hst interior elements strengths detailed reporting …...rfq: 829309-furniture and furnishings...
TRANSCRIPT
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology (58
Points)
Sustainability (2
Points)
Cost
(40
Points)
Totals
(100
Points)
HST Interior Elements 48.00 2.00 40.00 90.00
BrandMax. RFP Cost
Points
3 Branch 40
Offeror's Name
Total Estimated Cost
Based on Submitted
Discount
RFP Cost Point
Distribution
HST 23,499.00$ 40.00
HST Interior Elements
Strengths
Weakness
829308-Furniture and Furnishings
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
RFQ: 829309-Furniture and FurnishingsApproach and Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 38.06 89.06
Contract Furniture 45.00 2.00 31.15 78.15
Facility Planners 51.00 2.00 34.42 87.42
HST Interior Elements 48.00 2.00 40.00 90.00
Interior Design Services 56.00 2.00 38.65 96.65
Nashville Office Interiors 49.00 2.00 39.82 90.82
Brand Max. RFP Cost Points
9 to 5 Seating 40
Offeror's Name
Total Estimated Cost Based on
Submitted Discount RFP Cost Point Distribution
HST 4,049.00$ 40.00
NOI 4,067.00$ 39.82
Interior Design Services 4,190.00$ 38.65
A-Z 4,255.00$ 38.06
FACILITY PLANNERS 4,706.00$ 34.42
CONTRACT FURNITURE ALLIANCE 5,200.00$ 31.15
A-Z
Strengths
Weakness
Contract Furniture Alliance, Inc.
Strengths Detailed responses to questions #10, #11,#12 and #17;
829308-Furniture and Furnishings
Did not provide a time frame for quotes involving design and specifications; does not
provide inventory services.
Strong relationship with manufacturer.
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Interior Design Services
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness N/A
Strong overall approach and process; Strong relationship with manufacturer; Detailed
response to question #9, #15 and #17;Years of experience with Metro.
Detailed reporting on questions #9; Strong process response for question #13.
Short ship and missing products process; Does not provide inventory management.
Good overall approach and methodology;Strong relationship with manufacturer; Strong
responses to questions #7 and #8.
Direct responses to various questions difficult to find.
Did not provide direct contact provided title of job.
Generic response for questions #4; Did not provide percentage of time dedicated to
Metro on question #4; Did not provide time frame for question #7;Failed to answer
questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed
response to question #4 and #17;
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Contract Furniture 45.00 2.00 39.85 86.85
Facility Planners 51.00 2.00 33.72 86.72
HST Interior Elements 48.00 2.00 40.00 90.00
Brand
Max. RFP Cost
Points
Aceray 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 5,479.00$ 40.00
FACILITY PLANNERS 6,500.00$ 33.72
CONTRACT FURNITURE ALLIANCE 5,500.00$ 39.85
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
829308-Furniture and Furnishings
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40
Points)
Totals
(100
Points)
Contract Furniture 45.00 2.00 35.84 82.84
Facility Planners 51.00 2.00 37.53 90.53
HST Interior Elements 48.00 2.00 40.00 90.00
Brand
Max. RFP Cost
Points
Allermuir 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 4,749.00$ 40.00
FACILITY PLANNERS 5,062.00$ 37.53
CONTRACT FURNITURE ALLIANCE 5,300.00$ 35.84
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
829308-Furniture and Furnishings
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40
Points)
Totals
(100
Points)
A-Z 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
Points
Allsteel 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
A-Z 18,400.00$ 40.00
A-Z
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
HST Interior Elements 48.00 2.00 37.51 87.51
Nashville Office Interiors 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
Points
AMQ Solutions 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
NASHVILLE OFFICE INTERIORS 3,000.00$ 40.00
HST 3,199.00$ 37.51
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 39.59 90.59
Contract Furniture 45.00 2.00 36.66 83.66
Facility Planners 51.00 2.00 38.55 91.55
HST Interior Elements 48.00 2.00 40.00 90.00
Nashville Office Interiors 49.00 2.00 39.63 90.63
Brand
Max. RFP Cost
Points
Arcadia 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 4,949.00$ 40.00
NASHVILLE OFFICE INTERIORS 4,995.00$ 39.63
A-Z 5,000.00$ 39.59
FACILITY PLANNERS 5,135.00$ 38.55
CONTRACT FURNITURE ALLIANCE 5,400.00$ 36.66
A-Z
Strengths
Weakness
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 36.66 89.66
HST Interior Elements 48.00 2.00 40.00 90.00
Brand
Max. RFP Cost
Points
Arconas 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 5,499.00$ 40.00
FACILITY PLANNERS 6,000.00$ 36.66
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness Direct responses to various questions difficult to find.
