incident report
DESCRIPTION
Incident ReportTRANSCRIPT
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
TRIP INCIDENT REPORT
Report Date: 17.12.13 Incident Date:21.11.13 Time: 21.40 to 1:00
Operation Impact ---------→ Blackout:Yes Crushing stoppage:YES
Phase Section Sub-Section
SGU-Pahse-2 boiler#2 Steam temprature control
Area responsible for the Defect
Mechanical Electrical Control
Name of the Staff Involved Designation Department
vinoth kumar DCS operators operation
What Happened? Black out due to Steam Temprature low.
When did the incident occur?
time:21:40 date:21.11.13
Where did the incident occur?
Boiler#2
How did the incident occur? boiler#2 temprature control valve malfunction while boiler in line.
Why did the incident occur? main steam Temprature control valve malfunction.
Determine corrective action and its completion date. attemprator conrol valve mal function corrected 21/11/2013
Action to be taken to avoid similar incident in futureBoiler MSSV to be closed and load reduction.
Nos of Similar Incident: 1
Report prepared by: Yousif Mohammed Abdelmalik Signature: Yousif Date: 16/12/2013
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
Total Loss Time in Hrs: 3:20
Other Outage: Irrigation
Equipment Code No
Boiler#2-attemperator
Area responsible for the Defect
Operation
Operation.
Shift Supt Name
Yousif Mohammed Abdelmalik
What Happened? Black out due to Steam Temprature low.
When did the incident occur?
time:21:40 date:21.11.13
Where did the incident occur?
Boiler#2
How did the incident occur? boiler#2 temprature control valve malfunction while boiler in line.
Why did the incident occur? main steam Temprature control valve malfunction.
Determine corrective action and its completion date. attemprator conrol valve mal function corrected 21/11/2013
Action to be taken to avoid similar incident in futureBoiler MSSV to be closed and load reduction.
Ref No: WCG-SG-ITR-C13-14/01
Report prepared by: Yousif Mohammed Abdelmalik Signature: Yousif Date: 16/12/2013
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
TRIP INCIDENT REPORT
Report Date: 17/12/13 Incident Date:22.11.13 time:7:44a.m to 10.30 a.m
Operation Impact ---------→ Blackout:Yes Crushing stoppage:YES
Phase Section Sub-Section
SGU-Phase-2 Fuel feeding
Area responsible for the Defect
Mechanical Electrical Control
Name of the Staff Involved Designation Department
Ali Altoum Shift Super. Eng Mill House
Wali Eldin Mech.Technicain Operation
Herald Varghese DCS operator Operation
What Happened?
main steam temperature low in both boilers
When did the incident occur?
22/11/13 7:44 a.m
Where did the incident occur?
Boiler#2&4
How did the incident occur?
wet bagaase from mill house.
Why did the incident occur?
high moisture bagasse.
Determine corrective action and its completion date.
Action to be taken to avoid similar incident in future
Arrangement with Mill Shift Supt to inform us for any gap or trash or any mill bypassed,feed boilers through back feeding .
Nos of Similar Incident: 2
Boiler#2&4
Bagasse transfer to baggase yard PH-01 at any starting of mill,during gap from mill and when low Feeding because of trash. Arrangement with Mill Shift Supt to inform us for any gap or trash or any mill bypassed.
Report prepared by: Eihab Mohammed Ali Signature: Eihab Date: 16/12/2013
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
Total Loss Time in Hrs: 2.46
Other Outage: Irrigation
Equipment Code No
Bagasse
Area responsible for the Defect
Operation
Operation
Shift Supt Name
Ali Altoum
Eihab Mohammed Ali
Eihab Mohammed Ali
What Happened?
main steam temperature low in both boilers
When did the incident occur?
22/11/13 7:44 a.m
Where did the incident occur?
Boiler#2&4
How did the incident occur?
wet bagaase from mill house.
Why did the incident occur?
high moisture bagasse.
Determine corrective action and its completion date.
Action to be taken to avoid similar incident in future
Arrangement with Mill Shift Supt to inform us for any gap or trash or any mill bypassed,feed boilers through back feeding .
