imagebasic display print jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… ·...

57
( I I I I ___ IEST · Dtt is FINAL REPORT MAY 1964 Doiri'9raded at 12 year intervals DOD DJR -- -- Special handling required. Not releasable to foreign nationals except U. K, Australia and Canada By authority of CG DTC Dote: 12 May 1964 75 ·-: . . ::· .. (,. \...)... . ' ..... 'f l , . i..,.lr'l __.- -- - --; .·---, :l.ll<> _,. - '9!l""' ....... -, .... ";"' Oi""")t;tr,ootr r.._

Upload: others

Post on 28-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

(

I I I

I ~

AUTUM~ ~QL[) ___ ~ IEST ~3 ~ ~- · Dtt is "·r;;;~ ~ ~

FINAL REPORT

MAY

1964

Doiri'9raded at 1 2 year intervals ~ N~matically dedo~_j_!jed DOD DJR S200~l0. ----Special handling required. Not releasable to foreign nationals except U. K, Australia and Canada By authority of CG DTC Dote: 12 May 1964

;~~Y 6~:;~~ 75 ~-. -~ ~,~ ::~~~~'-~ri ~'JrQ'"" ·-: '\~. . . ::· .. ~ (,. \...)... . '

-~.,...._,. ..... -~ ~ 'f l • , . i..,.lr'l • __.- -- - --; .·---, -~r:r :l.ll<>

_,. -'9!l""' J~ ....... *~ -, .... ";"' ::t')r·::./~>;ri

Oi""")t;tr,ootr r.._ • ···-~

Page 2: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

l

r

---~~~:~ .... ____ .__ __ _

Deseret Test Center F1nal Raporc !EST 63-2

OTC·TEST•63·3·FR "AO 3'15779

!:ll~!mi~!IIJIII~llll I

AU!t}lN G 0 L D tU)

82 Pages

Classification of Pages

Secret Pages i through iv,

Prepared by

HEADQUARTERS DESERET TEST CENTER Fort Douglas, Utah

l through 30, A-5 through A-8, B-1 through B-12, C·l through C-12, F-5 and F-6

Unclassified Pages v ehrough x, A-1 through A-4, D-t, D-2, E-1, E-2, F-1 through F-4

Page 3: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

{

I

·uNCL/\SS\f\EO FOREI~ORD

1, (S) Deseret rest Center test 63-2, AUIU}rn GOLD (,), ~as cond~cced in the vicinity of the Hawaiian Islands during the period 3 Hay 1963 to 31 Nay 1963. The purpose of the test was to determine tl! degrea of penetratlon of representat•ve fleet ships, operating under three different matertal readiness conditions, by a s1mulant biological aerosol released from an operational weapon syste<'~.

2. (S) Authority for conducting the test is contained i~:

Letter, Chief of Naval Operations to Commanding Ceneral Deseret Test Center ~- Subject: Chemical-Biological Extracontinental Test Program, Navv Suoport for (S), dated 10 July 1962, SECRET ./

Document, Desaret !est Center Outline Plans for Testing in fY 1963, Des~ret Test Center (U), Fort Douglas l3, Utah, dated 25 May 1962, SECRET

3. (S) The test ~111a designed by the Oeseret Test Center, Fort Douglas, Utah. Various units from the Army, Navy, and ~!arines contributed support to the test program.

4. (S) Acknowledgement is made of the technical contribution of the U. S. Navy Department, Bureau of Ships, Final Report, Operation TRANSIT III. This document provided the basic concepts o~ which the AUTmm GOLD (U) <:est '.ii!S based,

UNCLASSIFIED

Page 4: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

SECTIO" l

INTRODUCTION

1,

2 •• ~

Test Program DTCTP 53-2, AUTU}~ GOLD (U), was conducted ~n es, consist of three trials each or nine trials total.

Page 5: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

----

the Navy Hark IV and the Army Hl7 prote<:t:i'le masks were ~est:ed to determine mask leakage.

----~---2 ___ .. --·-·

-- _," '.

Page 6: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

J 0 •

;

I

l

I

I

I

l I

I

I I

I

I

f

SECTION I:

ACCONPLISHNEt\T OF TEST OBJECTIVES

1. (U) INTRODUCTION

Th1s sect•on restates the test jbjectives as or~ginally presented in the AUTllilN GOLD (1.") Test Plan, dated 5 April 1963, and ind1cates the degree co which each object1ve was accom­pl~shed

2. (S) OBJECTIVES

1J "'l'o Ot:l ta.in ir.forrr.a~~cr. on t,;e a.egl"ee o[ ; enetration of nc.vc;;~ ,;ilips '-2 sin;ulG~nt .oio~ogiaaZ uen;::c;le ::~en re~eane<.o. [:r>om c..n ope:rati.onal type : eapon <':fStertl t.'1Ji~ea ~ne s~ps «P~ opcraoir.g un~er different r~eaaincns aondi tior:r,. n

a. This objective was accompl1shed. Data are reported and discussed on pages 18 to 23. Conclusions are presented on page 29.

