hydrology project ii central water and power research station pune
TRANSCRIPT
Hydrology Project I Institutional Strengthening Upgradation of Current Meter Rating Tank Facility Hydrometric Instrumentation Services Facility R&D Studies Reservoir Sedimentation Survey using IBSRSS Field Investigations & Development of Model for Predicting Water Quality in Reservoir Systems: Panshet and Ujjani Estimation of Irrigation Return Flow – Kukadi, Maharashtra Training of Trainers
Create a Centre of Excellence for Equipment and Maintenance
14
9 9
67
12
5 56
0
2
4
6
8
10
12
14
Part
icip
ants
CWC AP GUJ KAR KER MAH MP ORI TN
Agencies
Personnel
trained: 73
Five rounds of ToT Course on ‘Analogue/ Digital Water Level Recorder (A/DWLR), Bank Operated Cable Ways (BOCW) and Sediment Sampling’
Guest Faculty byCWPRS :
HYMOS Implementation
Six BasicCourses
Two RefresherCourses One TOT
Course
One AdvancedCourse
Follow-up at Data processing
centers
27
1211
16
11 107 7
3
74
0
5
10
15
20
25
30
Pa
rtic
ipa
nt
Tra
ine
d
CWCMAH GUJ AP KAR KER TN ORI CHSG MP OTH
Agency/State
HYMOS: Officials Trained
0
5
10
15
20Pa
rticp
ants
AP GUJ KAR KER MP CHSG MAH TN CWC
Agency/State
TOTAL Officers Trained :60
Faculty in Refresher courses for ToT
in Hydrometry
Hydrology Project II
CWPRS-Component
With the experience gained and facilities created, CWPRS is well equipped to offer services to implementing agencies under vertical and horizontal extensions
Major Activities Proposed Under HP II
Hydrometric Instrumentation Services Facility for calibration, repairs and trouble-shooting of DWLRs
DWLR technology development
Sustainable DSS technology development/ training to implementing agencies
Purpose-driven studies of river basins using HP data, addressing SW issues relevant to implementing agencies
CWPRS-Component of Hydrology Project IICWPRS-Component of Hydrology Project II
No.No. CategoryCategory AmountAmount
(Rs million)(Rs million)PercentaPercenta
gege
11 WorksWorks 0.970.97 2.632.63
22 GoodsGoods 15.8715.87 42.9142.91
33 TrainingTraining 8.578.57 23.1823.18
44 ConsultancyConsultancy 2.902.90 7.847.84
55 StaffStaff 5.165.16 13.9513.95
66 O&MO&M 3.513.51 9.499.49
TotalTotal 36.98 100.00
Amount: Rs 36.98 million
Purpose Driven Studies
Type of studies proposed for identified river Type of studies proposed for identified river basinsbasins
Water availabilityWater availability Drought and floodsDrought and floods Ungauged basins Ungauged basins Studies will have linkage through IWRMStudies will have linkage through IWRM
for development/ planning of available for development/ planning of available
water resourceswater resources
DSS StudiesDSS Studies
Customising DSS for specific basins of Customising DSS for specific basins of implementing agencies (Maharashtra, implementing agencies (Maharashtra, Gujarat, etc.)Gujarat, etc.)
Purpose Driven StudiesActivity/ Description 2006 2007 2008 2009 2010 2011 2012
Discussions with StatesDiscussions with States **
Identification of Identification of purpose driven Studiespurpose driven Studies ** **
For selected basin(s): For selected basin(s): Finalising scope/ Finalising scope/ methodology/ methodology/ responsibilityresponsibility
** **
Identification and Identification and procurement of data/ procurement of data/
Machinery & Machinery & Equipment Equipment
** ** ** ** ** ** ** **
Participation in training Participation in training programs/ workshop/ programs/ workshop/ Symposia/ meetings/ Symposia/ meetings/ conferencesconferences
** ** ** ** ** ** ** ** ** ** ** ** ** ** ** **
Purpose Driven StudiesActivity/ DescriptionActivity/ Description 20062006 20072007 20082008 20092009 20102010 20112011 20122012
Field experiments/ Field experiments/ analysis/ model analysis/ model development/ test development/ test runsruns
** ** ** ** ** ** ** **
Test & Validation Test & Validation runs/ submission of runs/ submission of interim reportinterim report
** ** ** ** ** ** ** **
Model use/ Model use/ recommendations/ recommendations/ submission of final submission of final reportreport
** ** ** **
Preparation and Preparation and submission of submission of Completion ReportCompletion Report
** **
Budget Allocation - 2006-07
External SupportExternal Support :: Rs 4 millionRs 4 million
Domestic SupportDomestic Support :: Rs 1 millionRs 1 million
TotalTotal :: Rs 5 millionRs 5 million
Procurement Plan for first 18 monthsDescriptionDescription Estimated cost Estimated cost
(Rs million)(Rs million)
1 (A). Software & data acquisition1 (A). Software & data acquisition (B). Equipment (as required for (B). Equipment (as required for
purpose-driven studiespurpose-driven studies
0.230.230.280.28
2. Audio-visual 2. Audio-visual 0.210.21
3. Office equipment3. Office equipment 0.710.71
4. Training equipment4. Training equipment 0.180.18
5. Wagon/Van5. Wagon/Van 0.720.72
6. Supplementary training on 6. Supplementary training on domain softwaredomain software
1.281.28
Total Total 3.613.61