ibm i workload migration and moving - apsu€¦ · ibm i workload migration and moving data between...

16

Upload: dotuyen

Post on 22-May-2018

220 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3
Page 2: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

IBM i workload migration and moving data between platforms

Paul Wade Regional Lead Sales Engineering EMEA

Page 3: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

Migration

What is migration really?• Hardware Upgrades

- P6 -> P7, P7-> P8 • P->V, V->P, etc.• OS Version• Server Consolidation• Server Relocation• Data Center Move (and to/from Hosting)• SAN Migration (to/from or vendor)• Ground to Cloud• Cloud to Cloud• Database Vendor• Database Version• OS Vendor• Application Version• Reorg While Active

Page 4: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

Migration Goals

Goals Rarely Change • Migration with the least possible downtime to

production environment • Protection against system failure during all phases of

the migration • Failback option in case of problems with new System/

App/Location • Migrate one HA product to another

Page 5: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

Migration Goals

Example - Health Care specialist AS/400 730 – System i 570 Big Bang migration would have caused a 20 hour outage Migrate 800Gb over 3 nights Test Migration at midnight Sign off users from 730 Sign on users to 570 Downtime (Minutes)

Parallel Method

Cascade Method

Primary (System “A”)

Backup (System “B”)

Primary (System “C”)

Backup (System “D”)

Primary (System “C”)

Backup (System “D”)

Primary (System “A”)

Backup (System “B”)

Page 6: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

Ease of Use with Vision Solutions Portal (VSP)

Consolidated View of Availability • Browser based

A single pane of glass for managing HA/DR solutions across platforms

Integrated, Intuitive Help System • Fly-over help notes • Smart Sort • Smart prompting

Highly Customizable Interface • User-defined • System level security

• Monitoring at a glance • Multi-instance, multi-product • Runs in Windows, IBM i and AIX

Page 7: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

VSP Highlights

At-a-Glance Monitoring Hover Text over Icons

Throughput Analysis GraphsLights Out Monitoring

Hyper Link to VSP for resolutionE-mail

Notification

Action Required

Attention (May resolve itself)

Okay (Switch Ready)

Page 8: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

Database Migration Scenarios

Modernization • Upgrading database version• Upgrading application version

30% planned to consolidate/combine databases in the next year.

28% plan to convert to a different database. 19% plan to reduce the number databases.*

Legacy

App/Database

Legacy

App / Database

New

App / Database

Conversion • Moving data to new database or application• Switch to new operating system

Consolidation • Reducing # of database platforms• Standardizing on fewer vendors• Reducing number of DBs by

consolidating into a centralized database, data mart or data warehouse

Page 9: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

Database Migration Scenarios

Issues: • Hope you can complete all steps in available time window…

- Data volumes becoming ever larger – takes longer to copy and convert data - Business becoming more 24 x 7 - reduced downtime window opportunities

• Final testing/verification limited to what remaining time you have • Many stages are dependant on completion of previous stage

Monday AM

EOD Friday SundaySaturday

DOWNTIME

All Users Off

System

Users Back On System

Backups Copy Data Transform Data Testing/verify

Page 10: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

Migration Benefits

Victaulic is a world leader in mechanical pipe joining systems. was founded in Network City in 1925 to market a radical new concept in the piping industry - a mechanical bolted coupling that would engage into pipe grooves and use a gasket seal.

Benefits over traditional migration approach 1. Reduce cut-over window - cut-over less than 4 hours after some 10.1 upgrade tasks run 2. Parallel testing/training snapshots - Full function and current 10.1 data after upgrade tasks run 3. Application set up configuration remains fluid - will be replicated to new release automatically 4. Parallel projects - other business projects can now run in parallel to the migration.

Live Users Experience no downtime during the

migration process.

Planned cutover expected to take less than

4 hours

Delta Migration Toolkit used to help map 7.1 schema

to 10.1 schema within DT SHARE metabase

Target 10.1 schema remains in-sync with 7.1 scheme in real time for extended duration to

allow parallel testing

DT SHARE replication periodically suspended and

snapshot copy of 10.1 schema made for testing

progress

Test users Can test & train on 10.1 using snapshot data after some 10.1 upgrade tasks have been run

Real Time CDC Replication

!Infor-Lawson M3 Java 7.1

Infor !!Lawson

M3 Java 10.1

Project Dates Start Jan 2013 Cut-Over June 2013 Project Location Nazerth, Belgium

Page 11: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

Migration Benefits

Why have Victaulic chosen the Delta Migration with Double-Take SHARE?

BUSINESS REASON Nr #1 - LESS INTRUSIVE TO OUR BUSINESS When we went live from Movex V11 to M3 7.1 in Europe in 2010, we executed 10 traditional data migration phases which results in around 250 - 300 Business Days testing by our business users. Add on top of that consultants’ hours testing.’

BUSINESS REASON Nr #2- MORE EXTENSIVE TEST PERIOD POSSIBLE ‘We want to start populating the BUSINESS DATA for the CHINA GO Live planned next year. This replication allows us to start populating M3 7.1 and get prepared way ahead of the go live.’

BUSINESS REASON Nr #3- ENAGED USERS & GREATER CERTAINTY OVER TIMELINE ‘Our people in China are early engaged in the M3 10.1 Go live game. They see their data flow from one system to the other and this creates engagement and dedication to do a good data entry job.

‘When our manufacturing in Poland went live in 2011, we had to postpone due to the fact that the entry of manufacturing part codes and BOM’s was heavily underestimated

‘With this scenario, we can start early in the game and avoid postponing the go live data as the entry of the data can start in M3 7.1

Page 12: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

Transform the Way You Do Business

Breaks down barriers between • Multiple databases • Incompatible applications • Disparate platforms

Makes data sharing easy • Captures changes • Transforms the data • Replicates it to the desired target

Allows for • Greater productivity • Higher profitability • Immediate ROI • All with no programming!

How can Double-Take Share transform the way you do business?

Page 13: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

Migration

What is migration really?• Hardware Upgrades

- P6 -> P7, P7-> P8 • P->V, V->P, etc.• OS Version• Server Consolidation• Server Relocation• Data Center Move (and to/from Hosting)• SAN Migration (to/from or vendor)• Ground to Cloud• Cloud to Cloud• Database Vendor• Database Version• OS Vendor• Application Version• Reorg While Active

Page 14: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

Migration…. DONE

Page 15: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3

IN SUMMARY

Vision Solutions is the industry leader protecting businesses’ data, applications and servers with solutions that meet every business continuity need.

Solution Area Offerings Key Messages

Cloud Protection and Recovery

High Availability and

Disaster Recovery

Migration and Cross-Platform Data Sharing

• RaaS Platform • Metered Usage • APIs for custom integration

• Server Protection • Agentless VM Protection • Private Cloud Protection

• Cross-Platform Data Sharing • Windows/Intel/AMD • IBM Power Systems

• Cloud BC/DR made easy • Cloud Adoption Acceleration • Risk mitigation for the Cloud

• Physical, Virtual, Cloud Protection • Protection of data, apps, servers • Protect heterogeneous environments

• Near-zero downtime migrations • Risk mitigation • Easy, real-time data sharing between DBs

The Vision Solutions Partner Program offers partners no-risk, unlimited potential for increased revenue and the affords them the ability to provide their customers the most innovative

protection, recovery, availability and migration solutions.

Page 16: IBM i workload migration and moving - APSU€¦ · IBM i workload migration and moving data between ... When we went live from Movex V11 to M3 7.1 in Europe ... start populating M3