2) "1'o esdmate the magnitude and ~'ersistenay of si~uZant oiologiaaZ aeroeots retained after conducting air wasl. G~nd hose down procedures."

b. This objectLVe was accompl1shed. Data are reported and discussed on pages 24 to 25. Conclusions are presented on page 29.

J) "To provide infomacion on tne ;;erformanae o;· the Partiahrome SeZeaticn Device ar.d ita com-ponents under- tl;e envir-ol".mental conditions o:f thiv t.ece."

c. This ObJective was accomplished. The results assocLated with this objective are not included in this report. Douglas Aircraft Company, under contract to Fort Detrick, has analyzed the data and submitted a report on 24 July 1963. Their report number is SH 44553. This final repcn:t conta:~.ns no furcher informatLon on this objective.

"':o evaluate ae l2":ac.! viot.cr~k-z,.aai rott.. c:r;emi­aaL pror;eatiue eq:.~?nent." •

d This objective was accompllshed within the limits of skill of particl{>ating personnel in fittiClg the H-17 and ~IV masks. Data and discussion are presented en pages 25, Dl, and D2.

'!"'-..,.._.... , I lilt\ I "1'1'\lrtr:n d This objective was accompllshed within the limits of skill of no~H~.M,.,M :::"·::-·' ,_ i'··•-- ·'·JJI)It..;LHtl~'{nt:tr n ........

Page 7: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

I

I

I

I

I

I

I

I

I

I

I

I I

I I I

I I

?F?FF PI -------~-a .:,;- • ;.,·_;.',"'

SECTIOt;; III

TEST PROCEDt:RES

1 .• gg_

All trtals of A~~u~ru GOLD (U) wece conduc~ea •n an appr:>:nmat:ely 60 mtles t~est-southwesc of the Hawauan Is

2. • ll!OLOG!CAL TRACER

3. rlfl VJEAPON SYSTE~!

base operatLons were Stac~on, Kaneohe, Hawati.

sea atea

a, The weapon system, conststing of an Aero 14B spray tank mounted on a A4B Jet aicccaft, was employed (see Ftgure 2) in all trials of AUTuCW GOLD (U) to s~mulate an actual bto al attack on a shtp or fleet of ships.

4, • TARGET SHIPS

a. The four targe~ shtps ltsted below were asstgnea by the U, S, Navy as typtcel operattonat fleet shtps. these ships ~reshown in F~gwtes ~ chrougn 7

Page 8: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

~------1 -, I I I -1 I I ~ I 1 c. I 1 0 .q: I I i:lLI I I ~ Q:: I I Q: .;t I r LLJ 1 I ct I I 0 I I "it I I

1 I

1 <t I --- ----'

Page 9: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

a Q

!j

• I

I

l

l

I

1 5.

' ' '

Tvpe :iumber ~

APA 215 1;55 Navart:o LST 1158 1:55 "hoga County DO 825 uss Carpenter DOG .13 l:SS iioel

b. Personnel on each ship uere briefed on proc.adures for p:ret:rial exercises and the need was stressed for actaining the three material readiness conditions dur~ng the pretrlal trainlng exer­cises and subsequent trLals, Ship personnel conducted these exercises and l.nspections prior to the AUTU~(N GOLD (tf) trials to determine each ship's capability co ful cono,Lcio~s u~der its present condit

men were trained du:ring

' : ;:r_,~ ... .,. '' '

----------

Page 10: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

)

• •

-· ,.

::

~

:!

• ..J w • 0 :X:

"' ,. . "' :> <

~

~ .

"' ~

" ~

0 u 1 0 ~ i

~ • • • ~

:.: ·- .•••• .:::-------· _. '. •

Page 11: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

I

JCP•I, OPG \ '- ,

UNCLASSiFitu DESEBET TEST CENTER TEST PLAN 63-2

REVISION 1

APRIL 1963

AUTUMN GOLD (Ul

RMSION 1

SPICW. lfANDI.INO IIQUII!D HOT IUIAWI.I! TO FOIIEION NATIONAl$ EXCEPT U, K., AUS. TIAL~AND CANADA IYfRoiiTY o" C:G ore tiA'R: 5 Aprlll'M:I

If j.ij

II I /J

/"i3

., /§ . ... - ... ~

l!! ' ' "

' ' . I~ ·- ... • I a

HEADQUAII.TE.IIS

DESERET TEST CENTER

FOtT DOUGLAS

UTAH DOWNQIADED AT 12 \'I!AiliHi!IVALS NOT AUTOMATICAIJ.Y DIQAS$1FIED

llOD 011 noo.1o Copy-;.,~ of 1dt!'Copfes

DTC 63-198

a

i }

) )

Page 12: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

• \.

