  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    1/43

    HUAWEI TECHNOLOGIES Co., Ltd.

    www.huawei.com

    HUAWEI Confidential

    Securit Le!el" 秘密

    Huawei WLAN Stadium

    Coverage Solution

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    2/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e '

    #roect #re-aration

    #roduct Selection

    '

    Contents

      /andwidth *e0i+n1

      *e-loment *e0i+n2

    #roect Ca0e3

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    3/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e 1

    WLAN Planning Steps

    Project DeliveryRequirement

    collection

    Presales

    networ!

    planning

    Customer

    communication

    and quotation

    Detailed site

    survey

    A"tersales

    networ!

    planning

     Networ4

     -lannin+

    0olution

    #roduct 0election

    /andwidth de0i+n

     A# ca-acit de0i+n

     A# de-loment

    Channel -lannin+

    Ca5le route and -ower 0u--l de0i+n

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    4/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e 2

    Requirement Collection and Site Survey#tem Description

    Stadium structure#re-are a 0cale drawin+ of the 0tadium and learn the 0tadium 0tructure 60ome -icture0 or material0 can 5e found on the

    Internet7.

    Coverage area *etermine the tar+et co!era+e area0, includin+ the 0tand, -ar4in+ lot, and corridor.

    $ser distri%utionO5tain u0er di0tri5ution information, includin+ the total num5er of u0er0 in the 0tadium, u0er di0tri5ution on each 0tand.

    U0uall, the u0er den0it !arie0 in different area0 of the 0tadium.

    Service type *e0cri5e the maor t-e0 of 0er!ice0 tran0mitted on the WLAN" !ideo, we5 -a+e 5row0in+, or 8I#.

    Percentage o"

    concurrent users

    Chec4 whether the cu0tomer ha0 0-ecial re9uirement0 on the -ercenta+e of concurrent u0er0. U0uall, the num5er of

    concurrent u0er0 account0 for '(: of total u0er0.

    &erminal typeU0uall, the ratio of '.2 GH; terminal0 to 3 GH; terminal0 i0 ". The -ro-ortion of 3 GH; terminal0 increa0e0 a0 more and

    more 3 GH; de!ice0 are u0ed.

    Availa%le c'annels Chec4 a!aila5le 3 GH; channel0 0u--orted at the local 0ite.

    Sa"ety certi"ication Chec4 whether CE or

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    5/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e 3

    #roect #re-aration

    #roduct Selection

    '

    Contents

    /andwidth *e0i+n1

      *e-loment *e0i+n2

    #roect Ca0e3

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    6/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    AP Selection) #ndoor Settled APs

    #a+e )

    Huawei APsAP*+,+ seriesAP*+,+SN-DN

    AP.+,+ seriesAP.+,+SN-DN

    AP/,,+ seriesAP/,,+SN-DN

    Appearance

    Product positioningSmall and medium enter-ri0e0,mid=ran+e mar4et

    Small, medium, and lar+eenter-ri0e0, mid=ran+e mar4et

    >edium and lar+e enter-ri0e0

    0#0( '?' '?' 1?1

    Num%er o" concurrentusers supported

    1(@3( 2(@)( )(@((

    0a1imum num%er o"users supported

    ' ' '

    Antenna type /uilt=in antenna /uilt=in antenna E?ternal antenna

    0a1imum transmitpower "or eac' antenna

    B d/m '( d/m '( d/m

    Power consumption ).( W @ D.3 W ).3 W @ (.' W .B W @ 3.B W

    Power supply mode #oE" =2 8 *C #oE" =2 8 *C #oE" =2 8 *C

    23(D $ $ $

    Hig'density mode = $ $

    Wor!ing mode

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    7/43CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    AP Selection) (utdoor APs

    #a+e B

    Huawei APs(utdoor seriesAP.*,+DN

    (utdoor seriesAP..,+DN

    Appearance

    Hig'density mode $ $

    0#0( '?' '?'

