Ministry of ROADS and highways (mrh) REPUBLIC OF ghana
PREPARATORY SURVEYON
EASTERN CORRIDOR DEVELOPMENT PROJECTIN
THE REPUBLIC OF GHANA
FINAL REPORTAPPENDIX (DRAWINGS)
JAPAN INTERNATIONAL COOPERATION AGENCY(JICA)
CENTRAL CONSULTANT INC. PADECO CO., LTD.
JANUARY 2013
C R ( 3 )
1 3 - 0 0 2
E I
-
JAN
UA
RY
2013P
RE
PA
RA
TO
RY
SUR
VE
Y O
N E
AST
ER
N C
OR
RID
OR
DE
VE
LO
PM
EN
T P
RO
JEC
TIN
TH
E R
EP
UB
LIC
OF
GH
AN
AF
INA
L R
EP
OR
T
Ministry of ROADS and highways (mrh) REPUBLIC OF ghana
PREPARATORY SURVEYON
EASTERN CORRIDOR DEVELOPMENT PROJECTIN
THE REPUBLIC OF GHANA
FINAL REPORTAPPENDIX (DRAWINGS)
JAPAN INTERNATIONAL COOPERATION AGENCY(JICA)
CENTRAL CONSULTANT INC. PADECO CO., LTD.
JANUARY 2013
-
DRAWING TITLE
PART I
NEW ROAD BETWEEN ASUTSUARE JCT. – ASIKUMA JCT.
1. LOCATION MAP ・・・・・・・・・・・・・・・・・・・ 1
2. PLANS AND PROFILES ・・・・・・・・・・・・・・・・・・・ 2 - 24
3. TYPICAL CROSS SENTION ・・・・・・・・・・・・・・・・・・・ 25 - 26
4. GENERAL PLANS OF BRIDGES ・・・・・・・・・・・・・・・・・・・ 27 - 30
5. CROSS SECTIONS ・・・・・・・・・・・・・・・・・・・ 31 - 75
6. INTERSECTION DESIGNS ・・・・・・・・・・・・・・・・・・・ 76 - 78
7. CULVERTS LOCATION ・・・・・・・・・・・・・・・・・・・ 79
8. BUS BAY LAYOUT ・・・・・・・・・・・・・・・・・・・ 80
9. TOLL BOOTH LAYOUT ・・・・・・・・・・・・・・・・・・・ 81
10. FOOTBRIDGE ・・・・・・・・・・・・・・・・・・・ 82
PART II
ASUTSUARE - AVEYIME ROAD
1. LOCATION MAP ・・・・・・・・・・・・・・・・・・・・ 1
2. PLANS AND PROFILES ・・・・・・・・・・・・・・・・・・・・ 2 - 9
3. TYPICAL CROSS SENTION ・・・・・・・・・・・・・・・・・・・・ 10
4. CROSS SECTIONS ・・・・・・・・・・・・・・・・・・・・ 11 – 23
5. CULVERTS LOCATION ・・・・・・・・・・・・・・・・・・・・ 24
6. GENERAL PLAN OF CULVERT ・・・・・・・・・・・・・・・・・・・・ 25
-
PART I
NEW ROAD BETWEEN ASUTSUARE JCT. – ASIKUMA JCT.
DRAWINGS
-
Asikuma JCT.
Asutsuare JCT.
Asutsuare
Aveyime
Kpong
Atimpoku
Juapong
Pedoe-Dufo
Frankadua
Osi-Abura
Kpalukope
AkuseVolivo
Volo
Dufor-Adidome
N2
N2
Volta
Volta
Project:
Scale : As Shown Sheet 1/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
LOCATION MAP
JAN. 2013
LOCATION MAP
S=1:5,000,000
Project:
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GENERAL MAP DETAIL MAP S=1:300,000
-
Project:
Scale : As Shown Sheet 2/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in metre.
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(1/23)
JAN. 2013
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
-
Project:
Sheet 3/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(2/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 4/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
JAN. 2013
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(3/23)
Scale : As Shown
1. All dimensions are in metre.
-
Project:
Sheet 5/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(4/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 6/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(5/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 7/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(6/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 8/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(7/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 9/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(8/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 10/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(9/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 11/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(10/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 12/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(11/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 13/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(12/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 14/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(13/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 15/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(14/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 16/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(15/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 17/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(16/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 18/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(17/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 19/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(18/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 20/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(19/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 21/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(20/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 22/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(21/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 23/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(22/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 24/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE JCT. - ASIKUMA JCT.
PLAN & PROFILE(23/23)
Scale : As Shown
1. All dimensions are in metre.
JAN. 2013
-
Project:
Scale : 1:100 Sheet 25/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in millimetre.
