huawei connectors for site master tn37
TRANSCRIPT
-
8/3/2019 Huawei Connectors for Site Master TN37
1/7
Request Date : 6/11/2009 No of Request ( Max -2, Min - 1)
No of Request ( Max -2, Min - 1) 1
Engineer Name Ganeshbabu
Employee Code 1255
AXIS BANK Account Number 168010100133593
Account Holder Name G.Ganeshbabu
Advance Requisition Ref no: huawei/061109/TN37
Feasibility / I&C/O&M - 1
CRM serial Number CRM serial Number
CRM Status
Material Available for Project at
Site (Y / N) CRM Status
Customer Name Huawei E1 Availablity (Y/N) Customer Name
WO number Infra ready at site (Y/N) WO number
WO date WO date
Zone South Zone
Region ROTN Region
Sub Region Sub Region
Location Location
Type of City Non Presence Type of City
KM 201-400&above KM
Project Activity(O&M / Feasibility /
I&C / Travel ) Others
Project Activity(O&M / Feasibility
/ I&C / Travel )
Project Name (TCL/ Eric/ Huwaei/
Reliance /ITI/ BSNL/TNEB /Telsima
/others) Huawei-Idea
Project Name (TCL/ Eric/ Huwaei/
Reliance /ITI/ BSNL/TNEB
/Telsima /others)
Site Premission Obtained (Y / N) Site Premission Obtained (Y / N)
Planned for Date Of Work Planned for Date Of Work
Duration of Work Duration of Work
No. Of engineer No. Of engineer
No. of technecian No. of technecian
Particulars Budget- Description Budgeted Cost / Allowance Details Quantity Un
Class A 150.00 Lumpsum
Class B & Class C 100.00 Lumpsum
25-100 KM 240.00 Lumpsum
101-200 KM 560.00 Lumpsum
201-400 & Above Km 720.00 Lumpsum
1 - 2 AP Installation 75.00 Lumpsum
AP Installation - Tikona 3 - 4 AP Installation 60.00 Lumpsum
More then 5 AP Installation 50.00 Lumpsum
Radio Link - Tikona Each Installation 150.00 Lumpsum
Survey - Tikona Each Survey 50.00 Lumpsum
Class A 200.00 Lumpsum
Class B & Class C 150.00 Lumpsum
Class A 250.00 Lumpsum
Class B & Class C 200.00 Lumpsum
Class A 150.00 Lumpsum
Class B & Class C 100.00 Lumpsum
25-100 KM 360.00 Lumpsum
101-200 KM 680.00 Lumpsum
201-400 & Above Km 840.00 Lumpsum
25-100 KM 600.00 Lumpsum
101-200 KM 1480.00 Lumpsum
201-400 & Above Km 1800.00 Lumpsum
25-100 KM 240.00 Lumpsum
101-200 KM 560.00 Lumpsum
201-400 & Above Km 720.00 Lumpsum
O&M in GCL presence Class A,B,C 100.00 Lumpsum
Preventive maintanence in GCL
presenceClass A,B,C 50.00
Lumpsum
25-100 KM 240.00 Lumpsum
101-200 KM 560.00 Lumpsum
201-400 & Above Km 720.00 LumpsumTotal Allowance
GI 1.5 inch Pole - 3 Meter 200.00 Lumpsum
GI 1.75 inch Pole - 5 Meter 300.00 Lumpsum
Floor Mount, Mason & concrete 1000.00 Lumpsum
Extra Fixtures setup for 5 M Pole 1000.00 Lumpsum
Set of Clamps 50.00 Per Piece
Antenna Fixture "L" Type 800.00 Per Piece 8
STP Cable - ISI Brand 15.00 Per Mtr
PVC Pipe with Accessories 20.00 Per Mtr
Tag - 50 Nos 80.00 Per packet
Insulation tapes, Weather proof kit,
screws and othes Per Installation200.00
Per installation
Flexible Hose 6.00 Per Mtr
Sheilded Connectors 7.00 Per Piece
Earthing Cable in Mtrs 30.00 Mtr
Movement of Materials Rack Shifting 750 - 1000 Per trip
Total(Material)
TOTAL (Convayance+materail)
Other incl. Office expenses, Mobile,
Rent, Taxes, Communication
expenses
Coupling Connectors for
Site master(2 Nos) 2
I&C in non Presence Location for
P2P links
South:Cuddalore
,Dharmapuri,Pon
dicherry,Thirupa
thur,Thiruvannamalai,Vellore,Ch
ennai
South,Chennai
North,Chennai
West, Chennai
Central,Coimbat
ore,Tirupur,Erod
e,Salem,Madurai,
Trichy,Bangalore
,Belgum,Bellary,
Feasibility
I&C in non Presence Location for AT
I&C in non Presence Location
excluding P2P
