Page 1: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000
Page 2: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Item

No.

2.42

Daban-Wamoti Bauxite Mining Project (Mine Lease, Area – 642.0550 Ha. & Production

Capacity 0.24 MTPA) located at Vill: Daban, Nani Wamoti, Khanai, Balapar & Rasalai,

Tehsil Abdasa & Nakhatrana District Kutch, Gujarat (Old File No. J-11015/132/2005- IA.II)

Proposal No.: IA/GJ/MIN/80929/2018 File No.: J-1 1015/152/2018-IA.II(M)

INDEX

Sr.

No.

EDS by EAC(Non-Coal), MoEFCC, New

Delhi as per MoM Nov. 15-16,2018

Reply by GMDC Page No.

i. Information as per Annexure-III of

agenda

Provided in Encl. 1 Pg. No. 2-3

ii. Past production details of the mine from

the inception of the mine till date duly

authenticated by the State Mines and

Geology Department.

Provided in Encl. 2 Pg. No. 4-7

iii. PP should submit an undertaking by way

of affidavit as required as per Ministry's

O.M No 3-50/2017 -IA. II(M) dated

30.05.2018 to comply with all the

statutory requirements and judgment of

Hon'ble Supreme Court dated

the 2nd August 2017 in Writ Petition

(Civil) No. 114 of 2014 in the matter of

Common Cause versus Union of India

and Ors.

Provided in Encl. 3 Pg. No. 8-9

iv Valid executed copy of mining lease valid

upto 2036.

Provided in Encl. 4 Pg. No. 10-40

Page 3: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Enclosure - 1 (Information as per Annexure – III)

Page 2 of 40

Page 4: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Daban - Wamoti Bauxite Mine Annexure - III

ProposedProduction(Tonne)

AchievedProduction

(Tonne)

2006-07 2371.890 2371.892007-08 242931.746 242931.7462008-09 142555.000 142555.0002009-10 149715.000 149715.0002010-11 118648.000 118648.0002011-12 194797.000 194797.0002012-13 277513.000 2777513.0002013-14 54918.000 54918.0002014-15 108742.000 108742.0002015-16 10000.000 10000.0002016-17 151737.000 151737.0002017-18 98374.000 98374.000

Plan Period Planned Actual Remark

First fiveyear period(2006 to2010)

1200000 656222

Second fiveyear period(2011 to 16)

1200000 645970

Third fiveyear period(Current)(2017 to 18)

480000 250111

240000TPA

DMG CertifiedProduction

RemarkMining Plan /Mining

Review of Mining Plan (Production Capacity 240000 TPA)(Earlier & Current)

TheExcavation

details duringapproved

Mining plansperiods areprovided infollowing

table

It can be clearly seenfrom the excavationdetails that totalexcavation is verymuch within plannedexcavation quantitycummulative forentire five year periodof approved mineplan/mining Scheme

FinancialYear

GoG IMD order no.MCR/1593/G-57/350/ CHH dated12/11/2006 for642.0550 Ha.MiningleaseExecuted on dt.28/03/2006 withvalidity for 30years.

EC No. J-11015/132/2005-IAII(M)dated8/12/2005for Bauxite(0.24MTPA).

CTE NOCGPCB FT-133/18490dated22/06/2004

NO: PC/CCA-KUTCH-519/ID29981/424388 dated29/09/2017, valid upto05/09/2022

CTEMining Lease Detail(Initial, Renewal,Transfer) with datevalidity

EC DetailsCapacity(Tonne)dated ,Letter No.,Amendmentetc.

CTO underAir Act(Date,Validity,Capacity)

NO: PC/CCA-KUTCH-519/ID29981/424388dated 29/09/2017,valid upto05/09/2022

CTO under Water Act(Date, Validity,Capacity)

Page 3 of 40

Page 5: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Enclosure - 2 (Past Production details of mine

from the inception of the mine till by State Mines & Geology

Department)

Page 4 of 40

Page 6: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

~

\!) -'

T:f ~

r;J tr

-'

1\9 (Y

b

c ~

r> .x

) r;:(

-c> ::>

<T' ck

~

ti\5 ~

0 0

(Y

tlJ)

(Y

~

<:;:;) ~

)p

-. _

; +-'

('\.' \_,

<T' rv

d

~~ a ro

52 3

0 ;:r

-'

,-j.l ._

·~ •.1(

;:,' ro

~

CY

';:;)

·~

.._ -'

~

~

<7' ~

...-tl.!l

9 =c

_, ~,-;,

oU

O

--;:;·

~

~~-

,-..; -

... -

~.;>-:~ ~

~-

·-

_,: ... --

--

. ..

'-tJ'>

-~·

" o

v

-.-d

---. --

"' I

c;-' lU

.,.,_.

..... tlll

I ~

.._ ,.....,

~~·

·;:r ti

~~

~

I

~

" ~)

~)

-;0

! b

' m

'"':")

rv u

=" : C

'r'

l ,.:.;

·--•::

--; .....,.

>.'c

"

(/'

5 ..,~

..... r.:r

~ <

r" (.)

~ ~

a;:: ..&

.

_,

I ~

r:f ;:'(

c i

. "C'l

;:t' ";;::>

\!:!) ~

~ ~

"!.1 :~

g ~

~ c;;

~

V) ~

o' .x

) q~i-i

-~

.x)

r> crv

~

rg. ~

r:;i tr

·~ ~__.:...

;p <T'

~

r;J r;:1

CJG

:,--J: r;::t

;g ~ ~

_, ~·~' --·:

(!

