"I hereby declare that I have read this final year project report and in my opinion this
final year project is sufficient in telllls of scope and quality for the award of the
degree ofBachelor of Civil Engineering."
Signature
Name of Supervisor : ASSOC. PROF. IR. AD NAN B. ZULKIPLE
Date : NOVEMBER 2009
PERPUSTAKAAN UMP
111111111111111111111111111111111111111111111111 0000046135
ROAv l'ID 1 YV \JKl"'... 1VlVDEL11'11CfU~f--:JALAN TANJUNG LUMPUR - PEKAN AND
FEDERAL ROAD 3 USING EMME/3
AISHAH BINTI SHAHID-DIN
A final year project submitted in partial fulfillment of the
requirements for the award of
Bachelor Degree of Civil Engineering.
Faculty of Civil Engineering and Earth Resources
Universiti Malaysia Pahang
NOVEMBER 2009
PERPUSTAKAAN UN1VERSITI MALAYSIA PAHANG
No. Perolehan No-:Par19§lian
04613 5 1b
I Taril(h
\'1-S/ • l\3i-
:s 0 ::woq
APP "n1 'r> I Q;,c ,
ii
STUDENT DECLARATION
"I hereby declare that this final year project report, submitted to University Malaysia
Pahang as a partial fulfillment of the requirements for the degree of Bachelor of Civil
Engineering. I also certifY that the work described here is entirely my own except for
excerpts and summaries whose sources are appropriately cited in the references."
Signature
Name
Date '·*······· : AISHAH BINTI SHAHID-DIN
: NOVEMBER 2009
Specially dedicated to my beloved father, mother, brothers, sisters and all my
friends.
iii
iv
ACKNOWLEDGEMENT
First and foremost, thanks to Allah S. W. T and His willingness, I had
completed my final year project as requirement to graduate and acquire a bachelor
degree in Civil Engineering form University Malaysia Pahang.
I would like to express my appreciation to many people who have contributed
to successful completion of this project paper. Lots of thanks to Assoc. Prof. Ir.
Adnan b. Zulkiple as my project supervisor who help a lot in coaching and give
constructive ideas in completing this final year project. A special dedication to my
beloved friend, Syarifah and Mohd Fauzi who had also help me a lot in succeeding
this final project.
I also would like to thank all my course mates and friends who had
participated by offering their helping making this project with successfully. Lot of
experience and valuable knowledge that I gain during completing the project. All
experience gleaned shall not I forget.
Last but no least, for all my beloved family members especially my father
and mother who have contributed in giving me the moral support, encouragement
and understanding in carrying out the project to such great degree. May Allah S. W. T
reward all of them for their very kind help.
vii
TABLE OF CONTENT
CHAPTER TITLE PAGE
TITLE i
STUDENT DECLARATION ii
DEDICATION iii
ACKNOWLEDGEMENT iv
ABSTRACT v
TABLE OF CONTENT vii
LIST OF TABLES X
LIST OF FIGURES xi
LIST OF APPENDIX xiv
1 INTRODUCTION
1.1 Introduction 1
1.2 Objective 2
1.3 Scope of study 2
1.4 Problem statement 3
1.5 Significant of Study 3
1.6 Expected Outcome 3
viii
2 LITERATURE REVIEW
2.1 Introduction 4
2.2 Basic Representation 4
2.2.1 Node table 5
2.2.2 Link table 5
2.3 Layer -based approach 6
2.3.1 Classification and labeling 6
2.3.2 Direction 6
2.3.3 Turn penalties 6
2.4 Traffic prediction 7
2.5 Traffic models 7
2.6 Trip distribution 9
2.7 Origin Destination (OD) matrix 11
3 METHODOLOGY
3.1 Introduction 13
3.2 Flow chart 14
3.3 Data collection 15
3.3 .1 Planning system 15
3.3.2 Junction and links modeling 16
3.4 Road network modeling 18
3.5 OD matrix 22
3.6 Volume Delay Function 22
3.7 Trip distribution 23
3.8 Turn tables 23
4 RESULTS AND ANALYSIS
4.1 Introduction
4.2 Analysis
4.3 Network File Analysis
4.4 Base Network
4.5 Turns Table
4.6 OD table using gravity method
5 CONCLUSIONS AND RECOMMENDATIONS
5.1 Conclusions
5.2 Recommendations
REFERENCES
APPENDIX
IX
25
25
26
28
37
39
43
44
46
48
X
LIST OF TABLES
TABLE NO. TITLE PAGE
2.1 illustrative trip table 9
3.1 Modeled internal and external zones 15
3.2 Example of data for nodes 19
3.3 Example of data for link 20
3.4 Volume for speed and capacity by road type 22
4.1 Link attributes 26
4.2 Base year OD model- am peak hour distribution
to destination 40
4.3 Base year OD model-length between zone's
Centroids 41
4.4 Base year OD modeltrip distribution based on
gravity 42
xi
LIST OF FIGURES
FIGURE NO. TITLE PAGE
2.1 Traffic model network with a road inventory 8
2.2 Gravity model 10
3.1 Flow chart of methodology 14
3.2 Arch View GIS version for study area 17
3.3 Example of road network model at study area 21
3.4 Turn table at drunmy centroids 26
4.1 Base year network model 28
4.2 Road network model showing centroids, nodes
and links 29
4.3 Road network model showing centroids, nodes
and links (zoom 1) 30
4.4 Road network model showing centroids, nodes
and links (zoom 2 ) 31
4.5 Road network model showing centroids, nodes
and links (zoom 3) 32
4.6 Road network model showing centroids, nodes
and links (zoom 4) 33
4.7 Road network model showing centroids, nodes
and links (zoom 5 ) 34
4.8 Road network model showing link length 35
xii
4.9 Road network model showing number of lanes 36
4.10 Tum table at 3 way junction 37
4.11 Tum table at 4 way junction 38
4.12 Tum table at dummy intersection 38
5.1 Flow chart methodology of recommendation 45