I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012 South Grove Intermediate School Beech Grove, Indiana. WELCOME. Rickie Clark, INDOT Office of Public Involvement Purpose/Explanation of Public Hearing Public Hearing Format Visit our sign-in table - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

I-465 at I-65 Interchange ModificationPublic Hearing 6:00pmTuesday, April 10, 2012

South Grove Intermediate SchoolBeech Grove, Indiana

Page 2: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

WELCOME Rickie Clark, INDOT Office of Public Involvement Purpose/Explanation of Public Hearing Public Hearing Format Visit our sign-in table Informational Handouts Submitting public comments for hearings transcript Informal Q & A following formal presentation and

comment session

Page 3: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Public Hearing Sign-in at attendance table to be added to project

mailing list A public hearing notice was mailed to known

property owners within project area Announcement of this hearing was posted to INDOT

website at: http://www.in.gov/indot.htm Legal notice of public hearing published in The

Indianapolis Star on 3/26/12 & 4/2/12, The Indianapolis Recorder on 3/22/12 & 4/5/12

Page 4: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Project Team Indiana Department of Transportation Indiana Division Federal Highway Administration Indianapolis Metropolitan Planning Organization American Structurepoint, Inc. & United Consulting Elected Public Officials

Page 5: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Project Stakeholders Indiana Department of Transportation Indiana Division Federal Highways Administration Indianapolis Metropolitan Planning Organization Marion County City of Indianapolis and local communities Elected Public Officials Community residents and citizens Emergency Services Commuters Trucking Industry Commercial District / local businesses Community Organizations

Page 6: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Project Development Process

We Are Here

Engineering Assessment

Project purpose &

need

develop project

alternatives

Screen project

alternatives

Release environmental document and

preliminary design

Public Hearing to

solicit public comment

Finalize design &

environmental document

Real estate acquisition activities clear r/w

Construction

Page 7: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Environmental Document Requirement of the National Environmental Policy

Act (NEPA) Requires INDOT to analyze and evaluate the

impacts of a proposed project to the natural and socio-economic environments

Impacts are described in environmental document Environmental document was released for public

involvement February 2012

Page 8: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Environmental Document Development of document begins once purpose and

need for the project has been clearly identified Develop a number of possible alternatives including a

“Do Nothing” alternative as a baseline for comparison

Screen alternatives to identify a preferred alternative Solicit public comment on environmental document

and preliminary design plan Solicit, address, and fully consider public comments

as part of decision making process

Page 9: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Elements of the Environmental Documentation

Real Estate Community ImpactsAir Quality Wetlands and WaterwaysNoise FloodplainsFarmland Endangered SpeciesHazardous Materials Historic/Archaeological

Cultural Resources

Page 10: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Project Purpose & Need Regional Growth & Development have resulted in

increased congestion along I-465 & I-65 Interim improvement to address most critical

congestion at interchange Westbound to southbound traffic Northbound to eastbound traffic

Page 11: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Proposed Improvements I-465 / I-65 Interchange

New flyover ramp westbound to southbound Remove existing loop ramp Widen existing ramp northbound to eastbound Relocate existing ramp eastbound to southbound Maintain all other existing ramps

Page 12: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Proposed Improvements I-465 New Auxiliary Lanes

Emerson Avenue to I-65 Eastbound and Westbound Add lanes to existing median Widening for flyover ramp Westbound near Sherman Drive

I-65 New Auxiliary Lane I-465 to Southport Road Southbound Direction Widening on outside

Page 13: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Proposed Improvements Sherman Drive over I-465

Lengthen bridge to accommodate I-465 widening Widen bridge to provide 8ft shoulders 16ft – 6 inch minimum vertical clearance over I-465

Page 14: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Other Alternatives Considered No Build

Continued congestion & safety issues Would not address purpose & need

Add outside travel lanes (keep wide median) More significant r/w acquisition, environmental impacts Higher construction costs vs. proposed alternate Recommend add travel lanes on median instead

Full interchange improvements Budgetary constraints Recommend interim improvements instead Fix most critical deficiencies with available funding

Page 15: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Maintenance of Traffic (MOT) Maintain 3 lanes along I-465 at all times