    Num%er o" concurrent users supported )( )(

    0a1imum num%er o" users supported ' -er radio ' -er radio

    Antenna type E?ternal antenna E?ternal antenna

    Maximum transmit power for eachantenna ') 6'.2 GH;7F'( 63 GH;7 d/m 'B 6'.2 GH;7 F '2 63 GH;7 d/m

    Power consumption '3.3 W 1( W

    Power supply mode #oE" =2 8 *C Local AC -ower 0u--l

    Wor!ing mode

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    8/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    Antenna Selection

    #a+e

    18° (2! "#$% 1&° (& "#$% '° (2! "#$% '° (& "#$%

    Appearance

    Num%er o" antennasrequired %y eac' AP

    Applica%le "requency '.2 GH; 3 GH; '.2 GH; 3 GH;

    5ain 6d2i7 D .3 '

    Hori8ontal lo%e 3 )( )(

    9ertical lo%e 3 1( 1(

    Polari8ation mode *ual=-olari;ed *ual=-olari;ed *ual=-olari;ed *ual=-olari;ed

    )nterface N=female' N=female' N=female' N=female'

    Applica*le APs A#)3(*N A#))(*N

     A#)3(*N A#))(*N

     A#)3(*N A#))(*N

     A#)3(*N A#))(*N

    +imension (mm% 12(12('3 '3('3('3 '3(33)( '1(2333

    Part num%er  'B(122 'B((D( 'B((' 'B((D

    "*" -Attenuators need to be congured to meet safetycertication requirements of dierent countries.

    . It i0 recommended that ou u0e 0mall an+le antenna0 in area0 with a hi+h u0er den0it, 0uch a0 the 0tand0. Small an+le

    antenna0 can control the A# co!era+e area within the effecti!e ran+e to reduce interference.

    '. U0e )(antenna0 in area0 with a low u0er den0it, 0uch a0 the -ar4in+ lot.

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    9/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e D

    #roect #re-aration

    #roduct Selection

    '

    Contents

      /andwidth *e0i+n2

      *e-loment *e0i+n3

    #roect Ca0e)

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    10/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e (

     

    10, 2012 CQ of some Operator 

    ,erminal -andwidth +esign

     :ey indicator) delay ; L -a+e

    5row0in+One=wa ;

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    11/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

     A--lication0 %e9uired *ata %ate %emar40

    We5 -a+e5row0in+

    )(=2(( 45-0 Si;e of a we5 -a+e" '(( K/ dela" 2 to (0

    8ideo 0treamin+ '(=3)( 45-0 %eal=time 0er!ice0

    In0tantme00a+in+

    1'=)2 45-0 ' K/@Se00ion, (.30

    Email 2(( 45-0 (( K/@Se00ion, '0

    Socialnetwor4in+

    '(( 45-0 3( K/@Se00ion, '0

    8oI# '3) 45-0 %eal=time 0er!ice0, for e?am-le, '3) 45-0 G/% for

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    12/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    4ans wit'in t'e

    coverage area o"

    t'e APs

    4ans connected to

     t'e Wi4i networ!

    4ans t'at use t'e

     networ!

    concurrently

     Seating Capacity

    @uantity Percentage

    Audience mem%ers wit' smart p'ones++++ ,++B

    Smart p'ones connected to t'e Wi4inetwor! ++++ ,++B

    Smart p'ones t'at use Wi4i servicesconcurrently

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    13/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e 1

    #roect #re-aration

    #roduct Selection

    '

    Contents

    /andwidth *e0i+n1

      *e-loment *e0i+n2

    #roect Ca0e3

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    14/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    Stand

    &ypical Coverage 0ode 6,7EESide 0ode

    #a+e 2

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    15/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    &ypical Coverage 0ode 6,7EESide 0ode

    #a+e 3

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    16/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e )

    &ypical Coverage 0ode 6,7EESide 0ode

    . In 0ide mode, A#0 and antenna0 can 5e in0talled a5o!e the 0eat0 in the la0t row of each laer. A#0 are

    -laced in a line, which facilitate0 ca5le de-loment and -ower 0u--l 6See

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    17/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    Second layer 

    4irst layer 

    #a+e B

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    18/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    &ypical Coverage 0ode 67 EE(ver'ead 0ode

    #a+e

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    19/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e D

    &ypical Coverage 0ode 67 EE(ver'ead 0ode

    .*e-lo A#0 in o!erhead mode if no -ro-erin0tallation -o0ition i0 a!aila5le or cu0tomer0 do not

    a--ro!e in0tallation0 in the la0t row of 0eat0.

    '.U0e '.2 GH; antenna0 and 3 3 GH;

    antenna0.

    1.#ro-erl de0i+n channel0 of A#0 to -re!ent that co=

    channel interference de+rade0 A# -erformance.

