IGCC Power Plant Design of Dispatch Capabilities Ming-Wei Yang, Benjamin P. Omell and Donald J. Chmielewski Illinois Institute of Technology AIChE Annual meeting 2012 100 101 102 103 104 105 106 107 108 109 0 50 100 150 200 Time (days) Revenue ($1000/hr) Dispatch o Dispatch

Upload: lydiep

Post on 24-Mar-2018

222 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

IGCC Power Plant Design of Dispatch Capabilities

Ming-Wei Yang, Benjamin P. Omell and Donald J. Chmielewski

Illinois Institute of Technology

AIChE Annual meeting 2012

100 101 102 103 104 105 106 107 108 109

0

50

100

150

200

Time (days)

Rev

en

ue (

$1

00

0/h

r) Dispatch

"o Dispatch

Page 2: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Outline

• Motivation and Objective

• Control of IGCC Dispatch Operation

• Equipment Design

• Case Study

Page 3: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Integrated Gasification Combined Cycle

Page 4: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Power System Operation

Gas Turbine

Coal Fired

Grid

DemandNuclear

Page 5: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

IGCC Role: Conventional Wisdom

Gas Turbine

Coal Fired

Grid

DemandNuclearIGCC

Page 6: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

IGCC with Dispatch Capabilities

Gas Turbine

Coal Fired

Grid

DemandNuclear

IGCC

Page 7: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

IGCC With Dispatch

- Respond to Market Prices - Increase Average Revenue

Electricity Spot Price

Opportunity:

0 5 10 15 200

50

100

time (days)

Energy Value

($/MWhr)

Page 8: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Process Modification for Dispatch Capabilities

Page 9: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

IGCC with Throughput Manipulation

Manipulation

of Fuel Flow

Page 10: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Hydrogen Gas Storage

Hydrogen

Gas

Storage

Assume Carbon

Capture Operations

Page 11: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

IGCC with Compressed Air Storage

Compressed

Air

Storage

Page 12: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Dispatch Opportunities

Gasification Block(Includes ASU Distillation,

Gasifier and Acid Gas Removal)

Power Block(Includes Expansion Turbine,

Combustion Turbine, HRSG,

and Steam Turbine)

ASUs,A

C

coal

s,H2H2

G

H2 Storage(MH2)

Compressed

Air Storage(MA)

MACASU Main

Air Compressor

PGPC

P�

Page 13: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Dispatch Manipulations

Gasification Block(Includes ASU Distillation,

Gasifier and Acid Gas Removal)

Power Block(Includes Expansion Turbine,

Combustion Turbine, HRSG,

and Steam Turbine)

ASUs,A

C

coal

s,H2H2

G

H2 Storage(MH2)

Compressed

Air Storage(MA)

MACASU Main

Air Compressor

PGPC

P�

Page 14: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Process Model

Gasification Block(Includes ASU Distillation,

Gasifier and Acid Gas Removal)

Power Block(Includes Expansion Turbine,

Combustion Turbine, HRSG,

and Steam Turbine)

ASUs,A

C

coal

s,H2H2

G

H2 Storage(MH2)

Compressed

Air Storage(MA)

MACASU Main

Air Compressor

PGPC

P�

322

221

/

/

βν

νββ

GHH

HCA

Pdt

dM

Pdt

dM

−=

−=

Page 15: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Constrained Process Model

Gasification Block(Includes ASU Distillation,

Gasifier and Acid Gas Removal)

Power Block(Includes Expansion Turbine,

Combustion Turbine, HRSG,

and Steam Turbine)

ASUs,A

C

coal

s,H2H2

G

H2 Storage(MH2)

Compressed

Air Storage(MA)

MACASU Main

Air Compressor

PGPC

P�

max

max

max

22

max

22

max

0

0

0

0

0

GG

CC

HH

HH

AA

PP

PP

MM

MM

≤≤

≤≤

≤≤

≤≤

≤≤

νν 322

221

/

/

βν

νββ

GHH

HCA

Pdt

dM

Pdt

dM

−=

−=

Page 16: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Outline

• Motivation and Objective

• Control of IGCC Dispatch Operation

• Equipment Design

• Case Study

Page 17: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Controller Design Using Instantaneous Revenue

ePC

Economic ModelPredictiveControl

Economic LinearOptimal Control

Page 18: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Economic Model Predictive Control

Maximize Average Revenue with Point-wise-in-time Constraints

0

min max

1max

. .

