Identifying Solutions 101
Overhead Reliability to Resiliency
Betsy Coppock
10.10.19
![Page 2: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/2.jpg)
Reliability to Resiliency
• Once you have a goal - Figure out the solution
• To find the solution, you need to figure out what’s the problem
• To figure out the problem you need to know what’s happening
2
![Page 3: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/3.jpg)
Reliability to Resiliency
• Goal - Xcel Energy wants a more resilient system
– Less damage in storms
– Easier and faster to repair
– Less hazards to the public
– Uniform and guided inspection
• Not much has changed since utilities began using wood poles and crossarms
3
![Page 4: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/4.jpg)
Finding the Problem - Testing with EPRI
• Did 13 tests
• Old line but almost all
poles sound at ground line
• Conductors
– Old #4 Cu solid
– Old and new #2 ACSR
– New 2/0 ACSR
• Crossarms
– Old existing wood
– Added new wood
– Added fiberglass
4
![Page 5: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/5.jpg)
Pole Failure
• Ground line pole failure difficult to achieve
• Top of pole failed frequently
• Pole top condition prior to test was a strong indicator if pole top would stay intact during test.
• Good inspection/ maintenance programs should limit storm damage
![Page 6: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/6.jpg)
Crossarm Failure
• Typically insulators and insulators ties were stronger than old cross-arms
• Broke tops off some porcelain pin insulators
![Page 7: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/7.jpg)
Conductor Size Impact
• Damage happens on impact but also on conductor breakage recoil
• Pole top damage common all conductors
• Old #4 Cu higher probability of conductor breakage
• New #2 ACSR conductor high probability of crossarm breakage
• New 2/0 ACSR broken pole at groundline
7
![Page 8: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/8.jpg)
8
EPRI Pole Strength testing
• Pole Strengths
– Class 2, southern
pine for mainline
– 4,000 lb strength
![Page 9: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/9.jpg)
9
EPRI Component testing
![Page 10: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/10.jpg)
10
EPRI Tie and pin insulator test
![Page 11: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/11.jpg)
11
Pole top pin and insulator test
![Page 12: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/12.jpg)
12
Post insulator testing and steel distribution tie
![Page 13: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/13.jpg)
13
Post insulator test and aluminum preformed tie
![Page 14: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/14.jpg)
14
Structure Loading
![Page 15: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/15.jpg)
Mechanical Strength Coordination
• Texas Ice Storm
15
![Page 16: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/16.jpg)
Structure Testing 2018
• Xcel Energy tangent structure 15kV
16
![Page 17: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/17.jpg)
EPRI Structure Testing 2018
• Coordinated release – 15/25kV
– PUPI 2000 Tangent Arm
– 336 ACSR
– 4” x 4” washers
• Damage – 15/25kV
– Steel top ties came loose
– Bent arm pins
– Some arm bracket bending
– Possible insulator damage
17
![Page 18: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/18.jpg)
Preformed Tie on Pin Holding Strength
• Release
– Insulator rotates
– Pins bend
– Ties came loose
• Strength
– Arm pins bend easier than pole top pin
– Release at a lower strength
18
![Page 19: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/19.jpg)
Structure Testing 2018
• Xcel Energy tangent structure 35kV
19
![Page 20: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/20.jpg)
Structure Testing 2018
20
![Page 21: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/21.jpg)
Structure Testing 2018
• PUPI Arm Strength 6400lb vertical
– 336 ACSR, distribution tie, 4” x 4” washer above and below
• Three tests, same results – tried weaker tie and stronger arm
– Cantilever is too much
21
![Page 22: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/22.jpg)
• Insulator doesn’t rotate and insulator pin doesn’t bent
• Arm does twist to help release
Preformed Tie on Post Insulator Holding Strength
22
![Page 23: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/23.jpg)
23
Fiberglass arm testing
• 35kV Polymer Post
– 4” x 4” top and bottom
– 16” tall polymer post
– Maximum force – 961 lb
![Page 24: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/24.jpg)
Structure Testing 2019
• Xcel Energy tangent structure 35kV
• Polymer clamp top insulators
– Force to slip around 1,000 lb.
24
![Page 25: Identifying Solutions 101 Overhead Reliability to](https://reader031.vdocuments.site/reader031/viewer/2022012016/61da8c8f9ff64d1563698ac4/html5/thumbnails/25.jpg)
• Change in thinking about the Distribution System
• Automobile Industry
• Not selling 1950’s Chevy (Even if you like the styling)
• New models are better, more reliable, safer and efficient
• Utility Business
• Building 1900’s distribution isn’t going to take you further
• Inspect, maintain and replace exiting structures
• Build more resilient structures going forward
Conclusion