I ORIGINAL STATE OF INDIANA INDIANA UTILITY REGULATORY COMMISSION IN THE MATTER OF AN ORDER ) APPROVING ADVISORY COMMITTEE ) RECOMMENDATIONS PURSUANT TO ) INDIANA CODE CHAPTER 8-1-26. ) APPROVED: ORDER OF THE COMMISSION NOY 05 2014 Indiana Code chapter 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission's Pipeline Safety Division ("Division") to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee ("Advisory Committee") reviews those recommendations and recommends civil penalties in the Case. The Cases received pursuant to Indiana Code chapter 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations. Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission hereby UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is hereby directed to prepare and send notice to the parties advising them of the determination. IT IS SO ORDERED. STEPHAN, MAYS-MEDLEY, HUSTON, WEBER AND ZIEGNER CONCUR; WEBER NOT PARTICIPATING IN THOSE MATTERS INVOLVING VECTREN: APPROVED: NOV 05 2014 I hereby certify that the above is a true and correct copy of the Order as approved. &Jlr&£ ____ I Secretary to the Commission

Upload: others

Post on 11-Nov-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

I ORIGINAL

STATE OF INDIANA

INDIANA UTILITY REGULATORY COMMISSION

IN THE MATTER OF AN ORDER ) APPROVING ADVISORY COMMITTEE ) RECOMMENDATIONS PURSUANT TO ) INDIANA CODE CHAPTER 8-1-26. )

APPROVED:

ORDER OF THE COMMISSION

NOY 05 2014

Indiana Code chapter 8-1-26 provides the procedure for the Indiana Utility Regulatory Commission's Pipeline Safety Division ("Division") to find violations of said chapter. Upon review of those findings, the Indiana Underground Plant Protection Advisory Committee ("Advisory Committee") reviews those recommendations and recommends civil penalties in the Case.

The Cases received pursuant to Indiana Code chapter 8-1-26 and ripe for Commission action are attached hereto and collectively referred to as the Advisory Committee Recommendations.

Pursuant to statute, the Advisory Committee has submitted their recommendations to the Commission. The Commission hereby UPHOLDS the findings of violations by the Pipeline Safety Division and APPROVES the recommendations of the Advisory Committee as listed on the attached pages. The Assistant General Counsel to the Division is hereby directed to prepare and send notice to the parties advising them of the determination.

IT IS SO ORDERED.

STEPHAN, MAYS-MEDLEY, HUSTON, WEBER AND ZIEGNER CONCUR; WEBER NOT PARTICIPATING IN THOSE MATTERS INVOLVING VECTREN:

APPROVED: NOV 05 2014

I hereby certify that the above is a true and correct copy of the Order as approved.

~ &Jlr&£ ____ I Secretary to the Commission

PSD Case Index for Conference on November 5, 2014

Case Respondent Other Party Recommended Prior Penalties

No. Penalty

5662 NIPSCO Miller Pipeline $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5663 Larry Norman NIPSCO Warning Letter No prior

5665 NIPSCO Miller Pipeline $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5667 NIPSCO GE Marshall $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5671 NIPSCO Precision Trenching $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5672 Hoosier Property NIPSCO Warning Letter No prior

Maintenance

5675 J&B West Construction NIPSCO Training Warning Letter

5676 Green Thumb Jasper Muni Gas Warning Letter No Prior

Landscaping

5678 NIPSCO Habitat for Humanity $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5682 NIPSCO Lee Excavating $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5683 Lawson Electric NIPSCO Warning Letter No prior

5686 Mike Thompson NIPSCO Warning Letter No prior

5688 NIPSCO H & G Underground $1,000 314 priors (Warning

Utilities Letter, Training,

Written Plan)

5692 Skyway Trucking NIPSCO Training Warning Letter

1

PSD Case Index for Conference on November 5, 2014

Case Respondent Other Party Recommended Prior Penalties

No. Penalty

5696 NIPSCO Pavey Excavating $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5698 NIPSCO Grimmer Construction $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5699 NIPSCO Grimmer Construction $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5701 Kihn Concrete Community Natural Gas Warning Letter No prior

5702 Hoosier Fence and Deck NIPSCO Warning Letter No prior

5704 Pfister Sprinkler NIPSCO Training 314 priors (Warning

Letter, Training,

Written Plan)

5706 Ben Potis NIPSCO Warning Letter No prior

5708 NIPSCO Hoosier Fence & Deck $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5709 NIPSCO Pete Saint Mary $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5710 NIPSCO Fort Wayne City Utilities $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5711 NIPSCO Schneck Excavating $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5712 Earth Construction NIPSCO Training Warning Letter

5718 Valparaiso Sewer NIPSCO Training Warning Letter

2

PSD Case Index for Conference on November 5, 2014

Case Respondent Other Party Recommended Prior Penalties

No. Penalty

5721 NIPSCO Earth Construction $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5728 NIPSCO Indiana Earth Inc. $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5729 Citizens Energy Group Millennium $1,000 59 (Warning Letter,

Training)

5731 Michael Hough NIPSCO Warning Letter No prior

5734 Lagrange County REMC NIPSCO Warning Letter No prior

5735 NIPSCO Kankakee Valley REMC $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5739 NIPSCO Riccis Landscape $1,000 314 priors (Warning

Management Letter, Training,

Written Plan)

5741 NIPSCO Kline Excavating Inc. $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5743 NIPSCO GE Marshall $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5747 Middlebury Septic NIPSCO Warning Letter No prior

5749 NIPSCO NIPSCO $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5751 NIPSCO Advance Irrigation $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5752 Citizens Energy Group K and K Fence $1,000 59 (Warning Letter,

Training)

3

PSD Case Index for Conference on November 5, 2014

Case Respondent Other Party Recommended Prior Penalties

No. Penalty

5755 NIPSCO LGS Plumbing Inc. $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5757 NIPSCO Band W Specialized Drilling $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5768 Rebecca Cartwright NIPSCO Warning Letter No prior

5784 Rothenberger Co. NIPSCO Warning Letter No prior

5785 Rieth-Riley NIPSCO $3,000 19 priors (Warning

Letter, Training)

5788 Van Gordon NIPSCO Warning Letter No prior

Construction

5799 Migul Becerril NIPSCO Warning Letter No prior

5800 Zach Raymond NIPSCO Warning Letter No prior

5801 NIPSCO Rivers Edge Construction $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5808 NIPSCO Walsh and Kelly (Griffith) $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5811 NIPSCO Band W Specialized Drilling $1,000 314 priors (Warning

Letter, Training,

Written Plan)

5812 Bieson Excavating Rennselaer Muni Gas Warning Letter No prior

6313 Qualkenbush Bros. Indiana Natural Gas Corp. Training Warning Letter

6329 Conwell Construction Indiana Natural Gas Corp. Warning Letter No prior

6330 Qualkenbush Bros. Indiana Natural Gas Corp. $500 + training Training

6331 Jerry Hammond Midwest Natural Gas Corp. Warning Letter No prior

4

PSD Case Index for Conference on November 5, 2014

Case Respondent Other Party Recommended Prior Penalties

No. Penalty

6334 Service Experts Heating NIPSCO Warning Letter No prior

&Air

6340 Walsh and Kelly NIPSCO Training 5 priors (Warning

(Griffith) Letter, Training)

7385 NIPSCO C&E Excavating Training 314 priors (Warning

Letter, Training,

Written Plan)

7386 NIPSCO Haskins Excavating Training 314 priors (Warning

Letter, Training,

Written Plan)

7389 NIPSCO Henry Electric Training 314 priors (Warning

Letter, Training,

Written Plan)