( )

T

e

x u

C P dtT

s t x Ax Bu Gw

z D x D u

z z zτ

= + +

= +

≤ ≤

∫&

• Braun, 1992 • Morris et al., 1994• Kintner-Meyer and

Emery, 1995• Henze et al., 2003

• Oldewurtel et al, 2010• Ma et al, 2012 • Mendoza-Serrano and

Chmielewski, 2012

Page 19: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Literature on EMPC

• Conceptual Development and Stability Issues: Rawlings and Amrit (2009); Diehl, et al. (2011); Huang and Biegler (2011); Heidarinejad, et al. (2012)

• Process Scheduling: Karwana and Keblisb (2007); Baumrucker and Biegler (2010); Lima et al. (2011); Kostina et al. (2011)

• Power Systems: Zavala et al. (2009); Xie and Ilić (2009), Hovgaard, et al. (2011), Omell and Chmielewski (2011)

• HVAC Systems: Braun (1992); Morris et al. (1994); Kintner-Meyer and Emery (1995); Henze et al. (2003); Braun (2007); Oldewurtel et al. (2010), Ma et al. (2012); Mendoza and Chmielewski (2012)

Page 20: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Economic Linear Optimal Control

{ }( )

0

2 min max

1max lim

. .

E[ ] min ,

T

e GT

x u

C P dtT

s t x Ax Bu Gw

z D x D u

z z z

→∞

= + +

= +

≤ −

∫&

Maximize Average Revenue with Statistical Constraints

• Yang, 2009• Yang, Omell, Chmielewski,

2011

• Yang, Omell, Chmielewski,2012

• Mendoza-Serrano andChmielewski, 2012

Page 21: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Electricity Price Model

weC

Page 22: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Electric Price Spectral Density

eCw

10-3

10-2

10-1

100

101

10-2

100

102

104

Frequence (rad/hr)

Sp

ectr

al

Den

sity

(($

/MW

)2/h

r)

Page 23: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Electricity Electric Price Realization

eCw

100 101 102 103 104 105 106 107 108 109

70

80

90

100

110

Time (days)

Ele

ctr

icit

y V

alu

e (

$/M

W h

r)

Page 24: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Scaled Electricity Prices

x Ax Bu Gwα= + +&

Overall Process Model:

Page 25: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

min max

x u

x Ax Bu Gw

z D x D u

z z z

α= + +

= +

≤ ≤

&

1 2 2

22 3

max

max

2 2

max

2 2

max

max

/

/

0

0

0

0

0

AC H

HH G

A A

H H

H H

C C

G G

dMP

dt

dMP

dt

M M

M M

P P

P P

β β ν

ν β

ν ν

= −

= −

≤ ≤

≤ ≤

≤ ≤

≤ ≤

≤ ≤

Constrained State Space Model

Page 26: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Stochastic Constraint

Lxu

uDxDz

GwBuAxx

ux

=

+=

++=&

zjjjj

jj

T

j

T

uxxuxjj

T

w

T

xx

njzz

LDDLDD

GGSBLABLA

L

...1,2 and 2

)()(

)()(0

such that Find

minmax

2

=−<<

=

+Σ+=

++Σ+Σ+=

σσ

ζσ

ρρζ

α

Page 27: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Stochastic Constraints

*

Constraints:2 ii z<ζ

2z

1z

zjjjj

jj

T

j

T

uxxuxjj

T

w

T

xx

njzz

LDDLDD

GGSBLABLA

L

...1,2 and 2

)()(

)()(0

such that Find

minmax

2

=−<<

=

+Σ+=

++Σ+Σ+=

σσ

ζσ

ρρζ

α

Page 28: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

[ ][ ]GGGGG

eeeee

PPPPP

CCCCC

=−=

=−=

, ~

, ~

ELOC Objective Function

GeGe

Ge

T

GeT

PCPCE

PCEdtPCT

+=

=

∫∞→

]~~

[

][1

lim0

where

Page 29: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

ELOC Objective Function

GeGe

T

GeT

PCPCEdtPCT

+=

∫∞→

]~~

[1

lim0

Then, enforce the conditioneG CP~~

α=

Ce

e

eeGe

CE

CCEPCE

Σ=

=

=

α

α

α

]~[

])~

(~[]

~~[

2

Page 30: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

ELOC Synthesis

zjjjj

jj

T

j

T

uxxuxjj

T

w

T

xx

njzz

LDDLDD

GGSBLABLA

ts

...1,2 and 2

)()(

)()(0

..

minmax

2

=−<<

=

+Σ+=

++Σ+Σ+=

σσ

ζσ

ρρζ

α

{ }GeCe

LPC

jjx

+Σ≥Σ

αα

σζ ,,,0,min

xLu ELOC=⇒

Page 31: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

ELOC Synthesis

zjjjj

jj

T

j

T

uxxuxjj

T

w

T

xx

njzz

LDDLDD

GGSBLABLA

ts

...1,2 and 2

)()(

)()(0

..

