http:// vienna group trigger meeting cern, 6 dec. 2005 presented by claudia-elisabeth wulz global...

12
http://wwwhephy.oeaw.ac.at/p3w/cms/trigger Vienna Group Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Claudia-Elisabeth Wulz Global Muon Trigger Global Muon Trigger Global Trigger Global Trigger H. Bergauer, Ph. Glaser, M. Jeitler, K. H. Bergauer, Ph. Glaser, M. Jeitler, K. Kastner, Kastner, B. Neuherz, T. Nöbauer, I. Magrans de Abril, I. B. Neuherz, T. Nöbauer, I. Magrans de Abril, I. Mikulec, Mikulec, M. Padrta, H. Rohringer, H. Sakulin, Th. M. Padrta, H. Rohringer, H. Sakulin, Th. Schreiner, Schreiner, J. Strauss, A. Taurok, C.-E. Wulz J. Strauss, A. Taurok, C.-E. Wulz

Upload: kimberly-foster

Post on 27-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

http://wwwhephy.oeaw.ac.at/p3w/cms/trigger

Vienna GroupVienna Group

Trigger MeetingCERN, 6 Dec. 2005

Presented by

Claudia-Elisabeth WulzClaudia-Elisabeth Wulz

Global Muon TriggerGlobal Muon TriggerGlobal TriggerGlobal Trigger

H. Bergauer, Ph. Glaser, M. Jeitler, K. Kastner,H. Bergauer, Ph. Glaser, M. Jeitler, K. Kastner,B. Neuherz, T. Nöbauer, I. Magrans de Abril, I. B. Neuherz, T. Nöbauer, I. Magrans de Abril, I.

Mikulec, Mikulec, M. Padrta, H. Rohringer, H. Sakulin, Th. Schreiner, M. Padrta, H. Rohringer, H. Sakulin, Th. Schreiner,

J. Strauss, A. Taurok, C.-E. WulzJ. Strauss, A. Taurok, C.-E. Wulz

Page 2: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

C. - E. Wulz 2 Trigger Meeting, Dec. 2005

Global Trigger Crate

L1 GLOBAL TRIGGER 9U Crate

CLK,BCRES, L1A

8 FinOR +8 TechTrig

A.T. 16.3.04

PC: RUN Control

4MUONS

VME

VME

VME

Top viewFRONT SIDE BACK SIDE

GTL9U

GTL9U

BACKPLANESIGNALS

TIM6UTTC

4TAU, ET*, JetNr, 4 free

(ET*=total E T,HT,ME T)

Technical Triggersignals

4IEG, 4EG, 4JET, 4fJET

PSB9U

PSB9U

PSB9U

RO-data13 ChLinks

slot not used

8 RPC, 4 DT4 CSC muons

12 CABLESMIP/QUIET

PSB9U

PSB9U

PSB9U

GMT

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

SLOT_Nr

L1A_OUT

32 TTCciTTC racks

TTS racks

ConvCrate

GCT crate

M/Q bits

GCT data

L1A, Bgo32 cables to 32 TTCci

FDL9U128 Algo

Status Signals

TCS 9U

PSB9U

L1A_OUT

TOTEM

EmuCrate

aTTSDAQ

APVE

128 ALGOs

S-links: DAQ, EVMGTFE

TTC - GPS

PSB (Pipelined Synchronizing Buffer)Input and Synchronisation

GMT (Global Muon Trigger)Global Muon Trigger logicGTL (Global Trigger Logic) Algorithm logic

FDL (Final Decision Logic) Level-1 Accept decision

GTFE (Global Trigger Frontend) Readout

TCS (Trigger Control System Module) Central Trigger Control

L1A_OUT (Level-1 Accept Module) Distribution of Level-1 Accept

CONV6U (Conversion Boards) Reception of status signals from the subsystems

TIM (Timing Module) Timing

Page 3: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

C. - E. Wulz 3 Trigger Meeting, Dec. 2005

Final GT/GMT modules

FDL

PSB

In 904

GMTGTFE

GTL

Page 4: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

C. - E. Wulz 4 Trigger Meeting, Dec. 2005

Final GT modules

TCS

In 904

CONV6U

In 904

In 904

TIM

In 904

L1AOUT

In 904

Page 5: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

C. - E. Wulz 5 Trigger Meeting, Dec. 2005

Module Status

Name # needed @ CERN in Vienna

TCS 1 1 1

L1AOUT 2 1 1

CONV6U 4 4 2

PSB 7 1 2

TIM 1 2 1

GTL 1 GTL6U: Dec. 2005

GTL9U: Apr. 2006

1

FDL 1 1 of 2: Jan. 2006 2

GTFE 1 1: May 2006 1 (firmware ongoing)