'r ......... ,JCP-1, OPG i r

VI. • OBJECTIVES

E. To t~ain persorJtel in operational procedures in preparation £or .future trial.s

VII •

Page 13: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

PART I

DEFENSIVE TESTS (Secret}

UNCL~SS\HEO

I. (U} TITLE

frotective Masks M17 and Mark V.

II. • CB.m::TIVES

The objectives of this test are as follows:

A. To obtain data on the leakage of the M17 and Mark V protective masks under operational conditions

B. To obtain data on the two methods of determining mask leakage.

III. • PROCEDURES

In each trial of AUTUJ.!N GOLD, 32 test subjects (eight per ship, four at each of two stations per ship} will be positioned at two above deck sampling sites. Sixteen test subjects will don the M17 protective mask and 16 subjects will don the ~1ark V protective "ask at function time and conti­nue wearing the masks until z~Js minutes. The schedule for test subjects at each station and the types of protective masks for each test sybject is given in Table H 1

NUMBER OF TEST

SUBJ&:TS

1 1 , - ...... -, - - - -

TEST SUBJECTS AND TYPE OF P!lOTECTIVE MAS't<S AT SHIP FOR DTCTP 63-2 (C)

TYPE OF MASK

HAilK 'I ORONASAL

X X X

X X X

All test subjects not wearing the oronasal mask and all test subJect controls will provide a gargle sample prior to function time and again immediately after Z+35 minutes. All gargle samples and the oronasal masks will be assayed on the laboratory ship YAG 40. Leakage of the protective masks will be determined by analysis of the data.

Page 14: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

r--- -1Jcp-l, DPG \ I

L '

APPENDIX I

PERSONNEL RF.QUIREMEh~S ( Confideatial)

'rhe type and number of' :personnel required to conduct this test are listed in Table I~l

~AW:E I-1 (C); TYPE AND l!UM.BER OF PERSONNEL REQUIRED FOR D'XC 'l'P 63-2 (U)

SOURCE OF PERSOlillEL l'iUMBER :REQUIRED POSITION 'riME

DACJ DPG I DTC IliA V'J I DES CIUPrlOll FROM I TO BIO CIV MIL

1 X 1 Test Director Apr X l Ass. Test Dir. X l Admin. Officer X l Meteorologis.t xn 3 Met, Techaician

xu 25 Laboratory Pers. xn 1 Safety Officer

X x•• 1 1 Photographer x•• 5 Dissem. Crev

X l Dissem. Crew x•a 100 Sampler Crew (

X 5 Sampler Foremen xu 5 Ch, Sampler Crew

X l Munitions Techn.

X l Munitions Tecbn. x•s 2 Pilot • Jet xas 2 Pilot, Helicop. x•s 3*4 Aircraft Crew

X 5 Mobile Lab. Ib 'il'i9

•• SHAD crev personnel e3 The 100 personnel vill be the normal crew aboard the Navy vessels

(25 men per Yq~Bel) • 4 The number will depend upon the type of' aircraft f'urniahed.

II

II

II

II

" II

II

II

II

" " II

It

n

It

" " "

es The Jet aircraft, helicopters, pilots, and crews will be supplied and lll&i11tB1ned by the 13th. Mari11e Air Group, Marine Corps Air Station, ltalleohe • Hawaii

SIFIED

30 Jun

II

" II

n

" " II

II

" II

II

II

" II

" " " II

Page 15: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

--

(

/

/

\

~ I

J /

I'

~ o--Vl

DA ~roreel No UNCLASS\F\ED

1X 650:<'!20619

Reporr No OTC .:,.u 115~

SHADY GROVE I!S (tc.)

FINAL REPORT

June 1966

by

Erne~t H Ruhlman !Pions Ofhc~r]

Hoadquarte,.. e Dourel Tul Cenlor e Fort Douglas, Utah e 84113

In addit1on fo secutlty nqu~remenh whu:h Clpply to !hi~ dotvmanl and rnv11 b& met, II rnoy bi'J funh,t drs1rrbuted by rhe i'lolder on!~ with 1po1dfrc approYol

of lh• A~ltng Ccunf"!and•r, TC

Thi1 docvme!'lt contams .nformatron aiiect•ng !he nohorcl defenn of lha U S. wrlhm The. rr&anmg Df the Espionage Laws, Till~ 16, USC, $e(' 193 and 794 The lronsm.uror' or reY'elo11on of rll

e:u~renn In any monniJt 10 011 unauthota:IJd p.:ts:Jn

u. prohrbr!ld by low •

BY A.UTHOftl fY Dole 17 J e

GitOUP I

EXClUDED FROM AlJTOMATIC COWN

G!ZADINO AND DEClASSIFICATION

5•,r.r Pagru r 111, '" vr rhru -.v I fl'\ru 9, 14 thtu 17 19 t/Hu 89,9/ rtTru 94 98 rhru 109 Ill thrv 110, 120, !23, 124, 12Q 128 liVt.. 167 1¢9 thru J)'J 17:5 thtu 177 179 thru 195 197 trtru 163 '26S 1hn.1 '275, 277, 305 300

Conlld•ntia/ Pages u, v, 10 thrv 13 18 95 thtu 97 117 thru 119 172 thrv 174 178

UndouHhd PageJ :.:v• 90,110 121,122 125 127 lbB 19b,1tJ..t 1lb '21B rntu 304

,,

UNCLf\SS\HEO

"

r

Page 16: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

UNCLASS\F!EO

INTRODUCUON (U)

1. - llAGKGROUNll

2. ~~ SCOPE

a. ThLs test consisted of 25 trials, divided into three phases: A, B, and D.