ASUTSUARE JCT. - ASIKUMA JCT.
TYPICAL CROSS-SECTION (1)
JAN. 2013
TYPICAL CROSS-SECTION (1)S=1:100
Project:
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
-
C
Project:
Sheet 26/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
TYPICAL CROSS-SECTION (2)S=1:200
Scale : 1:100
1. All dimensions are in millimetre.
ASUTSUARE JCT. - ASIKUMA JCT.
TYPICAL CROSS-SECTION (2)
JAN. 2013
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
-
53000
19000
A1
P1
A2
Bridge Length = 520000
125000 270000 125000
VCL=160000
8000
8000
BH-2
Dep=18.00m
BH-01
Dep=13.00m
ELEVATION
Estimated Support Layer -2.760m
6500Concrete Pileφ=1400 l=13500 n=10
6500Concrete Pile
φ=1400 l=13500 n=10
53000
19000P2
11500 11500
9.240m
17100
Bridge Length = 520000
125000 270000 125000
PLAN
6500
17100
6500
17100
23000
11500
23000
11500
GENERAL PLAN OF BRIDGE ACROSS VOLTA RIVER (1) S=1:1000
Scale : Sheet 27/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in millimetre.
GENERAL PLAN OF BRIDGE
ACROSS VOLTA RIVER (1)
JAN. 2013 1:1000
Project:
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
-
17100
400 16300 400
2000 6150 6150 2000
3000
53000
23000
SECTION OF TOWER
19000
17100
400 16300 400
2000 6150 6150 2000
3000
SECTION OF SUPERSTRUCTUER SECTION OF ABUTMENT
8000
1400 4x3575=14300 1400
17100
17100
Concrete Pileφ=1400 l=13500 n=10
φ1400
S=1:200
Project:
Scale : Sheet 28/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in millimetre.
1:200
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GENERAL PLAN OF BRIDGE ACROSS VOLTA RIVER (2)
GENERAL PLAN OF BRIDGE
ACROSS VOLTA RIVER (2)
JAN. 2013
-
16000(Irrigation Canal) 4000
(Service Road)3500
(Embankment)
8000(Road) 15000(Irrigation Canal)
20.000
30.000
Gradient
300.000
15.000
23300.000
18.000
24.550
25.850 I=2.000%
L=357.500m
NO.23
250.000
50.000
23250.000
18.000
24.358
NO.23
I=2.000%
L=247.598m
VCL=260000 VCR=6500000
Bridge Length = 50000
260.000
10.000
23260.000
24.427
1500
50 Girder Length = 49900 50
350 Span Length = 24150 350200
350 Span Length = 24150 350
224
1450
A1
285.000
25.000
23285.000
24.533
P1
310.000
10.000
23310.000
24.542
A2
17.0
ELEVATION S=1:200
A1
No.23+260.000
A2
No.23+310.000
M F F
8000
6500 8000
L=200.000 A=400.000
L=200.000 A=400.000
4.0%4.0%
4.0%4.0%
KIP Road(W=8m)
No.23+
290
50005000
5000
BH-6
EL=58.0m
Dep=3.35m
PlannedHeight
GroundHeight
AccumulatedLength
Length
Chainage
Average Curve
Radius
Super
Elevation
M
17100
400 16300 400
2000 6150 6150 2000
CROSS SECTION S=1:100
920 7X2180=15260 920
70
154
1450
i=2.50% i=2.50%
Bridge Length = 50000
50 Girder Length = 49900 50
350 Span Length = 24150 350200
350 Span Length = 24150 350
PLAN S=1:200
A1 A2
17100
5000
18100
5000 5000
17100
400
2000
6150
6150
2000
400
17100No.23+260.000
No.23+310.000
KIP Road(W=8m)
No.23+290
GENERAL PLAN OF BRIDGE ACROSS APGIP CANAL S=1:200
Scale : As Shown Sheet 29/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in millimetre.
GENERAL PLAN OF BRIDGE
ACROSS APGIP CANAL
JAN. 2013
Project:
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
-
No.61
15.000
61000.000
66.019
69.800
950.000
50.000
60950.000
66.789
69.800
NO.60
960.000
10.000
60960.000
69.800
A1
985.000
25.000
60985.000
69.800
P1
10.000
10.000
61010.000
69.800
A2
2.5%
2.5%
Alabo river
No.60+985
I=0.000%
L=640.000m
R=∞
L=4211.268m
10000
10000
8000
Bridge Length = 50000
50 Girder Length = 49900 50
350 Span Length = 24150 350200350 Span Length = 24150 350
224
1450
ELEVATION S=1:200
A1
No.60+960.000
A2
No.61+10.000
M MF F
Estimated Height of Bearing Layer
67.155(H.W.L.)