GMT 1 1: Dec. 2005 1

Page 6: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

C. - E. Wulz 6 Trigger Meeting, Dec. 2005

PSB9U Pipelined Synchronizing Buffer

– All 3 available boards are working

– Bit error rate tests have been succesful (no bit errors in 1013 transfers)

– Signal transfer from Global Calorimeter Trigger • in principle OK

– Problems with wrongly made cables • led to delays (and almost ruined a PSB …)• now understood

– Technical trigger inputs • Working with TOTEM• Work on scintillator hodoscope min.bias trigger / beam gas veto is planned

Page 7: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

C. - E. Wulz 7 Trigger Meeting, Dec. 2005

TCS + L1AOUT

PSB

Trigger ControlSystem

+Output Module

PipelineSynchronizing

Buffer

TimingBoard

TIM

GlobalCalorimeter

Trigger

Integration Tests with Global Calorimeter Trigger

Page 8: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

C. - E. Wulz 8 Trigger Meeting, Dec. 2005

Global Muon Trigger Logic Board

Status: Sent to CERN today!

GMT

• Module has been commissioned in Vienna

• Chips redesigned for CAEN controller

• One remaining error, which will be solved by a new chip on new mezzanine board: one muon always gets same charge.

• Further tests are planned with spares in Vienna

• Software integration is under way

• Planned integration tests at CERN in 904 (Dec. 2005-Feb. 2006):

– RPC LB-TB-Sort-GMT

– CSC-TF-GMT

– DTSC-DTTF-Sort-GMT

Page 9: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

C. - E. Wulz 9 Trigger Meeting, Dec. 2005

GTL, FDL and GTFE

• GTL9U– Board is produced. Commissioning has started in Vienna.

• FDL– Available for some time. Needed in Vienna for tests with GTL9U.

• GTFE– Board is produced.– Basic electrical tests OK.– Commissioning has started.

• Fast Monitoring Module (FMM)– responsible: CERN– Communication with Global Trigger OK– Software development: Hannes Sakulin

Page 10: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

C. - E. Wulz 10 Trigger Meeting, Dec. 2005

Trigger Control System and Timing

• Trigger Control System (TCS) is operational– Software integration into Trigger Supervisor

• TIM modules are operational

• Global Clock (TTC) is running– responsible: CERN– Trigger output goes to TTCci module, under test– locale distribution by Vienna TIM module

• Emulators– responsible: Imperial College, London– Communication with Global Trigger OK– continue to work on firmware

• Fast Monitoring Module (FMM)– responsible: CERN– Communication with Global Trigger OK– Software development: Hannes Sakulin

Page 11: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

C. - E. Wulz 11 Trigger Meeting, Dec. 2005

Test Schedule

Ongoing in 904: TCS, PSB input board, TTC– Trigger Control System validation– Test with Global Calorimeter Trigger– Test with TTC

Jan. - March 2006: GTL6U, FDL– test logic and trigger decision

From Dec. 2005: GMT– test with other muon subsystems

Jan. - March 2006: preparation for magnet test and Cosmic Challenge From Apr. 2006: GTL From May 2006: GTFE

Page 12: Http:// Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global

C. - E. Wulz 12 Trigger Meeting, Dec. 2005

Summary

At least one board of all Global Trigger modules exists. At least one board of all Global Trigger modules exists.

Tests in building 904 are ongoing. Tests in building 904 are ongoing.

Software development efforts are reinforced. GUIs for Software development efforts are reinforced. GUIs for trigger setup and operation exist. trigger setup and operation exist.

Participation in the cosmic challenge during the magnet Participation in the cosmic challenge during the magnet test is prepared.test is prepared.

Latency has been verified. Latency has been verified.