Maintain 2 lanes along I-65 at night Maintain 3 lanes during daytime hours

Maintain ramp traffic within interchange Maintain existing ramps until new ramps are

complete

Detour for Sherman Drive for bridge work

Page 16: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Environmental Document

Categorical Exclusion (CE) Level III released for public involvement by Indiana Department of Transportation on 2/14/12

CE classification means that the proposed project will not have “significant” environmental impacts

Page 17: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Environmental Document Viewing Locations:

Indiana Department of Transportation Indiana Government Center North, Room N642, 100 North

Senate Avenue, Office of Public Involvement, Indianapolis, Indiana 46204; (317) 232-6601

United Consulting 1625 North Post Road Indianapolis, Indiana 46219; (317) 895-2585

Page 18: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Environmental Document Endangered Species Impacts

State endangered Kirtland’s Snake identified within ½ mile of the project

Provisions to protect the Kirtland’s Snake will be included in the project

Wetland Impacts Wetlands were identified adjacent to the proposed project All wetlands were delineated and will be avoided during

construction

Page 19: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Noise Walls Analysis required for added capacity projects Solicit input regarding constructability of proposed

noise walls Proposed noise wall locations

I-465 Eastbound I-465 Westbound I-65 Northbound (Near Edgewood Avenue)

Page 20: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Environmental Document Socioeconomic

An environmental justice analysis shows that no disproportionately high adverse environmental or health impacts to low-income populations or minority populations will occur from this project

Cultural Resources INDOT on behalf of Federal Highway Administration

issued a “No historic properties affected” finding on August 29, 2011

Page 21: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Environmental Document Air Quality The project area is located within a non-attainment

area for fine particulate matter (PM) 2.5 Qualitative PM 2.5 Hot Spot Analysis concluded

the proposed project will not cause or contribute to a violation of 24-hour or annual NAAQS for fine particulate matter

Page 22: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Real Estate Acquisition Process

Page 23: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Right-of-Way New r/w is required around interchange

No additional r/w along I-65, I-465 or Sherman Drive

No relocations / permanent structure acquisitions Residential land – 1.7 acres Unimproved land – 4.5 acres 6.2 acres r/w total

Page 24: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Real Estate Acquisition Process How Land is Purchased

Explains the process of buying property needed for highway improvements

“Uniform Act” of 1970 All federal, state and local governments must comply Requires just compensation

Acquisition Process Appraisals Review appraisals Negotiations

Page 25: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Real Estate Acquisition Process Amount of compensation cannot be less than fair

market value

Partial Acquisition INDOT will state amount to be paid for acquisition Separate amount will be stated for damages to the portion

retained by the property owner If remainder has little or no value, INDOT will consider

purchasing remainder

Page 26: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Real Estate Acquisition Process Agreement

Proceed as normal real estate purchasing transaction

No Agreement Mediation Condemnation Court would determine the purchase price for necessary

r/w

Page 27: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Project Schedule Preliminary Engineering: 2011 – 2013 Public Hearing: April 2012 Right-of-Way Engineering: Spring 2012

Appraising & Acquisition: 2012 – 2013 Letting: Summer 2013 Construction: 2013 – 2014 Project Complete: Late 2014

Page 28: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Submit Public Comments Submit public comments using the options described in 1st

page of information packet Public Comment Form Via e-mail Participating during public comment session via microphone Verbal comments recorded and transcribed for inclusion into public

hearings transcript INDOT respectfully requests comments be submitted by

Friday, April 27, 2012 All comments submitted will become part of public record,

entered into transcript, reviewed, evaluated and given full consideration during decision making process

Page 29: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

Resource Location INDOT Greenfield District Office, 32 South

Broadway, Greenfield, Indiana 46140 Construction, maintenance and transportation project

development activities in East Central Indiana Customer Service Center (855) 463-6848

[email protected] Brandye Hendrickson, Greenfield District Deputy

Commissioner Nathan Riggs – Media Relations Director Dwayne Myers – Local Programs Director

Page 30: I-465 at I-65 Interchange Modification Public Hearing 6:00pm Tuesday, April 10, 2012

THANK YOU

Please visit with INDOT project officials

Project Open House Project maps, displays, public comments table INDOT project officials available for informal Q & A

Thank you for your attendance this evening www.IndyCommute.indot.in.gov