7391 Zachary Black NIPSCO Warning Letter No prior

7392 Anthis Career NIPSCO Warning Letter No prior

Center/Fort Wayne

7394 Mark Stevens NIPSCO Warning Letter No prior

7396 Montgomery Well Drill NIPSCO Warning Letter No prior

7397 Gordon Myers NIPSCO Warning Letter No prior

7398 Hugh McPartland NIPSCO Warning Letter No prior

7401 Lawnscape Land NIPSCO Warning Letter No prior

Management

7403 Century Builders NIPSCO Warning Letter No prior

7404 Jarrod Hill NIPSCO Warning Letter No prior

7406 Alicia Gilliard NIPSCO Warning Letter No prior

7407 Kent Gilmer NIPSCO Warning Letter No prior

5

PSD Case Index for Conference on November 5, 2014

Case Respondent Other Party Recommended Prior Penalties

No. Penalty

3166 Vectren QC Communications Training 134 priors (Warning

Letter, Training,

Written Plan)

3547 Vectren QC Communications Training 134 priors (Warning

Letter, Training,

Written Plan)

3618 Vectren Miller Pipeline Training 134 priors (Warning

Letter, Training,

Written Plan)

4036 Vectren Rivertown Construction Training 134 priors (Warning

Letter, Training,

Written Plan)

4448 Vectren Environmental Construction Training 134 priors (Warning

Letter, Training,

Written Plan)

4568 Vectren Rininger Excavating Training 134 priors (Warning

Letter, Training,

Written Plan)

4587 C and J Construction Vectren Warning Letter No prior

4602 Vectren Meade Incorporated Training 134 priors (Warning

Letter, Training,

Written Plan)

4606 Vectren Meade Incorporated Training 134 priors (Warning

Letter, Training,

Written Plan)

4616 Double Bee Fence Co. Vectren Warning Letter No prior

4620 QC Communications Vectren Training (or $750 if 9 priors (Warning

fail to train) Letter, Training)

4638 QC Communications Vectren Training (or $750 if 9 priors (Warning

fail to train) Letter, Training)

4965 DK Concrete Vectren Warning Letter No prior

6

PSD Case Index for Conference on November 5, 2014

Case Respondent Other Party Recommended Prior Penalties

No. Penalty

4967 Price Excavating Vectren Training (or $750 if No priors (escalated

fail to train) to training for

multiple dangerous

practices failure to

timely notify operator

of damage and self-

repair.

5153 Vectren 3D Company Training 134 priors (Warning

Letter, Training,

Written Plan)

5156 Double Bee Fence Co. Vectren Training (or $750 if 1 prior (Warning

fail to train) Letter)

5159 B.L. Brown Construction Vectren Training (or $750 if 1 prior (Warning

fail to train) Letter)

5161 Vectren Lykins Contracting Training 134 priors (Warning

Letter, Training,

Written Plan)

5163 Vectren Lykins Contracting Training 134 priors (Warning

Letter, Training,

Written Plan)

5164 Vectren Lineal Contracting Training (or $750 if 134 priors (Warning

fail to train) Letter, Training,

Written Plan)

5180 Lunar Construction Vectren Warning Letter No prior

5187 Lykins Contracting Vectren Warning Letter No prior

5188 Lunar Construction Vectren Training (or $750 if 1 prior (Warning

fail to train) letter)

5190 BL Brown Construction Vectren Training (or $750 if 1 prior (Warning

fail to train) letter)

5191 Jason Elpers Vectren Warning Letter No prior

5197 Central Fence Vectren Warning Letter No prior

7

PSD Case Index for Conference on November 5, 2014

Case Respondent Other Party Recommended Prior Penalties

No. Penalty

5219 Bynum Fanyo Utility Vectren Warning Letter No prior

5646 Tecton Construction Vectren Training (or $750 if 1 prior (Warning

fail to train) Letter)

5664 Vectren Foley Foundations $1,000 146 priors (Warning

Letter, Training,

Written Plan)

5674 Finzel Irrigation Vectren Warning Letter No prior

5687 Vectren Pendleton P&L $1,000 146 priors (Warning

Letter, Training,

Written Plan)

5689 Rotor Rooter Vectren Warning Letter No prior

5694 Vectren Calumet Civil Contractors $1,000 146 priors (Warning

Letter, Training,

Written Plan)

5715 Environmental Vectren Warning Letter No prior

Construction

5716 Vectren Dave Q'Mara Contractor $1,000 146 priors (Warning

Letter, Training,

Written Plan)

5753 J.D.H Contracting Vectren Training 146 priors (Warning

Letter, Training,

Written Plan)

5756 Terry Pool Company Vectren Warning Letter No prior

5772 Vectren Sub Surface of Indiana $1,000 146 priors (Warning

Letter, Training,

Written Plan)

5778 Lineal Contracting Vectren $3,000 5 priors (Warning

Letter, Training)

5782 . F X Underground Vectren Training Warning Letter

8

PSD Case Index for Conference on November 5, 2014

Case Respondent Other Party Recommended Prior Penalties

No. Penalty

5802 Vectren Miller Pipeline $1,000 146 priors (Warning

Letter, Training,

Written Plan)

5804 Swinney Brothers Vectren Warning Letter No prior

5809 Teds Plumbing Vectren Warning Letter No prior

5814 Bloomington Utilities Vectren Warning Letter No prior

6041 Roger Wallace Vectren $500 + training No prior. Escalated

penalty. Excavator

clamped off the line

and failed to notify

operator of leak for

2weeks

6044 John McClintic Vectren Warning Letter No prior

6050 Vectren Town of Plainfield $1,000 146 priors (Warning

Letter, Training,

Written Plan)

6058 Gilliland Trucking Vectren Warning Letter No prior

6059 Slater Construction Vectren Warning Letter No prior

6064 Vectren Poisel Construction $1,000 146 priors (Warning

Letter, Training,

Written Plan)

6066 Vectren Evansville Water/Sewer $1,000 146 priors (Warning

Letter, Training,

Written Plan)

6067 Randy's Tree Service Vectren Warning Letter No prior

6068 Mr. Fence Vectren Warning Letter No prior

7502 Brian Spencer Vectren Warning Letter No prior

9

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: QC Communications Other Party: Vectren Case No.: 4620 Date of Advisory Meeting: August 26, 2014 Date of Damage: 4/10/2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter Special instructions: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Lit Training or $750 civil penalty if fail to take training

D Civil penalty of $ ________________ _

D Other -------------------------------------------

Additional Information: -----------------------------------

APPROVED: IL III ~ ----~~---------------------------------(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: QC Communications Other Party: Vectren Case No.: 4638 Date of Advisory Meeting: August 26,2014 Date of Damage: 4/17/2014

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty:

D Warning letter Special instructions: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

~ Training or $750 civil penalty if fail to take training

D Civil penalty of $ ________________ _

D Other -------------------------------------------

Additional Information: -----------------------------------

APPROVED: __ ~~~~~~v----__________________________ _ (initialed) Ben Warren

Chairman

Committee Recommendation to IURC

Respondent: NIPSCO Other Party: Acorn Landscaping Case No.: 4956 Date of Advisory Meeting: August 26, 2014 Date of Damage: April 24, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f): mislocate or failure to locate

The Advisory Committee recommends the following penalty: ~'f'~ro~ ~r 1 'JSO \f: =f<u I

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------

APPROVED:~~~~0~~~ ______________________________ _ (initialed) Ben Warren

Chairman

Coahran, Lisa

From: Erich, Kelsey Sent: To:

Monday, December 01,201410:04 AM Coahran, Lisa

Subject: RE: 4956 - No Investigative Summary

It appears Mike changed the case to a No Violation. He put notes in the database indicating this, but I don't have any additional information.