60.300
7000 6000 7000
BH-3
Dep=7.50m
Gradient
PlannedHeight
GroundHeight
AccumulatedLength
Length
Chainage
Average Curve
Radius
Super
Elevation
70.000
60.000
17100
400 16300 400
2000 6150 6150 2000
CROSS SECTION S=1:100
920 7X2180=15260 920
70
154
1450
i=2.50% i=2.50%
Alabo river
No.60+
985
Bridge Length = 50000
50 Girder Length = 49900 50
350 Span Length = 24150 350200350 Span Length = 24150 350
PLAN S=1:200
A1
No.60+960.000
A2
No.61+10.000
17100
7000
18100
6000 7000
17100
400
2000
6150
6150
2000
400
17100
GENERAL PLAN OF BRIDGE ACROSS ALABO RIVER S=1:200
Scale : As Shown Sheet 30/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in millimetre.
GENERAL PLAN OF BRIDGE
ACROSS ALAVO RIVER
JAN. 2013
Project:
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
-
STA =0+000.000
STA =0+200.000
STA =0+400.000
STA =0+600.000
STA =0+800.000
STA =0+958.639
STA =1+000.000
STA =1+200.000
Project:
Scale : 1:200 Sheet 31/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in metre.
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (1/45)
JAN. 2013
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
-
STA =1+304.160
STA =1+400.000
STA =1+600.000
STA =1+800.000
STA =2+000.000
STA =2+200.000
STA =2+400.000
STA =2+600.000
STA =2+800.000
Project:
Sheet 32/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (2/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =3+000.000
STA =3+200.000
STA =3+400.000
STA =3+587.200
STA =3+600.000
STA =3+800.000
STA =3+937.200
STA =4+000.000
STA =4+200.000
Project:
Sheet 33/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (3/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =4+322.902
STA =4+400.000
STA =4+600.000
STA =4+672.902
STA =4+800.000
STA =5+000.000
STA =5+200.000
STA =5+400.000
STA =5+600.000
Project:
Sheet 34/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (4/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =5+691.244
STA =5+800.000
STA =6+000.000
STA =6+200.000
STA =6+307.235
STA =6+400.000
STA =6+600.000
STA =6+800.000
STA =6+985.175
Project:
Sheet 35/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (5/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =7+000.000
STA =7+200.000
STA =7+285.175
STA =7+364.636
STA =7+400.000
STA =7+600.000
STA =7+664.636
STA =7+800.000
STA =8+000.000
STA =8+200.000
Project:
Sheet 36/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (6/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =8+400.000
STA =8+600.000
STA =8+782.888
STA =8+800.000
STA =8+982.888
STA =9+000.000
STA =9+200.000
STA =9+400.000
STA =9+527.852
STA =9+600.000
Project:
Sheet 37/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (7/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =9+727.852
STA =9+800.000
STA =10+000.000
STA =10+200.000
STA =10+400.000
STA =10+600.000
Project:
Sheet 38/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (8/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =10+800.000
STA =11+000.000
STA =11+200.000
STA =11+400.000
STA =11+600.000
STA =11+800.000
STA =12+000.000
STA =12+200.000
Project:
Sheet 39/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (9/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =12+400.000
STA =12+600.000
STA =12+800.000
STA =13+000.000
STA =13+200.000
STA =13+400.000
STA =13+600.000
STA =13+800.000
STA =14+000.000
Project:
Sheet 40/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (10/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =14+200.000
STA =14+400.000
STA =14+600.000
STA =14+800.000
STA =15+000.000
STA =15+200.000
STA =15+400.000
STA =15+600.000
STA =15+694.715
Project:
Sheet 41/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (11/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =15+800.000
STA =16+000.000
STA =16+069.715
STA =16+200.000
STA =16+400.000
STA =16+600.000
STA =16+800.000
STA =17+000.000
STA =17+200.000
Project:
Sheet 42/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (12/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =17+400.000
STA =17+600.000
STA =17+753.585
STA =17+800.000
STA =18+000.000
STA =18+128.585
STA =18+200.000
STA =18+400.000
STA =18+600.000
Project:
Sheet 43/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (13/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =18+800.000
STA =19+000.000
STA =19+200.000
STA =19+400.000
STA =19+600.000
STA =19+800.000
STA =20+000.000
STA =20+018.624
STA =20+200.000
Project:
Sheet 44/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (14/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =20+393.624
STA =20+400.000
STA =20+600.000
STA =20+766.940
STA =20+800.000
STA =21+000.000
STA =21+141.940
STA =21+200.000
STA =21+400.000
Project:
Sheet 45/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (15/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =21+600.000
STA =21+800.000
STA =22+000.000
STA =22+200.000
STA =22+400.000
STA =22+600.000
STA =22+625.144
STA =22+800.000
STA =22+825.144
Project:
Sheet 46/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (16/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =23+000.000
STA =23+079.458
STA =23+200.000
STA =23+279.458
STA =23+281.542
STA =23+400.000
STA =23+481.542
Project:
Sheet 47/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (17/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =23+600.000
STA =24+200.000
STA =24+334.261
STA =24+400.000
STA =24+592.846
STA =24+600.000
STA =24+800.000
STA =24+842.846
Project:
Sheet 48/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (18/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =25+000.000
STA =25+100.890
STA =25+200.000
STA =25+350.890
STA =25+400.000
STA =25+538.687
STA =25+600.000
STA =27+000.000
Project:
Sheet 49/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (19/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =27+200.000
STA =27+400.000
STA =27+498.441
STA =27+600.000
STA =27+748.441
STA =27+800.000
STA =28+000.000
STA =28+200.000
STA =28+400.000
Project:
Sheet 50/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (20/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =28+600.000
STA =28+800.000
STA =29+000.000
STA =29+116.113
STA =29+200.000
STA =29+400.000
STA =29+600.000
Project:
Sheet 51/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (21/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =29+616.113
STA =29+800.000
STA =30+000.000
STA =30+200.000
STA =30+400.000
STA =30+529.587
STA =30+600.000
Project:
Sheet 52/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (22/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =30+800.000
STA =31+000.000
STA =31+029.587
STA =31+053.274
STA =31+200.000
STA =31+400.000
STA =31+600.000
STA =31+800.000
STA =32+000.000
STA =32+200.000
Project:
Sheet 53/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (23/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =32+400.000
STA =32+600.000
STA =32+800.000
STA =33+000.000
STA =33+200.000
STA =33+400.000
STA =33+600.000
STA =33+800.000
STA =34+000.000
Project:
Sheet 54/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (24/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =34+120.550
STA =34+200.000
STA =34+400.000
STA =34+600.000
STA =34+800.000
STA =35+000.000
STA =35+200.000
STA =35+400.000
Project:
Sheet 55/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (25/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =35+600.000
STA =35+800.000
STA =36+000.000
STA =36+200.000
STA =36+400.000
STA =36+600.000
STA =36+800.000
STA =37+000.000
Project:
Sheet 56/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (26/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =37+200.000
STA =37+400.000
STA =37+600.000
STA =37+800.000
STA =38+000.000
STA =38+200.000
STA =38+400.000
STA =38+600.000
STA =38+800.000
STA =39+000.000
Project:
Sheet 57/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (27/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =39+200.000
STA =39+400.000
STA =39+600.000
STA =39+800.000
STA =40+000.000
STA =40+200.000
STA =40+400.000
STA =40+600.000
Project:
Sheet 58/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (28/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =40+800.000
STA =41+000.000
STA =41+200.000
STA =41+400.000
STA =41+600.000
STA =41+608.702
STA =41+800.000
STA =42+000.000
STA =42+200.000
Project:
Sheet 59/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (29/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =42+400.000
STA =42+600.000
STA =42+800.000
STA =43+000.000
STA =43+200.000
STA =43+400.000
STA =43+600.000
STA =43+800.000
STA =44+000.000
Project:
Sheet 60/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (30/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =44+200.000
STA =44+400.000
STA =44+600.000
STA =44+800.000
STA =45+000.000
STA =45+200.000
STA =45+400.000
STA =45+600.000
Project:
Sheet 61/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (31/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =45+800.000
STA =46+000.000
STA =46+016.541
STA =46+200.000
STA =46+400.000
STA =46+600.000
STA =46+800.000
STA =47+000.000
Project:
Sheet 62/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (32/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =47+200.000
STA =47+400.000
STA =47+600.000
STA =47+800.000
STA =48+000.000
STA =48+200.000
STA =48+400.000
STA =48+600.000
STA =48+800.000
Project:
Sheet 63/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (33/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =49+000.000
STA =49+200.000
STA =49+400.000
STA =49+600.000
STA =49+800.000
STA =50+000.000
STA =50+200.000
STA =50+400.000
STA =50+600.000
Project:
Sheet 64/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (34/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =50+800.000
STA =51+000.000
STA =51+200.000
STA =51+400.000
STA =51+600.000
STA =51+800.000
STA =52+000.000
STA =52+200.000
Project:
Sheet 65/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (35/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =52+400.000
STA =52+600.000
STA =52+800.000
STA =53+000.000
STA =53+200.000
STA =53+400.000
STA =53+600.000
STA =53+800.000
STA =54+000.000
Project:
Sheet 66/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (36/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =54+200.000
STA =54+400.000
STA =54+600.000
STA =54+800.000
STA =55+000.000
STA =55+200.000
STA =55+400.000
STA =55+600.000
STA =55+800.000
Project:
Sheet 67/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (37/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =56+000.000
STA =56+200.000
STA =56+400.000
STA =56+600.000
STA =56+800.000
STA =57+000.000
STA =57+197.998
STA =57+200.000
STA =57+400.000
Project:
Scale : 1:200 Sheet 68/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (38/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =57+600.000
STA =57+697.998
STA =57+800.000
STA =58+000.000
STA =58+095.920
STA =58+200.000
STA =58+400.000
STA =58+595.920
STA =58+600.000
STA =58+800.000
Project:
Sheet 69/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (39/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =59+000.000
STA =59+200.000
STA =59+400.000
STA =59+600.000
STA =59+800.000
STA =60+000.000
STA =60+200.000
STA =60+400.000
STA =60+600.000
Project:
Sheet 70/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (40/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =60+800.000
STA =61+000.000
STA =61+200.000
STA =61+400.000
STA =61+600.000
STA =61+800.000
STA =62+000.000
STA =62+200.000
STA =62+400.000
Project:
Sheet 71/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (41/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =62+600.000
STA =62+639.760
STA =62+800.000
STA =63+000.000
STA =63+139.760
STA =63+200.000
STA =63+400.000
STA =63+600.000
Project:
Sheet 72/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (42/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =63+800.000
STA =64+000.000
STA =64+200.000
STA =64+312.702
STA =64+400.000
STA =64+600.000
STA =64+800.000
STA =64+812.702
Project:
Sheet 73/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (43/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =65+000.000
STA =65+200.000
STA =65+400.000
STA =65+600.000
STA =65+800.000
STA =66+000.000
STA =66+200.000
STA =66+400.000
Project:
Sheet 74/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (44/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =66+600.000
STA =66+800.000
STA =67+000.000
STA =67+027.142
Project:
Sheet 75/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE JCT. - ASIKUMA JCT.
CROSS SECTION (45/45)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
Project:
Scale: As Shown
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in metre.
INTERSECTION (1)
JAN. 2013
ASUTSUARE JCT.
Juapong
Asutsuare
Afienya
S=1:2,000
INTERSECTION (1)
Sheet 76/82
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
S=1:500
-
Project:
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
INTERSECTION (2)
Bridge across
Volta River
VOLIVO INTERSECTION
Austsuare Jct.
Asutsuare
INTERSECTION (2)
Sheet 77/82
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
1. All dimensions are in metre.
JAN. 2013 Scale: As Shown
S=1:500
Aveyime
S=1:2,000
-
S=1:500
Project:
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
INTERSECTION (3)
ASIKUMA JCT.
HaveHo
Juapong
Avegame
S=1:2,000
INTERSECTION (3)
Sheet 77/82
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
1. All dimensions are in metre.
JAN. 2013 Scale: As Shown
-
Project:
Sheet 79/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in mm.
ASUTSUARE JCT. - ASIKUMA JCT.
CULVERTS LOCATION
JAN. 2013
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale :NTS
CULVERTS LOCATION
TYPE A
H
B
TYPE B
H
B B B
Road Between Asutsuare Jct. and Asikuma Jct.
Station Culvert Size Remarks1 No.00 + 660 Box 1 - B1.0 H1.0 Type A (Box)2 No.01 + 710 Box 1- B1.2 H1.0 Type A (Box)3 No.07 + 100 Box 3 - B2.0 H1.2 Type B (Box)4 No.08 + 000 Box 3 - B1.4 H1.0 Type B (Box)5 No.10 + 410 Box 1 - B2.5 H1.0 Type A (Box)6 No.12 + 780 Box 1 - B1.0 H1.0 Type A (Box)7 No.15 + 340 Box 1 - B1.2 H1.0 Type A (Box)8 No.15 + 700 Box 1 - B1.2 H1.0 Type A (Box)9 No.24 + 320 Box 1 - B4.0 H2.6 Type A (Box)
10 No.25 + 210 Box 3 - B5.0 H2.0 Type B (Box)11 No.26 + 700 Box 1 - B1.0 H1.0 Type A (Box)12 No.33 + 000 Box 1 - B1.2 H1.0 Type A (Box)13 No.45 + 890 Box 1 - B1.0 H1.0 Type A (Box)14 No.47 + 800 Box 1 - B1.0 H1.0 Type A (Box)15 No.49 + 540 Box 1 - B1.8 H1.3 Type A (Box)16 No.50 + 157 Box 1 - B1.0 H1.0 Type A (Box)17 No.54 + 910 Box 1 - B1.2 H1.2 Type A (Box)18 No.60 + 500 Box 1 - B1.0 H1.0 Type A (Box)19 No.62 + 000 Box 1 - B1.8 H1.3 Type A (Box)20 No.62 + 770 Box 1 - B1.8 H1.3 Type A (Box)21 No.65 + 510 Box 1 - B1.0 H1.0 Type A (Box)
NoteDimensions of Box Culvert are in meters
-
Project:
Sheet 80/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in mm.