minmax

2

=−<<

=

+Σ+=

++Σ+Σ+=

σσ

ζσ

ρρζ

α

{ }GeCe

LPC

jjx

+Σ≥Σ

αα

σζ ,,,0,max

xLu ELOC=⇒

Can be Solved with a Convex Optimization Problem

Page 32: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Case Study Process Parameters

Adapted from NETL Baseline Report (Case 2)

- PNnom= 544MW PG

nom= 611MW PCnom = 67MW

- ννννH2nom = ννννGnom = 90 tonneH2/hrννννCnom = ννννASUnom = 790 tonne compressed air/hrννννcoal nom = 220 tonne coal/hr

- ββββ1 = 0.085 MW hr /tonne airββββ2 = 8.78 tonne air / tonneH2ββββ3 = 6.79 MW hr /tonneH2ββββ4 = 2.44 tonne coal /tonneH2

Page 33: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

ELOC Example

Synthesis

Gas

Storage

MW 1222

H tonne705

max

2

max

2

=

=

G

H

P

M

2

Ce /MWhr)20($=Σ

Page 34: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

ELOC Example

100 101 102 103 104 105 106 107 108 109

0

50

100

150V

alu

e (

$/M

W h

r)

100 101 102 103 104 105 106 107 108 109

0

500

1000

1500

Po

wer (

MW

)

100 101 102 103 104 105 106 107 108 109

0

500

1000

Time (days)

Ma

ss (

ton

nes)

Instantaneous

Average

Maximum

PG

Ce

MH2

Page 35: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

ELOC Example

100 101 102 103 104 105 106 107 108 109

0

50

100

150

Time (days)

Revenue (

$1000/h

r)

Dispatch

"o Dispatch

Average Revenue without Dispatch= 48,000 $/hrAverage Revenue with Dispatch = 55,000 $/hrOverall increase of 14.6%

Page 36: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

ELOC Example

Synthesis

Gas

Storage

MW 1222

H tonne705

max

2

max

2

=

=

G

H

P

M

2

Ce /MWhr)20($=Σ

Page 37: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Outline

• Motivation and Objective

• Control of IGCC Dispatch Operation

• Equipment Design

• Case Study

Page 38: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Equipment Size Variables

−−−−

−+Σmax

2

maxmax

22

max

max

222 ))((max

GHcAHHAA

HHHCef

PcPcMcMc

cPV ννα

zjjjj

jj

T

j

T

uxxuxjj

T

w

T

xx

njzz

LDDLDD

GGSBLABLA

ts

...1,2 and 2

)()(

)()(0

..

minmax

2

=−<<

=

+Σ+=

++Σ+Σ+=

σσ

ζσ

ρρζ

α

Page 39: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Equipment Size Variables

−−−−

−+Σmax

2

maxmax

22

max

max

222 ))((max

GHcAHHAA

HHHCef

PcPcMcMc

cPV ννα

zjjjj

jj

T

j

T

uxxuxjj

T

w

T

xx

njzz

LDDLDD

GGSBLABLA

ts

...1,2 and 2

)()(

)()(0

..

minmax

2

=−<<

=

+Σ+=

++Σ+Σ+=

σσ

ζσ

ρρζ

α

Page 40: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Equipment Size Variables

−−−−

−+Σmax

2

maxmax

22

max

max

222 ))((max

GHcAHHAA

HHHCef

PcPcMcMc

cPV ννα

zjjjj

jj

T

j

T

uxxuxjj

T

w

T

xx

njzz

LDDLDD

GGSBLABLA

ts

...1,2 and 2

)()(

)()(0

..

minmax

2

=−<<

=

+Σ+=

++Σ+Σ+=

σσ

ζσ

ρρζ

α

Page 41: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Equipment Size Variables

−−−−

−+Σmax

2

maxmax

22

max

max

222 ))((max

GHcAHHAA

HHHCef

PcPcMcMc

cPV ννα

zjjjj

jj

T

j

T

uxxuxjj

T

w

T

xx

njzz

LDDLDD

GGSBLABLA

ts

...1,2 and 2

)()(

)()(0

..

minmax

2

=−<<

=

+Σ+=

++Σ+Σ+=

σσ

ζσ

ρρζ

α

Page 42: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Outline

• Motivation and Objective

• Control of IGCC Dispatch Operation

• Equipment Design

• Case Study

Page 43: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Case Study Economic Parameters

Adapted from NETL Baseline Report (Case 2)- cf = $33/tonne coal

- cG = $2.55x105/MW

cC = $1.04x106/MW

- cA = $35.2/tonne compressed air cH2 = $540/tonneH2.