Ref No: WCG-SG-ITR-C13-14/02
Bagasse transfer to baggase yard PH-01 at any starting of mill,during gap from mill and when low Feeding because of trash. Arrangement
Report prepared by: Eihab Mohammed Ali Signature: Eihab Date: 16/12/2013
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
TRIP INCIDENT REPORT
Report Date: 17/12/13 Incident Date:24/11/13 Time: 7.48 a.m to 10:57a.m
Operation Impact ---------→ Blackout:YES Crushing stoppage: Yes 4:05
Phase Section Sub-Section
SGU-Phase-02 BHS BC-6A
Area responsible for the Defect
Mechanical Electrical Control
Name of the Staff Involved Designation Department
Khalid Field operator Operation
Abdel Rahim Shift Supv Operation
Herald Varghese DCS operator Operation
What Happened?
Chute Jam due to Angle Piece which led to BHS stoppage and Boiler 2&4 pressure drop and blackout.
When did the incident occur?
23/11/2013 7:10 hr
Where did the incident occur?
Ph-02 Bagasse Handling System
How did the incident occur?
during boiler 2&4 runnig with back feeding angle piece in conveyor which led to final chute jam and BC-6A trip.
Why did the incident occur?
foreign material in BHS
Determine corrective action and its completion date.
Chute Jam Cleaning started and finished 8:00 Am
Action to be taken to avoid similar incident in future
Bagasse yard PH-02 cleaned from foreign material as well as the walk way for all conveyor PH-02.
Nos of Similar Incident: 3
Report prepared by: Eihab Mohammed Ali Eljack Signature: Eihab Date: 16/12/2013
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
Total Loss Time in Hrs: 3:09
Other Outage: irrigation load
Equipment Code No
BC-6 conveyer
Area responsible for the Defect
Operation
Operation
Shift Supt Name
Eihab Mohammed Ali
Eihab Mohammed Ali
Eihab Mohammed Ali
What Happened?
Chute Jam due to Angle Piece which led to BHS stoppage and Boiler 2&4 pressure drop and blackout.
When did the incident occur?
23/11/2013 7:10 hr
Where did the incident occur?
Ph-02 Bagasse Handling System
How did the incident occur?
during boiler 2&4 runnig with back feeding angle piece in conveyor which led to final chute jam and BC-6A trip.
Why did the incident occur?
foreign material in BHS
Determine corrective action and its completion date.
Chute Jam Cleaning started and finished 8:00 Am
Action to be taken to avoid similar incident in future
Bagasse yard PH-02 cleaned from foreign material as well as the walk way for all conveyor PH-02.
Ref No: WCG-SG-ITR-C13-14/03
Report prepared by: Eihab Mohammed Ali Eljack Signature: Eihab Date: 16/12/2013
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
TRIP INCIDENT REPORT
Report Date: 17/12/13 Incident Date:11/12/13 Time: 17:58
Operation Impact ---------→ Blackout:Yes Crushing stoppage: Yes
Phase Section Sub-Section
SGU-Pahse-I Boiler#1 Travelling Grate
Area responsible for the Defect
Mechanical Electrical Control
Electrical Control
Name of the Staff Involved Designation Department
What Happened? Travelling grate NO.1 motor stopped due to communication problem
When did the incident occur?
17:58 hr 11/12/2013
Where did the incident occur?
Boiler#1
How did the incident occur?
Why did the incident occur? problem still not rectified.
Determine corrective action and its completion date. travelling grate motors to be checked for communication problem.
Action to be taken to avoid similar incident in futuremany equipment have the same problem (communicaion problem) to be checked.
Nos of Similar Incident: 2
During boiler#1 running with 3 burners travelling garte motor stopped due to communicatio problem and led to burners trip due to interlock.
