Improving safety and environmental outcomes through data analysis – a shared responsibility Stuart Smith AIChECCPS Asia Pacific Conference Tuesday, 10 February 2015

Upload: others

Post on 03-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2

Improving safety and environmental outcomes through data analysis – a shared responsibility 

Stuart Smith

AIChE‐CCPS Asia Pacific ConferenceTuesday, 10 February 2015

Page 2: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2

Notifiable incidents 

2

~ NOPSEMA

Notifiable incidents

.... Q)

.c E ::J z

500

400

300

200

100

2005 2006 2007 2008 2009 2010

Hours (millions) 16

14

12

10

8

6

4

2

_j_.__...._LJ.......J.__l_~ o

2011 2012 2013 2014

Reportable EM incidents - Dangerous occurrences - Accidents --Total hours worked

----

Page 3: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2

Dangerous occurrences

3

~ NOPSEMA

Dangerous occurrences- unplanned events, SCE* damage, other

14

12

VI ..... :::1

10 0

.s::. 8 c:

0

-E 6 ..... Q) Q. 4 Q) .... Ill 0::: 2

0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

--unplanned event- implement ERP --Damage to safety-crit ical equipment

Other kind needing immediate investigat ion

Note: SC£ refers to safety-critical equipment. ----

Page 4: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2

Root causes of OHS reportable incidents

4

Page 5: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2

Hydrocarbon releases

5

~ NOPSEMA ----Hydrocarbon releases

2.5

2.0 ~ :J 0

.£: 1.5 c 0 -·-E 1.0 .... QJ a. QJ

1;; 0.5 0:::

2005 2006 2007 2008 2009 2010 2011 2012 2013 2014

Total HC liquid re leases - r ota I HC gas re leases

Page 6: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2

International benchmarking‐Hydrocarbon gas releases

6

Page 7: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2

Injuries

7

~ NOPSEMA

Total recordable cases (TRCs) - injuries

15

~ 12 ::;)

0 ~

c: 0

8 .E .... Ql 0. Ql 4 -"' a::

0

2005 2005 2007 2008 2009 2010 2011 2012 2013 2014

Note: Total recordable cases is the sum of fatalities, major injuries, L ns {lost time injuries}, A Dis (alternative duties injuries) and Mns (medical treatment injuries)

----

Page 8: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2

International benchmarking‐Injury rates

8

Page 9: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2

Assessment and inspection

9Date

~ NOPSEMA

Assessments notified 600

500

400

1l 300 E :> z 200

100

0

2005 2006 2007 2008 2009 2010 2011

Note: Assessments where NOPSEMA has formally notified the duty holder in writ ing of a decision.

2012 2013

PSZ

Only indudes assessments that have been notified and completed (i.e. excludes those in progress and recalled/cancelled)

Inspections

250

200

150 :;; ..0 E :> 100 z

50

0 2005 2006 2007 2008 2009 2010 2011 2012 2013

• OHS WI

----

2014

2014

Page 10: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2

Enforcement 

10

~ NOPSEMA

Enforcement actions

lri ..c E ::J z

120

100

80

50

40

20

0

2005 2006 2007

- Enforcements

2008 2009

Note: Excludes verbal warnings/advice, directions and invest igation notices

2010 2011 2012 2013

Total hours worked

Hours (millions)

2014

16

14

12

10

8

6

4

2

0

----

Page 11: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2

Areas for continued focus

11

• Performance standards

• Management of change 

• Emergency response arrangements

• Blow Out Preventers and associated well control equipment

• Consultation

Page 12: Improving safety and environmental through data analysis ...€¦ · Stuart Smith AIChE‐CCPS Asia Pacific Conference Tuesday, 10 February 2015. Notifiable incidents 2