icharm workshop - pwri · 2018. 6. 21. · source: corps of engineers (june 1996) “final report:...

27
ICHARM Workshop ICHARM Workshop AGENDA for AGENDA for Research & Applications Research & Applications in in Governance (Institutions) & Integrated Governance (Institutions) & Integrated Flood and Water Management Flood and Water Management Eugene Z. Stakhiv Eugene Z. Stakhiv Institute for Water Resources Institute for Water Resources US Army Corps of Engineers US Army Corps of Engineers

Upload: others

Post on 17-Dec-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

ICHARM WorkshopICHARM Workshop

AGENDA forAGENDA forResearch & ApplicationsResearch & Applications

ininGovernance (Institutions) & Integrated Governance (Institutions) & Integrated

Flood and Water ManagementFlood and Water Management

Eugene Z. StakhivEugene Z. StakhivInstitute for Water ResourcesInstitute for Water ResourcesUS Army Corps of EngineersUS Army Corps of Engineers

Page 2: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Policy, Planning, Programmatic & Policy, Planning, Programmatic & Engineering Responses to KatrinaEngineering Responses to Katrina

Many Agency Task Forces and independent Many Agency Task Forces and independent Commissions, NSF, ASCE, NAS, etc.Commissions, NSF, ASCE, NAS, etc.Representing all levels of government & agenciesRepresenting all levels of government & agenciesLittle coordination among the groups (no integration)Little coordination among the groups (no integration)A priori legislation and decisions made separately, A priori legislation and decisions made separately, prescribing & constraining choices and actions prescribing & constraining choices and actions Things will Things will ‘‘settle downsettle down’’ –– federal federal govgov’’tt bears most of bears most of costs costs –– will influence responseswill influence responsesRole of public participation? (what happens when the Role of public participation? (what happens when the collective private interest conflicts with collective private interest conflicts with ‘‘public public interestinterest’’?)?)

Page 3: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

““Lessons learnedLessons learned””Too complacent Too complacent w.r.tw.r.t. evacuation plans. evacuation plansEngineering design criteria not updatedEngineering design criteria not updatedSimplistic, outdated methodologies, (1960Simplistic, outdated methodologies, (1960’’s)s)Fragmented decision authorities Fragmented decision authorities –– too much too much subsidiaritysubsidiarity, perhaps, perhapsHow to deal with residual risks of How to deal with residual risks of catastrophes catastrophes –– i.ei.e beyond design criteriabeyond design criteriaWhat is societal responsibility for stubborn What is societal responsibility for stubborn individuals who do not evacuate?individuals who do not evacuate?What new institutions are needed to What new institutions are needed to manage in integrated manner?manage in integrated manner?

Page 4: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Real Flood Damages 1903-1996 (billion 2000 dollars)

0

2

4

6

8

10

12

14

16

18

1900

1903

1906

1909

1912

1915

1918

1921

1924

1927

1930

1933

1936

1939

1942

1945

1948

1951

1954

1957

1960

1963

1966

1969

1972

1975

1978

1981

1984

1987

1990

1993

1996

1999

2002

2005

Dir

ect A

djus

ted

Dam

ages

(bill

ion

2000

dol

lars

-

100

200

300

400

500

600

700

800

900

Tota

l Adj

uste

d D

amag

es (b

illio

n 20

00 d

olla

rs)

Direct Adjusted Damages

Total Adjusted Damages

MississippiRiver Valley

Ohio & Lower Mississippi River

Basins

Kansas &Missouri Rivers

HurricaneDiane

Hurricane Agnes

Teton DamFailure

Midwest Floods

Page 5: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

0

10

20

30

40

50

60

70

1900

1903

1906

1909

1912

1915

1918

1921

1924

1927

1930

1933

1936

1939

1942

1945

1948

1951

1954

1957

1960

1963

1966

1969

1972

1975

1978

1981

1984

1987

1990

1993

1996

1999

2002

2005

Dir

ect D

amag

es p

er C

apita

(200

0 do

llars

)

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

Tota

l Dam

ages

per

Cap

ita (2

000

dolla

rs)

Direct Damages per Capita

Total Damages per Capita

MississippiRiver Valley

Ohio & Lower Mississippi River

Basins

Kansas &Missouri Rivers

HurricaneDiane

Hurricane Agnes

Teton DamFailure

Midwest Floods

Real Flood Damages per Capita (2000 dollars)

Page 6: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Flood Damages as Percent of GDP(Based on damages and GDP data in 2000 dollars)