Feasibility / I&C/O&M - 2
O&M for Non Presence
IF I&C the following need to be filled
Installation & Commisioning for
MMDS & Wimax
Feasibility NON presence Location
Installation & Commisioning for AT
report
East:Asansol,Du
rgapur,Malda,Mu
shirabhad,Guwa
hati,Shilong,Ran
chi,Patna,BBSR,
Cuttack,Rourkela
,Raipur,Dhanbad
North:Noida,Ghaziabad,
Gurgaon,Delhi,UP-
East,UP-
West,Dehradoon,Haridw
ar,Rudrapur,Roorki,Jaip
ur,Udhaipur,Jodhpur,J&
K,Himachal
Pradesh,Haryana
Installation & Commisioning for P2P
West:Ahmedabad,Anand
,Saurashtra-Kutch,South
Gujarat,North
Gujarat,Andheri,Kurla,VT,Navi
Mumbai,Thane,Pune,Na
gpur,Aurangabad,Goa,N
asik,Kolhapur,Ahmedna
gar,Jhansi,Chattrapur,S
agar-Sehore,South-East
Indore,Ratlam Sub
Area,North
Gwalior,Dhamo -
Dingori, South MP
Purchase of Materials
-
8/3/2019 Huawei Connectors for Site Master TN37
2/7
Other incl. Office expenses, Mobile,
Rent, Taxes, Communication
expenses
Other incl. Office expenses, Mobile,
Rent, Taxes, Communication
expenses
Other incl. Office expenses, Mobile,
Rent, Taxes, Communication
expenses
Total Other Expences
TOTAL ADVANCE Amount
TOTAL ADVANCE Amount
TO Be Filled by TSD - Accounts
Cleared By ( Accounts Exe. Name)
WO availble in CRM ( Y / N)
Advance Request Cleared Date
-
8/3/2019 Huawei Connectors for Site Master TN37
3/7
Material Available for Project at
Site (Y / N)
E1 Availablity (Y/N)
Infra ready at site (Y/N)
Total
ACTUTAL
EXPENSES
Approved by
RH/ZH Value Remarks
Quantity Unit rate
Total
ACTUTAL
EXPENSES
Approved
by RH/ZH
Value Rem
0 150.00 0
0 100.00 0
0 240.00 0
0 560.00 0
0 720.00 0
0 75.00 0
0 60.00 0
0 50.00 0
0 150.00 0
0 50.00 0
0 200.00 0
0 150.00 0
0 250.00 00 200.00 0
0 150.00 0
0 100.00 0
0 360.00 0
0 680.00 0
0 840.00 0
0 600.00 0
0 1480.00 0
0 1800.00 0
0 240.00 0
0 560.00 0
0 720.00 0
0 100.00 0
050.00
0
0 240.00 0
0 560.00 0
0 720.00 0
0 0 0 0
0 200.00 0
0 300.00 0
0 1000.00 0
0 1000.00 0
0 50.00 0
0 800.00 0
0 15.00 0
0 20.00 0
0 80.00 0
0
200.00
0
0 6.00 0
0 7.00 0
0 30.00 0
0 750.00 0
0 0 0 0
0 0 0 0
1600
1.00
0
IF I&C the following need to be filled
West:Ahmedabad,Anand
,Saurashtra-Kutch,South
Gujarat,North
Gujarat,Andheri,Kurla,VT
,Navi
Mumbai,Thane,Pune,Nag
pur,Aurangabad,Goa,Na
sik,Kolhapur,Ahmednag
ar,Jhansi,Chattrapur,Sag
ar-Sehore,South-East
Indore,Ratlam Sub
Area,North
Gwalior,Dhamo -
Dingori, South MP
North:Noida,Ghaziabad,
Gurgaon,Delhi,UP-
East,UP-
West,Dehradoon,Haridw
ar,Rudrapur,Roorki,Jaip
ur,Udhaipur,Jodhpur,J&
K,Himachal
Pradesh,Haryana
sol,Durga
pur,Malda,
Mushirabh
ad,Guwah
ati,Shilon
g,Ranchi,
Patna,BBS
R,Cuttack,
Rourkela,South:Cu
ddalore,D
harmapuri
,Pondiche
rry,Thirup
athur,Thir
uvannama
lai,Vellore,
Chennai
South,Che
nnai
North,Che
nnai West,
Chennai
-
8/3/2019 Huawei Connectors for Site Master TN37
4/7
0
1.00
0
0
1.00
0
0
1.00
0
1600 0 0 0
1600 0 0 0
mount Spent Date Amount Spent Date
Expense Submitted Date Expense Submitted Date
Total Expenses Total Expenses
Net Payable/Rec Net Payable/Rec
To be filled by EngineerTo be filled by Engineer TO Be Filled by TSD - Accounts
Cleared By ( Accounts Exe. Name)
TOTAL ADVANCE Amount
Advance Request Cleared Date
WO availble in CRM ( Y / N)
-
8/3/2019 Huawei Connectors for Site Master TN37
5/7
Grand
Total(Advan
ce)
Grand
Total(Expen
ce)
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0
0 0
0 0
0 0
0 0
-
8/3/2019 Huawei Connectors for Site Master TN37
6/7
0 0
0 0
0 0
1600 01600 0
-
8/3/2019 Huawei Connectors for Site Master TN37
7/7