Thanks,

Kelsey Erich

Indiana Utility Regulatory Commission

101 West Washington Street, Suite 1500 E

Indianapolis, IN 46204

Confidentiality Notice: This e-mail transmission may contain deliberative, confidential or other legally privileged information that is not subject to public disclosure under Ind. Code § 5-14-3-4(b), and is intended only for the individual or entity named in the e-mail address. If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution, or reliance upon the contents of this e-mail is strictly prohibited.

From: Coahran, Lisa Sent: Monday, December 01,20149:56 AM To: Erich, Kelsey Subject: 4956 - No Investigative Summary

Kelsey,

There is a Recommendation Form for 4956 in the folder for this case, but no Investigative Summary. I need the summary to merge with form for the Commissioners. Can you locate and forward?

Thanks.

Lisa Coahran Legal Assistant - General Counsel Indiana Utility Regulatory Commission 101 W. Washington St., Ste. 1500 E. Indianapolis, IN 46204 Tel: (317) 233-6140

1

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: NIPSCO Other Party: Miller Pipe Line Case No.: 5662 Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, September 03,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

dvisory Committee recommends the following penalty: 000

Special instructions ifwarning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;;.e=l=ki=· n=g:t....,;;;;a=b.;;;..;st=a=in=s~ _____ _

APPROVED: __ ~~~~< __ ~~~~====== ________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Larry Norman NIPSCO 5663 June 24, 2014 Tuesday, September 03, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory commi~~ommends the following penalty: \j ()f,/\~ . \ c_ .

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....;S;;;..e=l=ki=· n=g=....;:;:;a=b.;;;..st=a=in=s;;....-_____ _

APPROVED: __ ~~ ___ ~~~===~~ __________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Other Party: Foley Foundations Case No.: 5664 Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 04, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)

The Advis !y Committee recommends the following penalty: . \000

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: L v-----~---------------------------------------(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to lURe

Respondent: Other Party: Case No.:

NIPSCO Miller Pipe Line 5665

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 04, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: $ IDDO

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....:;;;;.S=el;.:;;ki::;;,;·n::;;,;gr:a...;;:;a;..;;;;b.:;;.st.:;,;;;a;.;;.in::;;,;s~ _____ _

APPROVED:~~~~ht~~~ _________ ____ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO GE Marshall Inc 5667

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 04, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The AdV:3ry Committee recommends the following penalty: If)CP

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ -=.Se=l=ki=· n=g=-:;;:a=b.:;;.st=a=in=s=....-_____ _

APPROVED: ___ ~~ __ ~ __ ~~~_-_-__________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

NIPSCO Precision Trenching Inc 5671 June 24, 2014 Wednesday, September 04, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Adviso Committee recommends the following penalty: cO

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S""-e.;;..;;l=ki=· n=go::::a.....;;..a=b""-st.;;.;;.a=in=s"'--_____ _

APPROVED: (initialed) -----------------------Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Hoosier Property Maintenance And Snow Removal Inc

Other Party: NIPSCO Case No.: 5672 Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 04, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory ~ommitte~mends the following penalty:

WMY\\~ \c Contactin 811

SelfRe air

Additional Information: ____ ..;.;S;...;;;e.;;;;lki=·=n-=g...;;.;a;...;;;;b..;;;..st=a=in=s~ _____ _

APPROVED: L IJ~ -----~----------------(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: t=; {"\ L eJ Other Party: Ve.c-kn Case No.: 5 lat Y Date of Advisory Meeting: _____ ~.....;.I.--L...;...L/~/ L-I LI.....L.-________ _ Date of Damage: q 7 5" J I 3

The lURe Pipeline Safety Division finds the following violation: \ c.. :b - l - '2 (, - 'J...D (ct) L L.) .

The Advisory Committee recommends the following penalty: ~ "in \JJ (i)[II\\ "j lew

Additional Information: -------~---------

APPROVED: __ ~ ____ ~_~ ________________________ ___ (initialed)

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent:

Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

J & B West Construction And Remodeling NIPSCO 5675 June 24, 2014 Thursday, September 05, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Adviso,ry Committee recomm,S!1ds the follo,,:ing penalty: T (l (\ ~ 0"- ~ 50C)O ,. -+ ~ \

S ecial instructions i warni letter: White Linin Potholin Contactinu 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ ...:;;S;..;:;e~lki=·=n.z:Lg...:;;a;.;;;;b..::;;..st=a=in=s~ _____ _

APPROVED:~~~ ___ ~_~ ________________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Green Thumb Landscaping Other Party: Jasper Municipal Gas Case No.: 5676 Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 06, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)

The Advisory Committee recommends the following penalty: ltfar: V\ ~ "j \ e:\-\u-

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------

APPROVED: ____ ~ ______ ~~~===~ ___________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Habitat For Humanity 5678

Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 06, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: S \QDD

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ --'S.;;;...e.;;.;;.l=ki=· n;;;.;.og=....;;.;;a..;.;.b.;;...st.;..;..a;;.;.;.in.....;s"'--_____ _

APPROVED: __ ~~F=--~~--~--~~~~------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to lURe

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

NIPSCO Lee Excavating 5682 June 24, 2014 Friday, September 06, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: ()' \ Of)D

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;...e=l=ki=·n=g::::L-,.;.;;a=b;;;...st=a=in=s~ _____ _

APPROVED: ___ ~ ____ ~ __ t_-_~ ____ - __________________ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Lawson Electric NIPSCO 5683

Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 06, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty: WMV\i~ leJkr

S ecial instructions i warnin letter: White Linin Potholin Clearance Zone (Two-Foot Rule) Damaging Lines

Additional Information: _____ S;;;;;..e=l=ki=· n;;;;;.,jg::::t....,;.;;a=b.;;;..st,;;.;;,a=in=.;;;;...s ______ _

/ 1!_1 APPROVED: __ ~~ ___ hl __ IC-___________________________ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Mike Thompson NIPSCO 5686

Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 09, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)(prior)

The Advisory Committee [;-mmends the following penalty:

I .d (),r n ~ I.e., Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;;..e=l=ki=· n=g=.....;.;;a=b.;;..st=a=in=s~ _____ _

APPROVED: _____ ~~~~~\~~~ ___________ ~ ________________________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Vectren Pendleton Power & Light 5687

Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 09, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)

The Advisory Committee recommends the following penalty: 5 \000

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------------

APPROVED: L !L-------~=-----------------------------------------------------------------------

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: NIPSCO Other Party: H & G Underground Utilities LLC Case No.: 5688 Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 09, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)

The Advisory Committee recommends the following penalty: -j)\OOO

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S;;;;;.e=l=ki=· n=g:::s.....:;;;a=b.:;;..st=a=in=s:::....-_____ _

APPROVED: __ ~~. ~~i1~~~ ______________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to lURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Roto Rooter - I Y\d \'n.napu \\ ~ Vectren 5689 June 24, 2014 Tuesday, September 10, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)

The Advisory commW ecommends the following penalty: \0(}J V\\~ ~e;

Potholino Contactin 811 SelfRe air

Additional Information: -----------------------------------

APPROVED: ~ hl~ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to lURe

Respondent: Other Party: Case No.:

Skyway Trucking Inc NIPSCO 5692

Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, September 10, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penal~

~~)nO("" j SUQO . f ~'I Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;;..e=l=ki=·n=g::t....,;;.;;a=b.;;..st=a=in=s~ _____ _

APPROVED:~t:~ ___ ~ __ ~ ________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Vectren Calumet Civil Contractors 5694

