improving productivity using fme workbench

19
Improving Productivity Using FME Workbench Robert Schultz Heidi Lee Geomatics Coordinator Geomatics Technologist RCMP E Division RCMP E Division April 27, 2012

Upload: safe-software

Post on 21-Jun-2015

2.583 views

Category:

Technology


2 download

DESCRIPTION

Presented by Robert Schultz & Heidi Lee, RCMP E Division The RCMP Geomatics and Mapping Unit recently deployed FME Workbench as part of our geo-spatial data processing and distribution capabilities. FME has provided us with the capability to run many data processing work flows simultaneously using multiple inputs and outputs with varying file and field formats. Using examples of our FME models, we will demonstrate how FME has increased our productivity by streamlining our work flows, improving QA/QC and reducing the amount of time to respond to mapping and data requests. As well, we will discuss the challenges we encountered, highlighting lessons learned. Specific examples will include the production of map data for dispatch centres and mobile data terminals and the mapping of vehicle GPS logs.

TRANSCRIPT

Page 1: Improving Productivity Using FME Workbench

Improving Productivity Using FME WorkbenchRobert Schultz Heidi LeeGeomatics Coordinator Geomatics TechnologistRCMP E Division RCMP E Division

April 27, 2012

Page 2: Improving Productivity Using FME Workbench

Improving Productivity Using FME Workbench

Overview RCMP Geomatics

PRIME Map Data Updates

GPS Log Mapping

Wrap Up and Questions

Page 3: Improving Productivity Using FME Workbench

RCMP Geomatics and Mapping

Provide Geo-Spatial Data and Analytical Services Analytical and Administrative Mapping Server Application Development Advice and Guidance – SME Maintenance of Province Wide Base Map Resolving Address Validation Issues Production of Custom Map Data Mapping GPS Logs

Page 4: Improving Productivity Using FME Workbench

Improving Productivity Using FME Workbench

PRIME Map Data Updates

GPS Log Mapping

Page 5: Improving Productivity Using FME Workbench

PRIME Map Data Updates

PRIME Police Records Information Management Environment

Dispatch and Record Management

Page 6: Improving Productivity Using FME Workbench

PRIME Map Data Updates

Page 7: Improving Productivity Using FME Workbench

PRIME Map Data Updates

Page 8: Improving Productivity Using FME Workbench

PRIME Map Data Updates

Page 9: Improving Productivity Using FME Workbench

PRIME Map Data Updates

Page 10: Improving Productivity Using FME Workbench

PRIME Map Data Updates

Page 11: Improving Productivity Using FME Workbench

GPS Log Mapping

Police Cars Equipped with GPS Receivers Facilitates Dispatch Better Geographic Distribution

Location History is Logged

Page 12: Improving Productivity Using FME Workbench

GPS Log Mapping

Page 13: Improving Productivity Using FME Workbench

GPS Log Mapping

Size of GPS Logs

Typical log has 5 – 15 thousand records

Log for one server for an entire day can exceed 400,000 records

Page 14: Improving Productivity Using FME Workbench

GPS Log Mapping

Page 15: Improving Productivity Using FME Workbench

GPS Log Mapping

Variable Field Formats As hardware was upgraded, the GPS Time field

format began to change

Field values went from 5 to 6 characters 5 Characters = Seconds from UTC 6 Character = HHMMSS

Page 16: Improving Productivity Using FME Workbench

GPS Log Mapping

The addition of decimals complicated things Seconds

12345 5 characters 12345. 6 characters

HHMMSS 123456 6 characters 123456. 7 characters 123456.000 10 characters

Resulted in using TWO TestFilter transformers

Page 17: Improving Productivity Using FME Workbench

GPS Log Mapping

Page 18: Improving Productivity Using FME Workbench

Improving Productivity Using FME Workbench

Simplified Data Processing

Handles Variable Field Formats

Handles Large Files

Allows Timely Turnaround

Page 19: Improving Productivity Using FME Workbench

Thank You!

Questions?

For more information:

[email protected]

[email protected]