(l) Phase A. This phase cons•sted of etght tr1als which were to serve as a preliminary check of all test urocedures pr1or to conducting the pathogenic age~t phases and to obtain data to ~haracterize d1ffus1on 1n a marine env1ronment. These tt~als involved release of the biological tracer mater1al llG. Details of Phase A are presented in the meteorological section (l'art III) and Appendix A.

1 UNCL~SS\HED

Page 17: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

UNGt ASSIFIED

(2) Phase B. This phase consisted of 13 trials wherein agent UL and biological tracer BG were simultaneously released in order to obtain data on decay and infectivity.

(3) Phase D. This phase consisted of four trials involv­ing the S<multaneous release o£ agent OU and tracer BG to obtain data on decay.

b. This report is divided into three parts:

'Part ! ... pertains to all aspects of Phase·B trials.

Part II.. ;'Cover!\ all aspects of l'hase-D trials.

Part III ••• covers all aspects of meteorology, including atmospheric diffusion characteristics and model fitting, as well as aspects of Phase-A trials.

UNCLASSIFIED 2

Page 18: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

\ ---(S) SECTIO:i III

TEST PROCEDURES (U)

1.

3. ~ AGENT MATERIAL

4.

were ~ncluded to enhance the aerosol survival of the age~t in adverse meteorological envirolli~ents. Additive• were mixed with the UL Loncentrate as follow&: f>ve percert raffinose; 0.1

. . .

• 1'- ..._... -- •

UNCLASSIFIED

Page 19: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

\ JCP-1, OPG ' •

~~.... q J\NCL~S 1.,'

- I

aY AUTHORilY G. DTC Dole< 18 Morch 1966

CLASSIFIED E.'c~:.wr F:;o .. t. SCH~DULE C'-~ E:\LlliP'HO,I CA'~~

:DWLA.SSUX

r( z:,.., :::}-

o- st> '\Nr.\ -...} ~

Thl1 dcx;llmllf'll et~nlainJ

nar,qnal dcfn•• llf r1-l• U S th• bpionoge Low•. Title 18,

i. t '. ~ ••• -~ •• ·, "":".

~; . ' . - .

"nd 79_. ln. tnvumiUHUI or rw•lotlon "' \u. cont.ntt 1n gny mon11•r to an unaurl'lori:zad p1N<lf1

Copy-'4- 8of 200 Copi1>s

ore 66-555

1 1ted by ldw ~

. '/X-6'

I:

li'L n-_+ .... ~ ..,,_ ,, ___ ... _

! ~. ~·:·~ ~-:··;;: -~~zo ~

Page 20: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

. .

····---

•'

TEST 65-1 -- COPPER HEAD. (U)

DESERET TEST CENTER FORT DOUGLAS UT

MAR i966

Page 21: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

t

• ""' •

JCP-1, DPG I

... ABSTRACT

·'

COPPER HEAD wae designed to study ship penetration and downwind cloud diffusion in a frigid marine environment. The biological tracer, Bacillus subtillis var, niger (BG) 1 was disseminated from an Aero l4B spray tank mounted on an

UNCLASSIFI

Page 22: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP·I,OPG

CLASS\FIED

l . . - . .

c.

PREFACE

Lf"\vull n .. v

Page 23: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

-- -~-- -~--~ -- ------------ -- --

UNCLASSIFIED .. SECTIOi! ri

ACCOOLISHME!I• OF !EST OJlJECTIVES (U)

l, • P!\lM."J',Y OBJEC!IVES

a, The £irst prima~y objectiv~ wa• to determine the percen• tnge of aerosol penetration (and its relation slze) into an ship under

b. !he second primary objective ~as to co~ara biological cloud tre~el in a frigid ~arine environw.ent with predicted cloud on diffu<ion models for pr«vailing di

2, • SECONDARY OEJECTI\IES

a, The first secondary objective was to deterMine if a ship's passage--in a frigid, !l'.arin• environmellt--thtough biological aerosols gene~ated by a ~u~~ent lina•sou~ce, aerial-spray-tank tem resu.l t':ld in exterior and in

b, The second $econdary objective """ to dete~mioe if • betapropiolactone-spray system could be employed under oper­ational conditions to decontaminate an interior compartment of a ship after aerosol in a

c, The third secondary objective was to d•'erMin> the oper­ational feasibility of an installed e~terior dec~-wash•down

.