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 11,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The A visory Committee recommends the following penalty: \00

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------------

APPROVED: ______ ~~ _____ ~~ _____ K--_--____________ ---_____ ~ ______________________________ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Pavey Excavating Incorporated 5696

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 11,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)

The Ad~SOry Committee recommends the following penalty: \00)

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S"'-e.;;;..;;l=ki=" n=g=-.;;..;;a.;.;.b",-st.;..;.a=in.;;...s~ _____ _

APPROVED: ___ ~~~~_~~-=~ _________________________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Grimmer Construction Company 5698

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 12, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advis ry Committee recommends the following penalty: \OE)O

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ --.;.;;..Se=l=ki=·n=g~a=b.;;;;..st=a=in=s~ _____ _

APPROVED: __ ~~· ~~Li~~ ________________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Grimmer Construction Company 5699

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 12, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: :\\000

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S~e=l=ki=·n=g=.....;;.;;.a=b=st=a=in=s~ _____ _

APPROVED: __ ~~· ~~~~~ __________________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Kihn Concrete Community Natural Gas, Inc. 5701

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 12, 2013

The lURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committey recommends the following penalty: \d a)U\~ ~e.ttur

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Infonnation: ~ ) ok '. d f' \ 1/ ; ~ \ 5 c.o I{\ S \ ~ e...d \' ~)LCQ.AJ a..::f-l OVl 'I un c::!...Lr

APPROVED: __ ~~ _____ LL_~ ______________________ ____ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to lURe

Respondent: Other Party: Case No.:

Hoosier Fence And Deck Incorporated NIPSCO 5702

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 12,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(1)

The Advisory Committee\rec,qmmends the following penalty: UO,}{Y\ , 0j e.-'\-Kf

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S.;;..e=l=ki=·n=gc::o.....;;.;;a..;.;.b.;;..st.;;.;;.a=in=s~ _____ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Pfister Sprinkler Systems NIPSCO 5704

Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 13,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory ~ommittee recommends the follow~ng penalty: . :1-X:CU (\\N){ 0 (" :t 5000 \ + +Cl.J I

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;;..e=l=ki=·n=g~a=b.:;;..st=a=in=s~ _____ _

APPROVED: __ ~~ __ V_~ ______________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Ben Potis NIPSCO 5i06

Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, September 14, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty:

l ! \ a m~ leh Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....;.;;;.S..;;;.;el=ki=· n=g=-..;.;;a=b.;;;..st=a=in=s~ _____ _

APPROVED:~~~~ __ ~~· ~=. ==~~~~ ________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Hoosier Fence & Deck Incorporated 5708

Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 16, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)

The Ad5;f&iJmmittee recommends the following penalty:

Special instructions i(warningletter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....;S.;;;;...e~l=ki=·n=g=......;;.;;a=b.;;;;...st=a=in=s~ _____ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Pete Saint Mary 5709

Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 16, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: S \otD

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ --.;S.;;;..e=l=ki=· n=g=-.;.;;.a=b.;;;..st=a=in=s~ _____ _

APPROVED: __ ~~~ __ ~_Y ________________________ __

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

NIPSCO Fort Wayne City Utilities 5710 June 24, 2014 Monday, September 16, 2013

The lURe Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The dvisory Committee recommends the following penalty:

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....:S;;;;..e:::;.;;l~ki;;;;,;· n;=.lg=-=a=b.:;;;..st:;.;;a:.:;;in;;:;s~ _____ _

APPROVED: __ ~_· __ ~~~~_' ______________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

NIPSCO Schneck Excavating Incorporated 5711 June 24, 2014 Tuesday, September 17, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Ad~Ory Committee recommends the following penalty: IDOO

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ ....:S;;:;.e=l=ki=·n=g::L...,;;.;;a=b.;;;.st=a=in=s~ _____ _

APPROVED: __ ~.~~ ___ ~~~~ ____________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Earth Construction Inc. NIPSCO 5712

Date of Advisory Meeting: June 24, 2014 Date of Datnage: Tuesday, September 17,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(I)

The Advisory Committee recomme~~ the following penalty: :fOrnJ ~ 0 r :50 00 i +- A,. I Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S;;;;..e=l=ki=· n=g=-:;.;a.;;;.b.;;;..st=a=in=s;;;....-_____ _

APPROVED:~~~~L1~~-~----------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Environmental Construction Vectren 5715

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 18,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Committee ftsommends the following penalty: WQx-vll j \e~~

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------------

APPROVED:~~-------~~~---=~~~-------------------------------------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Vectren Dave O'Mara Contractor 5716

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 18,2013

The lURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)

The AdViSO:§ Committee recommends the following penalty: fcP2

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: ____ ~~~~~------------------------------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to lURe

Respondent: Other Party: Case No.:

City Of Valparaiso Sewer Department NIPSCO 5718

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 18,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advis~ry Committee recommends the followin~ penalty: . -r rOJ 1'\\ ~ 0 r ::l ~O It- !;a, , /

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ ......;.;;;..Se=l=ki=·n=g::::t....,;;,;;a=b.;;;..st=a=in=s~ _____ _

APPROVED:~.~~ __ ~~~~ ________________________ _ (ini tial ed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: NIPSCO Other Party: Earth Construction Inc. Case No.: 5721 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 19, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: j)\DCO

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;;,.e;:.:;l:;.;;,:ki;::;.:" n;;.zg=-=a=b..:;;..st:;,.:;a=in=s:=:....-_____ _

APPROVED:~~ _____ ~~~ ______________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

NIPSCO Indiana Earth Incorporated 5728 June 24, 2014 Friday, September 20, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)

The Advisory Co~mittee recommends the following penalty: S\00U

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;;..e=l=ki=· n=g::t...,.:;;:;a=b.::;;..st=a=in=s:=:....-_____ _

APPROVED: __ ~~ ___ ~_c __ ~ _____ -~-----------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Citizens Energy Group Millenium Contractors 5729

Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, September 21, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: 5\000

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: Warren abstains ----------------~~~~~~==--------------------------

APPROVED: ____ ~~ ________ ~(~--------------------------------------(initialed) Dan Meiners

Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Michael Hough NIPSCO 5731

Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, September 21, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committ~mmends the following penalty: Ir0Qx(\\ ~ ~e5

Special instructions i{warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ ~S.;;.;el=ki=·n=g~a=b..;;;..st=a=in~s ______ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lagrange County Remc Other Party: NIPSCO Case No.: 5734 Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 23, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Committee l ~ecommends the following penalty: Wcu-n,~ \e\iV'

Contactin 811 SelfRe air

Additional Information: ____ ....;.;S;;;...;e;;.;;;.lki=·n;;.o::ga....;;a;.;;.;;b;;..;;;s;..;;.;ta;.;;.;i=n;.;;;.s ______ _

APPROVED: I ~ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Kankakee Valley Remc 5735

Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 23, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty:

S loW Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ -.;S;;..e=l=ki=" n=g=-=a=b.;;;..st=a=in=s~ _____ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Riccis Landscape Management 5739

Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, September 24, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: :j))QDO

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ ---"'-S..;;..;el=ki=o n=go::a...;;.;;a.;.;.b.;;;..st.;;.;;.a=in=s""---_____ _

APPROVED: ___ ~~ __ ~~~~ ______________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Kline Excavating Inc 5741

Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, September 24, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: ,:J lEPO

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .-..::;;..S.;;.;el:;:;,;ki:;:;,;· n:=.lg=-:;;:a=b..:;;.st::.;;a;.::.in=s~ _____ _

APPROVED: __ ~~~ ___ ~ __ ~ ____________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Ge Marshall Inc 5743

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 25, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: 3 \000

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ ......;.;;;..S..;..;el=ki=· n=g~a=b.;;;..st.;;..;.a=in=.;;;...s ______ _

.~ 'L--APPROVED: ______ ~~----f/--~-------------------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Middlebury Septic Inc NIPSCO 5747

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 25,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Committry recommends the following penalty: \,0 {).jr-y\ ~ lk We/' .

