implementation update aashto rac meeting, july 22, 2014

13
SHRP2 Implementation | July 22, 2014 Implementation Update AASHTO RAC Meeting, July 22, 2014 Debra Elston, Director, Office of Corporate Research, Technology, and Innovation Management, FHWA Jim McDonnell, Program Director, Engineering, AASHTO

Upload: uttara

Post on 04-Jan-2016

50 views

Category:

Documents


5 download

DESCRIPTION

Implementation Update AASHTO RAC Meeting, July 22, 2014 Debra Elston, Director, Office of Corporate Research, Technology, and Innovation Management, FHWA Jim McDonnell , Program Director, Engineering, AASHTO. What we’ll cover. Implementation milestones SHRP2 budget - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

Implementation UpdateAASHTO RAC Meeting, July 22, 2014

Debra Elston, Director, Office of Corporate Research, Technology, and Innovation Management, FHWAJim McDonnell, Program Director, Engineering, AASHTO

Page 2: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

What we’ll cover

• Implementation milestones• SHRP2 budget• Project management system• Program evaluation• Implementation assistance update• Continual improvement• Next steps

Page 3: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

Implementation Milestones

Page 4: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

Implementation Status to Date

Of the more than 100 research projects, we are moving forward with 64 products in 42 distinct implementation efforts

SHRP2 Deployment Snapshot100+ Research projects Original projects undertaken by TRB

64 Implementable products As prioritized by FHWA and AASHTO

42 Total anticipated implementation efforts

64 products implemented as 42 products/product bundles

27 Efforts on the street 24 in IAP rounds 1 – 4 + 3 additional deployments = 64% deployment

15 Efforts remaining 36 percent remaining

12 Planned efforts 9 new products in rounds 5 & 6 + 3 non IAP

3 Product disposition TBD R01, R06F, C40

Page 5: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

Implementation Budget

$126.0

$5.0

$5.3$7.4

$12.5$11.8

SHRP2 Implementation Budget (in $M)

Product Development & Implementation * (75%)

Pre implementation (3%)

Communications & Out-reach (3%)

Program Administration (4%)

Contingency (8%)

FHWA/AASHTO Implemen-tation Staff (7%)

Focus Area BreakdownRenewal - $40.5Capacity - $24.6Reliability - $27.7Safety - $33.4

Page 6: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

Project Management and Tracking

• 2-pronged, quarterly tracking system in place– MS Project– Narrative, qualitative report

• Quarterly reporting structure– Universal template, Highlights, Challenges– Summary report per focus area per quarter

• Key highlights from first quarterly report – Example– Approaching milestone of 50000 trained in L12/32 TIM– Champions and opinion leaders identified for C06– Showcases, demos and workshops held for R04, R05, R09, R10

& R26

Page 7: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

SHRP2 Program Evaluation

Products

OutputsCompleted R&T

Implementation Activities (Workshops, Training,

Grants,Lead Adopters, etc.)

Knowledge DisseminationSpecification AdoptedChange in Behavior

Innovation Tested/Deployed

Saved Time, Money or Lives

Outcomes

Impacts/BenefitsSelect Product

Evaluations

Implementation Assistance

Results

Tracking System

SHRP2 Implementation | June 2014 7

Page 8: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

Implementation Assistance ProgramSo Far…• SHRP2 IAP projects underway in 48 states; more coming in round 4• Applications Received (Rounds 1-4): 414

– from 49 State DOTs + DC DOT– from 38 MPOs– from 10 tribes, 6 “others,” FHWA/FLH

• Awards (Rounds 1-3): 65 recipients received 146 awards (representing work on 180 projects*)

– 44 State DOTs + DC DOT– 16 MPOs– 1 tribe, 3 “others,” FHWA/FLH

• Beyond the IAP – successful implementation efforts ongoing in Traffic Incident Management (L12) – 41 states involved

• Thus, all 50 states + DC are engaged in SHRP2 implementation

Page 9: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

Implementation Assistance

SHRP2 Implementation | June 2014 9

Page 10: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

Implementation AssistanceRound 4

Economic Analysis Tools bundle – C03/11Advanced Travel Analysis Tools bundle – C10/04/05/16

Pavements: New Composite Pavement Systems – R21 Rapid Technologies to Enhance QC on Asphalt Pavements – R06C Tools to Improve PCC Pavement Smoothness During Construction – R06EStructures: Nondestructive Testing for Concrete Bridge Decks – R06A Nondestructive Testing for Tunnel Linings – R06G Service Life Design for Bridges – R19AProject Delivery: Managing Risk in Rapid Renewal Projects – R09 Innovative Strategies for Managing Complex Projects – R10

Reliability Data and Analysis Tools bundle – L02/05/07/08 (C11)

Concept to Countermeasure – Research to Deployment Using the SHRP2 Safety Databases

Page 11: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

Planning for more products

Product IPW IAP roundPlanWorks (C01) Fall 2014 Round 5Capacity Process Bundle (C02/08/09/12/15) Spring 2014 Round 5Service Limit State Design for Bridges (R19B) Fall 2014 Round 53D Utility Location Data Repository (R01A) Winter 2014 Rounds 5 & 6Utility Locating Technologies/Innovation in Locating Deep Utilities (R01B/C)

Winter 2014 Round 6

Techniques to Fingerprint Construction Materials (R06B)

Fall 2014 Round 6

Advanced Methods to Identifying Pavement Delamination (R06D)

Fall 2014 Round 6

WISE: Workzone Impact Estimation Software (R11)

Summer 2014 Round 6

Nondestructive Testing for Concrete Bridge Decks (R06A)

Winter 2013 Round 6

Round 5 – January 2015Round 6 – June 2015

Page 12: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

We are listening…

Challenge Solution Result

Engage transportation agencies in every state

State visits; increased targeted outreach and communication; better time intervals throughout IAP; examination of widest potential audience

As of Round 4, all but 2 AASHTO member departments have applied through the IAP. MPOs, local DOTs, and others are also applying.

Connect customers and facilitate peer-to-peer knowledge transfer

Updated GoSHRP2 site features In the Field section; commitment to contributing to peer exchange; updated contact info on site

More availability of user data and stronger linkage of peer connections

Streamline the post-selection IAP activities

Use lessons learned to standardize process

Expectations are managed, funds are allocated more timely, and projects are initiated quicker

Page 13: Implementation Update AASHTO RAC Meeting, July  22, 2014

SHRP2 Implementation | July 22, 2014

The future

• Continual process improvement• Coordination between AASHTO and FHWA• Keeping pace with product developments • Key successes• Safety implementation• Reauthorization• Questions, feedback from the Implementation

Advisory Committee• www.fhwa.dot.gov/goshrp2