ieee p-1622 voting systems electronic data interchange february 8–9, 2011 meeting at the us...

53
IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P- 1622 Chair

Upload: estella-gray

Post on 13-Jan-2016

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

IEEE P-1622Voting Systems

Electronic Data Interchange

February 8–9, 2011 Meetingat the US Election Assistance Commission

Arthur M. Keller, Ph.D., P-1622 Chair

Page 2: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Welcome

• Call the meeting to order.• Appoint a secretary.• Thanks for participating in an issue of national

import.• Thanks to James Long of EAC for hosting this

meeting.• Thanks for John Wack of NIST for helping to

organize this meeting.

February 8, 2011 2IEEE P-1622 WG Meeting

Page 3: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Welcome

• Belinda Collins, Director of NIST Technology Services.

February 8, 2011 3IEEE P-1622 WG Meeting

Page 4: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Welcome

• James Long, U.S. Election Assistance Commission. Our host.

February 8, 2011 4IEEE P-1622 WG Meeting

Page 5: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

IEEE Matters

• Attendance. In person attendees, make sure you sign the attendance list each time.

• Remote attendees, we will take attendance periodically. You need to attend at least half of the meeting in order to count as attending the meeting.

February 8, 2011 5IEEE P-1622 WG Meeting

Page 6: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

The IEEE-SA strongly recommends that at each WG meeting the chair or a designee:– Show slides #1 through #4 of this presentation– Advise the WG attendees that:

• The IEEE’s patent policy is consistent with the ANSI patent policy and is described in Clause 6 of the IEEE-SA Standards Board Bylaws;

• Early identification of patent claims which may be essential for the use of standards under development is strongly encouraged;

• There may be Essential Patent Claims of which the IEEE is not aware. Additionally, neither the IEEE, the WG, nor the WG chair can ensure the accuracy or completeness of any assurance or whether any such assurance is, in fact, of a Patent Claim that is essential for the use of the standard under development.

– Instruct the WG Secretary to record in the minutes of the relevant WG meeting: • That the foregoing information was provided and that slides 1 through 4 (and this

slide 0, if applicable) were shown; • That the chair or designee provided an opportunity for participants to identify

patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) of which the participant is personally aware and that may be essential for the use of that standard

• Any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom.

– The WG Chair shall ensure that a request is made to any identified holders of potential essential patent claim(s) to complete and submit a Letter of Assurance.

– It is recommended that the WG chair review the guidance in IEEE-SA Standards Board Operations Manual 6.3.5 and in FAQs 12 and 12a on inclusion of potential Essential Patent Claims by incorporation or by reference.

IEEE Patent Policy Instructions

February 8, 2011 6IEEE P-1622 WG Meeting

Page 7: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Participants, Patents, and Duty to InformAll participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants:

“Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents

“Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims

“Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents)

The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group

Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2 Early identification of holders of potential Essential Patent Claims is strongly

encouraged No duty to perform a patent search

Slide #1February 8, 2011 7IEEE P-1622 WG Meeting

Page 8: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Patent Related LinksAll participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development.Patent Policy is stated in these sources:

IEEE-SA Standards Boards Bylawshttp://standards.ieee.org/develop/policies/bylaws/sect6-7.html#6IEEE-SA Standards Board Operations Manualhttp://standards.ieee.org/develop/policies/opman/sect6.html#6.3

Material about the patent policy is available at http://standards.ieee.org/about/sasb/patcom/materials.html

Slide #2

If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at [email protected] or visit http://standards.ieee.org/about/sasb/patcom/index.html

This slide set is available at https://development.standards.ieee.org/myproject/Public/mytools/mob/slideset.ppt

February 8, 2011 8IEEE P-1622 WG Meeting

Page 9: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Call for Potentially Essential Patents• If anyone in this meeting is personally aware of the

holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance (LOA): – Either speak up now or– Provide the chair of this group with the identity of the holder(s) of any

and all such claims as soon as possible or– Cause an LOA to be submitted

Slide #3February 8, 2011 9IEEE P-1622 WG Meeting

Page 10: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Other Guidelines for IEEE WG Meetings All IEEE-SA standards meetings shall be conducted in compliance with

all applicable laws, including antitrust and competition laws. Don’t discuss the interpretation, validity, or essentiality of patents/patent

claims.

Don’t discuss specific license rates, terms, or conditions. Relative costs, including licensing costs of essential patent claims, of different technical

approaches may be discussed in standards development meetings.