. I

I I 1 I

I I

Page 24: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

I l

I I ! I

' I l

I

UNCl.ASSiFl ..• ,_......_, .... d, The fou~ch secondary ohjecti~e ~a• to obtain information on the perforl\l!lnee of on Aero- tanlc jet•al.rcraft we•tootta sys teat sell in "

3

:; '"1'1"' .

---.

Page 25: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP..f,DPO

(S) ~Jlctrwfn

TEST PROCEDURES (U) (v.) 1. ~ TEST LOCATION

2.,

3 •

The test location was off the coast of Newfoundland, Canada, in international waters. Area coordinates were 460 to 460 40'N 540 to 56°W. The base of operations was the u.s. Naval Station, Argentia, Newfoundland, Marine and contractor air~ craft support was stationed at Ernest Harmon Air Force Base, Newfoundland. (See Fig 1).

TARGET SKIP

Page 26: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP-1, OPG

5. j!!) {U}

~ ~ ' I .

UNCLASS\FIED

• TR!AL SUMMARY

Table 1 summarizes the scope and conditions for this test aeries, (tJ 1

TABU l f;,(f· 'B.UJ. S:~t (U)

~ . . . . ~- . . ' . . ~· .,~

\ 14 San &~

2• l iab 6~

3 1 h'b 65

4 1a i'th u

' u r.b 65

6 \6 ftb 61

\8 ,,, 6l

u r.~ ''

• 14 F•b ~5

Page 27: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

" '

Page 28: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

5. • TI\IA!, Sl*IAR'i

UNCLASSIFIED .-.

Table 1 SU(I';i!Btizas the scope and conditions for tt,t.s test set"i~s. ~

rA!!..t' z fl nut. .!I..W..Mr

,.

tr. Jln 63

l h., 6)

7 .:,~ ~J

ti hb .ss \5 hb 6S

l~ Ftb 6J

1' 1•11 iJ

l~ r•b 6S

24 Tt~ IJ!

Jlrvct tG~r·­, n ~vt>li)0JrltU

I 'I I I I

I . : !

Page 29: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

Deseret Test Center Final Report TEST 63·1 llNCLASSiflED

118 Pages

*f. A G E R B E L L E (U)

Phase l

(Revised)

Prepared by

HEAJJQUAR'l$RS Deseret Test Center Fort Douglas, Utah

30 June 1965

UNCLASSIFIED

Page 30: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP·l,OPG

I

~FlED

tests was to compare protective masks against

study the effectiveness of

A secondary ob)ecttve of the iency of the M-17 and the Mark V

a biological aerosol.

Tbe target ship (YAG 39) was exposed to an average dosage of

disseminated from a continuous point source installed on a tugboat.

Hi

Hi UIVI.JLM~;)ft-/tU

Page 31: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP·I, DPG

• FOREWORD

1, ~ This Final Report outlines the work accomplished during the biological operations test series-~EAGER BELLE (U), Phase I·· conducted in the vicinity of Hawaii during the months of January and March 1963,

iv UNCL 4SSIFIED ._.. UNCLASSIFIFn

, •

Page 32: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

..,;::.~~~ ~.l;'\ .. .., '"?w...,"" ?... ------------------------------------------

I JCP·I, OPG '

wrz-q ... ·-.... ... ..... • """~ lPN "iii"'"i.t "'"-ll on.,.... t• u ,., .... ,.. ••• Hut1 .- ..,.. ,...lJ.letn '• p..to~Lr -.pa 1' •• ....,,;!!1!111' ... ,war=·• 1'1'• ,, •

Technical Report

distributed by

~~

Defense Technical Information Center DEFENSE LOGISTICS AGENCY

Cameron Station ·Alexandria, Virginia 22314

tlllf\1 t. N'IC:ICn

Page 33: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

• , JCP-1, OPO I

I

I

I I

1 I

I

I

I

I

I

'

~

u.;, ~ • n ... l 'IIOJ'C'rt """'~:::.w ~!.- ~ttl.-"'-~~!cal operation• test •eriea -- nicknmoed EAGER BEttE (U), Phaao It .... c.on.duc.ted. tn the 'Y I.e. inlt.y of lla.w:li dul:1ng th• UX~nths

Fobrua<Y, Horch, an-I June 19o3.

UNCLASSIFIED lU

-. ~ . ..- .. ' -

Page 34: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP-1, Of'G I IJMGI_ASSW\EQ '

UNCLASSIFIED iv

Page 35: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

J JCP-1, _DPG \....-. \ JNCLASS\f\ED

S£CTION II

ACcoom.ISII'!I!:<l' ~ T!!!T Ol!Jl!CT117n" (!Jt

a. Flrst Prtmny ObJective

~ 1110 'Cel.a:.t:: blo\og\.1:a.l a~:roso\. c.\Oud t'l:&"lel to pl:'edtcttd c!ou4 u·a.v...\. based .,n present p.:oedlct1on r.oodeh fot" J.revai tina c:onditloa..."

b.