Report prepared by: Yousif Mohammed Abdelmalik Signature: Yousif Date: 16/12/2013
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
Total Loss Time in Hrs: 2:45
Other Outage: Irrigation load
Equipment Code No
Travelling Grate Motor
Area responsible for the Defect
Operation
Shift Supt Name
Yousif Mohammed Abdelmalik
Abubaker Imam Ahmed
Ahmed Abdelrahman
What Happened? Travelling grate NO.1 motor stopped due to communication problem
When did the incident occur?
17:58 hr 11/12/2013
Where did the incident occur?
Boiler#1
How did the incident occur?
Why did the incident occur? problem still not rectified.
Determine corrective action and its completion date. travelling grate motors to be checked for communication problem.
Action to be taken to avoid similar incident in futuremany equipment have the same problem (communicaion problem) to be checked.
Ref No: WCG-SG-ITR-C13-14/04
During boiler#1 running with 3 burners travelling garte motor stopped due to communicatio problem and led to burners trip
Report prepared by: Yousif Mohammed Abdelmalik Signature: Yousif Date: 16/12/2013
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
TRIP INCIDENT REPORT
Report Date: 20\12\2014 Incident Date:20\12\2014 Time: 02:27pm
Operation Impact ---------→ Blackout:Yes Crushing stoppage:Yes
Phase Section Sub-Section
1 BOILER BOILER-03
Area responsible for the Defect
Mechanical Electrical Control
Name of the Staff Involved Designation Department
HERALD K. VARGHESE Dcs operator BOILER
K.C. BHORADE BOILER FIELD OPERATOR BOILER
Mohamed.Elsagadi BOILER FIELD OPERATOR BOILER
What Happened?
Boiler-3 pressure, and furnace temp. coming down, due to wet baggase from mills.
When did the incident occur?
20\12\2014 02:27pm
Where did the incident occur?
Boiler-03
How did the incident occur?
Why did the incident occur?
DUE to wet baggase furnace got dumped and furnace temp. comes down
Determine corrective action and its completion date.
We have to stop Belt Conveyors as not allow from mills go to the boilers.
Action to be taken to avoid similar incident in future
Nos of Similar Incident:
After NO-CANE mills started at 1.20pm. Wet baggasse and more gap and less cane feeding starting from 1.50 pm. experienced we close the silo gates and max. bagasse diverted to yards mean time seeing SC4 current we are taking yard baggase. silo got empty we opened silo gates this wet bagasse entered to silo. Due to moisture baggase in silo furnace temp. comes down to 650 to 580 deg.c we closed PRDS (2.5ATA, 11ATA). At 53KG/Sq cm we try to start oil burner but BURNER READY indication not came ( after seeing furnace condition we started oilbpump, and purging given)
Report prepared by: A.GOVINDARAJAN Signature: Date: 20/12/2014
we have to stop bc-3, and we have to take back feeding, , and situation not improved we have to put minimum one burner in service
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
Total Loss Time in Hrs:
Other Outage:hrs 2:40 hr:min
Equipment Code No
Area responsible for the Defect
Operation
ü
Shift Supt Name
A.GOVINDARAJAN
What Happened?
Boiler-3 pressure, and furnace temp. coming down, due to wet baggase from mills.
When did the incident occur?
20\12\2014 02:27pm
Where did the incident occur?
Boiler-03
How did the incident occur?
Why did the incident occur?
DUE to wet baggase furnace got dumped and furnace temp. comes down
Determine corrective action and its completion date.
We have to stop Belt Conveyors as not allow from mills go to the boilers.
Action to be taken to avoid similar incident in future
Ref No: WCG-SG-ITR-
After NO-CANE mills started at 1.20pm. Wet baggasse and more gap and less cane feeding starting from 1.50 pm. experienced we close the silo gates and max. bagasse diverted to yards mean time seeing SC4 current we are taking yard baggase. silo got
we opened silo gates this wet bagasse entered to silo. Due to moisture baggase in silo furnace temp. comes down to 650 to 580 deg.c we closed PRDS (2.5ATA, 11ATA). At 53KG/Sq cm we try to start oil burner but BURNER READY indication not
Report prepared by: A.GOVINDARAJAN Signature: Date: 20/12/2014
we have to stop bc-3, and we have to take back feeding, , and situation not improved we have to put minimum one burner in
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
TRIP INCIDENT REPORT
Report Date: 15\01\2015 Incident Date:14\01\2015 Time: 05:06pm
Operation Impact ---------→ Blackout:No Crushing stoppage:Yes
Phase Section Sub-Section
1 BOILER Slat conveyor
Area responsible for the Defect
Mechanical Electrical Control
Name of the Staff Involved Designation Department
Tanaji Patil Dcs operator BOILER
Rajendra Badode Dcs operator BOILER
Anglo , Salah,Omer Musa,Ibrahim Ramadan SC-4 Operator BOILER
What Happened?
