imic discussion bob ross interconnectix business unit mentor graphics corporation ibis summit...
TRANSCRIPT
![Page 1: IMIC DISCUSSION Bob Ross Interconnectix Business Unit Mentor Graphics Corporation IBIS Summit Meeting, San Diego, CA December 7, 1998](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ec85503460f94bd4fc8/html5/thumbnails/1.jpg)
IMIC DISCUSSION
Bob Ross
Interconnectix Business Unit
Mentor Graphics Corporation
IBIS Summit Meeting, San Diego, CA
December 7, 1998
![Page 2: IMIC DISCUSSION Bob Ross Interconnectix Business Unit Mentor Graphics Corporation IBIS Summit Meeting, San Diego, CA December 7, 1998](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ec85503460f94bd4fc8/html5/thumbnails/2.jpg)
IBIS Status Update
JEDEC/IBIS Meeting» New Requirements& Needs» IMIC (I/O Interface Model for Integrated Circuits)
IBIS Version 3.2» Delay, Expected January 15, 1998 Ratification Vote» BIRD57 (for Bus Hold/Active Termination Extension)
– Consideration on December 18, 1998
– ibischk3.2 parser change
DesignCon99 IBIS Summit February 1, 1999» Accuracy Issues, Future Features, Booth
![Page 3: IMIC DISCUSSION Bob Ross Interconnectix Business Unit Mentor Graphics Corporation IBIS Summit Meeting, San Diego, CA December 7, 1998](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ec85503460f94bd4fc8/html5/thumbnails/3.jpg)
Why Consider IMIC?
Started 1996 to Enhance IBIS Version 2.1 by EIAJ I/O Project Modeling Group
Targeted to Future Needs, Protect Process, Expand to New Device Architectures
Mixture of IBIS and SPICE IBIS/EIAJ Meetings/Presentations 2/97, 6/97, 1/98,
6/98, 10/98 London IEC Meeting - Why IBIS & IMIC? POSSIBLE SOLUTIONS TO IBIS LIMITATIONS
![Page 4: IMIC DISCUSSION Bob Ross Interconnectix Business Unit Mentor Graphics Corporation IBIS Summit Meeting, San Diego, CA December 7, 1998](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ec85503460f94bd4fc8/html5/thumbnails/4.jpg)
Brief IMIC Overview EIAJ Slides From Older Presentations (separate
package)» Standard: http://tsc.eiaj.or.jp/tsc/SSC/iopg.htm
EIAJ Overview» Level 1: Signal Integrity» Level 2: Power Integrity» Level 3: Future EMI
Scope» Module (IBIS EBD)» IC (IBIS Component & Models)» Package (IBIS Package)
![Page 5: IMIC DISCUSSION Bob Ross Interconnectix Business Unit Mentor Graphics Corporation IBIS Summit Meeting, San Diego, CA December 7, 1998](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ec85503460f94bd4fc8/html5/thumbnails/5.jpg)
Brief IMIC Overview Cont’d Missing Information for Digital Simulators
» Model Type (must derive from other information)» Specs for Thresholds, Overshoots, Timing, etc.» Some Connection Information (explicit differential pins,
ground/power relations, etc.) IMIC: IBIS, SPICE & Table SPICE
» Buffer Models - Table SPICE Construction» Package/Module Models SPICE & .SUBCKT Calls» IBIS Style Shell» SPICE PWL Stimulus» TYP, SLOW, FAST Packages, Buffers, Stimulus
![Page 6: IMIC DISCUSSION Bob Ross Interconnectix Business Unit Mentor Graphics Corporation IBIS Summit Meeting, San Diego, CA December 7, 1998](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ec85503460f94bd4fc8/html5/thumbnails/6.jpg)
IBIS/IMIC Options Merge
» Complicates Well Accepted IBIS» Unacceptable Sacrifices in IBIS of IMIC» Actual Dual Support by EDA Vendors
Link» Leverage IBIS Specification & Acceptance & IMIC
Package, Buffer Details» IBIS “Submodel” & Package Extension?
Be Independent» Translator Path: IMIC to IBIS
![Page 7: IMIC DISCUSSION Bob Ross Interconnectix Business Unit Mentor Graphics Corporation IBIS Summit Meeting, San Diego, CA December 7, 1998](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ec85503460f94bd4fc8/html5/thumbnails/7.jpg)
Linkage Discussions
Package Model Linkage» IMIC Spice - Provides Format Convention
– Supports FAST, SLOW, TYP Packages
» Standard Spice Table Spice For Buffers
» Buffers by Construction for New Features– May Be Proprietary– May Be Complicated - Behavioral Approach in IBIS
Extensions May Still Be Adequate
» Single Complete Model by Construction & Scaling» Accuracy Details
![Page 8: IMIC DISCUSSION Bob Ross Interconnectix Business Unit Mentor Graphics Corporation IBIS Summit Meeting, San Diego, CA December 7, 1998](https://reader035.vdocuments.site/reader035/viewer/2022072015/56649ec85503460f94bd4fc8/html5/thumbnails/8.jpg)
Discussion
Study Group Participants» Stephen Peters, Raj Raghuram, Norio Matsui, Bob Ross» Others Welcome
Issues» Complexity» Support (IC & EDA Vendors)» Simulation Speed» Accuracy» Logistics» Incompatibilities?