implementing the water framework directive at an environmental and water directorate, hungary
DESCRIPTION
Implementing the Water Framework Directive at an Environmental and Water Directorate, Hungary. László Kóthay director Trans-Tisza Region Environmental and Water Directorate www.tikovizig.hu. Statements of the Water Framework Directive. - PowerPoint PPT PresentationTRANSCRIPT
Implementing the Water Framework Directive at an Environmental and
Water Directorate, Hungary
László Kóthaydirector
Trans-Tisza Region Environmental and Water Directorate
www.tikovizig.hu
Statements of the Water Framework Directive
Water is not a commercial product like any other but, rather, a heritage which must be protected, defended and treated as such.
The purpose of this Directive is to establish a framework for the protection of inland surface waters, transitional waters, coastal waters and groundwater.
Our mission is in the scope of the WFD To prevent the deterioration of aquatic ecosystems Long-term protection of available water resources Enhanced protection of the aquatic environment To ensure the progressive reduction of pollution of surface-
and groundwater To achieve the „good water status” until 2015
Aims and requirements
To reach „good water status” Water quality protection should be more coordinated
with water resources management The unit of the water management is the river basin To make a plan for river basin management Have to observe the ongoing processes (monitoring) To apply the economic analysis in the decision making
procedure of river basin management, insist on the Principle of „Polluter pays”
Appearance of recovery of costs for water services To apply the Principle of subsidiarity
Regulation of River-basin management
To determinate the river basin districts
Identification of the appropriate competent co-coordinating authorities
To ensure the fulfill of the WFD requirements and to coordinate the programmes of measures
Tasks to complete in the river basin areas
To determinate the protected areas To identify drinking water bodies To determinate surface water bodies and groundwater bodies,
and to establish the monitoring system To ensure the progressive reduction of pollution of surface-
and groundwater To enhance the safety of flood-protection To identify the point and diffuse pollution sources To regulate the emission limit values To prepare the programme of measures to the period of 2000-
2015 River basin management approach instead of member states’
borders
Black Sea
Countries in the Danube River Basin
Danube-river basin
13 countries
. Hungary is situated within the drainage basin of the River Danube, in the lowest
part of the Carpathian Basin
Flood plains covering close to one-quarter of the country’s territory, affecting
2,5 million inhabitants in 700 settlements.
95% of the surface water resources of the country originate abroad
Normal mean flow in the major Hungarian rivers (m3/s)
• Groundwater resources are available almost everywhere• Thick alluvial deposits in the major part of the country,• Karst aquifers in the mountainous regions
• Groundwater resources are available almost everywhere• Thick alluvial deposits in the major part of the country,• Karst aquifers in the mountainous regions
GROUNDWATER AQUIFERS
EXTENDED USE OF GROUNDWATER
Except cooling water, 2/3 of the total use is from groundwater
Ipar0
100
200
300
400
500
600
700
public
industry
Fishponds, animal breeding
irrigation
Surface water
Bank filt. wat.Karstic water
Groundw. from porous aquifer
Total
95 % of the drinking water is from groundwater
Administrative setup
Agriculture and Rural Development
M. of Health
M. of Interieur M. of Foreign Affairs
M. of Economy and Transp. M. of Finance
M. of JusticeInterministerial Committee
for the implementation of WFD
Ministry of Environment and Water
NGOs
The organizational and institutional system needed for the fulfillment of WFD
4 large planning units for the international coordination and reporting to the EU
6
7
21
16
10
11
5
174 15
9
14
3
12
18
13
8
18 planning subunit for working out
The main coordinator of the reporting is the General Directorate for Environment, Nature and Water, with the participation of
Environmental and Water Directorates, the Environmental Authorities and National Park Directorates, which are
coordinating there own tasks, too
Tasks related to the characterisation of surface waters
Preliminary designation of surface water bodies according to the System ARevision of digital maps containing water courses
Extension of surface water typology
Preliminary assessment of• human activities• hydrological and morfological impactsDetermination of reference conditions and limit values
Information on the ecological status • hydrological parameters• morphological and biological parameters
Designation and characterisation of water bodies based on the above
Assessment of the impact of human activities on the chemical status
2002 2003 2004 Tasks
Tasks related to the characterisation of groundwaters
2002 2003 2004 Tasks
Preliminary designation of water bodies based on hydrogeological characteristicsInformation on human activities (pressures)
Estimation of the available groundwater resources
Actual hidrological situation (hidrological survey)
Co-ordination and summary of th above works
Survey of water quality changes due to human activities
Selection of water bodies in critical status,further charactrisation
Economic analysis
20 0 20 40 60 80 100 Kilometers
A vízfolyások B-típusú tipológiáját meghatározó részterületek Aquatic landscapes, determining the B-typology of rivers in Hungary
Budapesti Mûszaki és Közgazdaságtudományi EgyetemViziközmû és Környezetmérnöki Tanszék
A mederanyagot meghatározó fed?réteg szemösszetételegainsize classes of the covering layers, determining river substratum:durva/coarseközepes/mediumfinom/fine
Al-ökorégiók/sub-ecoregions:meszes hegyvidék/calcerous mountainsszilikátos hegyvidék/siliceous mountainsmeszes dombvidék/calcerous hilly regionsmeszes síkvidék/calcerous plainstõzeges (szerves) területek/peaty (organic) regions
A mederanyagot meghatározó fedõréteg szemösszetételegainsize classes of the covering layers, determining river substratum:
Aquatic landscapes
Topography (landscape, elevation, slope)
Geology (hydrogeology)
sub-ecoregions
Substratum
aquatic landscapes
B-typology
Size of the catchment
B - typology
Typology for rivers
Sub-ecoregions Substratum Size of the catchment
Organic (peaty) regions small medium
