improved refractories for slagging gasifiers in igcc power systems

29
Improved Refractories for Slagging Gasifiers in IGCC Power Systems Cynthia P. Dogan, Kyei-Sing Kwong, James P. Bennett and Richard E. Chinn Albany Research Center U.S. Department of Energy/Office of Fossil Energy 17 th Annual Conference on Fossil Energy Materials Baltimore, MD April 22-24, 2003

Upload: duongtuong

Post on 28-Dec-2016

223 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

Improved Refractories for Slagging Gasifiers in IGCC Power Systems

Cynthia P. Dogan, Kyei-Sing Kwong,James P. Bennett and Richard E. Chinn

Albany Research CenterU.S. Department of Energy/Office of Fossil Energy

17th Annual Conference on Fossil Energy MaterialsBaltimore, MDApril 22-24, 2003

Page 2: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

Electricity

Coal

Petroleum Coke

Refinery Co-products

Steam

Syngas

Particulate Removal

Syngas Conversion

Total Package

Gasifier

Slag/Soot

Steam

Combustion Turbine

Steam Turbine

Bac

k-up

/ Pe

akin

g Fu

el

Solids Co-products

Sulfur

CO2 & Sulfur

Removal

CO2

Gasification

Chemicals

Oxygen

Page 3: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Material Challenges Inherent to Slagging Gasifier Technology

• Operating Temperatures of 1250° to 1600°C.

• Thermal Cycling.• Alternating Reducing and

Oxidizing Environment.• Corrosive Slags of Variable

Chemistry.• Corrosive Gases.• Pressures ≥ 400 psi.

Page 4: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Gasifier Containment Strategy

Refractory Lining

Steel Shell

Flowing Slag

Thermocouple

Page 5: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Current “best” refractories last 4 to 18 months, with a replacement cost of up to $1,000,000 and 2-3 weeks downtime.

Page 6: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Current “best” thermocouples do not survive more than a few days

of gasifier operation

Page 7: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Gasifier manufacturers and operators list increased refractory lifetime as one of THE most important needs of the industry.

Page 8: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Project Research Goals:

• Enhance gasifier reliability and economics through the development of– Improved refractory materials and repair

techniques for longer service life.– Longer-life thermocouple assemblies for more

reliable temperature control.

Page 9: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Research Approach

• Post-mortem evaluation of spent materials to identify failure mechanisms.

• Engineer new materials capable of resisting failure, and test in laboratory.

• Pilot-scale and/or commercial-scale testing.

Page 10: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories: Post-mortem Evaluation

Page 11: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories: Post-mortem Evaluation

Page 12: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories Solution:Reduce Slag Penetration and Attack

Page 13: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories Solution

Engineer the matrix composition to encourage reaction with the slag, causing the slag to solidify at the surface of the refractory.

Page 14: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories Solution

ARC’s Improved Refractory Current Industry Best

Page 15: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories SolutionOptimize Composition for Chemical,

Mechanical, & Thermal Stability

Page 16: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories SolutionIn collaboration with ANH Refractories, Inc., scale-up production in a commercial setting

Page 17: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories SolutionExpanded testing for chemical, mechanical

& thermal stability

Page 18: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories Solution:Rotary Kiln Exposure Test

• > 1650° C• 5 hour exposure• Coal Slag from a

commercial gasifier

Page 19: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories Solution:Rotary Kiln Exposure Test

ARC/ANH Refractory Commercial High-Cr2O3 Refractory

Page 20: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories Solution:Rotary Kiln Exposure Test

Page 21: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories Solution:Next Step

Complete proof-of-concept testing in preparation for placing test panels in commercial gasifiers in early Fall.

Page 22: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Refractories SolutionNext Step: Non-Chrome Alternatives

Page 23: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Thermocouple:Post-mortem Evaluation

Two primary failure mechanisms:•Mechanical failure•Slag penetration and attack

Page 24: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Thermocouple SolutionCreate a more corrosion-resistant thermocouple protection system through the optimization of the ceramic sheath and the development of an improved filler material.

Filler

Ceramic Sheath

Page 25: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Thermocouple Solution:Coatings

SiO2 penetration from the slag “Densified Surface

Page 26: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Thermocouple Solution:Improved Filler Material

An improved filler material has been developed, along with a dry-pressing method of manufacture that can be readily adapted to a commercial setting.

Page 27: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Thermocouple Solution:Next Step

In collaboration with our industrial partners, manufacture thermocouple assemblies for proof-of-concept testing in working gasifiers

Page 28: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Conclusions

• A modified high-chrome refractory has been developed at the Albany Research Center that shows improved performance in simulated slagging gasifier environments.

• A thermocouple protection assembly is being designed for longer life in a slagging gasifier environment.

Page 29: Improved Refractories for Slagging Gasifiers in IGCC Power Systems

FY 2002 On-site ReviewAugust 20-21, 2002

FY 2002 On-site ReviewAugust 20-21, 2002

17th Annual Conference on Fossil Energy MaterialsApril 22 - 24, 2003

Thank You!