Technical considerations remain primary focus

Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets.

Don’t discuss the status or substance of ongoing or threatened litigation.

Don’t be silent if inappropriate topics are discussed … do formally object.---------------------------------------------------------------

See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for

more details.

Slide #4February 8, 2011 10IEEE P-1622 WG Meeting

Page 11: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Overview of the IEEE-SA Process

Malia ZamanProgram Manager

Voting Systems Electronic Data Interchange CommitteeP1622 Working Group Meetings

Feb 8-9, 2011

Page 12: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

A New Beginning for P1622

P1622 is important work.We welcome the involvement of all stakeholders.IEEE is proud to be associated with this effort.Developing a standard to support voting systems in the U.S. is critical.Together, IEEE, NIST, and other stakeholders must see the standard through to completion.

February 8, 201112

Page 13: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

In this Presentation we will cover:

Overview of the IEEE-SA ProcessProject Approval ProcessDevelopment of Draft StandardSponsor Balloting ProcessmyBallot/myProject Access/Membership ServicesStandards Board Approval ProcessResources

February 8, 201113

Page 14: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

IEEE—A Global Organization

IEEE is a non-profit organization for scientific and educational advancement

IEEE is made up of international technical professionals living

around the world who are fostering technological innovation and excellence for the benefit of

humanity

February 8, 201114

Page 15: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

IEEE Standards Association

Oversees development of standards within IEEE Global Membership– Over 7 000 individual members– Over 127 corporate members– Approximately 20 000 participants

Broad Standards Portfolio– Approximately 1 000 active standards– Approximately 400 standards in development

Governed by volunteersAn independent organization – Participants come together to develop standards with many constituents

February 8, 201115

Page 16: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Board of Governors (BOG)Legal & fiduciary, strategy, policy, finance,

Bus Dev, International, Appeals, Awards

Standards Board (SASB)

Standards ProcessSCC Oversight

Corporate Advisory Group (CAG)

Corporate Program Strategy Sponsor

SponsorsSocieties (Computer Society), Committee (EASC), Standards

Coordinating Committees (SCC’s) ,CAG, etc.

Standards Working Groups/Projects

ISTO

IEEE-SA Governance Structure

February 8, 201116

Page 17: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Five principles guide standards development

Ensuring integrity and wide acceptance for IEEE standards

IEEE standards reflect the standardization principles as stated by the WTO

IEEE Standards Development

February 8, 201117

Page 18: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Societies and Technical Sponsor Committees

IEEE Aerospace and Electronic Systems Society (AES)

IEEE-SA Board of Governors (BOG) IEEE Broadcast Technology Society (BTS) IEEE Computer Society (C)• C/SAB Standards Activities Board

• P1622 Voting SystemsElectronic Data InterchangeWorking Group

IEEE Consumer Electronics Society (CES)

IEEE Communications Society (COM)

IEEE Electromagnetic CompatibilitySociety (EMC)

IEEE Industry Applications Society (IAS)

IEEE Microwave Theory and TechniquesSociety (MTT)

IEEE Nuclear and Plasma SciencesSociety

IEEE Nanotechnology Council (NTC)

IEEE Power & Energy Society (PE)

IEEE Power Electronics Society (PEL) IEEE Robotics and Automation Society (RAS) IEEE Reliability Society (RS) IEEE-SASB Coordinating Committees (SASB)

IEEE Vehicular Technology Society (VT)February 8, 201118

Page 19: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

IEEE Sponsors –Role of the Sponsor

Organization within IEEE that assumes responsibility for a particular standards ideaTakes responsibility for the technical content of the document and provides oversightResponsible for determining the scope and nature of the technical contentNot a financial sponsorshipIEEE already has a large number of Sponsors– There are the various societies within the IEEE – Within those societies, there are often many

committees that are active in standards development

February 8, 201119

Page 20: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

IEEE Standards Development: Process Flow

Idea!

Project Approval Process

Develop Draft

Standard

IEEE-SA Standards

Board Approval Process

Sponsor Ballot

Publish Standard

Maximum of 4 years

February 8, 201120

Page 21: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

IEEE Standards Development: Project Authorization

Develop Draft Standard

IEEE-SA Standards

Board Approval Process

Sponsor Ballot

Publish Standard

Maximum of 4 years

• A potential working group or study group gathers to work on the Project Authorization Request (PAR), up to six months before a PAR needs to be submitted.

• With the support of the sponsor, submit a PAR to IEEE-SA Standards Board (SASB) for an approval to start the project.