coarse small, medium,
Siliceous mountainous regions
Calcerous mountainous regions coarse small, medium,
Calcerous hilly regions coarse small medium large very large
medium - fine small, medium, large
Calcerous plains coarsesmall medium large, very large,
medium - fine small, small, medium, large, very large,
River types
River sections according to types
Arrangement of streams in the point of human activities’ impact
Red: heavily modified water bodies
Pink: possibly heavily modified water bodies
Blue: artificial water bodies
Green: natural water bodies
Rivers’ arrangement
Suggestions of reference water bodies
Hierarchical approach:
• geological structures• hydraulic boundaries
• temperature• flow regime
Mainly suitable for quantitative analysis 3D processing with GIS
Identification of groundwater bodies
1st layer: mountains (surface catchment, geological units)
and basins (downward and upward flow)
Identification of groundwater bodies
2nd layer: thermal water in porous aquifers
Identification of groundwater bodies
Identification of groundwater bodies
Identification of groundwater bodies
3rd layer: Water bodies in cold and thermal karstic aquifers
Tasks of the Water Resources Tasks of the Water Resources Management and River Basin Management and River Basin
Development Group, which Development Group, which was was established inside the TIKÖVIZIG:established inside the TIKÖVIZIG:
According to WFDAccording to WFD To estimate the status of the water bodiesTo estimate the status of the water bodies To determinate the sub-basinsTo determinate the sub-basins Data processing of water managementData processing of water management Economic analysis to achieve the target Economic analysis to achieve the target
statusstatus Controlling and processing the monitoring Controlling and processing the monitoring
databasedatabase Processing, controlling and analProcessing, controlling and analyysing the sing the
water production and water quality database water production and water quality database of groundwater-usersof groundwater-users
According to the Act 2003/120 (Hungary)
• Preparation the programme of measures to achieve the good water status, including the protection of water resources and sustainable using• Preparation of water management plans• To retain the possibilities of water utilization, observation and evaluation of status, analysis the impact of human activity• Reasonable use of water resources, application of legal and economic regulations (Water Resources Charge)
Determination, marking and Determination, marking and standardization of the groundwater standardization of the groundwater bodbodiesies
Assembling the Assembling the ssub-basin district ub-basin district plansplans
AnalAnalyysis of loads and effects causing sis of loads and effects causing hydromorphological and water hydromorphological and water chemical changeschemical changes (natural, artificial, (natural, artificial, and heavily modifiedand heavily modified statuses)statuses)
Integration of loads into a MS SQL Integration of loads into a MS SQL database system, which are: water database system, which are: water intakes, water inflows, inter-basin intakes, water inflows, inter-basin diversions, objects and activities diversions, objects and activities influencing the flows and outflowsinfluencing the flows and outflows
According to the Act 2003/120 (HU)
Present status of the execution of Present status of the execution of WFD requirements related to WFD requirements related to surface watersurface water
Deadline: 31. December 2004Deadline: 31. December 2004
Fulfillment: esurable with hard workFulfillment: esurable with hard work
Integration of VIZIR database into the recently Integration of VIZIR database into the recently used water management GIS system based on used water management GIS system based on ArcGIS.ArcGIS.
Arrangements, maintenance taskArrangements, maintenance taskss for achieving for achieving good water status, keeping records, good water status, keeping records, designatingdesignating protective areas, reporting the protective areas, reporting the performanceperformance..
Reshaping the recently active hydrographic Reshaping the recently active hydrographic monitoring system which consists 10monitoring system which consists 10..000 000 objects according to the Water Framework objects according to the Water Framework DirectiveDirective..
Organizing informative and consultative forums Organizing informative and consultative forums in river basin management plansin river basin management plans..
Jobs to do
GroundwatersGroundwaters
GroundwatersGroundwaters
Preliminary characterization (done)Preliminary characterization (done)
Status and borders of groundwater bodies or Status and borders of groundwater bodies or body-groups (done)body-groups (done)
Description of groundwater bodies (in process)Description of groundwater bodies (in process)
General characterization of overlying strata (in General characterization of overlying strata (in process)process)
DDetermination of etermination of those groundwater bodies for those groundwater bodies for which there are directly dependent surface which there are directly dependent surface water ecosystems or terrestrial ecosystemswater ecosystems or terrestrial ecosystems (in (in process)process)
Public information and consultationPublic information and consultationaccording to WFDaccording to WFD
To keep consultations to the water-usersTo keep consultations to the water-users To introduce To introduce a timetable and work a timetable and work
programme for the production of the plan,programme for the production of the plan, at at least three years before the beginning of the least three years before the beginning of the period to which the plan refers;period to which the plan refers;
To introduce the tasks and water To introduce the tasks and water management problems to solve management problems to solve at least at least 22 years before the beginning of the period to years before the beginning of the period to which the plan referswhich the plan refers
To introduce this programme-plan at least a To introduce this programme-plan at least a year beforeyear before
To introduce the plan by the MinistryTo introduce the plan by the Ministry To ensure To ensure at least six months to comment in at least six months to comment in
writing on those documents writing on those documents
EURO INBO, Krakow Event
THANK YOU FORYOUR KIND ATTENTION!
László Kóthay