829308-Furniture and Furnishings
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
Detailed reporting on questions #9; Strong process response for question #13.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Alfred Williams 52.00 2.00 33.33 87.33
HST Interior Elements 48.00 2.00 35.40 85.40
Interior Design Services 56.00 2.00 36.43 94.43
Nashville Office Interiors 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
Points
Bernhardt 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
NASHVILLE OFFICE INTERIORS 5,000.00$ 40.00
HST 5,649.00$ 35.40
INTERIOR DESIGN SERVICES 5,490.00$ 36.43
ALFRED WILLIAMS 6,000.00$ 33.33
Alfred Williams
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
Did not provide percentage of time dedicated to Metro on question #4; response to question #12 was not clear.
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Did not provide direct contact provided title of job.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 38.40 91.40
Nashville Office Interiors 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
Points
Buzzispace 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
NASHVILLE OFFICE INTERIORS 6,000.00$ 40.00
FACILITY PLANNERS 6,250.00$ 38.40
Facility Planners
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Alfred Williams 52.00 2.00 40.00 94.00
Nashville Office Interiors 49.00 2.00 33.33 84.33
BrandMax. RFP Cost
PointsBodybilt 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
ALFRED WILLIAMS 5,000.00$ 40.00
NASHVILLE OFFICE INTERIORS 6,000.00$ 33.33
Alfred Williams
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
Did not provide percentage of time dedicated to Metro on question #4; response to question #12 was not clear.
N/A
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 39.64 90.64
Contract Furniture 45.00 2.00 35.52 82.52
Facility Planners 51.00 2.00 40.00 93.00
HST Interior Elements 48.00 2.00 39.23 89.23
Brand
Max. RFP Cost
Points
Claridge 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 4,706.00$ 40.00
HST 4,798.00$ 39.23
A-Z 4,749.00$ 39.64
CONTRACT FURNITURE ALLIANCE 5,300.00$ 35.52
A-Z
Strengths
Weakness
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Alfred Williams 52.00 2.00 30.36 84.36
Facility Planners 51.00 2.00 35.63 88.63
HST Interior Elements 48.00 2.00 38.94 88.94
Interior Design Services 56.00 2.00 39.37 97.37
Nashville Office Interiors 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
PointsClarus Glass
Boards 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
NASHVILLE OFFICE INTERIORS 5,010.00$ 40.00
HST 5,147.00$ 38.94
INTERIOR DESIGN SERVICES 5,090.00$ 39.37
FACILITY PLANNERS 5,625.00$ 35.63
ALFRED WILLIAMS 6,600.00$ 30.36
Alfred Williams
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
Did not provide percentage of time dedicated to Metro on question #4; response to question #12 was not clear.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Did not provide direct contact provided title of job.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Contract Furniture 45.00 2.00 35.38 82.38
Facility Planners 51.00 2.00 39.10 92.10
HST Interior Elements 48.00 2.00 39.92 89.92
Nashville Office Interiors 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
Points
Cramer 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
NASHVILLE OFFICE INTERIORS 4,600.00$ 40.00
HST 4,609.00$ 39.92
FACILITY PLANNERS 4,706.00$ 39.10
CONTRACT FURNITURE ALLIANCE 5,200.00$ 35.38
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
829308-Furniture and Furnishings
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
Points
Deflect-O 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
A-Z 4,801.00$ 40.00
A-Z
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 40.00 93.00
HST Interior Elements 48.00 2.00 39.79 89.79
Brand
Max. RFP Cost
Points
Emuamericas 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 5,422.00$ 40.00
HST 5,450.00$ 39.79
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness Direct responses to various questions difficult to find.
