2/18/15 1 1 Hybrid Project Management is the Future! Understanding Agile from a PMP ® ’s Perspective! 2 The claim that Agile is outside the PMBOK ® Guide has no basis in fact! Hybrid Project Management is the Future! Understanding Agile from a PMP ® ’s Perspective! Fact – The PMBOK ® Guide included Rolling Wave Planning, Progressive Elaboration, and Decomposition long before the Agile Manifesto was written.

Upload: lenhan

Post on 06-May-2018

220 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

1  

1

Hybrid Project Management is the Future!

Understanding Agile from a PMP®’s Perspective!

2

The claim that Agile is outside the PMBOK® Guide has no basis in fact!

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

•  Fact – The PMBOK® Guide included Rolling Wave Planning, Progressive Elaboration, and Decomposition long before the Agile Manifesto was written.

Page 2: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

2  

3

The claim that Agile is a revolution is an exaggeration!

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

•  Fact – Agile applies Lean Principles to project management. It offers improved planning and team management practices.

4

Every Agile framework is missing two key tools.

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

•  Fact – Every Agile framework is missing budgeting and sophisticated scheduling tools. The PMBOK® Guide solves those problems and makes Agile better!

Page 3: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

3  

5

Agile, as practiced by many agilists, ignores the estimating and planning needs of the organizational-customer.

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

•  Fact – Many Agilists ignore the proven scheme of ROM, Budgetary, and Definitive estimates for reliable planning that supports the organizational-customer. The PMBOK® Guide solves that problem and makes Agile better

6

Before we go any further…

Please let me introduce myself.

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 4: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

4  

7

Introduction: John Stenbeck, PMP, PMI-ACP, CSM, CSP

•  Sr. PM Consultant for client-side ERP implementations

•  Past President and VP of Prof. Dev. for PMI-SD

•  Adjunct instructor at the University of California San Diego (UCSD)

•  Trained 9,000+ technical professionals in Aerospace, Defense, High Tech, Financial Services, Bio-medical and Life-science fields

8

GR8PM Introduction:

Published Jan. 2012

Added CSP Prep

May 2013

Kindle version February 2014

Page 5: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

5  

9

GR8PM Introduction:

Agile Government Contracting,

August 2014

10

GR8PM Introduction: GR8PM Strongly Endorses Agile because…

… PMI-ACP continues to be PMI’s fastest growing

certification …

… PMI-ACP® holders has grown 75 percent since

last year …

Page 6: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

6  

11

GR8PM Introduction: GR8PM Strongly Endorses Agile because…

PMP®s 1997

PMP®s 1996 PMP®s

1995 PMP®s 1994 PMP®s

1993

12

GR8PM Introduction:

•  PMP and PMI-ACP Exam Prep and CSM classes

•  Professional Development On-site & Public seminars: •  Agile 101 for PMP®’s – Best Practices •  Advanced Agile-Enterprise Practices for PMP®’s •  Agile (Federal) Government Contracting •  Managing Virtual Teams: Tips and Tricks from the Pro's •  Masters Course in Estimating and Risk Management

•  Agile-Organization Support Services: •  Agile Enterprise Roll-out & PMO Deployment Consulting •  Agile Coaching, Mentoring and Training

Page 7: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

7  

13

GR8PM Introduction: Partial List of Past Clients •  Booz Allen Hamilton, Inc., McLean, VA

•  Guinness Bass Import Company, Greenwich, CT

•  Lucent Technologies – Bell Labs, Allentown, PA

•  Nike Corp., Beaverton, OR

•  Oracle Corp., Redwood Shores, CA

•  Orange County Public Works, Orange, CA

•  Qualcomm Inc., San Diego, CA

•  U.S. Army – Space & Terrestrial Comms., Fort Monmouth, NJ

•  U.S.D.A. – National Finance Center, New Orleans, LA

•  Visa – Smart Cards, Foster City, CA

14

Hybrid Project Management is the Future!

Understanding Agile from a PMP®’s Perspective!

Page 8: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

8  

15

The Agile Domain: Level 1 – Single-team Projects

The Focus of Hybrid Project Management: Level 2 – Programs with Multiple &Virtual Teams

Level 2 – Programs with Multiple &Virtual Teams Level 3 – Portfolios & Enterprises

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

16

QUICK REVIEW: Level 1 – Single-team Projects

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 9: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

9  

17

QUICK REVIEW: Level 1 – Single-team Projects

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

18

Why will you hate Hybrid Project Management?

Key Question:

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Henry Ford said, “Thinking is the hardest work there is…that’s why so few people do it!”

