:

    Est. $2.6M for General Operating for Core Services

    Est. $1.6M for debt service on $20M/20yr bond forimmediate roadwork in the next 2-3 years

    Est. $1 M to augment annual roadway program

  • 7/31/2019 Income Tax Presentation012 Compat 2

    12/13

    Overall Picture

    We cant cut our way out of our financial picture Due to state budget cuts and property devaluation, we face a

    $2M deficit in 2013 (this does not include loss of grant dollars)

    The .5% income tax is not a cure-all

    The City will be continue to be aggressive in findingefficiencies and stretching dollars

    The income tax will allow the City to cover the shortfall and

    provide much needed infrastructure improvements for the

    city If Lorain seeks a better future, we must invest in our

    community

    Its up to us

  • 7/31/2019 Income Tax Presentation012 Compat 2

    13/13

    of 1% Income Tax

    Presentation

    June 25, 2012