Contactin 811 SelfRe air

Additional Information: ____ ..;;;S;;..;;e;.;;;.;lki=·=n~g...:;;a;.;;;;b...;;..st=a=in=s~ _____ _

APPROVED: __ ~~~_il----____________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO NIPSCO 5749

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

visory Committee recommends the following penalty: 000

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....;S;;;;..e=l=ki=·n=g=:t......:;;a=b=st=a=in=s~ _____ _

APPROVED: ___ ~ ____ ~_n ________________________ __

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Advanced Irrigation 5751

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: ~\Of)O

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S"'-e.;;.,.;;l=ki=· n=g:::o....;;.;;a=b"'-st.;..;;.a=in=s;;........ _____ _

APPROVED: __ ~~~ ____ ~_· _~_--~~~ __________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No. :

Citizens Energy Group K And K Fence Company 5752

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advis ry Committee recommends the following penalty: I. 000

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: Warren abstains ----------------~~~~~~==--------------------------

APPROVED: __ ~~~~~ ________________________ _ (initialed) Dan Meiners

Vice Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: J.D.H. Contracting Other Party: Vectren Case No.: 5753 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(I)

The Advisory Committee recommends the following penalty: rCCL\ £\ \ 'J:;:: Q r ~ snO 0 .) +-- +' a.... I

Special instructions i[warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: _£u-' __ A1_~~ _________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

NIPSCO L G S Plumbing Inc 5755 June 24, 2014 Thursday, September 26, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advis !y Committee recommends the following penalty: \000

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....;S;;;;..e=l=ki=· n=g~a=b=st=a:.;.in=s:::..-_____ _

APPROVED: ______ ~~ __________ AL_~ _______________________________________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Terry Pool Company Vectren 5756

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)(expire)

The Advisory Committee, ~ecommends the following penalty: \A )c1X:n I~ W~

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED:~~~ ___ iJl~_~~~=== ___________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to lURe

Respondent: Other Party: Case No.:

NIPSCO BAnd W Specialized Drilling 5757

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: 3 \000

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....;S;;;;..e=l=ki=·n=g::a...;;.;a=b.;;..st=a=in=s~ _____ _

APPROVED:_~~~_L1_~_--__ -_· _______ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Rebecca Cartwright NIPSCO 5768 June 24, 2014 Saturday, September 28, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee ry~ommends the following penalty: ~Qx- Y\ \ ~ \.U~r

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....;S.;;;...e;;..;;l=ki=·n=g::::t.,..,,;..;a.;.;;..b.;;;...st;..;;.;a=in=s~ _____ _

APPROVED: (initialed) ----------------------

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Vectren Sub Surface Of Indiana Inc 5772 June 24, 2014 Monday, September 30,2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(1)

The AdViSj; Committee recommends the following penalty: \DOO

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------------

APPROVED: _____ ~~==_._. ~JV( _____ ~ _______________________________________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Lineal Contracting Vectren 5778

Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, October 01, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

visory Committee recommends the following penalty: DeD

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED:~~~~~~~~~~~~~~~-(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

F X Underground Vectren 5782 June 24, 2014 Wednesday, October 02,2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(I)

The Advisory Committee recommend&the following penalty: '\ f'(lA"rI!g D (' J :s 0 {)f) • + -/'-a...". , I

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: ____ ~~ ___ ~tCL_c_~~~_-_-________________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Rothenberger Company Inc NIPSCO 5784

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, October 02, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory ComJt1it~~e r~commends the following penalty: vJar~\!j \L~

Contactin 81i SelfRe air

Additional Information: _____ S;;;;;..e=l=ki=· n=g::t....,;;;;a=b=st:.;;a=in=s~ _____ _

APPROVED: ___ ~ __ ~tJL----________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Rieth Riley Construction NIPSCO 5785 June 24, 2014 Wednesday, October 02, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)(prior)

The dvisory Committee recommends the following penalty: . ODO ...

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S~e=l=ki=·n=g~a=b~st=a=in=s~ _____ _

APPROVED:~~~ __ )0~~ ___________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Van Gordon Construction Incorporated NIPSCO 5788 June 24, 2014 Thursday, October 03, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recomI}1;ends the following penalty:

lU (}Jr n.~ tVJdcf Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ --'S.;;;...e.;;..;;l=ki=· n=g:o....;;.;.a.;.;..b.;;;...st;;..;;.;a=in=s"'--_____ _

/

APPROVED:~~~~~~~~~~~~~~~~~_ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Migul Becerril NIPSCO 5799

Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, October OS, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Com ittey\recrommends the following penalty: VJ OJ V\ f' C\rtL

Contactin 811 SelfRe air

Additional Information: ____ ...;.;;S;..;;;e..;;;.;;lki;.;;;·;.;;;n.o:::o.g..;;.;a;..;;;b..;;..st.;..;;.a;.;;;in;.;;;s~ _____ _

APPROVED: _____ ~~~~~~-----------------------------------------------------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Zach Raymond NIPSCO 5800

Date of Advisory Meeting: June 24, 2014 Date of Damage: Sunday, October 06, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)

The Advisory Committee re:JWllends the following penalty:

\A.} Ilrl'\~ ~

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .......;.;;;..S.;;..;el=ki=· n=g=-.;..;;a=b.;;;..st=a=in=s~ _____ _

APPROVED: ___ ~ ____ ~_· ~ __ ---______________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

NIPSCO Rivers Edge Construction 5801 June 24, 2014 Monday, October 07, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The dvisory Committee recommends the following penalty: \OCQ

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S~e=l=ki=·n=g=.....;;.;a.;.;;;.b~st.;.;.a=in=s~ _____ _

APPROVED:~~~~~~=====~~~~~~~_ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Vectren Miller Pipe Line 5802 June 24, 2014 Monday, October 07, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)

The AdvisorY Committee recommends the following penalty: j) \OL)O

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: tJ\\ \ \ u oJo&i--oJ'vl~.

APPROVED: __ ~~~~~~~_' ______________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Swinney Brothers Vectren 5804 June 24, 2014 Tuesday, October 08, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)

The Advisory Committee reco mends the following penalty: Q.rn \ tv

Contactinu 811 SelfRe air

Additional Information: -----------------------------------

APPROVED: ___ ~~~---~---~-~-------------------------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: NIPSCO Other Party: Walsh And Kelly - Griffith Case No.: 5808 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, October 10,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty: . ~JDOO

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ________ S ..... el_ki ..... · n __ g~a.-..b __ st.;..;.a=in __ s~ _____ _

APPROVED: __ ~~~---~-~--~----------------------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Teds Plumbing Other Party: Vectren Case No.: 5809 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, October 10, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)

The Advisory Committee recommends the following penalty: lA.JQ fy\)~ \, W

\ 0

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information:

(initialed)

----------------------------------------------------------------------

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO BAnd W Specialized Drilling 5811

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, October 10,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: ,$~OOO

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;;;..e=l=ki=· n=g:t....,;;.;;a=b.;;;..st=a=in=s~ _____ _

APPROVED: __ ~~~ __ ~ _____ - ____________________ __

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Bieson Excavating Inc. Rennselaer Municipal Gas System, City Of

Case No.: 5812 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, October 10, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee re~ends the following penalty: \A \(l..[V\ I~ \1,