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    20/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    &ypical Coverage 0ode 67 EE4loor 0ode

    #a+e '(

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    21/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e '

    &ypical Coverage 0ode 67 EE4loor 0ode

    . *e-lo A#0 in floor mode to enhance 0i+nalco!era+e if the 0tand de-th i0 lar+er than '3 m or

    the u0er den0it i0 hi+h 60ome 0tadium ma ha!e

    no 0tandin+ area07.

    '.  Adu0t downtilt an+le0 of antenna0 in0talled a5o!e

    the la0t row of 0eat0 or on the ceilin+ to control

    co!era+e area0.

    1. #ro-erl de0i+n channel0 of A#0 to -re!ent that

    co=channel interference de+rade0 A#

    -erformance.

    2. Si+nal0 need to -a00 throu+h concrete -anel0,

    0eat0, and -eo-le, which ma4e0 them attenuate.Carr out te0t0 to !erif the 0i+nal attenuation.

    U0e indoor A#0 if the 0i+nal attenuation i0 0mall,

    and u0e outdoor A#0 and antenna0 if the 0i+nal

    attenuation i0 lar+e.

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    22/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e ''

    Coverage 0ode Comparisons

    .o/erageMode

    Ad/antage +isad/antage Recommends

    Side

    . A#0 and terminal0 are !i0i5le to eachother in line=of=0i+ht di0tance, with-enetration lo00 within the allowedran+e.

    '. The A#0 are ea0 to in0tall.1. A#0 are -laced in a line. Co=channel

     A#0 are far from each other, -ro!idin++ood anti=interference ca-a5ilit.

    . The la0t row of 0eat0 i0 near the ceilin+. A#0 are within reach of the audience. Inthi0 0ituation, A# -rotection 5o?e0 arere9uired.

    '. If the 0tand de-th i0 lar+e, cu0tomer0 needto de-lo A#0 in other mode0 to enhance0i+nal co!era+e.

    (ver'ead

    . A#0 are ea0 to in0tall on ceilin+0 with5ridlewa0.

    '. A#0 and terminal0 are !i0i5le to eachother in line=of=0i+ht di0tance, with-enetration lo00 within the allowedran+e.

    . It i0 difficult to in0tall A#0 on hi+h ceilin+0with 0im-le 0tructure.

    '. Channel -lannin+ mu0t ta4e all A#0around into con0ideration. Thi0 mode ha0-oor anti=interference ca-a5ilit.

    4loor 

    . A# 0i+nal0 attenuate due to o50tacle0.The A# co!era+e area can 5econtrolled. Therefore, man A#0 can5e de-loed to connect more u0er0.

    '. A#0 are de-loed at the rear of the0tand, in!i0i5le to the audience.

    O50tacle0 5etween the 0tand and terminal0are com-le? therefore, 0i+nal attenuation i0

    hard to e0timate.

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    23/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    Num%er o"concurrent

    users

    &otal num%er o"users > Percentageo" concurrent users

    Stand si8eDesign drawings

    > site surveys

    Average%andwidt'required

    Service type

    Provide t'e results)

    ,= AP location

    = AP quantity

    = Num%er o" users covered

    %y eac' AP

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    24/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*. #a+e '2

    AP Capacity Design 6 2andwidt'AP DistanceNum%er o" C

    oncurrent $sers on ?ac' APF Re"erence &a%le7

    *ata in the ma--in+ relation0hi- ta5le i0 5ein+ te0ted.

    Currentl, the followin+ t-ical data i0 a!aila5le. A00ume four '.2 GH; channel0 are a!aila5le.

     A# di0tance" B.3 m

    Num5er of concurrent u0er0 on each A#" 3( 6'.2 GH;"3 GH; "7

     A!era+e 5andwidth -er u0er" 1((=3(( 45-0

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    25/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    C'annel Design Principles

    #a+e '3

    . *etermine the a!aila5le channel0 at the local 0ite.

    *etermine a!aila5le '.2 GH; channel0. In countie0 that 0u--ort channel0 =1, u0e channel0 , D, 1, and 2

    to increa0e the di0tance 5etween co=channel A#0 if man A#0 need to 5e de-loed.

     A!aila5le channel0 !ar in different countrie0 and re+ion0. Some countrie0 or re+ion0 will re0er!e 0omechannel0. Select channel0 5a0ed on the condition0 at the local 0ite.

    In 0ome countrie0 or re+ion0, a!aila5le 3 GH; channel0 ma differ in indoor and outdoor 0cenario0. Select

    channel0 accordin+ to local 0tandard0.

    ountry Code

    e Com#iance

    '. #lan the channel0.