C~...) ~~r~ •••

c.

Second Prlmary Obt~etlva

obtaln additional 1nfor~tlon on ~eApon systen perfornanee (Aero Spray is.nk dt.sse:mlnatln~ t'hc bLo\eglca\ tracu, BG) ovet tht ~pen under the mete oro loglca.l condlt tons encountered. 11

Thlrd PrimarY ObJective

~11To obtain Lnfornatlon to aulst ln the dellgn and e:uc:utlon ot future trlah."

1'-l' . · .. _~,11-- ..... :

Page 36: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP·I, OPG l . UN81 ASS\FIEO -

I

l

I

I UNClASSIFIED

I '

I

I •

Page 37: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP·I, OPG '

tAflLF I (L~CLASS1FIE02: Sc'ill.'•R~ rt~TL'l!!S or TRIALS

IH.u. lll'ltarc:e of ~o. ::o. g{ llLu. J.tr .c Une.=. F"t:"., ... .~o. :,pray of 1.\n!,;> Alt~ lcn~th 1.o~rt;~t \o.t'gC!t: !»"'.\J)ll 'Tan'<• Pot

(E'fals T'd~t .. "'"'"rc~. " ((<1 (·1) q,: •( .. 1 ( 0 L\M

• ... • WIP \\r., )~ tllllllllllll' • ""' • ... • 8 ... ¥Ko;;. ' ¥N; )9

• • • • ~lot:; 19 .. - • ·-~· • • • ·-UNCLASSIFIED

4

I

Page 38: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

I I

I

I

I I

I

. --

. n -·~ . . . . .....

Page 39: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JGP-1, DPG . ) -, I, . . - ~

• I ~

[ Ao!iiJP l;'ii:,

1-./)

\.0

II" ccc.r ~., ro !!O:::u'·'t r!!qu remen•s wh•c~ Cfl"O'y ro

1111~ d~Cume.,r 0"'~ 'T'.J~· be r-c• ' '110/ ~.: fv••r.e•

c.l·~•·•bult:d bt •he t-oldo:!• o••ly w.rn 1pec•f•c puor

approval of rhe CG OTC.

8Y AUrHo,··y

OAT: :1'2

'h1 documenr conr:::: ..,, m 1a·ma• O'l ::Jr;~::r•rg ·-e

nol•a'1al ac 1e:n'c o 1 r.,o;o \J S n tl·ur I'll~ rrecn .. S o 1

•)·c fso•onc.gc l::Jw' r.rrc '5 'J S C 5PcS 7""'~

ere.: 79J lhf' rral"'\'"r1 H•O" o• rc .. !!lar.on ol ''"

ccn'f''liJ ,,.. on, mcnn,.r ro on uno...r'"'or,~cd p~t!.:::"

'' proh•b••e-.::: by law

~OU? ::!

cow~~Gr:,.,o::J ,.... 12 v~ .• ~ r.'I·::";A:.S NOT AU ... OMATrC ~LY O':C~AS51FIEC>

THIS DOCUMENT MUST NOT BE ANNOUNCED~ TECH~l)AL ABSTRACT BULLETIN

~ ~,,:,---Uf!jp' '_-;;,yf<-{·~·i;'/·/' / \ \

. f. :/.d#,_,,r, Copy 1 ( I o' 175 cop•es - '-

c~c 65 226C

. . .. . ... ' ' . ~·

. . ....

....-;-/ '·--C.C:

Page 40: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP-1, OPG

I •( I I'

ABSTRACT

FLOWER DR!fl.l (U), Phase I, as amended, designates a test designed to f>nd a simulant for agent GB, to assess shipboard vulnerability to an enveloping vapor of toxic agent, and to establish co~parative penetratLon properties for GB sirnulant and agent. The USS GEORGE EAS1}~~ (YAG 39), a specially designed and equipped test ship, was subJected to attack by candidate agent GB si~ulants and agent GB. The ship attack was by envelopement of test agent disseminated from a gas turbLne mounted on the bow of the test ship and by simulated enveloprnent·-d>rect inJection of test agent into the aLr ·--- ·-- . . . .

. .

~ ....... - : -· -=-.·:::-:· --:-- .. ~-. . . . - -.- .. :., ....

-~ --

, ,,~, 'l"f"lrlrn

Page 41: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP-1, OPG

coast

• ,;rl, \ t.::.c :,;:\l=.D ,, '

PREFACE

The testing at sea was conducted over the periods thru Apr~l and August thru September 1964, off the HawalL.

lV

Page 42: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP·I, OPG

• 1. •

£. •

. ~ r • ~-r • • !