• PAR is reviewed by New Standards Committee (NesCom) and based on its recommendation, IEEE-SA Standards Board (SASB) approves/disapproves the project

Idea!

Project Approval Process

February 8, 201121

Page 22: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

IEEE Standards Development: Draft Development

IEEE-SA Standards

Board Approval Process

Sponsor Ballot

Publish Standard

Maximum of 4 years

• Working group (WG) is created/maintained under policies and procedures (P&P) of the sponsoring committee

• WG officers are designated to start the development of the standard

• Write the draft of the standard • Submit finalized draft for Mandatory Editorial Coordination

(MEC) to ensure conformance with IEEE requirements.

Idea!

Develop Draft

Standard

Project Approval Process

February 8, 201122

Page 23: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

IEEE Standards Development: Sponsor Balloting

IEEE-SA Standards

Board Approval Process

Publish Standard

Maximum of 4 years

• A ballot group is formed using an electronic balloting system called myProject/myBallot™ .

• Composition of that balloting group cannot change when the ballot is initiated.• A sponsor ballot is initiated with the draft, to be reviewed, commented, and voted

by the ballot group.• Needs 75% return response rate from the ballot group, and needs 75%

affirmative(approved) votes• WG reviews all the approved and disapproved votes with comments submitted by

the ballot group.• Make a reasonable attempt to resolve all negative votes

• Add or revise materials as suggested• Submit responses to the comments

• Recirculate the revised draft standard and comments out to the ballot group .

Idea!

Project Approval Process

Develop Draft Standard

Sponsor Ballot

February 8, 201123

Page 24: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Creating a Web Account and MyBallot/myProject

Access/Membership Services

Accessing the myProject system requires an IEEE Web Account: https://webapps1.ieee.org/WebAccount/Registration

MyBallot /MyProject Link:https://development.standards.ieee.org/my-site/home

Membership Services:http://standards.ieee.org/membership/index.html

February 8, 201124

Page 25: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

IEEE Standards Development: Approval Process to Publication

Maximum of 4 years

• Submit the final draft standard to Standard Review Committee (RevCom).

• RevCom reviews the submitted documents and materials, and makes a recommendation to IEEE-SA Standards Board for an approval of the draft standard.

• IEEE-SA Standards Board reviews the recommendation and approve the draft standard.

• Publish Standard• Complimentary copies sent to the WG.

Idea!

Project Approval Process

Develop Draft Standard

Sponsor Ballot

IEEE-SA Standards

Board Approval Process

Publish Standard

February 8, 201125

Page 26: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Resource Links

February 8, 201126

Additional Information:http://standards.ieee.org/develop/index.html

Additional Information:http://standards.ieee.org/develop/index.html

Page 27: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Comments/Questions:

February 8, 201127

Page 28: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

For more information…

Contact:

Malia ZamanProgram Manager

Technical Program DevelopmentPhone: +1 732 562 3838

Email: [email protected]

February 8, 201128

Page 29: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

IEEE

• Sue Vogel, Director of Technical Committee Programs, IEEE Standards Association.

February 8, 2011 29IEEE P-1622 WG Meeting

Page 30: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Review AgendaToday• Ratify goals for the meeting.• Common data format (CDF) and discussion of

requirements.• Discussion of use case strategy.• CDF requirements from an election analysis perspective.• Presentation on OASIS EML.Wednesday• Election system manufacturer presentations.• Agreement on issues.• Schedule next meeting.• Adjourn.

February 8, 2011 30IEEE P-1622 WG Meeting

Page 31: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Goals for the Meeting

1. Endorse and build upon the use case strategy for developing a CDF.

2. Decide which existing data format to utilize as the basis for CDF development.

3. Determine scope of a CDF for standardization.

4. Agree on timeline, next steps, and schedule next meeting.

February 8, 2011 31IEEE P-1622 WG Meeting

Page 32: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

P-1622 WG Status and Overview

• WG created a draft in 2007 that never proceeded to ballot.

• SCC 38 voted to reconstitute P-1622 for review of draft and revision or redraft as necessary.

• P-1622 has a new PAR (Project Activity Request).

• P-1622 also wrote a new P&P document.• At this meeting tomorrow, we will decide how

to proceed with standard drafting process.

February 8, 2011 32IEEE P-1622 WG Meeting

Page 33: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

15 minute break

• Resume at 10:30am.

