Capabilities and benefits of using Silk Central Test Manager within Your organization.TRANSCRIPT
![Page 1: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/1.jpg)
Good luck at your hunt!
Hunt on the white rabbits
By Andrew Issaenko ©May, 2010
![Page 2: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/2.jpg)
Do We test good?
![Page 3: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/3.jpg)
• Kan we predict the end quality?
• Are our test results 100% reliable?
• Is our test planning 100% reliable?
• Do we test as efficient as possible?
![Page 4: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/4.jpg)
Do We Know
![Page 5: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/5.jpg)
For Sure?
![Page 6: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/6.jpg)
Do We Want to
![Page 7: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/7.jpg)
Know for Sure?
![Page 8: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/8.jpg)
Yes!
![Page 9: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/9.jpg)
Test Overview
Qua
lity o
f del
ivera
bles
:
Prod
uct d
efec
ts an
d PC
Rs
Achievement of desired goals:
Coverage of the test scope by testing
Qualit
y of t
he p
roje
ct:
Issue
s ont
he b
usin
ess g
oals
of th
e pro
ject
The real test progress vs planned realization:
Realization and spent time of each planned test task
![Page 10: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/10.jpg)
Test Manager for You?As Project Management
• Progress Tracking: Current situation and work left
• Predictability: Impact on the future test executions by latest test results
• Test Budget Control: Control over spent test time and test budget
![Page 11: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/11.jpg)
Test Manager for You? As Test Engineer/Application Administrator
• Test-Progress: Always up-to-date info about the test progress
• Team work facilitation: Distributing manual test execution work between several persons
• Flexibility: Flexible way of planning test execution
![Page 12: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/12.jpg)
Test Requirements (Representation of the test scope)
Level Name Priority Risk Dependenties Resources
1 Applications (Domains, Sources)
HighMediumLow
High
2 Services InheritedHighMediumLow
InheritedHighMediumLow3 Sub-Services
4 Functions
5 Platforms or configurations
![Page 13: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/13.jpg)
Test Requirements Realization
Level Description of the category
1 Consists of two items for different products under test. Those products are groups of features.
2 Each feature is the group of user functions.
3 Each sub-feature is one user function.
Experience of LO 3.7
Level Description of the category
1 Test scope is separated between new and existing functionality.
2 Each group of features is a functionality related to a particular domain/application.
3 Each feature is a service offered by application to the end user.
4 Each sub-feature is a function that supports this service.
Experience of PZMO Mei 2010
Level Description of the category
1 Each group of features is the type of available business process.
2 Each feature is the business process for the certain type of data.
Experience of dKOC
![Page 14: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/14.jpg)
• Groups of product/features, certain features or subfeatures (product specifications)
• WBS en Project Initiation Document (PID) (project documents)
• Business Importance (define priority)
• Risk expectations from project management and development team (define risks)
Test Requirements Sources
![Page 15: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/15.jpg)
Test Requirements FillingManual Synchronization with external sources
In all cases of filling up test requirements, it is possible to select synchronized test scope manually or automatically by using requirements filters.
![Page 16: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/16.jpg)
Test BridgeFrom/To the test scope
• Automatic generation of test cases for chosen part of Test Scope
• Test Scope on the basis of existing Test Design
• Features Based generation of Test Design
• Sub Features Based generation of Test Design
![Page 17: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/17.jpg)
Filling Test Design • Predefined Attributes for test steps: Name, Action and Expected Result
• Custom Attributes for Test Cases/Steps
• Synchronization with Microsoft sources
• Manual and automated test cases
• Planned Test Execution Time per test caseManual filling up test case steps
Synchronisation with external sources: MS Excel/Word
![Page 18: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/18.jpg)
Test Design Linking • Internal project issue at a test case
• PCR en defects of Issue Manager (Star Team) can be linked to a test case(n) en direct entered within Test Manager on the basis of test results
• Test cases can make use of automated test scripts en test data in Star Team.
![Page 19: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/19.jpg)
Planning Test ExecutionWhat, by Whom
• Each Test Execution in Test Manager is a planned task in project planning
• Planned Test Cases can be defined manually or selected by filter
• Test Execution work distribution between more persons
• Manual and automated tests can be combined but only from the same test container
![Page 20: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/20.jpg)
Planning Test Execution Dependencies
• Startup en Cleanup test procedures (also from another test container)
• Conditional dependencies
• Test deployment on the basis of dependencies
![Page 21: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/21.jpg)
Start Test ExecutionAdapt Test Planning
• Executions Management
• Continue with existing test execution tasks
• Start Test Execution on de basic of previous test results
![Page 22: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/22.jpg)
Test Management Planning and Progress Tracking
• Automatic e-mail notification of involved persons
• Auto-measurement of time spent for test execution
• Manual/planned start of test execution
• Overview of all test execution activities
![Page 23: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/23.jpg)
Test ResultsEnter and Overview
• Latest result and the base for test conclusion per each test sep
• Passed/Failed/Unresolved/Unsupported
• Overview of the current test results during test execution
• Attach any file to clarify test results
![Page 24: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/24.jpg)
Automatische Test• Test Execution Servers define where
application(s) under test runs
• SilkTest AUT define where SilkTest Agent runs
• Run Analyses define from which host(s) dynamic test execution information is collected
• Collect Product code coverage information
Deployment Options
Product Code Coverage
![Page 25: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/25.jpg)
Trophies Room-10• Test Requirements:
– Borland Caliber Synchronization– MS Word/Excel Synchronization
• Test Design: – Automatic generation of test cases– MS Word/Excel Synchronization– Linking with met internal and external
issues– Use of test data/scripts in Star Team
• Test Execution:– Work distribution and Team work
facilitation– Automatic measurement of execution
time– Control and Overview per each test
case and each test step– Integration with code coverage tools
![Page 26: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/26.jpg)
Overal Test ReportsWhich information:
• The quality of deliverables:
• Conformance of deliverables to the desired goals (feat for business)
• The latest test progress vs. planned test realization:
• The quality of project:
Where do you get this information from?:
•Issue Manager: Reports on all deliverables related issues
•Test Manager: Reports on the latest coverage of test scope by test activities
•Test Manager & Planning Tool: One test execution is a task of project planning
•Test Manager: Reports on all project related issues
![Page 27: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/27.jpg)
So.. What Now?• Use of test manager within LG projects is a
goal confirmed and supported by management!
• Import Test Scope from existing sources
• Import existing test cases in Test Manager
• Pink Roccade LG is a learning organization!
![Page 28: Hunt On The White Rabbit 10 A Eng](https://reader035.vdocuments.site/reader035/viewer/2022062418/555499ffb4c90502618b45b2/html5/thumbnails/28.jpg)
Camp Fire• Questions and Discussion