SECTION !I ~ t.,·~~:_; .... ;!.:.'t;l::.~::.. -~ .~:

ACCOMPLISH}ffiNT OF TEST OBJECTIVES (U)

PRIMARY OBJECTIVE

a. The primary object1ve of FLO'-'ER DRUM Phase l, as amende .. •vas to obtain comparative information on the penetrability of ships exposed to agent GB and a suitable s1mulant; this involved f~nding a simulant for agent GB suitable for sh1p envelopment and penetration studies, establishing comparative penetration properties for GB simulant and agent GB, and assess1ng sh1p penetrab~lity or vulnerabil1ty to an enveloptng vapor of toxic agent GB. The experiments were to be accompllshed under four test 'co~ditions; also, they were to include the testing of spec1fic <nstalled protective systems •

SECONDARY OBJECTIVE

a, The secondary objective was to report information applicable to the Navy's Chemical Training Program.

-......-, .. -··~-. •. ·.: "";•,; . , .. ~. '

3 - . - ..... "·- .

Page 43: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

,. JCP-1, DPG

3, • ADDITIONAL OBJECTIVES

a, Add~tional Objectives were:

(1) To obtain information on the performance of the E41 V-G Agent Alarm System and the Hydrogen Flame Emission Detector (HYFED) candidate point sampling alarms (modified for shipboard use) when exposed to a cloud of GB.

(2) To obta~n information on the performance of the Pass~ve Long Path Infrared (LOPAIR) advance warning alarm (modifie~ for shipboard use) when exposed to a cloud of GB.

. . -·~

. .. -. .

. - ··-·~ .. ~:~.~ ~· . ._~-\~~-·: :· .. -.· . . .

-" 4

Page 44: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP-1, OPG

'':''·~ ' ' -

SECTION lll

TEST PROCEDURES (U)

l, • TEST LOCATIOt'i

The test location was off Hawaii in an area assigned by CONHAWSEAFRON, .._

2.. • ESCORT SHIP

3, 1ll TEST SHIP

.. .. ·~ :.

5 ' ' • J ., -- .. . ... ::.

__ .._. ___ llllllat '-11.....-.

Page 45: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

a, The four mater1al conditions were as follows:

1) ZEBRA

This is a mater1al readiness condit1on set at or near battle; ct ts designed mainly to :acil1tate fire and flood control and is a "standard'' Navy material readiness condition. Under this condition, the deckhouse ventilation system remained operative and maximum watertight tntegrity was maintained, with as much compartmentation as possible,

2) ZEBRA CIRCLE WILLIAM

This is also a "standard" Navy material readiness cond1tion. Under thts condition, all ventLlatLon

7

Page 46: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP-1, OPG •

fans were secured, and all CIRCLE WILLIAM fittings were closed; however, there were no improvised closures over the ventilation system intakes or exhausts,

3) l!odified ZEBRA CIRCLE WILLIAM

This is an experimental material readiness condi· tion wh~c~ theoretically, could be set on all combatant ships as a CBR protective measure. Under this condition, all ventilation systems were secured; covers for all intakes and exhausts·-·•hich on most ships must be improvised--were closed, The intent was to completely seal off interior spaces from external contamination, It is apparent that this condition cannot be rapidly set because of the many ventilation intake and exhaust coverings that have to be jury-rigged; nor can it be maintained indefinitely because of the need for ventilation of the engineering spaces.

4) NAXIMUM CBR SECURITY

This was an experimental condition in which the air su~ply to the deckhouse Lest area was filtered through an !!16 gas-particulate filter, Under this condltion, all fittings and ventilation exhausts were closed,and the chemically pure supply air created a positive pressure in the deckhouse of 0.5 em (0,2 in,) of water; the exhaust air flowed outward through leaks and natural vents, This condition caused the deckhouse to be under "collective" protection.

8

Page 47: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP·I, OPG

' .\.I .. '

b. The YAG 39 was enveloped by disseminating the test agent from a modified Model T·45M·2 MARS Portable Gas Turbine ~hich

ced on the helicopter deck the bow of the ship

Page 48: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP-1, oPG

6 , • tRIAL PROCEDURE!S

a, During the trials, the target ship (YAG 39) steamed into the wind maintaining a relative windspeed of 10 to 30 knots. The YAG 40 maintained a parallel course forward and starboard of the target ship. When the appropriate material condition was set and all personnel except the disseminator crew were within the Safety Citadel, agent GB or simulant was disseminated for 10 minutes•-from the MARS turbine on the bow for envelopment trials or by direct injection into the ventilation system intake; dissemination was effected at a rate which maintained an average concentration of approximately 50 mg/mJ at the forward deckhouse bulkhead.

b. During GB dissemination, the disseminator crew wore M5 protective ensembles and all other personnel (who were in the Safety Citadel) wore ~m5, M7Al, or M17 protective masks. After dissemination ceased, all personnel whose duties required them to leave the Safety Citadel wore protective masks until the ship was cleared of GB. During the dissemination period of

11 ··'I- ........