829308-Furniture and Furnishings
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
Detailed reporting on questions #9; Strong process response for question #13.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology (58
Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Contract Furniture 45.00 2.00 40.00 87.00
Facility Planners 51.00 2.00 31.48 84.48
HST Interior Elements 48.00 2.00 37.26 87.26
Nashville Office Interiors 49.00 2.00 37.26 88.26
Brand
Max. RFP Cost
Points
ERG International 40
Offeror's Name
Total Estimated Cost
Based on Submitted
Discount
RFP Cost Point
Distribution
HST 5,367.00$ 37.26
NASHVILLE OFFICE INTERIORS 5,367.00$ 37.26
FACILITY PLANNERS 6,353.00$ 31.48
CONTRACT FURNITURE ALLIANCE 5,000.00$ 40.00
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Contract Furniture 45.00 2.00 37.39 84.39
Facility Planners 51.00 2.00 40.00 93.00
Nashville Office Interiors 49.00 2.00 35.90 86.90
Brand
Max. RFP Cost
Points
Flexsteel 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 4,487.00$ 40.00
NASHVILLE OFFICE INTERIORS 5,000.00$ 35.90
CONTRACT FURNITURE ALLIANCE 4,800.00$ 37.39
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
Short ship and missing products process; Does not provide inventory management.
N/A
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
829308-Furniture and Furnishings
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 40.00 93.00
BrandMax. RFP Cost
PointsGar Products 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 5,294.00$ 40.00
Facility Planners
Strengths
Weakness
829308-Furniture and Furnishings
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
HST Interior Elements 48.00 2.00 40.00 90.00
BrandMax. RFP Cost
PointsGaylord Archival
2015 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 9,999.00$ 40.00
HST Interior Elements
Strengths
Weakness
829308-Furniture and Furnishings
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Alfred Williams 52.00 2.00 37.39 91.39
Contract Furniture 45.00 2.00 37.79 84.79
Facility Planners 51.00 2.00 36.24 89.24
Interior Design Services 56.00 2.00 40.00 98.00
Nashville Office Interiors 49.00 2.00 38.89 89.89
Brand
Max. RFP Cost
Points
Global 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
INTERIOR DESIGN SERVICES 8,880.00$ 40.00
NASHVILLE OFFICE INTERIORS 9,134.00$ 38.89
FACILITY PLANNERS 9,800.00$ 36.24
CONTRACT FURNITURE ALLIANCE 9,400.00$ 37.79
ALFRED WILLIAMS 9,500.00$ 37.39
Alfred Williams
Strengths
Weakness
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
Did not provide percentage of time dedicated to Metro on question #4; response to question #12 was not clear.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Did not provide direct contact provided title of job.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Alfred Williams 52.00 2.00 37.39 91.39
Contract Furniture 45.00 2.00 37.79 84.79
Interior Design Services 56.00 2.00 40.00 98.00
Nashville Office Interiors 49.00 2.00 38.89 89.89
Brand
Max. RFP Cost
Points
Global Care 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
INTERIOR DESIGN SERVICES 8,880.00$ 40.00
NASHVILLE OFFICE INTERIORS 9,134.00$ 38.89
CONTRACT FURNITURE ALLIANCE 9,400.00$ 37.79
ALFRED WILLIAMS 9,500.00$ 37.39
Alfred Williams
Strengths
Weakness
Contract Furniture Alliance, Inc.
Strengths
Weakness
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
Nashville Office Interiors
Strengths
Weakness N/A
Did not provide direct contact provided title of job.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
829308-Furniture and Furnishings
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
Did not provide percentage of time dedicated to Metro on question #4; response to question #12 was not clear.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
HST Interior Elements 48.00 2.00 40.00 90.00
BrandMax. RFP Cost
PointsGreen Mill 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 5,000.00$ 40.00
HST Interior Elements
Strengths
Weakness
829308-Furniture and Furnishings
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
HST Interior Elements 48.00 2.00 40.00 90.00
BrandMax. RFP Cost
PointsGroup Lacasse 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 4,650.00$ 40.00
HST Interior Elements
Strengths
Weakness
829308-Furniture and Furnishings
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Nashville Office Interiors 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
Points
Haworth 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
NASHVILLE OFFICE INTERIORS 4,800.00$ 40.00
Nashville Office Interiors
Strengths
Weakness N/A
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
829308-Furniture and Furnishings
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Alfred Williams 52.00 2.00 40.00 94.00
BrandMax. RFP Cost
PointsHerman Miller
for Healthcare 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
ALFRED WILLIAMS 20,100.00$ 40.00
Alfred Williams
Strengths
Weakness Did not provide percentage of time dedicated to Metro on question #4; response to question #12 was not clear.
