Hyde Park Towers

Energy audits subsidised through the NSW Office of Environment & Heritage’s Energy Saver program.

Page 3: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

CONSUMPTION 30% V NETWORK & OTHER CHARGES 70%

30%

49%

21%

Power Bills

Consump-tion

Network

Page 4: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

LIGHT LEVELS BEFORE UPGRADES

AREA AVERAGE (lux) UNDERLIT/OVERLIT

Car Park 45 Overlit

Fire Stairs 112 Overlit

Lift Lobby 185 Overlit

Ground Floor 242 Overlit

Apt. Corridors 38 Overlit

Page 5: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

SUSTAINABILTY INITIATIVES TO DATE

November 2010 Installed Power Factor Correction Equipment

August 2011– Approval for LED Upgrades at Annual General Meeting

September 2011 –156 Fluoro Lights in Fire Stairs converted to 82 LED multi function sensor lights

November 2011 – Converted 262 x 35w Halogen down lights

to 7w LED globes on residential levels, gym, pool and lobbies

February 2012– Converted 307 Fluoro Lights in Car Park

from T8 to T5 Eco Savers Kits

June 2012 Completed LED Upgrade

July 2012 Adjusted Variable Speed Controllers - TOU

March/April 2013 Installed 4 new Hydraulic Water Pumps Sets

Page 6: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

CONVERSION COST/ENERGY SAVING CERTIFICATES

• Fire Stairs Multi Function LED

Project Cost = $28,750.00

Generated 858 ESC’s = $18,000

Net Cost = $10,750.00

LED LIGHTS IN COMMON AREAS

• Project Cost = $9,633.00

(Not eligible for ESC’s however power savings significant)

• T8-T5 CAR PARK CONVERSIONS

Project Cost = $8,018.00

ESC Rebate = $4,650.00

Net Cost $3,330

Total Project Cost After ESCs = $23,713

Page 7: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

PAYBACK ON LED UPGRADE=19 MONTHS

Page 8: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

AUSGRID WEBGRAPH

Page 9: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY
Page 10: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

POWER CONSUMPTION KW HOURS PEAK SHOULDER OFF PEAK

1 2 30

5000100001500020000250003000035000400004500050000

Jul-11Jul-12

Page 11: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

NO INITIATIVES?

$15,400PER MONTH

$184,000 per yearBudget $117,000

Page 12: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

POWER FACTOR CORRECTION EQUIPMENT

Page 13: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

What is Power Factor Correction?Power Factor is the ratio of “useful” power to “total” power consumed.In simple words Power Factor is a measure of how efficiently electrical power is consumed. The ideal Power Factor is unity - or one. Anything less than one, (or 100% efficiency), means that extra power is required to run equipment and a significant amount of wastage occurs.

Page 14: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY
Page 15: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY
Page 16: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY
Page 17: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY
Page 18: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

POWER BILL - DECREASEJULY 2011 – MAY 2013Network Charges

+50%Usage Charges - 4 year

Contract with Energy Australia

Energy Australia BillsJuly 2011 = $11,614.00

May 2013 = $10,447.13

Page 19: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

NO INITIATIVES?

$15,400PER MONTH

$184,000 per yearBudget $117,000

Page 20: HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY ELECTRICITY

ACT NOW - SMART GREEN BLOCKS