Page 10: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

10  

19

How Is Agile Planning Done? Iteratively

Key Question:

Who? Vision / Charter

What? FBS / WBS

When? Roadmap /

Logic Network

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

20

How Is Agile Planning Done? Iteratively

Key Question:

Who? Vision / Charter

What? FBS / WBS

When? Roadmap /

Logic Network

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 11: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

11  

21

How Is Agile Planning Done? Feature, Function, Capability (FFC)

Key Question:

Who?

What? FBS / WBS

When?

Objective

Phase 1 Phase 2

Work Package 1

Work Package 2

Work Package 3

Work Package 4

Product

Theme 1 Theme 2

Epic 1 Epic 2 Epic 3 Epic 4

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

22

How Is Agile Planning Done? Feature, Function, Capability (FFC)

Key Question:

Who?

What? FBS / WBS

When?

Product

Theme 1 Theme 2

Epic 1 Epic 2 Epic 3 Epic 4

C1

F4

F1

F3 C2

F2

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 12: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

12  

23

How Is Agile Planning Done? FFC Sizing (ROM Estimates)

Key Question:

Who?

What?

When?

Who?

What?

When?

C1 F3

F6

F1

F4

F2

C2 F5

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

24

How Is Agile Planning Done? FFC Schedule (Logic Network)

Key Question:

Denotes the Critical Path

Denotes a Deliverable

Milestone / Release

Milestone / Release

Milestone / Release

ROM-level Plan

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Who?

What?

When?

Who?

What?

When?

Page 13: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

13  

25

Analysis & Prep

Product Backlog Queue PDR Queue CDR Queue Mock-Up

Key Question: How Is Agile Planning Done? Enterprise = Integration

Enterprise integration using Kanban

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

26

Key Question: How Is Agile Planning Done? Iterative Decomposition

Who?

What?

When?

Who?

What?

When?

Features

Story7

Story3 Story4

Story8

Story1

Story5 Story6

Story2

Stories

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 14: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

14  

27

Key Question: How Is Agile Planning Done? Iterative Decomposition

Release #1 (4 Months) Iteration #1 – 4 Weeks Iteration #2 – 4 Weeks Iteration #3– 4 Weeks Iteration #4– 4 Weeks

Stories Stories Stories Stories Stories Stories Stories Stories Stories Stories Stories Stories

Story7

Story3 Story4

Story8

Story1

Story5 Story6

Story2

Story15

Story11 Story12

Story16

Story9

Story13 Story14

Story10

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

28

What is a Process? A process is any action, or set of actions, that change the state or function of an input in order to deliver a result or output.

INPUTS TOOLS & TECHNIQUES OUTPUTS

PMBOK© GUIDE

INPUTS ACTIONS OUTPUTS

LEAN PROCESS

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 15: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

15  

29

What is a (Lean) Process Map? •  A process map is an illustration of activity occurring over time. •  The goal is to communicate about the key steps in the process. •  There are many ways to map a process. •  Unneeded complexity (i.e., details) is a form of waste. •  Overlooked steps (i.e., inaccuracy) is a form of waste.

There’s no RIGHT answer!

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

30

What is a (PMBOK©) Process Map? •  A Logic Network with documented dependencies. •  The goal is to communicate about the project schedule. •  It facilitates Critical Path calculations to manage schedule risk. •  Unneeded complexity and overlooked steps are both waste.

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 16: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

16  

31

What is a (Agile) Process Map? •  A Logic Network for planning Releases. •  The goal is to communicate about interrelationships.

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

32

Creating an Agile Roadmap •  Logic Network Diagrams

•  Use MMFs to identify first-cut Release dates.

Roadmap – 1 Year Release #2 – 2 Months

Feature #7

Feature #8

Feature #9

Release #3 – 2 Months

Feature #10

Feature #11

Feature #12

Release #1 – 4 Months Feature

#1 Feature

#2 Feature

#3 Feature

#5 Feature

#6 Feature

#4

MMF

Roadmap & Release Plans: Tools & Techniques

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 17: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

17  

33

Creating an Agile Roadmap •  Logic Network Diagrams

•  What is the Logic Network when you get a flat tire?

STOP REMOVE

REPLACE GO

F

S

Roadmap & Release Plans: Tools & Techniques

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

34

RELEASE #1

RELEASE #2

RELEASE #3

Example: Logic Network – Roadmap Granularity

Roadmap & Release Plans: Tools & Techniques

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 18: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

18  

35

ITERATION #1

ITERATION #2

ITERATION #3

Example: Logic Network – Release Granularity

Roadmap & Release Plans: Tools & Techniques

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

36

Program Team Types: Remote Teams – Connected on a Team-to-Team basis

Remote Teams have inter-team communication complexity.