ASUTSUARE JCT. - ASIKUMA JCT.
BUS BAY LAYOUT
JAN. 2013
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale :NTS
SHOULDER (2.5m WIDE)
70000 30000 30000 70000
BUS BAY LAYOUT
SHOULDER (2.5m WIDE)
PEDESTRIAN PLATFORM (1.5m WIDE)
3500
500
120
3000 9000CARRIAGEWAY (7.3m WIDE)
120
BROKEN WHITE CENTRE LINE
0.12m DOTTED WHITE LINE
"BUS STOP"SIGN POST
RAISED BARRIER KERBS PLACEDWITH 1.0m GAPS
CONTINUOUS WHITE EDGE LINE
TRAPEZOIDAL SPEED CUSHION
6000
1000 4000 1000
75
25
7.5% S
lope 7.5% Slope
Finished Road Level
-
Project:
Sheet 81/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in mm.
ASUTSUARE JCT. - ASIKUMA JCT.
TOOL BOOTH LAYOUT
JAN. 2013
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale :1:1000
PROPOSED TOLL BOOTH AT DAFOR ADIDOME
TOLL BOOTH
TOLL BOOTH
TOLL BOOTH
C
L
C
L
PAVEMENT BLOCKS
PAVEMENT BLOCKS
PAVEMENT BLOCKS
PAVEMENT BLOCKS
TO ASIKUMA TO ASUTSUARE
210000
60000 45000 45000 60000
23070
3270
0
EXTENT OF CANOPY
TOLL BOOTHPAVEMENT BLOCKS PAVEMENT BLOCKS
TOLL BOOTH
PAVEMENT BLOCKS PAVEMENT BLOCKS
5050
4x56
50=2
2600
5050
3270
0
1185
090
0011
850
3270
0
1185
090
0011
850
-
SIDE VIEW
Carriageway2500 25003650 3650
Carriageway ShoulderShoulder
5500
100 100
Project:
Sheet 82/82
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in mm.
ASUTSUARE JCT. - ASIKUMA JCT.
FOOTBRIDGE GENERAL VIEW
JAN. 2013
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale :1:200
2650
250 250
100 1002650
6150
150
19x300=5700 1200 20x300=600010 2400300 12900
1001600
100100 3500 100
1000
100
200
600
100
200
21x1
50=3
150
20x1
50=3
000
150
6150
176001200 15200 1200
200 2000 200 200 2000 200
2400
1012
900
6000
1200
5700
300 16
00
2650
176001200 15200 1200
200 2000 200 200 2000 200
2400
1012
900
6000
1200
5700
30016
00
2650
3500
250035
002500
200
2000
200
2400
FOOTBRIDGE GENERAL VIEW
SIDE VIEW A-A
P L A N
6300
A
A
-
PART II
ASUTSUARE - AVEYIME ROAD
DRAWINGS
-
Asikuma JCT.
Asutsuare JCT.
Asutsuare
Aveyime
Kpong
Atimpoku
Juapong
Pedoe-Dufo
Frankadua
Osi-Abura
Kpalukope
AkuseVolivo
Volo
Dufor-Adidome
N2
N2
Volta
Volta
Project:
Scale : As Shown Sheet 1/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
LOCATION MAP
JAN. 2013
LOCATION MAP
S=1:5,000,000
Project:
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
GENERAL MAP DETAIL MAP S=1:300,000
-
Project:
Sheet 2/25
Description:GHANA HIGHWAY AUTHORITY
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: NotesJICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
ASUTSUARE - AVEYIME
PLAN & PROFILE (1/8)
OCT. 2012
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
Scale : As Shown
1. All dimensions are in metre.
-
Project:
Sheet 3/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
OCT. 2012
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
ASUTSUARE - AVEYIME
PLAN & PROFILE (2/8)
