ilrs workshop herstmonceux 2005 network collaboration ilrs 2005 workshop eastbourne, uk, october...

7
ILRS Workshop Herstmonceux 2005 ILRS Workshop Herstmonceux 2005 Network Network collaboration collaboration ILRS 2005 Workshop ILRS 2005 Workshop Eastbourne, UK, Eastbourne, UK, October 6th, 2005 October 6th, 2005

Upload: shon-floyd

Post on 05-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ILRS Workshop Herstmonceux 2005 Network collaboration ILRS 2005 Workshop Eastbourne, UK, October 6th, 2005

ILRS Workshop Herstmonceux 2005 ILRS Workshop Herstmonceux 2005

Network collaborationNetwork collaboration

ILRS 2005 WorkshopILRS 2005 Workshop

Eastbourne, UK, Eastbourne, UK,

October 6th, 2005October 6th, 2005

Page 2: ILRS Workshop Herstmonceux 2005 Network collaboration ILRS 2005 Workshop Eastbourne, UK, October 6th, 2005

ILRS Workshop Herstmonceux 2005 ILRS Workshop Herstmonceux 2005

Network collaborationNetwork collaboration

Are stations using the new Dynamic priorities list?Are stations using the new Dynamic priorities list? Would the network benefit from the unification of Would the network benefit from the unification of

IRVs?IRVs? Are stations looking at the newly available time Are stations looking at the newly available time

bias functions?bias functions? Are stations using the information on Eurolas (RT Are stations using the information on Eurolas (RT

network status)?network status)? Visiting operators, station engineers and station Visiting operators, station engineers and station

managersmanagers

Page 3: ILRS Workshop Herstmonceux 2005 Network collaboration ILRS 2005 Workshop Eastbourne, UK, October 6th, 2005

ILRS Workshop Herstmonceux 2005 ILRS Workshop Herstmonceux 2005

Dynamic prioritiesDynamic priorities

ZimmerwaldZimmerwald: Automatic access through time : Automatic access through time bias server. Automatic adjustment of internal bias server. Automatic adjustment of internal satellite priorities. (We use a 6-level priority satellite priorities. (We use a 6-level priority scheme based on the ILRS priorities.)scheme based on the ILRS priorities.)

MateraMatera: Not used at this moment.: Not used at this moment. Others?Others?

Page 4: ILRS Workshop Herstmonceux 2005 Network collaboration ILRS 2005 Workshop Eastbourne, UK, October 6th, 2005

ILRS Workshop Herstmonceux 2005 ILRS Workshop Herstmonceux 2005

Unification of IRVsUnification of IRVs

ZimmerwaldZimmerwald: Yes, I would very much prefer to : Yes, I would very much prefer to have one primary IRV set for each satellite. The have one primary IRV set for each satellite. The mission control should be more involved and take mission control should be more involved and take more responsibilities for the generation of the more responsibilities for the generation of the best-possible prediction sets (that's also true for best-possible prediction sets (that's also true for the new CPF prediction files).the new CPF prediction files).

MateraMatera: Yes if this means improved quality. Due : Yes if this means improved quality. Due to our tight divergence we’re very sensitive to IRV to our tight divergence we’re very sensitive to IRV quality.quality.

Others?Others?

Page 5: ILRS Workshop Herstmonceux 2005 Network collaboration ILRS 2005 Workshop Eastbourne, UK, October 6th, 2005

ILRS Workshop Herstmonceux 2005 ILRS Workshop Herstmonceux 2005

Time bias functionsTime bias functions

ZimmerwaldZimmerwald: We are automatically accessing : We are automatically accessing them and adjusting the prediction elements them and adjusting the prediction elements accordingly, right at start time of the passaccordingly, right at start time of the pass

MateraMatera: Manual checks only. The prediction : Manual checks only. The prediction software is being modified to allow for this.software is being modified to allow for this.

Others?Others?

Page 6: ILRS Workshop Herstmonceux 2005 Network collaboration ILRS 2005 Workshop Eastbourne, UK, October 6th, 2005

ILRS Workshop Herstmonceux 2005 ILRS Workshop Herstmonceux 2005

EUROLAS RT StatusEUROLAS RT Status

ZimmerwaldZimmerwald: Yes, we occasionally take the : Yes, we occasionally take the displayed time bias of a successful station to displayed time bias of a successful station to speed up acquisition. It's also a simple way to speed up acquisition. It's also a simple way to remotely check what the own station is doing. It remotely check what the own station is doing. It could also be used for satellite selection (no use could also be used for satellite selection (no use that all European stations simultaneously track that all European stations simultaneously track Starlette).Starlette).

Matera:Matera: Yes, the screen is displayed Yes, the screen is displayed continuously and frequently checked.continuously and frequently checked.

Others?Others?

Page 7: ILRS Workshop Herstmonceux 2005 Network collaboration ILRS 2005 Workshop Eastbourne, UK, October 6th, 2005

ILRS Workshop Herstmonceux 2005 ILRS Workshop Herstmonceux 2005

Visiting operators, station Visiting operators, station engineers and station managersengineers and station managers

Zimmerwald: Zimmerwald: Should not be a formal problem. Should not be a formal problem. It's more the interest or willingness to invest It's more the interest or willingness to invest money for such exchanges. I'd be very much in money for such exchanges. I'd be very much in favor of more such exchanges.favor of more such exchanges.

Matera: Matera: Very interested in such exchanges. EU Very interested in such exchanges. EU safety rules might be disturbing. safety rules might be disturbing.

Graz?Graz? Others?Others?