     A# channel0 0hould 5e -ro-erl -lanned to -re!ent interference. When -lannin+ A# channel0, a!oid interference from

    e?i0tin+ 0i+nal0, which i0 of +reat 0i+nificance to en0ure hi+h acce00 9ualit.

    O!erall channel -lannin+ rule0" Co=channel and adacent=channel A#0 0hould 5e de-loed far from each other to

    increa0e channel multi-le?in+ efficienc. Additionall, interference 5etween A#0 on the 0ame laer or different laer0

    0hould 5e con0idered.

    1. E?am-le"Second layer stand

    CHI

    CH .

    4irst layer stand

    CH,

    CH

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    26/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    . En0ure that the ca5le len+th from the acce00 0witch to A#0 doe0 not e?ceed ( meter0 6the ca5le len+th i0 not 0trai+ht=line

    di0tance 5etween the 0witch and A#0 5ut calculated 5a0ed on ca5lin+ rule07.'.  A!oid hea! ma+netic and electronic interference0 on the 0ite0 where acce00 0witche0 are in0talled.

    1. En0ure that relia5le AC -ower 0u--l i0 a!aila5le on the 0ite0 where the acce00 0witche0 are in0talled.2. #rotect the 0witche0 from moi0ture and du0t 6-urcha0e -rotection 5o?e0 accordin+ to en!ironment 0ituation07.

    3. *etermine the num5er of acce00 A#0 5a0ed on the num5er of 0witch interface0, #oE -ower 0u--l ca-a5ilit of the -ower

    module, and A# -ower con0um-tion 6note that outdoor A#0 ha!e hi+h -ower con0um-tion7.

    Deployment o" Access Switc'es

    #a+e ')

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    27/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    Ca%ling Rules and Power Supply 0odes

    Power supply using a Po? adapter 6applica%le to scenarios w'ere no

    AC power supply is availa%le7

    Po? power supply "or APs 6pre"erred7J in compliance wit' +=at

    Local AC power supply 6applica%le to indoor APs in scenarios w'ere AC

    power supply is availa%le7

    ,

    Po? power supply

    Local AC power supply

    $sing Po? adapter 

    Power Supply 0odes

    Ca%ling Rules

    . En0ure that the ca5le len+th from the A# to the acce00 0witch doe0 not

    e?ceed ( meter0.'. %e0er!e 3=meter len+th for ca5le adu0tment.

    1. Kee- the networ4 ca5le0 far awa from electroma+netic field.

    2. O5tain the cu0tomer0 and -ro-ert owner0 a--ro!al on the ca5lin+ route0.

    #a+e 'B

    C t t

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    28/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    #roect Ca0e

    #a+e '

    #roect #re-aration

    #roduct Selection

    '

      /andwidth *e0i+n1

    Contents

      *e-loment *e0i+n2

    3

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    29/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    Stadium Hig'Density Coverage Project

    #a+e 'D

    Hig'density coverage project "or KK stadium

    Project Preparation)

    The followin+ ta5le de0cri5e0 -roect re9uirement0 collected from cu0tomer0.

    #tem Requirement

    Coverage area Stand0 and corridor0

    Switc' location Wired a++re+ation -oint mar4ed on the ma-

    (nsite environment There i0 no interference 0ource on0ite.

    &erminal type #hone0 and ta5let0

    Service typeWe5 -a+e 5row0in+, 0ocial networ4in+, and !ideo -lain+ 6a few

    re9uirement07

    $ser distri%ution The num5er of u0er0 on the 0tand at each laer ha0 5een collected.

    Availa%le c'annels1), 2(, 22, 2, 3', 3), )(, )2, ((,(2, (, ', ), '(, '2,

    ',1', 1), 2(

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    30/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    AP Deployment at t'e Second Layer Stand

    #a+e 1(

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    31/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    I m

    PP

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    32/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    P

    En0ure that the di0tance 5etween the

     A# and 0witch i0 0maller than ( m.>a?imum -ower con0um-tion of each

     A#" '3 W>a?imum out-ut #oE -ower of an

    acce00 0witch" 1( W

    Each acce00 0witch connect0 to ( A#0.Num5er of acce00 0witche0 re9uired"

    6B' F )27@( 2

    Access Switc' Deployment at t'e Second Layer Stand

    #a+e 1'