- Interest Rate = 7%

Project Horizon = 30yrs

Average Price of Electricity = $90/MW hr

Page 44: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Case 1 ΣΣΣΣCe = ($20/MWhr)2

Standard Deviation Electricity Price is $20/MWhr

*

2Hν

max*

AMmax*

2HM

max*

CP

max*

GP

= 90 tonneH2/hr,

= 0.0 tonne air

= 705 tonneH2

= 67 MW

= 1222 MW

Present value of $5.08x108 and

Revenue increase of 14.6%

Solution:

Page 45: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Case 1: ΣΣΣΣCe = ($20/MWhr)2

100 101 102 103 104 105 106 107 108 109

0

50

100

150V

alu

e (

$/M

W h

r)

100 101 102 103 104 105 106 107 108 109

0

500

1000

1500

Po

wer (

MW

)

100 101 102 103 104 105 106 107 108 109

0

500

1000

Time (days)

Ma

ss (

ton

nes)

Instantaneous

Average

Maximum

PG

Ce

MH2

Page 46: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Changes in Electric Price Variation

($/MWhr)2 (tonne/hr) (tonne) (MW) (tonne) (MW)

Present

Value

($x106)

Revenue

Increase

(%)

202 90 0.0 67 705 1222 508 14.6

CeΣ*

2Hνmax*AM

max*CP

max*2HM

max*GP

Page 47: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Changes in Electric Price Variation

($/MWhr)2 (tonne/hr) (tonne) (MW) (tonne) (MW)

Present

Value

($x106)

Revenue

Increase

(%)

52 90 0.0 67 0.0 611 0.0 0.0

202 90 0.0 67 705 1222 508 14.6

CeΣ*

2Hνmax*AM

max*CP

max*2HM

max*GP

Page 48: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Changes in Electric Price Variation

($/MWhr)2 (tonne/hr) (tonne) (MW) (tonne) (MW)

Present

Value

($x106)

Revenue

Increase

(%)

52 90 0.0 67 0.0 611 0.0 0.0

102 90 0.0 67 705 1222 175 7.3

202 90 0.0 67 705 1222 508 14.6

CeΣ*

2Hνmax*AM

max*CP

max*2HM

max*GP

Page 49: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Changes in Electric Price Variation

($/MWhr)2 (tonne/hr) (tonne) (MW) (tonne) (MW)

Present

Value

($x106)

Revenue

Increase

(%)

52 90 0.0 67 0.0 611 0.0 0.0

102 90 0.0 67 705 1222 175 7.3

202 90 0.0 67 705 1222 508 14.6

402 90 0.0 67 705 1222 1172 29.3

452 90 6200 134 705 1222 1426 36.6

CeΣ*

2Hνmax*AM

max*CP

max*2HM

max*GP

Page 50: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Case 5: ΣΣΣΣCe = ($45/MWhr)2

100 101 102 103 104 105 106 107 108 109-200

0

200

Va

lue (

$/M

W h

r)

100 101 102 103 104 105 106 107 108 109

0

500

1000

1500

Po

wer (

MW

)

100 101 102 103 104 105 106 107 108 109

0

2000

4000

6000

Time (days)

Ma

ss (

ton

nes)

Instantaneous

Average

MaximumC

e

PG

PC

MA

MH2

Page 51: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Case 5: ΣΣΣΣCe = ($45/MWhr)2

100 101 102 103 104 105 106 107 108 109

0

50

100

150

Time (days)

Revenue ($1000/hr)

Dispatch

"o Dispatch

100 101 102 103 104 105 106 107 108 109

0

50

100

150

200

Time (days)

Revenue ($1000/hr) Dispatch

"o Dispatch

Case 1: ΣΣΣΣCe = ($20/MWhr)2

Case 5: ΣΣΣΣCe = ($45/MWhr)2

Page 52: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

max

2Hν

2Hν

Why is Throughput Manipulation Not Selected?

Page 53: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Conclusions

1. Three opportunities to make IGCC dispatchableinvestigated.

- H2 storage found to be most viable.

- Gasifier throughput found to be non-viable.

- Compressed air storage only viable under extreme price variability.

Page 54: IGCC Power Plant Design of Dispatch Capabilitiesmypages.iit.edu/~chmielewski/presentations/2012/IGCC_Design_AIChE...IGCC Power Plant Design of Dispatch Capabilities ... Economic Model

Department of Chemical and Biological Engineering

Illinois Institute of Technology

Acknowledgements

• Former Students and Collaborators:

Amit Manthanwar

Dr. Jui-Kun Peng (ANL)

Professor Javad Abbasian (ChBE, IIT)

• Funding:

National Science Foundation (CBET – 0967906)

Chemical & Biological Engineering Department, IIT