important things to remember during the ...important things to remember during the installation 1 of...
TRANSCRIPT
-
CHAUDHOT
FROIDCOLD
105180_QUICK-START-1_RevA
1355, 2nd Street, Industrial Park, Sainte-Marie (Québec) G6E 1G9Tel: 418 387-9090 or 1 877 465-2542 | Fax: 418 387-9089 | [email protected] | kaliastyle.com
QUIC
K-ST
ART
GUID
E1Important to follow the installation manual(s).
2Thermostatic valves manages the temperature only. Depending on which kit you’re installing, volume controls, 2-way diverter or 3-way diverter are necessary to manage water output.
3The plastic cover must be used to determine the depth of the valve and the diameter of the cut-out hole.
4Starting with the color line on the cartridge, align all the color lines found on the subsequent parts.
5Hot water supply on left and cold water supply on right.
8Before closing the walls, test the temperature manageability and watch for leaks.
Call Kalia if you need assistance or if you have any questions: 1-877-465-2542 or email at [email protected].
Please have in hand your product codes or installation manuals.
KEEP ALL INSTALLATION INSTRUCTION MANUALS FOR THE END-USER IF NEEDED FOR FUTURE REFERENCE.
CHAUDHOT
FROIDCOLD
6Remove cartridge and check valves before welding copper conduits (allow to cool).
7Purge lines to clear debris then reinstall or replace the cartridge.
MAX
MIN
IMPORTANT THINGS TO REMEMBER DURING THE INSTALLATION OF YOUR SHOWER SYSTEM1
MAX
MIN
Position fermée /Closed position
Pour sélecteur :/For diverter:104240, 104268 104269, 104270
Lignes de couleurs/Color lines
2019/06