0.0%

0.1%

0.1%

0.2%

0.2%

0.3%

0.3%

0.4%

0.4%

0.5%

0.5%

1900

1903

1906

1909

1912

1915

1918

1921

1924

1927

1930

1933

1936

1939

1942

1945

1948

1951

1954

1957

1960

1963

1966

1969

1972

1975

1978

1981

1984

1987

1990

1993

1996

1999

2002

2005

Dir

ect f

lood

dam

ages

as

perc

ent o

f GD

P

-

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

Tota

l flo

od d

amag

es a

s pe

rcen

t of G

DP

Direct damages as percent of GDPTotal damages as percent of GDP

MississippiRiver Valley

Ohio & Lower Mississippi River

Basins

Kansas &Missouri Rivers

HurricaneDiane

Hurricane Agnes

Teton DamFailure

Midwest Floods

Page 7: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

US Flood Policy Development &US Flood Policy Development &NonNon--Structural Floodplain ManagementStructural Floodplain Management

Gilbert White, 1942 DissertationGilbert White, 1942 DissertationExecutive Order 11988, Executive Order 11988, Floodplain MgmtFloodplain Mgmt (1977)(1977)P&S requirement for nonstructural plan (1980)P&S requirement for nonstructural plan (1980)Water Resources Development Act (WRDA1986)Water Resources Development Act (WRDA1986)Unified NatUnified Nat’’l l ProgProg for Floodplain Mgmt (1992)for Floodplain Mgmt (1992)Upper Miss R. Flood (1993)Upper Miss R. Flood (1993)““Galloway CommitteeGalloway Committee”” Report (1994)Report (1994)““Challenge 21Challenge 21”” Legislation (WRDA 99)Legislation (WRDA 99)Response to Katrina (2005Response to Katrina (2005-- ?)?)

Page 8: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

PRINCIPLES: Unified NatPRINCIPLES: Unified Nat’’l FPM Programl FPM Program

Modify Human Susceptibility to Flood DamageModify Human Susceptibility to Flood Damage(relocation, flood warning forecasting, disaster (relocation, flood warning forecasting, disaster preparedness, assistance, land acquisition, preparedness, assistance, land acquisition, etc.)etc.)Modify Impact of Flooding on People and Modify Impact of Flooding on People and CommComm--unitiesunities (emergency response, flood (emergency response, flood recovery)recovery)Preserve and Restore Natural Floodplain Preserve and Restore Natural Floodplain ResourceResource (land acquisition, restore (land acquisition, restore wetlands/habitats)wetlands/habitats)Modify FloodingModify Flooding (dams, dikes, detention basins(dams, dikes, detention basins

Page 9: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

““CHALLENGE 21CHALLENGE 21””

WRDA 99 (PL 106WRDA 99 (PL 106--53), Section 212: 53), Section 212: ““Flood Flood Mitigation and Mitigation and RiverineRiverine Restoration ProgramRestoration Program””“…“…projects to reduce flood hazards and restore projects to reduce flood hazards and restore the natural functions and values of U.S. riversthe natural functions and values of U.S. rivers””“…“…studies and projects shall emphasize, to the studies and projects shall emphasize, to the maximum extent practicable, nonstructural maximum extent practicable, nonstructural approaches to preventing or reducing flood approaches to preventing or reducing flood damagesdamages””ensure the restoration of natural functions and ensure the restoration of natural functions and values of floodplains.values of floodplains.

Page 10: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Policy Impediments to FDR (IWR;1998)Policy Impediments to FDR (IWR;1998)Full accounting of environmental, economic Full accounting of environmental, economic and social benefits difficultand social benefits difficultCurrent project justification (BCA) procedures Current project justification (BCA) procedures skew results and choice of alternativesskew results and choice of alternativesEmergency flood relief and recovery Emergency flood relief and recovery payments by agencies creates payments by agencies creates disdis--incentives incentives against nonagainst non--structural measuresstructural measuresFPM is not being pursued in coordinated FPM is not being pursued in coordinated manner manner –– land use decisions contrary to FPM land use decisions contrary to FPM principlesprinciples

Page 11: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Avoiding Flood Disasters:Avoiding Flood Disasters:An Applied Research Agenda for An Applied Research Agenda for