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: ___ ~~ ____ ~ ___ ~_· _______________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: City Of Bloomington Utilities Other Party: Vectren Case No.: 5814 Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, September 30, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Commit~ye recommends the following penalty: w(U-Y\r~ \tW

Special instructions if warning letter: White Lining Potholing Contacting 811 Qtearance Zone (two-Foot ~ Damaging Lines Self Repair

Additional Information: --------------------------------------------------------------------

APPROVED: _____ ~~~ ______ ~ _____ =~~~~~ ________________________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Wallace, Roger Vectren 6041

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 04, 2013

The lURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)

The ~dvisory Committee recommends the fol~wing penalty: c.l2 5DO -\- +v-~ .. :): ()..- 2) sro 0 j-r-

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: --------------------------------------------------------------------

! J~-APPROVED:~~~ ___ ~~_~~_-____________________________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Me Clintie, John Veetren 6044

Date of Advisory Meeting: June 24, 2014 Date of Damage: Sunday, September 29,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee,l1ecommends the following penalty: W(lj[n I~ l e.'-\-\if

Potholino Contactino 811 SelfRe air

Additional Information: -------------------------------------------------------------------

APPROVED:~~ _____ ~~ _________________________________________________________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Vectren Plainfield, Town Of 6050

Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 13,2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)

The AdViS3 Committee recommends the following penalty: \CJOO

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------------

APPROVED: _____ ~~ _____ ~~~v---_____ ~~ _____ - _________________________________________ ~ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to lURe

Respondent:

Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Gilliland, Robert Trucking & Excavating

Vectren 6058 June 24, 2014 Wednesday, September 25, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)

The Advisory Committee r commends the following penalty:

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: ___ ~~~----~---1~~~--------------------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Slater Construction Other Party: Vectren Case No.: 6059 Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 25, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee ecommends the following penalty: CL'r(\ \ V""

S ecial instructions 1 warnino letter: White Linin Potholin Contactino 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: --------------------------------------------------------------------

APPROVED: ___ .~~--~h4~~---------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: . Case No.:

Vectren Poisel Construction 6064

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, September 11,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The AdvisorY Committee recommends the following penalty: S \O()O

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information:

(initialed)

----------------------------------------------------------------------

Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Vectren Evansville Water & Sewer Dept 6066 June 24, 2014 Monday, September 23,2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)

The Advisory Committee recommends the following penalty: ~\OE)O

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: ____ ~ ______ ~~ ___ ~_' ______________________________ ___

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Mr Fence, Inc Other Party: Vectren Case No.: 6068 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, September 26, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(I)

The Advisory Commi e recommends the following penalty: \ \6

Contactin 811 SelfRe air

Additional Information: ------------------------------------

APPROVED: __ ~_=~ ___ ivL~~ ___ --_______________________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Randys Tree Service Vectren 6067

Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, September 20, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------------

APPROVED: _____ ~~~~~~: ~-~~~---------------------------------------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Qualkenbush Brothers Isral Qualkenbush

Other Party: Indiana Natural Gas Corporation Case No.: 6313 Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, October 25,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty: -tv-ru (\ i fi::l or j s-o 00 I~ :.ta....' J

Specialinstructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: 5~ ±tau (\I' ~ C<LS e.. 'i\ o. Co '330 . '\) D V'\. o-\- D!l v-L to

APPROVED: ___ ~ __ ~~~~ ________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Conwell Construction Indiana Natural Gas Corporation 6329

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, October 10,2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)( expire)

The Advisory Committee ree mends the following penalty: (lyhl

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------------

APPROVED: _____ ~~~ _____ ~ _____ ~_----________________________________________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent:

Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Qualkenbush Brothers Isral Qualkenbush

Indiana Natural Gas Corporation 6330 June 24, 2014 Thursday, October 03, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty: i s-oo + ~o._(~::~ () r <f ~(j au I f-

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------------

APPROVED:~~ __________ ~_~_=~~ __________________________________________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to lURe

Respondent: Other Party: Case No.:

Jerry Hammond Midwest Natural Gas Corporation 6331

Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, October 19, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty: \. tOJrV\i ~ \e-W

S ecial instructions i warnin letter: White Linin Potholin Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information:

81

--------------------------------------------------------------------

APPROVED: ___ ~~~ _____ ~ _____ o-_____ ~~= _____________________________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to lURe

Respondent:

Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Service Experts Heating & Air Conditioning NIPSCO 6334 June 24, 2014 Friday, October 11,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Committee, , ecommends the following penalty: \U OJrVl "0j Lu~

Contactin 811 Self Re air

Additional Information: ____ ...;.;;S;....;;;e~lki=·=n=.g~a;.;.;;.b..;;;;..st.;;.;.a=in=s~ _____ _

APPROVED: _____ ~~~ _____ ~~~~ _____ ---__________________________________________________ _____ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

R & R Excavating NIPSCO 6338

Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, October 14,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(I)

The Advisory Committee r~fom~ends the following penalty: \0 ('ifY\ l~ Lt.,\-k-f

Special instructions if warning letter: White Lining Potholing ·Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ -..;S;;;..e=l=ki=· n=g=-..;;.;;a=b.;;;..st=a=in=s~ _____ _

APPROVED: __ ~~~~~~~== ____________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

G ct}'C1·.t.,¥>, Ok Respondent: Walsh And Kelly -~oHth BeAd Other Party: NIPSCO Case No.: 6340 Date of Advisory Meeting: June 24, 2014 Date of Damage: Monday, October 14,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Committee recomm ends the follow.inlS penalty: J

-+-rQlJv\: ~ c> r J, $"C7LJD I +- ..(2Q..!.

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ ~S...;;.e=lki=·=n.=.g...;.;a...;;.b~st.;;.;.a;.;;.;in;.;;.;s~ _____ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO C & E Excavating 7385

Date of Advisory Meeting: June 24, 2014 Date of Damage: Wednesday, July 03, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty: --hOJ (\ i ""j /) r $ 750 i + ~ · I

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S""-e=l=ki=·n=g=.....;;.;;a=b""-st=a=in~s ______ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Haskins Excavating 7386

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, July 11,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory C~mmittee recommends the follow~n.s penalty,: :\:[{),.\(\\ ~ or \$ '150 1+ -!'cD'

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S;;;..e=l=ki=·n=g=-=a=b.;;..st=a=in=s~ _____ _

APPROVED: __ ~~ __ LL~~ __ -~~~~ ________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

NIPSCO Henry Electric 7389

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, July 18, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty: -+rQ,)f\\~ 0"- .1 7s--c::J ' t k'/

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ ...... S .... e __ l ...... ki.;;.;..· n ..... g::::o.....;..;;a.;.;;..h .... st;.;;..a;.;;;.;in=s"""'"--_____ _

APPROVED: __ ~~ ___ ~_v=~~~~~~~ ________________ ____ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Zachary R. Black Other Party: NIPSCO Case No.: 7391 Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, July 06, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty: \" ;Grn )".:) \l±\e£

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....;S:;;;..e;:;,;;l:.=,;;ki;.:· n:;:.;g=a....;;:a=b=st=a:.:;,in:;;.s~ _____ _

APPROVED: __ ~~~ ___ ~_~_· ______________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent:

Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Anthis Career CenterlFort Wayne Construction Trades NIPSCO 7392 June 24, 2014 Monday, July 08, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty: \da.x-V\~ ILW

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....;S.;;;..e.;;..;;l=ki=· n=g::::L...;;.;.a.;.;;.b.;;;..st;.;.a=in=s;;.....-_____ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No. :