Scale : As Shown
1. All dimensions are in metre.
-
Project:
Sheet 4/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
OCT. 2012
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
ASUTSUARE - AVEYIME
PLAN & PROFILE (3/8)
Scale : As Shown
1. All dimensions are in metre.
-
Project:
Sheet 5/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
OCT. 2012
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
ASUTSUARE - AVEYIME
PLAN & PROFILE (4/8)
Scale : As Shown
1. All dimensions are in metre.
-
Project:
Sheet 6/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
OCT. 2012
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
ASUTSUARE - AVEYIME
PLAN & PROFILE (5/8)
Scale : As Shown
1. All dimensions are in metre.
-
Project:
Sheet 7/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
OCT. 2012
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
ASUTSUARE - AVEYIME
PLAN & PROFILE (6/8)
Scale : As Shown
1. All dimensions are in metre.
-
Project:
Sheet 8/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
OCT. 2012
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
ASUTSUARE - AVEYIME
PLAN & PROFILE (7/8)
Scale : As Shown
1. All dimensions are in metre.
-
Project:
Sheet 9/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
OCT. 2012
PLANS=1:10,000
PROFILEH=1:10,000 V=1: 1,000
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
ASUTSUARE - AVEYIME
PLAN & PROFILE (8/8)
Scale : As Shown
1. All dimensions are in metre.
-
Project:
Scale : 1:100 Sheet 10/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in millimetre.
ASUTSUARE - AVEYIME
TYPICAL CROSS-SECTION
JAN. 2013
TYPICAL CROSS-SECTIONS=1:100
Project:
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
-
STA =0+200.000
STA =0+400.000
STA =0+600.000
STA =0+800.000
STA =1+000.000
STA =1+200.000
STA =1+400.000
STA =1+600.000
STA =1+800.000
STA =2+000.000
Project:
Sheet 11/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in metre.
ASUTSUARE - AVEYIME
CROSS SECTION (1/13)
JAN. 2013
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
-
STA =2+200.000
STA =2+400.000
STA =2+600.000
STA =2+800.000
STA =3+000.000
STA =3+200.000
STA =3+400.000
STA =3+600.000
STA =3+800.000
STA =4+000.000
Project:
Sheet 12/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (2/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =4+200.000
STA =4+400.000
STA =4+600.000
STA =4+800.000
STA =5+000.000
STA =5+200.000
STA =5+400.000
STA =5+600.000
STA =5+800.000
STA =6+000.000
Project:
Sheet 13/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (3/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =6+200.000
STA =6+400.000
STA =6+600.000
STA =6+800.000
STA =7+000.000
STA =7+200.000
STA =7+400.000
STA =7+600.000
STA =7+800.000
STA =8+000.000
Project:
Sheet 14/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (4/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =8+200.000
STA =8+400.000
STA =8+600.000
STA =8+800.000
STA =9+000.000
STA =9+200.000
STA =9+400.000
STA =9+600.000
STA =9+800.000
STA =10+000.000
Project:
Sheet 15/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (5/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =10+200.000
STA =10+400.000
STA =10+600.000
STA =10+800.000
STA =11+000.000
STA =11+200.000
STA =11+400.000
STA =11+600.000
STA =11+800.000
STA =12+000.000
Project:
Sheet 16/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (6/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =12+200.000
STA =12+400.000
STA =12+600.000
STA =12+800.000
STA =13+000.000
STA =13+200.000
STA =13+400.000
STA =13+600.000
STA =13+800.000
STA =14+000.000
Project:
Sheet 17/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (7/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =14+200.000
STA =14+400.000
STA =14+600.000
STA =14+800.000
STA =15+000.000
STA =15+200.000
STA =15+400.000
STA =15+600.000
STA =15+800.000
STA =16+000.000
Project:
Sheet 18/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (8/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =16+200.000
STA =16+400.000
STA =16+600.000
STA =16+800.000
STA =17+000.000
STA =17+200.000
STA =17+400.000
STA =17+600.000
STA =17+800.000
STA =18+000.000
Project:
Sheet 19/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (9/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =18+200.000
STA =18+400.000
STA =18+600.000
STA =18+800.000
STA =19+000.000
STA =19+200.000
STA =19+400.000
STA =19+600.000
STA =19+800.000
Project:
Sheet 20/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (10/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =20+000.000
STA =20+200.000
STA =20+400.000
STA =20+600.000
STA =20+800.000
STA =21+000.000
STA =21+200.000
STA =21+400.000
STA =21+600.000
Project:
Sheet 21/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (11/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =21+800.000
STA =22+000.000
STA =22+200.000
STA =22+400.000
STA =22+600.000
STA =22+800.000
STA =23+000.000
STA =23+200.000
STA =23+400.000
Project:
Sheet 22/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (12/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
STA =23+600.000
STA =23+800.000
STA =24+000.000
STA =24+200.000
STA =24+400.000
Project:
Sheet 23/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
ASUTSUARE - AVEYIME
CROSS SECTION (13/13)
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale : 1:200
1. All dimensions are in metre.
JAN. 2013
-
Project:
Sheet 24/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in mm.
