Outline
2
Introductiono Shipboard Microgridso Key Topics
System Overviewo Optimal planning and economic dispatch of a shipboard
power system
Test Scenario and Results
Conclusion
IECON 2016
Shipboard Microgrids
3IECON 2016
Maritime Vessels
Efficiency & Emissions
Electric Propulsion
Fuel Cells
Gas Turbines
Renewables
Reliability & Survivability
Redundant Design
New Architectures
Energy Storages
Control & Automation Energy Management
Generation Scheduling
System Overview
4IECON 2016
DCDC
ACDC
Econ
omic
Pow
er D
ispat
ch
Energy Storage System
Drilling Drive
AzimuthThruster
Electric Power Plant
DC Load
AC Load
System Load
Mission Profile
Shipboard Section
Plant Configuration
Units Specifications
Electric Layout
5IECON 2016
Shipboard electric power plant
, , ,( ) ;min maxDG i DG i DG iP P t P i N
2 1 1, ,( ) ( ) ( ) ( ) ( ( )) ( ) ( )offi
i
i i
t
i oi oi G i oi G i i si si i i
FC SUSDC
OC t P t P t u t e u t u t
1 , ,( ) ( ) ( ) ( ) /ESS ESS ESS ch ch ESS dch dchE t E t P t T P t T
00 10
, ,max
, ,max
,max
,max ,max ,max
( ) ( )( ) ( )
( )
ESS ch ch ESS
ESS dch dch ESS
ESS ESS
ch dch ESS
P t P u tP t P u tE t E
P P P
AC Side
DC Side
Chronological Load Curve
6IECON 2016
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 806
7
8
9
10
11
12
13
14
15
Time (minutes)
Pow
er [M
W]
Total Load
Measured LoadAverage Demand
Case A
Case B
Case C
Case D
Electrical load demand of the drill-ship for several mission profiles: • Case A- normal DP & normal drilling; • Case B- heavy DP & normal drilling, • Case C- heavy DP & heavy drilling; • Case D- survival
1
1 2(t). ( ). ( ) ; , ,...,j
j
t
D Dtp dt P j T j j M
Optimal Design and Operation
7IECON 2016
,max ,max,max ,max( )ESS ESSi E ESS P ESS
t T i NMin OC t C E C P
, , ,( ) ( ) ( ) ( ) ( ) ;DG i ESS dch ESS ch D OLi NP t P t P t P t P t t T
• Costs for installing ESS based on flywheel technology: 1600$/kWh and
600$/kW.
Simulation Results
8IECON 2016
(a) Plant #1- DG 1&2 (b) Plant #2- DG 3&4 (C) Plant #3- DG 5&6
Economic dispatch of DGs (in MW) during 5-minute intervals (Ti) for the given load profile
DGi
αoi
(¢) βoi
(¢/kW) γoi
(¢/kW2) αsi
(¢) βsi
(¢) ,
minDG iP
(MW) ,
maxDG iP
(MW)
Plant #1 1 450 10 13.5 10 20 0 7 2 430 12 13.0 12 24 0 7
Plant #2 3 460 12 13.5 12 18 0 7 4 390 58 5.6 11 19 0 7
Plant #3 5 370 57 5.4 11 21 0 7 6 340 52 5.2 12 20 0 7
Optimal operation of ESS
9IECON 2016
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
-4
-2
0
2
4
6
8
10
12
14
16
1 3 5 7 9 11 13 15
SOC
(%)
Dem
and
& E
SS O
utpu
t Pow
er (M
W)
Time Intervals
Load P_ESS SOC
• During off-peak times (e.g., 0-15 min. in normal DP and drilling mode), the storage unit mainly operates in charging mode to increase the back-up power for critical periods.
• During heavy DP or drilling times, the ESS is switched into discharge mode and shaves the peaks off of the load giving the DGs smoother operation and better performance.
• Optimal values for PESS,max and EESS,max were found to be 1.407 MW and 2.579 MWh, respectively.
Conclusion
10
• Compared to the conventional approaches, the proposed method:
addressed the question of how much energy storage to
install,
provided insight into the scheduling of different electric
power plants in a drilling vessel thorough various loading
levels and mission profiles.
IECON 2016
Thank Youfor
Your AttentionAmjad Anvari-Moghaddam, Tomislav Dragicevic, Lexuan Meng, Bo Sun, and
Josep M. [email protected]
The 42nd Annual Conference of IEEE Industrial Electronics Society