February 8, 2011 33IEEE P-1622 WG Meeting

Page 34: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

CDF Overview and Requirements

• Introduction to a CDF – John Wack, NIST.• EAC CDF requirements – James Long, EAC.• TGDC perspective on CDF standard timeline –

Patrick McDaniel, IEEE Rep to the TGDC (Technical Guidelines Development Committee).

February 8, 2011 34IEEE P-1622 WG Meeting

Page 35: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Use Case Strategy

• Use cases drive requirements.• Requirements drive data formats.

February 8, 2011 35IEEE P-1622 WG Meeting

Page 36: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

UOCAVA Use Case

• Joel Rothschild, FVAP.• John Wack, NIST.

February 8, 2011 36IEEE P-1622 WG Meeting

Page 37: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Post-election Tabulation AuditingUse Case

• Neal McBurnett.

February 8, 2011 37IEEE P-1622 WG Meeting

Page 38: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Other Use Cases

• Blank ballot export.• Remote ballot printing. (new)• Import of remotely printed ballots for canvass.• Automated testing of voting systems.• Interoperability of voting systems components

and devices.• Other suggestions?

February 8, 2011 38IEEE P-1622 WG Meeting

Page 39: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Blank Ballot Export

• Important for UOCAVA.• Data mapping address and jurisdiction to

ballot style.• Descriptions of ballot measures, contests and

candidates.• Information on presentation and layout.

February 8, 2011 39IEEE P-1622 WG Meeting

Page 40: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Remote Ballot Printing

• Print ballot with voter’s selections or print blank ballot where voter hand-marks selections.

• Ballot in local jurisdiction format or in FWAB format.

• Issue: Local or statewide contests.• Also print Voter’s Declaration/Affirmation.• Follow FWAB instructions (even if not using

FWAB).

February 8, 2011 40IEEE P-1622 WG Meeting

Page 41: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Import Remotely Printed Ballotsfor Canvass

• Also an interoperability issue.• Useful for UOCAVA.• Relates to above use case.

February 8, 2011 41IEEE P-1622 WG Meeting

Page 42: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Automated Testing of Voting Systems

• Black-box testing vs. code review.• Standard test cases and files vs. randomly generated test

cases and files.• Test cases and files that “cover” the space of alternatives.• Interaction of test cases and code path analysis.• Generating test decks for Logic and Accuracy Testing.

• Beyond “black box testing.” Why not have testing using constraints and specifications and based on knowledge of source code paths and boundary conditions?

February 8, 2011 42IEEE P-1622 WG Meeting

Page 43: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Interoperability of Voting Systems Components and Devices

February 8, 2011 43IEEE P-1622 WG Meeting

Page 44: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Use Case Discussion

• Other proposed use cases?• Priority for use case development.• Volunteers?

February 8, 2011 44IEEE P-1622 WG Meeting

Page 45: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Lunch (on your own)

• Return at 1:15pm.

February 8, 2011 45IEEE P-1622 WG Meeting

Page 46: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Use Case Discussion (cont’d)

• Other proposed use cases?• Priority for use case development.• Volunteers?

February 8, 2011 46IEEE P-1622 WG Meeting

Page 47: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

CDF Requirements:an Election Analysis Perspective

• Kim Brace, President, Election Data Services.

February 8, 2011 47IEEE P-1622 WG Meeting

Page 48: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Presentations on OASIS EML

• Technical overview – David Webber, OASIS EML.

February 8, 2011 48IEEE P-1622 WG Meeting

Page 49: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

15 minute break

• Resume at 3:30pm.

February 8, 2011 49IEEE P-1622 WG Meeting

Page 50: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Presentations on OASIS EML (cont’d)

• Initial technical analysisof EML suitability for UOCAVA use case – Carmelo Montanez-Rivera, NIST.

February 8, 2011 50IEEE P-1622 WG Meeting

Page 51: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Discussion on OASIS EML

• Comments and questions.

February 8, 2011 51IEEE P-1622 WG Meeting

Page 52: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Wrap Up for Day One

• IEEE.• UOCAVA.• OASIS EML.Tomorrow:• Vendor presentations.• Agreements on how to proceed.

• Think about what role you want to play.February 8, 2011 52IEEE P-1622 WG Meeting

Page 53: IEEE P-1622 Voting Systems Electronic Data Interchange February 8–9, 2011 Meeting at the US Election Assistance Commission Arthur M. Keller, Ph.D., P-1622

Adjourn

• Return back here at 9am Wednesday morning.

February 8, 2011 53IEEE P-1622 WG Meeting