ICHARMICHARMA key determinant of achieving Sustainable A key determinant of achieving Sustainable DevelopmentDevelopmentDisaster PreparednessDisaster PreparednessWarning and Evacuation planningWarning and Evacuation planningPlanning Planning ““bestbest”” combination of structural & combination of structural & nonnon--structural approaches (minimize riskstructural approaches (minimize risk--costs) costs) –– how to choose how to choose ““bestbest””PostPost--disaster assistance, relief & recoverydisaster assistance, relief & recoveryRehabilitation and reconstructionRehabilitation and reconstruction

Page 12: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Climate Variability Undermines GrowthClimate Variability Undermines Growth

Risk of Risk of recurrent recurrent droughtdrought

Natural legacy: Natural legacy: extreme climate variabilityextreme climate variability

10/97 – 2/98 Flood Infrastructure Damage $2.39 b10/98 –5/00 Drought Crop loss $0.24 b

Livestock loss $0.14 bReduction in hydropower $0.64 bReduced industrial prod. $1.39 bTOTAL $2.41 b $2.39 b

10/97 – 05/00 Cost of Climate Variability $4.8 b

Approx (annual) GDP ($9 b/yr) $22 bImpact as % GDP/annum 22%

Kenya: variability & shock

Page 13: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

LeonardoLeonardo’’s Collaboration with s Collaboration with NiccoloNiccolo::Vision and Virtual RealityVision and Virtual Reality

Page 14: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

IWRM & GovernanceIWRM & GovernanceFlood management is integral part of IWRMFlood management is integral part of IWRM‘‘GovernanceGovernance’’ is policy keystone of IWRM:is policy keystone of IWRM:what needs to be done ?what needs to be done ?who should do it ?who should do it ?how it should be done?how it should be done?who makes the decisions?who makes the decisions?

IWR IWR Management Management is the effective and is the effective and efficient efficient coordinationcoordination and and implementationimplementation of of policies, programs & public participationpolicies, programs & public participationIWRM is the implementation arm of SDIWRM is the implementation arm of SD

Page 15: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Sustainable Development

Environmental Policy

(Water Quality, Environmental Flows)

Transportation Policy

(Navigation)

Agriculture Policy(Irrigation)

Ocean Policy(Commercial Fisheries)

National Energy Policy(Hydro Power)

CZMFlood Plain

Management•Structural•Non-Structural•Insurance•Tax Incentives•Environment•Relocation•Zoning/Mapping•Regulatory

Watershed Management

IWRMNational Water Policy•Irrigation•Flood Control•Hydropower•Water Quality•Water Supply•Navigation•Urban Drainage•Recreation

TRADE

Page 16: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

riverriver

++

++ dykedyke

==

Political Political orderorder

==

Water management (and water reform) is ALWAYS political…..

Ancient Chinese Characters describing water management

Page 17: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Governance encompasses:Governance encompasses:Coordination among Institutions to achieve goals Coordination among Institutions to achieve goals (SD: economic efficiency, equity & environmental)(SD: economic efficiency, equity & environmental)Organizational and Administrative restructuringOrganizational and Administrative restructuringLegislation to achieve goals (programs, policies Legislation to achieve goals (programs, policies and regulations)and regulations)Joint research initiatives, technology transferJoint research initiatives, technology transferPolicy formulationPolicy formulationLegal and regulatory frameworksLegal and regulatory frameworksEconomic incentivesEconomic incentivesRole of public participation in decision makingRole of public participation in decision makingPerformance assessment; monitoring, appraisalPerformance assessment; monitoring, appraisal

Page 18: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

ICHARM: Too much science ICHARM: Too much science –– too too little management?little management?

Flood forecasting is not the sole answer Flood forecasting is not the sole answer -- just just one of many initial technical prerequisites for one of many initial technical prerequisites for integrated flood plain mgmtintegrated flood plain mgmtFlood forecasting techniques, by themselves Flood forecasting techniques, by themselves do not translate to flood warning and do not translate to flood warning and evacuation (see Katrina)evacuation (see Katrina)What is the integrated flood management plan What is the integrated flood management plan which reduces risks, and manages residual which reduces risks, and manages residual risks in an effective, efficient manner?risks in an effective, efficient manner?