Slat conveyor SC-4B break down.
When did the incident occur?
On 14\01\2015 at 05:06pm
Where did the incident occur?
SC-4B
How did the incident occur?
Why did the incident occur?
Nos of Similar Incident: 1
1-Mill stopped at 3:28 pm due to some problem mill side,3:56pm mill started again, improper low feeding up to 4:25pmsame time wet bagasse entered in silo,Boiler pressure drop to 56.1Kg/cm2 at 04:18pm,2- @04:25 pm crushing stopped as per our request ,BC-3 &BC-1 stopped accordingly due to wet bagasse. 3- @04:31pm Mill crushing started after pressure maintained ,boiler Pressure dropped again due to wet bagasse one burner lighted up @04:42pm and @04:50pm crushing stop from boiler side by stopping BC-3&BC-1,still there is no improvement in bagasse quality at,4-@5:01pm Mill start, Pressure 63kg/cm2. 5- @ 5:06pm Pull cord operated by SC-4 Operator observed abnormal sound at drive end side,Same time all SC-4 operator are near blr 01 silo gate to monitor bagasse quality and to close silo gates.
Determine corrective action and its completion date.
Action to be taken to avoid similar incident in future
Report prepared by:Eihab Eljack Signature: Date: 14/01/2015
SC-4B occured break down due to a lumps of bagasse fallen in SC-4B discharge chute,not moved forwerd and chute jam occured.
Breakdown maintenance immediately started after SC-4 stopped,damaged slats has been removed,renewed by new with link attachment ,completed at 02:00 am on 15/01/2015.
To give more attention to discharge chute to avoid chocking of discharge chute during mill start up
WHITE NILE SUGAR COMPANY
CO-GENERATION DEPARTMENT
Total Loss Time in Hrs:
Other Outage:hrs 9:20 hr:min
Equipment Code No
SC-4B
Area responsible for the Defect
Operation
ü
Shift Supt Name
Eihab
Eihab
Eihab
What Happened?
Slat conveyor SC-4B break down.
When did the incident occur?
On 14\01\2015 at 05:06pm
Where did the incident occur?
SC-4B
How did the incident occur?
Why did the incident occur?
Ref No: WCG-SG-ITR-C14-15/6
1-Mill stopped at 3:28 pm due to some problem mill side,3:56pm mill started again, improper low feeding up to 4:25pmsame time wet bagasse entered in silo,Boiler pressure drop to 56.1Kg/cm2 at 04:18pm,2- @04:25 pm crushing stopped as per our request ,BC-3 &BC-1 stopped accordingly due to wet bagasse. 3- @04:31pm Mill crushing started after pressure maintained ,boiler Pressure dropped again due to wet bagasse one burner lighted up @04:42pm and @04:50pm crushing stop from boiler side by stopping BC-3&BC-1,still there is
5- @ 5:06pm Pull cord operated by SC-4 Operator observed abnormal sound at drive end side,Same time all SC-4 operator are
Determine corrective action and its completion date.
Action to be taken to avoid similar incident in future
Report prepared by:Eihab Eljack Signature: Date: 14/01/2015
SC-4B occured break down due to a lumps of bagasse fallen in SC-4B discharge chute,not moved forwerd and chute jam
Breakdown maintenance immediately started after SC-4 stopped,damaged slats has been removed,renewed by new with link
To give more attention to discharge chute to avoid chocking of discharge chute during mill start up