829308-Furniture and Furnishings
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Alfred Williams 52.00 2.00 40.00 94.00
BrandMax. RFP Cost
PointsHerman Miller 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
ALFRED WILLIAMS 21,300.00$ 40.00
Alfred Williams
Strengths
Weakness Did not provide percentage of time dedicated to Metro on question #4; response to question #12 was not clear.
829308-Furniture and Furnishings
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 40.00 91.00
Facility Planners 51.00 2.00 33.39 86.39
Interior Design Services 56.00 2.00 38.90 96.90
Nashville Office Interiors 49.00 2.00 38.20 89.20
Brand
Max. RFP Cost
Points
HON 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
A-Z 16,300.00$ 40.00
INTERIOR DESIGN SERVICES 16,760.00$ 38.90
NASHVILLE OFFICE INTERIORS 17,068.00$ 38.20
FACILITY PLANNERS 19,528.00$ 33.39
A-Z
Strengths
Weakness
Facility Planners
Strengths
Weakness
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
N/A
Did not provide direct contact provided title of job.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 40.00 91.00
Alfred Williams 52.00 2.00 22.11 76.11Facility Planners 51.00 2.00 23.93 76.93HST Interior Elements 48.00 2.00 24.00 74.00
Nashville Office Interiors 49.00 2.00 22.11 73.11
Brand
Max. RFP Cost
PointsHumanScale-
Ergonomic
Seating 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
A-Z 5,638.00$ 40.00
NASHVILLE OFFICE INTERIORS 10,200.00$ 22.11
ALFRED WILLIAMS 10,200.00$ 22.11
HST 9,398.00$ 24.00
FACILITY PLANNERS 9,423.00$ 23.93
A-Z
Strengths
Weakness
Alfred Williams
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
Did not provide percentage of time dedicated to Metro on question #4; response to question #12 was not clear.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Contract Furniture 45.00 2.00 36.91 83.91
Facility Planners 51.00 2.00 40.00 93.00
HST Interior Elements 48.00 2.00 32.74 82.74
Nashville Office Interiors 49.00 2.00 37.65 88.65
Brand
Max. RFP Cost
Points
IZZY 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 4,706.00$ 40.00
NASHVILLE OFFICE INTERIORS 5,000.00$ 37.65
HST 5,750.00$ 32.74
CONTRACT FURNITURE ALLIANCE 5,100.00$ 36.91
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 24.35 75.35
Alfred Williams 52.00 2.00 32.66 86.66
Contract Furniture 45.00 2.00 35.41 82.41
Facility Planners 51.00 2.00 40.00 93.00
Nashville Office Interiors 49.00 2.00 38.63 89.63
Brand
Max. RFP Cost
Points
Jasper Group 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 8,942.00$ 40.00
NASHVILLE OFFICE INTERIORS 9,258.00$ 38.63
A-Z 14,690.00$ 24.35
ALFRED WILLIAMS 10,950.00$ 32.66
CONTRACT FURNITURE ALLIANCE 10,100.00$ 35.41
A-Z
Strengths
Weakness
Alfred Williams
Strengths
Weakness
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
N/A
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
Did not provide percentage of time dedicated to Metro on question #4; response to question #12 was not clear.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
HST Interior Elements 48.00 2.00 37.13 87.13
KI 50.00 2.00 40.00 92.00
Brand
Max. RFP Cost
Points
KI 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
KI 18,100.00$ 40.00
HST 19,500.00$ 37.13
HST Interior Elements
Strengths
Weakness
KI
Strengths Direct manufacturer.
Weakness
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Generic overall approach and methodology.