Page 19: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Basic Advice to ICHARMBasic Advice to ICHARMBudget allocation: ~25% new research; ~50% Budget allocation: ~25% new research; ~50% tech transfer of tech transfer of ““best practicablebest practicable”” methods; methods; ~25% training, capacity~25% training, capacity--buildingbuildingMany overlapping initiatives underway Many overlapping initiatives underway –– needs needs upgrading, synthesis, comparative analysisupgrading, synthesis, comparative analysisPeer review Peer review –– what works, in what what works, in what circumstances, what is costcircumstances, what is cost--effectiveeffectiveTechnology transfer and training to developing Technology transfer and training to developing nations nations --best practicable methodsbest practicable methods

Page 20: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

ICHARM Program Support to, and ICHARM Program Support to, and Coordination among:Coordination among:

UNESCO IHP, Phase VII Effort (2008UNESCO IHP, Phase VII Effort (2008--2013)2013)UN UN MDGMDG’’ssUN International Decade for WaterUN International Decade for WaterInternational Development Agencies (World Bank, International Development Agencies (World Bank, ADB, USAID, UNDP, CIDA, etc.)ADB, USAID, UNDP, CIDA, etc.)National approaches (Japan, Netherlands, US, National approaches (Japan, Netherlands, US, Bangladesh, etc.)Bangladesh, etc.)Comparative analysis of various programs and Comparative analysis of various programs and approaches approaches –– similarities and uniquesimilarities and uniqueThere are many useful methods There are many useful methods -- consolidateconsolidate

Page 21: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Institutional Aspects of Technical Decisions Institutional Aspects of Technical Decisions which influence plans & designswhich influence plans & designs

MethodologicalMethodological (e.g. engineering standards vs. (e.g. engineering standards vs. riskrisk--cost analysis; project justification rules; EIS, cost analysis; project justification rules; EIS, BCA, etc.)BCA, etc.)RegulatoryRegulatory (building codes, land uses, (building codes, land uses, ecological zones, etc.)ecological zones, etc.)EconomicEconomic (economic incentives, cost(economic incentives, cost--sharing, sharing, tax codes, insurance, discount rate, etc.)tax codes, insurance, discount rate, etc.)Social Social (public inputs, institutional veto powers)(public inputs, institutional veto powers)

Page 22: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Page 23: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Page 24: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

Existing Planning/Evaluation ParadigmsExisting Planning/Evaluation ParadigmsDescriptiveDescriptive (NOAA/CZM, (NOAA/CZM, McHargMcHarg, GIS), GIS)IndicativeIndicative (normative, P&S/P&G, BCA)(normative, P&S/P&G, BCA)PrescriptivePrescriptive (regulatory planning(regulatory planning-- an an oxymoron?)oxymoron?)ProscriptiveProscriptive (to avoid, NEPA/EIS)(to avoid, NEPA/EIS)ERSATZERSATZ ((EcorestorationEcorestoration sitting around sitting around the table the table ZeitgeistZeitgeist, or, see EPA Watershed , or, see EPA Watershed guidelines)guidelines)““Garbage CanGarbage Can”” PlanningPlanning (see Ersatz)(see Ersatz)

Page 25: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

DECISIONTHEORY

BCA

LP ELECTRE

WRAMMATSSWT

P&G

MAUT

FAULTTREE VOTING

P&S

BENEFITCOSTTHEORY

SOCIALCHOICETHEORY

UNCERTA

INTY

CERTAINTY

SINGLE DM MULTIPUBLIC

EFFICIENCY

EQUITY

Normative Evaluation PhilosophiesNormative Evaluation Philosophies

Page 26: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

US Impact Accounting SystemUS Impact Accounting System

•• National Economic Development (NED)National Economic Development (NED)–– beneficial and adverse effects on the national economy in beneficial and adverse effects on the national economy in

monetary termsmonetary terms

•• Environmental Quality (EQ)Environmental Quality (EQ)–– effects of plans on significant environmental resources effects of plans on significant environmental resources

and ecological, cultural and esthetic attributesand ecological, cultural and esthetic attributes

•• Regional Economic Development (RED)Regional Economic Development (RED)–– distribution of regional economic activity from each plan in distribution of regional economic activity from each plan in

terms of regional income and employmentterms of regional income and employment

•• Other Social Effects (OSE)Other Social Effects (OSE)–– effects on urban and community impacts, life, health, effects on urban and community impacts, life, health,

safety factors; displacement, long term productivity; safety factors; displacement, long term productivity; energy requirements and energy conservationenergy requirements and energy conservation

Page 27: ICHARM Workshop - PWRI · 2018. 6. 21. · Source: Corps of Engineers (June 1996) “Final Report: An Analysis of the Corps of Engineers Shore Protection Program,” IWR Report 96-PS-1

FinisFinis

ThanksThanks