,)(') ,)(')

rr'

b ";::f

' •t:t I)()

~

a '"

....,., :

. ~ ~

~

~

";::f rv

\!:!)

d .s~ l.l: c::s:

1\)

V)

.x)

~ ;x;

cP ';:;)

cg rv

r=fj ~

rb

I a=;

;:t' ~

' 4

. •

~

crv' ;;p ~

a ..0 l

~

-;5 ~ ~

";::f rr<

rb

a.. r;:f

"""' -::( ~

":' ~

~

Cll G.!

~

6"'

rv

b i

I)() :;:;

-c .x

) rv

;:'( J -

;;Y :g

~ ~

g ci

c "' \)()

(Y

0

cv u>

cv I)'

•-'

~

rv

;t (}!

;:p (\)

~

;:t' u

.) c!3

u.)

I)() .r'

®

;:'( rr"'C

~ ;;p

cP cv

tr 1\!)

::f ~ ~

"(!; -c

~ I)()

u.)

cg f'(l)

~

::f \.,V

I ~

";::f ·;;p

(~

r; ~

m

(/ b'

(!'/ -

•\9 ~

:;J r;:1

~

(Y

b

~

u.)

"C'l \

r> ~

~

(1.1

0 ~

;J ";::f ~

~

(1.1 ck

r;:1 -c

\,.. \!:!)

';:;)

('\") .x

) \!:!)

vV

) r;x)

N

:;:;' V

) r:f

.x)

'"i "

';:;) ;:t'

cg lf

~

,..... (1.1

~ ~

0 g

I)' ~

";::f CQ;

rg. ,.....

~

-~

~

~ ~

;g 5:1

c!3 ·-i

~-

c:c1 I

-c ~

;:'( ~

3 --

1\)

id ....,

~

\!) "'

1\)

~

~ ';:;)

•-'

"(!; rev

;::r'> ~

rv a=;

;:t' lf

';:;) rb

rv

(Y

~

u.)

";::f u

.)

rOO

' ;:t'

~

=c: ~

CQ; ·;;p

\!:!) a=;

r;x) ;;p

'"i (Y

~

rb

~ ~

";::f

rb

r;:( I

eP ";::f

~

(C?

-.._

o' ~

I r:f'

I V-~.

-;5 \)()

\!) ~

(Y

~

IX)

';:;) ~

;;Y :;:;

.x)

IX)

~

~-

(Y

~ @

b

~-1\9

~

~

I)' f'(l)

"' ~

·-i ;::J(

-' ~

;:t' ~

;:'( ;:'(

~

,...x) ()

~

Page 5 of 40

Page 7: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 6 of 40

Page 8: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

!VIL No: 624 (Daban-Wamoti)

L Date of Gujarat Govt. order regarding ML orde1·: 12/01/2006

2. Date of Mining Lease execution: 28/03/2006

3 Date of Notice sent at the time of opening of mines to competent AL tnoril it

Directorate of Geology & Mining and District Min ng Officer:01/02/20CJ7

4. Actual date of start of Mining operation as per record:01/02/2007

A B c D

Year Opening stock Closing St

at mines head Production Dispatch

at mines~ -

Unit (In Tonnes) -

2006-07 65477.260 2.371.890 24 )45.970 43303.1 -2007-08 43303.170 242931.746 12~ 335.450 162899.::

2008-09 162902.000 142555.000 67 )82.000 237875.( -2009-10 237875.000 149715.000 71144.000 316445.(

2010-11 316445.000 118648.000 14L: 889.000 290200.(

2011-12 290200.000 194797.000 287 588.000 197412.(

2012-13 197412.000 277513.000 19E066.000 302991.(

2013-14 302991.000 54918.000 42'395.000 309824.(

2014-15 309824.000 108742.000 30314.000 387952.(

2015-16 387952.000 10000.000 66 345.000 331607'.(

2016-17 331607.000 151737.000 'l000 483344.(

2017-18 483344.000 98374.000 )000 581718.(

:~:L

l:ad

'U t;'[

DC 00

co CIC

ICtO

J(i[

1(1(1

100

!C10

ICC

1: 'I DCiMS State

*Available data are taken from Demand Register 2nd Monthly statemen: 1:i'.'fr , II:; 1. 1.' ! .. :CUd

r:eoiq d Department

!

Page 7 of 40

Page 9: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Enclosure – 3 (Affidavit as per Ministry’s OM

date 30.05.2018)

Page 8 of 40

Page 10: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 9 of 40

Page 11: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Enclosure – 4 (Valid executed copy of Mining Lease)

Page 10 of 40

Page 12: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 11 of 40

Page 13: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 12 of 40

Page 14: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 13 of 40

Page 15: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 14 of 40

Page 16: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Lease Grant Document (Daban Wamoti Bauxite Mining Project)

Page 15 of 40

Page 17: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 16 of 40

Page 18: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 17 of 40

Page 19: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 18 of 40

Page 20: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Lease Deed Document (Daban Wamoti Bauxite Mining Project)

Page 19 of 40

Page 21: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 20 of 40

Page 22: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 21 of 40

Page 23: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 22 of 40

Page 24: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 23 of 40

Page 25: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 24 of 40

Page 26: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 25 of 40

Page 27: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 26 of 40

Page 28: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 27 of 40

Page 29: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 28 of 40

Page 30: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 29 of 40

Page 31: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 30 of 40

Page 32: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 31 of 40

Page 33: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 32 of 40

Page 34: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 33 of 40

Page 35: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 34 of 40

Page 36: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 35 of 40

Page 37: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 36 of 40

Page 38: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 37 of 40

Page 39: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 38 of 40

Page 40: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 39 of 40

Page 41: III) · Daban - Wamoti Bauxite Mine Annexure - III Proposed Production (Tonne) Achieved Production (Tonne) 2006-07 2371.890 2371.89 2007-08 242931.746 242931.746 2008-09 142555.000

Page 40 of 40