ASUTSUARE-AVEYIME
CULVERTS LOCATION
JAN. 2013
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
Scale :NTS
CULVERTS LOCATION
TYPE A
H
B
TYPE B
H
B B
TYPE C
D
D
TYPE D
D
Asutsuare - Aveyime Road
Station Culvert Size Remarks1 No.0+520 Box 1 - B3.1 H2.3 Type A (Box)2 No.1+747 Pipe 1 - D900 Type C (Pipe)3 No.2+450 Pipe 1 - D900 Type C (Pipe)4 No.3+540 Pipe 1 - D900 Type C (Pipe)5 No.3+920 Pipe 1 - D900 Type C (Pipe)6 No.6+550 Pipe 1 - D900 Type C (Pipe)7 No.8+310 Pipe 1 - D900 Type C (Pipe)8 No.8+950 Pipe 1 - D900 Type C (Pipe)9 No.9+264 Pipe 1 - D900 Type C (Pipe)10 No.9+350 Pipe 1 - D900 Type C (Pipe)11 No.10+300 Pipe 1 - D900 Type C (Pipe)12 N0.14+850 Box 2 - B2.5 H3.3 Type B (Box)13 No.15+405 Pipe 2 - D900 Type D (Pipe)14 No.17+710 Pipe 2 - D1700 Type D (Pipe)15 No.17+932 Pipe 2 - D900 Type D (Pipe)16 No.18+750 Pipe 1 - D900 Type C (Pipe)17 No.18+990 Box 1 - B1.0 H1.0 Type A (Box)18 No.20+294 Box 1 - B1.0 H1.0 Type A (Box)19 No.20+937 Box 1 - B1.0 H1.0 Type A (Box)20 No.21+350 Box 1 - B1.0 H1.0 Type A (Box)21 No.21+658 Box 1 - B1.0 H1.0 Type A (Box)22 No.22+174 Box 1 - B1.0 H1.0 Type A (Box)23 No.22+281 Box 1 - B1.0 H1.0 Type A (Box)
NoteDimensions of Box Culvert are in metersDimensions of Pipe Culvert are in millimeters
-
Project:
Scale : 1:200 Sheet 25/25
Description:
Revision
Rev. by: Date: Sign:Rev. no:
Signature:
Signature:
Signature:Drawn by:
Checked by:
Designed by: Notes
1. All dimensions are in millimetre.
GENERAL PLAN OF BOX CULVERT
ACROSS LUPE RIVER
JAN. 2013
GENERAL PLAN OF BOX CULVERT ACROSS LUPE RIVER S=1:200
Project:
GHANA HIGHWAY AUTHORITY
JICA PREPARATORY SURVEY ON EASTERN
CORRIDOR DEVELOPMENT PROJECT IN THE
REPUBLIC OF GHANA
REPUBLIC OF GHANAMINISTRY OF ROADS AND HIGHWAYS
(B2.50 X H3.30 @2)
SECTION A-A INLET DETAIL
PLAN
CoverDRAWING TITLEPART I NEWROAD BETWEEN ASUTSUARE JCT. – ASIKUMAJCT.DRAWINGS1. LOCATION MAP2. PLANS AND PROFILES3. TYPICAL CROSS SENTION4. GENERAL PLANS OF BRIDGES5. CROSS SECTIONS6. INTERSECTION DESIGNS7. CULVERTS LOCATION8. BUS BAY LAYOUT9. TOLL BOOTH LAYOUT10. FOOTBRIDGE
PART II ASUTSUARE - AVEYIME ROAD1. LOCATION MAP2. PLANS AND PROFILES3. TYPICAL CROSS SENTION4. CROSS SECTIONS5. CULVERTS LOCATION6. GENERAL PLAN OF CULVERT
HistoryItem_V1 AddMaskingTape 範囲: 現在のページ マスク座標: 横方向, 縦方向オフセット 1062.01, 9.29 幅 118.66 高さ 128.55 ポイント オリジナル: 左下
1 0 BL Both 41 CurrentPage 99
CurrentAVDoc
1062.0081 9.2912 118.6602 128.5485
QITE_QuiteImposingPlus2 QI+ 2.1a QI+ 2 1
0 112 0 1
1
HistoryList_V1 qi2base