Mark Stevens NIPSCO 7394

Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, July 11, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty: '\ )Qx-V\~ k{kr

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;;..e=l=ki=· n=g=....;;;a=b.;;;..st=a=in=s~ _____ _

APPROVED: __ ~~ __ ~~~~~ ______________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Montgomery Well Drrill Other Party: NIPSCO Case No.: 7396 Date of Advisory Meeting: June 24, 2014 Date of Damage: Thursday, July 11,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty: , D ().A"" f'"\ \""=3 \,L W-

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;;..e;;;.;;l=ki=· n=g::t....,;;,;;,a=b.;;;..st=a=in=s~ _____ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Gordon Myers NIPSCO 7397

Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, July 12, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee reco~1f1ends the following penalty: W a;r Y\ \' ~ \L.,\-lGV-

Special instruCtions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S._.e ..... l __ ki ..... · n .... g~a-.b._.st-.a __ in __ s~ _____ _

APPROVED: ___ ~~~_A%~~~ ____________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Hugh Mcpartland NIPSCO 7398

Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, July 12,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty: o (ly n 'Y:::J lk1;k.-r

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....;S.;;..e.;;.;;l=ki=· n=g~a.;.;;.b.;;..st;;...;.;a=in=s"'--_____ _

APPROVED: __ ~~~ ___ ~~~~~_-_-_-_-________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Lawnscape Land Management NIPSCO 7401

Date of Advisory Meeting: June 24,2014 Date of Damage: Friday, July 12,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty: \ },,) ().Jr VI i 'j u K\-uC

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;..e=l=ki=· n=g:t.,....;;.;;.a=b;;;..st=a=in=s~ _____ _

APPROVED: ____ ~ _____ ~~~_· ______________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Century Builders NIPSCO 7403

Date of Advisory Meeting: June 24, 2014 Date of Damage: Saturday, July 13, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee,rewnutlends the following penalty:

\M()..fVl~ ~

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ______ S;;;;..e=l=ki=· n=g::a..;;.;;a=b.;:;..;st=a=in=s;;.....-_____ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Jarrod Hill NIPSCO 7404 June 24, 2014 Saturday, July 13, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)( expire)

The Advisory Committee recoIAmends the following penalty:

\A.J Q..Jr V). '''J '-<--~ Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S.-.e.-.l=ki=· n;;;;."g=-..;;.;;.a=b.-.st=a=in=s~ _____ _

APPROVED: ___ ~~~~~~ _________________________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Alicia Gilliard NIPSCO 7406

Date of Advisory Meeting: June 24, 2014 Date of Damage: Tuesday, July 16, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee r=~ends the following penalty: wCUr V\\~ \tJ Y

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ____ .....:;;;;.S=el=ki=· n=g=-:;:a~b.:;;.st::.:;a:.::.in:::::.:;;...s ______ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

Kent Gilmer NIPSCO 7407 June 24, 2014 Tuesday, July 16, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory committee~ends the following penalty: \ j\j Cl.Y:V\ ~

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _____ S;;;;..e=l=ki=· n=g~a=b.:;..st=a=in=s::.....-. _____ _

APPROVED: __ ~~~ __ ~ ___ ~~~~_-_-_-________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Brian Spencer Other Party: Vectren Case No.: 7502 Date of Advisory Meeting: June 24, 2014 Date of Damage: Friday, July 19,2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)

The Advisory Committee r~::=ends the following penalty: t U <l.Xf\ , ~ \.L,~

letter: White Linin Contactin 811 l-t Self Re air

Additional Information: ----------------------------------------------------

APPROVED:~~~ ____ hL_~~_-____ -_____________________________ _____ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Key Concrete, Inc. NIPSCO 5209

Date of Advisory Meeting: August 26,2014 Date of Damage: July 29, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2) - failure to maintain two (2) feet of clearance with mechanized equipment.

The Advisory Committee recommends the following penalty:

D Warning letter Special instructions: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

~ Training or $750 civil penalty if fail to take training

D Civil penalty of $ ________________ _

D Other --------------------------------------------

Additional Information: .;;;;.S.;;.;el=ki=·n;;;.zg~ab;;;;..;s;;..;;t=a=in=s __________ _

APPROVED: .~ ~~ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Other Party: Qc Communications, Inc. Case No.: 3166 Date of Advisory Meeting: May 20, 2014 Date of Damage: Friday, June 08, 2012

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

. -h'oo 'Di~ Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------------------------------------------

APPROVED: _____ ~ ___________ tL _____ ~ ____________________________________________________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant . Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Other Party: Qc Communications, Inc. Case No.: 3547 Date of Advisory Meeting: May 20, 2014 Date of Damage: Wednesday, August 08, 2012

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty: c\'('Q, \ (\ \ "j

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _________________ _

APPROVED: ___ ~ ___ ~~~ ________________________ __

(initialed) Ben Warren Chairman

\

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

VECTREN MILLER PIPELINE 3618 May 20, 2014 8/23/2012

The IURC Pipeline Safety Division finds the following violation:

IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

'IQ...\()\~ Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _ ...... tA.....lII....\ \~lr~----.;o=L:;.:...h.....:.~~CLl=.;..'fL..;.....;....;;~=--___ _

APPROVED:_~~~_iL_~_~===~~ _________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

VECTREN RIVERTOWN CONSTRUCTION 4036 May 20, 2014 10/16/2012

The IURC Pipeline Safety Division finds the following violation:

IC 8-1-26-18(t)

The Advisory Committee recommends the following penalty: - ' \ '\0. ~\ D \~

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: ___ ~~~ ___ ~~~ __________________________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

VECTREN ENVIRONMENTAL CONSTRUCTION 4448

Date of Advisory Meeting: May 20,2014 Date of Damage: 2/1/2013

The IURC Pipeline Safety Division finds the following violation:

IC 8-1-26-18(f)

The Advisory Committee recommends the following penalty:

l' \[(\ \(\~ Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: -------------------------------------------------------------------

APPROVED: _____ ~~~ ______ JCi_~_==~~ ________________________________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Vectren Rininger Excavating Incorporated 4568

Date of Advisory Meeting: May 20, 2014 Date of Damage: Wednesday, March 20, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(1)

visory Committee recommends the following penalty: \ \

, \ '

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED:~~~_~~~ __________________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to lURe

Respondent: Other Party: Case No.:

C And J Construction Vectren 4587

Date of Advisory Meeting: May 20, 2014 Date of Damage: Thursday, March 28,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty: 11 )Ct--Y n I~l If- He:r'

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: _ih,--,-,~I'1"'""'lt"-_r_~a ........ 6s"",("",k"",,,,---~ ..... , _1\....;:;0>5..:.-____ _

J 1 C---APPROVED: ~ We-

--~~-------------------------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Other Party: Meade Incorporated Case No.: 4602 Date of Advisory Meeting: May 20, 2014 Date of Damage: Thursday, April 04, 2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)

The Advisory Committee recommends the following penalty: --h-Ci ,\{I \~

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED:~~~ __ ~_~ ________________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC .

Respondent: Other Party: Case No.:

Vectren Meade Incorporated 4606

Date of Advisory Meeting: May 20, 2014 Date of Damage: Thursday, April 04, 2013

The lURe Pipeline Safety Division finds the following violation: Ie 8-1-26-18(f)

The Advisory Committee recommends the following penalty:

rtUG\\~ Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: --------------------------------------------------------------------

APPROVED: ___ ~~ __ ~_~_--~_-________________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Double Bee Fence Company Other Party: Vectren Case No. : 4616 Date of Advisory Meeting: May 20, 2014 Date of Damage: Tuesday, April 09, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(1)

The Advisory Committee re~ends the following penalty: ().,f f\\':) \e ~

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: ____ ~~ ____ ~ ___ ~ _______ . ________________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

QC COMMUNICATIONS, INC. VECTREN 4620

Date of Advisory Meeting: May 20, 2014 Date of Damage: 4/10/2013

The IURC Pipeline Safety Division finds the following violation:

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the following p~nalty: ;gw{',,;@:, O r j ,sU \ * f QI I

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: -----------------------------------

APPROVED: __ ~~ __ ~~~~_~~_-_-____________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.: Date of Advisory Meeting: Date of Damage:

QC COMMUNICATIONS, INC. VECTREN 4638 May 20, 2014 4/17/2013

The IURC Pipeline Safety Division finds the following violation:

IC 8-1-26-20(a)(2)

The Advisory Committee recommends the followin~ p~nalty:

Ir~~~ o( $ /sc> ,{ t-Cv I -tu Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ________________ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Dk Concrete - Daniel Padilla Perez Other Party: Vectren Case No.: 4965 Date of Advisory Meeting: May 20, 2014 Date of Damage: Friday, May 31, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committe recommends the following penalty: ¥

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: (}rJ I llr C0b~ 'f"\,5

APPROVED: __ ~~ __ (j_~ ______________________ __ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Price Excavating Other Party: Vectren Case No.: 4967 Date of Advisory Meeting: May 20,2014 Date of Damage: Thursday, June 13,2013

The lURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)

The Advisory Committee recommends the following penaltY.: ..-.-( (u (\\ "'J o.~ $ 1'5-0 · /-- -!--a.. I fv

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

APPROVED: ___ ~~ __ ~~ _____ .~_-_--___________________________________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Other Party: 3D Company Case No.: 5153 Date of Advisory Meeting: May 20, 2014 Date of Damage: Friday, June 28, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Advtsory Committee recommends the following penalty:

·-tro.1011 Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED:~~~ ___ ~_c __ --___________________ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Double Bee Fence Co Vectren 5156

Date of Advisory Meeting: May 20, 2014 Date of Damage: Friday, July 12,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(I)

The Advisory Committee rec~ends thr following penalty:

-I \~~~ Or >E /SD 1-0-. / Iv Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ---------------------------------------------------------------------

APPROVED: ___ ~~~ ____ ~ ___ ~ _________________________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: B.L. Brown Construction & Excavation Other Party: Vectren Case No.: 5159 Date of Advisory Meeting: May 20, 2014 Date of Damage: Friday, July OS, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Committee recommends the ! lowing penal~ , ::±:TIl--< () J "j 9 r .'10 ~ D m-. I f., ~a.dl

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: ____ ~ ______ ~~~_~_-~~~ ___________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Vectren Other Party: Lykins Contracting Case No.: 5161 Date of Advisory Meeting: May 20,2014 Date of Damage: Wednesday, July 03,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(f)

The Adv/_sory Committee recommends the following penalty: v\"('Q) () I '--)

Special instructions if wffning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------------

APPROVED:~~~-----~~~---~~-------------------------------------------------------(initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Vectren Lykins Contracting 5163

Date of Advisory Meeting: May 20, 2014 Date of Damage: Wednesday, July 03, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-18(1)

The Advisory Committee recommends the following penalty:

~QJC\ \ :J Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------------

APPROVED: _____ ~~~ _____ ~~~~~ __________________________________________________ _____ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lineal Contracting Other Party: Vectren Case No.: 5164 Date of Advisory Meeting: May 20, 2014 Date of Damage: Monday, July 08, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)(expire)

The A,dvisory Committee recommends the following penalty:

i;:~;, VC $7,5]) ±rLl I +0 Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: ___ ~~ ______ ~ ___ ~_~~~~ ___________________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lunar Construction Other Party: Vectren Case No.: 5180 Date of Advisory Meeting: May 20, 2014 Date of Damage: Thursday, July 25, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory COR'llI)ittee_ recommends the following penalty:

\M(}flVl~ ~<~

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: --------------------------------------

APPROVED: ____ ~ ____ ~~_O~~~~ ________________________ _

(initialed) Ben Warren Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Lykins Contracting Vectren 5187

Date of Advisory Meeting: May 20, 2014 Date of Damage: Tuesday, July 02, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Committee r commends the following penalty: U I It;

Contactin 811 SelfRe air

Additional Information: -------------------------------------------------------------------

APPROVED: _____ ~~~ _____ ~~~ _______________________________________________________ ___ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Lunar Construction Other Party: Vectren Case No.: 5188 Date of Advisory Meeting: May 20, 2014 Date of Damage: Thursday, July 25, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following enalty: r -- ' ("\ \ tJ r . j u - <Cu +ro...., n

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: --------------------------------------------------------------------

APPROVED: ____ ~ ___ ~ ___ ~ _______________________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party: Case No.:

Bl Brown Construction & Excavation Vectren 5190

Date of Advisory Meeting: May 20,2014 Date of Damage: Tuesday, July 16,2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-20(a)(2)

The Advisory Committee recommends the followin penalty: ~Cu\ J ()r - ,- 0-; 1

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------------

APPROVED: _____ ~~~~~_~ ____________________________________________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Jason Elpers Other Party: Vectren Case No. : 5191 Date of Advisory Meeting: May 20, 2014 Date of Damage: Wednesday, July 17,2013

The IURC Pipeline Safety Division finds the following violation: Ie 8-1-26-16(g)

The Advisory Committee recommends the following penalty:

\J CVYlliJ d6r Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ---Lili...:.....l.:.;+l ~Lc.::....;....v __ Ov----:;....b ...... ~iru,u..:: I::Q;- ::l..YCI:.....=.,,~~~. ____ _

APPROVED: __ ~~~_~~(_-_--____________________ ____ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Central Fence Other Party: Vectren Case No.: 5197 Date of Advisory Meeting: May 20, 2014 Date of Damage: Wednesday, July 24, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory com~ittee recommends the following penalty: l) cur y) \ ~ s\\\)i

Special instructions if warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: OJ i I Lcr CubS-k&i'll2> .

APPROVED: _____ ~~/t~~ _____ ~ ____________________________________________________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Other Party:

Bynum Fanyo Utility Vectren

Case No.: 5219 Date of Advisory Meeting: May 20, 2014 Date of Damage: Tuesday, July 30, 2013

The lURC Pipeline Safety Division finds the following violation: Ie 8-1-26-20(a)(2)

The Advisory Committee reCYifendS the following penalty: \ \ n.« f\ \~ \c .

Special ilJ..str.uctions-i[-.wa1:niJJg letter:~ White Lining Potholing Contacting 811 ~e earance Zone (Two-Foot Rul~

'--- ----------Damaging Lines Self Repair

Additional Information: ----------------------------------------------------------------

APPROVED: __ ~~ ___ ~ __ ~ ____________________ _ (initialed) Ben Warren

Chairman

Indiana Underground Plant Protection Advisory Committee Recommendation to IURC

Respondent: Tecton Construction Other Party: Vectren Case No.: 5646 Date of Advisory Meeting: May 20, 2014 Date of Damage: Monday, June 10, 2013

The IURC Pipeline Safety Division finds the following violation: IC 8-1-26-16(g)

The Advisory Committee recommends the following penalty:\ _ -r-leuY\; ') or S 15D .[0--, I FV

Special instructions i(warning letter: White Lining Potholing Contacting 811 Clearance Zone (Two-Foot Rule) Damaging Lines Self Repair

Additional Information: ------------------------------------

APPROVED: __ ~~ ___ ~?uL ___ ~ ___ ~~~~ ___________________________ _ (initialed) Ben Warren