    2andwidt' and Capacity Design "or t'e Second

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    33/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    Total num5er of A#0" B' F )2 1) Total num5er of u0er0" '((( /a0ed on the model /andwidth=A# di0tance=Concurrent u0er0 on each A# and the

    terminal t-e ratio 6'.2 GH;"3 GH; "7, each A# allow0 23 concurrent u0er0 and

    each u0er o5tain0 a 5andwidth of 1(( to 3(( 45-0. Num5er of concurrent u0er0" 23 ? 1) )'( #ercenta+e of concurrent u0er0" )'(@'((( '.3:

     All u0er0 at the 0econd laer 0tand can connect to the Wi=

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    34/43

    AP D l t t t' 4i t L St d

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    35/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    I m

    PP

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    36/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    Access Switc' Deployment at t'e 4irst Layer Stand

    P

    En0ure that the di0tance 5etween the A#

    and 0witch i0 0maller than ( m.>a?imum -ower con0um-tion of each

     A#" '3 W>a?imum out-ut #oE -ower of an acce00

    0witch" 1( W

    Each acce00 0witch connect0 to ( A#0.Num5er of acce00 0witche0 re9uired"

    6)( F 337@( '

    #a+e 1)

    2andwidt' and Capacity Design "or t'e 4irst

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    37/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    2andwidt' and Capacity Design "or t'e 4irst

    Layer Stand

    Total num5er of A#0" )( F 33 3 Total num5er of u0er0" '1((( /a0ed on the model /andwidth=A# di0tance=Concurrent u0er0 on each A# and the

    terminal t-e ratio 6'.2 GH;"3 GH; "7, each A# allow0 23 concurrent u0er0 and

    each u0er o5tain0 a 5andwidth of 1(( to 3(( 45-0. Num5er of concurrent u0er0" 23 ? 3 3B3 #ercenta+e of concurrent u0er0" 3B3@'1((( ''.3:  All u0er0 at the fir0t laer 0tand can connect to the Wi=

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    38/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    Signal Coverage in Corridors

    AP 0odel @uantity Switc'

     A# )((*N 2) ? ' ) ? '

    #a+e 1

    2andwidt' Design "or Corridors

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    39/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    2andwidt' Design "or Corridors

    Total num5er of A#0" 2) for each floor 

    Total area of each corridor" 3)( m' Num5er of u0er0 -er 09uare meter" .' Total num5er of u0er0" B(1' /a0ed on the model /andwidth=A# di0tance=Concurrent u0er0 on each A# and the

    terminal t-e ratio 6'.2 GH;"3 GH; "7, each A# allow0 23 concurrent u0er0 and

    each u0er o5tain0 a 5andwidth of 1(( to 3(( 45-0.

    Num5er of concurrent u0er0" 23 ? 2) '(B( #ercenta+e of concurrent u0er0" '(B(@B(1' 'D.21:  All u0er0 in the corridor0 can connect to the Wi=

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    40/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    LocationNum%ero" seats

    AP Location AP.*,+DN Ant, AntAccessSwitc'

    R4Ca%le

    Attenuator 

    Secondlaer0tand

    '(((

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    41/43

    CO#$%IGHT &'(() HUAWEI TECHNOLOGIES CO., LT*.

    0aterial &ype @uantity 2ac!up

     A#

     A#)3(*N '3 '3

     A#)((*N D' D

     Antenna

     Ant '3 '3

     Ant' '3 '3

     AC AC))(3 =

    %< ca5le %< Ca5le=1 m ((2 3'

     Attenuator Attenuator=3 d/ 3(' 3(

     Acce00 0witch S3B((='#=#W%=LI=AC 1

    0aterial Statistics

    #a+e 2

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    42/43

    HUAWEI TECHNOLOGIES CO., LT*.保密材料,注意发放范围#a+e 2'

    Than40

    www.huawei.com

    A di N t ! Pl i S t C' l

  • 8/19/2019 Huawei Agile Stadium Solution Design Guide

    43/43

    Appendi1) Networ! Planning Support C'annel

    Networ! planning solution

    #n C'ina)

    (utside C'ina)

    4rontline

    personnel H@

    ?nterprise

    Networ!ingPro"essional

    Services

    Qhaoawei

    )DB)

    4rontlinepersonnel H@

    ?nterprise

    Networ!ingPro"essional

    Services

    Ru;hi

    ((3D3(

    Qhen+?iaodon+

    3D(2

    Qhaoawei

    )DB)