Mission Vehicle

Launch Site Life Support

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 19: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

19  

37

Distributed Teams have intra-team communication complexity.

Distributed Teams – Connected on a Member-to-Member basis

PM Scientist

Scientist PM

SME

SME

SME

Program Team Types:

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

38

Program Teams can include both Remote and Distributed Teams

Program Teams with virtual (i.e., Remote or Distributed) members have significant communication complexity.

Program Team Types:

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 20: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

20  

39

Best Practice #2: Eyes train Ears! •  To develop a good “ear” for hearing past accents establish a

Rule of Engagement that detailed written answers to the 3 daily questions will be emailed 2 hours before the call.

•  The second rule is that everyone starts by reading the written statement – verbatim – so other teammates can follow along and develop an “ear” for the spoken word.

•  This simple practice vastly increases the quality of communication!

•  Karen Schneider, IBM Global Projects Manager, and long-time PMI – San Diego community leader, shared this trick.

Program Team: Tools & Techniques

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

40

Before we do open Q&A… may I have your permission

to close with a bit of shameless self-promotion?!?

GR8PM

Traditional � Agile � Hybrid Training � Coaching � Consulting

Page 21: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

21  

41

"   First adopters = 16% "   Innovators and Early Adopters

"   Second Adopters = 34% "   Early Majority

"   Third Adopters = 34% "   Late majority

"   Fourth Adopters = 16% "   Laggards

Crossing the Chasm: Marketing and Selling Disruptive Products to Mainstream Customers, by Geoffrey A. Moore, HarperBusiness, 1991

Why is Agile Important to YOU?

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

42

How Do We Know Agile Has Crossed Over?

SCRUM ALLIANCE

Membership = 100K

PMI

Membership = 500K

• Enthusiasts • Visionaries • Pragmatists • Conservatives •  Skeptics

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 22: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

22  

43

TOTAL PROJECTS BY FRAMEWORK

Why is the PMI-ACP® important to YOU?

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

44

Why is the PMI-ACP® important to YOU?

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

PMP®s 1997

PMP®s 1996 PMP®s

1995 PMP®s 1994 PMP®s

1993

Page 23: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

2/18/15  

23  

45

Online Agile Fundamentals Class

•  4-Hour, 4-PDU Introduction to Agile. •  Serious content from a PMP®’s perspective.

•  Demonstrates the alignment of Lean principles, the PMBOK® Guide and Agile best practices.

•  On-demand training for learning on your schedule!

•  Only $59.95 … that’s $15 per PDU!! •  www.GR8PM.com / Catalog / Online Classes

2

PMI-CVC40off expires midnight tomorrow!!

46

If you would like a copy of this presentation, please email me, or connect with me on Linked In,

at [email protected]

Hybrid Project Management is the Future! Understanding Agile from a PMP®’s Perspective!

Page 24: Hybrid Project Management is the Future! - pmicvc.org PDR Queue CDR Queue Mock-Up Key Question: How Is Agile Planning Done? Enterprise = Integration Enterprise integration using Kanban

In-HoUse PRoGRaMs tailored to your

specific needs and programmed to move at

your pace – deliberate or fast – and

always in-depth! When you have a

group of associates who can

leverage a shortened learning curve

to produce more value, more quickly,

GR8PM comes through. You choose

the topic, the dates (including

weekends), and the specific

content from our

library of learning

modules. We

provide the

Instructor, Student

Materials, and

PDUs from PMI!

Our seminar...YoUR Facility!

Join GR8PM’s onlIne faMIlY to

get the most important, most up-to-

date information about the Project

Management profession.

www.linkedin.com/company/gr8pm/

www.facebook.com/gr8pminc

www.twitter.com/gr8pms

www.youtube.com/user/Gr8PMs

A gift you can share… andkeep… to help your friendsand yourself save money at

GR8PM.com

Use this coupon code

“GR8PM-10”to get MINUS 10% OFF

any purchase!

Thank YOU for being part of the

GR8PM family!

Help Your PMIChapter Excel!

More PMI Chapters partner with GR8PM for PMI-

ACP Exam Prep (and other Agile and Traditional PM

training courses) than any other REP!

GR8PM has enjoyed a 50% increase in the

number of PMI Chapters using GR8PM in each of

the last 3 years! Is it because we provide

remarkable Member value, or is it because we make

it super easy for (overburdened) Chapter leaders, or

is it because everything we do is offered 100%

Risk-free for the Chapter and produces income to

the Chapter? The answer is... all of those things!

Please ask your Chapter to invite us out, or better

yet, provide an email introduction suggesting we

work together!