----····--· '' I.

ship was cleared of GB. During the dissemination period of

., I

Page 49: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP-1, OPG • r"' ,,..1.,..-

the simulant trials, all personnel wore protective masks, During test periods, the only entrance to or exit from the Safety Citadel was thru a decontamination tunnel which consisted of a passageway that functioned as an air•sweep tunnel for the decontamination facility and also as one of two primary ventila­tion exhausts for the Safety Citadel. The passageway' was divided •nto four sections by perforated doors; the doors restricted the rate of airflow and maintaLned the interior/exterior pressure differential. The decontamination tunnel •1as outhtted with a gas chamber to be used for a protective mask check, shower facilities (not used during the test of vapor agents), and protective equipment and clothing removal facil•t•es, All pers.onnel worked in teams (of two or more persons) and all teams were checked irt and out of the Safety Citadel,

13

Page 50: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

..... - ......

e, Following the termination of sampling, a full aeration of the ship was accomplished, For the GB trials, aeration of the ship was continued until the enzyme ticket test of the Ml5Al Detector Kit indicated there was no GB in the exhaust air. When negative results were obtained at the exhaust vents, properly protected personnel confirmed the absence of GB within each area--again using the enzyme ticket test of the MlSAl Detector Kit.

20

~-...

Page 51: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP·I.OPG

...... rv) t'--r ('... ~ ) ,,...

..,......._ \Ji

I '-- . ~

l_;, ~ '-0 . JuNCLASSIFIE

Page 52: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

JCP-I,DPG -. .. ,J

ABSTRACT

The FLOWER DRUM, Phase II, test was conducted at sea in • l~ ~ a tropicsl environment to determine the effectiveness of a

shipboard ~ater•washdown-gystem as a protective and decootaminant measure against simulated aerial delivery of agent VX spray, Also, testing was conducted to provide information for the planning of FEARLESS JOHNNY 65·17 Test Center shipboard test,

UNCLASSIFIED ~

Page 53: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

UNCI ASSJFIED

SECTION 1

INTRODUCTION (U)

3, (S) TESTING

a. Trials were cond11eted in accordance wtth the FLOWER DRUM (II) Phase II, Test Plan, DTC 64·2 as amended •

... n •l.Jt..-.1 \VVJJ U ... L.J

Page 54: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

c~'>-

UNCLASSIFIED b. Three conditions of shipboard water washdown were tested to determine their effectiveness as protective and decontaminant measures against simulated, aerial delivery of agent VX spray. The three conditions were as follows:

L!A)- 1)

l\A>-- 2)

Condition l Washdown system was in operation before, during, and after agent dissemination,

Condition 2 Agent dissemination occurred soon after the washdown system was turned off, but while the exposed surfaces were still wet. The washdown system was again actuated after agent dissemination was completed,

Condition 3 Washdown system was not operating prior to or during agent dissemination, but was actuated after agent dissemination was completed,

UNCLASSIFIED

2

2

~ i ·I r 1

~I r..•

Page 55: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

• SECTION II

~~~ ACCOMPLISHMENT OF TEST OBJECTIVES (U)

l. ~ TEST OBJECTIVES

This seccion restates the test objectives as originally l<Aj-presented in the FLOWER DRUM, Phase II, Test Plan. It indicates

the degree to which each test objective was accomplished. The • objectives were:

L Vt) -z>

To investigate the effectiveness of shipboard water washdown, both as a protective and as a decontaminanc measure, against agent VX delivered from a mechanism that simulates aerial spray,

To obtain data and operational eKperience to contribute to the planning and operation of FEARLESS JOHNNY! (U), DTCTP 65-17.

UNCLASSIFIED

Page 56: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

TEST EQUIPMENT AND PROCEDURES (U)

TEST LOCATION AND DATE

Tnis test program was conducted at sea during November and D~camber 1964, off the Island of Oahu.

AGENT UTILIZED

l

)

l

' ' ;

A dyed liquid containing approximately 90•percent VX (by weight) was used in this program, To assist in taking radiometric measurements of contamination, radioactive "tagged VX" molecules containing the radioactive isotope, Phosphorus 32, were included in the agent,

3, ~ TEST VE!f!CLE

LL() _ a, Barge

--..._ The U,S, Navy Covered tighter (BaJ:ge), YFN 811, 11aa used as the bssic structure for the test arrangement.

UNCLASSIFIED

Page 57: ImageBASIC Display Print Jobdoxit.weebly.com/uploads/2/4/7/4/24749526/autumn_gold_final_repo… · DACJ DPG I DTC IliA V'J I DES CIUPrlOll BIO CIV MIL FROM I TO 1 X 1 Test Director

..

c. Test Vehicle Propulsion

~ During tha trials, the test vehicle waa towed by the U.S. Navy Tug, ATF 105, It was towed approximately lkm (0,62 mi) behind the tug,

4. • TEST EQUIPMENT

a, Dissemination Apparatus

! 1~1r1 A ~SIFIED

1 ·i