829308-Furniture and Furnishings
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
HST Interior Elements 48.00 2.00 40.00 90.00
BrandMax. RFP Cost
PointsKimball 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 4,800.00$ 40.00
HST Interior Elements
Strengths
Weakness
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
829308-Furniture and Furnishings
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 39.44 90.44
Contract Furniture 45.00 2.00 34.92 81.92
Facility Planners 51.00 2.00 33.33 86.33
Interior Design Services 56.00 2.00 40.00 98.00
Nashville Office Interiors 49.00 2.00 33.52 84.52
Brand
Max. RFP Cost
Points
LA-Z-Boy 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
INTERIOR DESIGN SERVICES 4,190.00$ 40.00
NASHVILLE OFFICE INTERIORS 5,000.00$ 33.52
A-Z 4,250.00$ 39.44
FACILITY PLANNERS 5,029.00$ 33.33
CONTRACT FURNITURE ALLIANCE 4,800.00$ 34.92
A-Z
Strengths
Weakness
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Did not provide direct contact provided title of job.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 32.80 85.80
HST Interior Elements 48.00 2.00 30.00 80.00
Interior Design Services 56.00 2.00 33.61 91.61
Nashville Office Interiors 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
Points
Leland 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
NASHVILLE OFFICE INTERIORS 5,000.00$ 40.00
HST 6,667.00$ 30.00
INTERIOR DESIGN SERVICES 5,950.00$ 33.61
FACILITY PLANNERS 6,098.00$ 32.80
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Did not provide direct contact provided title of job.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Contract Furniture 45.00 2.00 31.75 78.75
Facility Planners 51.00 2.00 29.31 82.31
HST Interior Elements 48.00 2.00 30.00 80.00
Nashville Office Interiors 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
Points
Magnuson 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
NASHVILLE OFFICE INTERIORS 5,000.00$ 40.00
HST 6,667.00$ 30.00
FACILITY PLANNERS 6,824.00$ 29.31
CONTRACT FURNITURE ALLIANCE 6,300.00$ 31.75
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Contract Furniture 45.00 2.00 36.85 83.85
Facility Planners 51.00 2.00 32.57 85.57
HST Interior Elements 48.00 2.00 40.00 90.00
Nashville Office Interiors 49.00 2.00 39.10 90.10
Brand
Max. RFP Cost
Points
Mayline 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 4,790.00$ 40.00
NASHVILLE OFFICE INTERIORS 4,900.00$ 39.10
FACILITY PLANNERS 5,882.00$ 32.57
CONTRACT FURNITURE ALLIANCE 5,200.00$ 36.85
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 40.00 93.00
BrandMax. RFP Cost
PointsMidmark 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 8,235.00$ 40.00
Facility Planners
Strengths
Weakness
829308-Furniture and Furnishings
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
PointsMity Lite 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
A-Z 5,975.00$ 40.00
A-Z
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 38.23 89.23
Interior Design Services 56.00 2.00 39.95 97.95Nashville Office Interiors 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
PointsNational Office
Furniture 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
NASHVILLE OFFICE INTERIORS 3,995.00$ 40.00
INTERIOR DESIGN SERVICES 4,000.00$ 39.95
A-Z 4,180.00$ 38.23
A-Z
Strengths
Weakness
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
N/A
Did not provide direct contact provided title of job.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Alfred Williams 52.00 2.00 40.00 94.00
Brand
Max. RFP Cost
PointsNemschoff 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
ALFRED WILLIAMS 5,500.00$ 40.00
Alfred Williams
Strengths
Weakness
829308-Furniture and Furnishings
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
Did not provide percentage of time dedicated to Metro on question #4; response to
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
HST Interior Elements 48.00 2.00 40.00 90.00
Nashville Office Interiors 49.00 2.00 38.53 89.53
Brand
Max. RFP Cost
PointsNeutral Posture-
Ergonomic 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 5,149.00$ 40.00
NASHVILLE OFFICE INTERIORS 5,345.00$ 38.53
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9,
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Contract Furniture 45.00 2.00 35.17 82.17
Facility Planners 51.00 2.00 38.53 91.53
HST Interior Elements 48.00 2.00 39.62 89.62
Interior Design Services 56.00 2.00 39.23 97.23
Nashville Office Interiors 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
Points
Nevers 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
NASHVILLE OFFICE INTERIORS 5,100.00$ 40.00
HST 5,149.00$ 39.62
INTERIOR DESIGN SERVICES 5,200.00$ 39.23
FACILITY PLANNERS 5,294.00$ 38.53
CONTRACT FURNITURE ALLIANCE 5,800.00$ 35.17
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Did not provide direct contact provided title of job.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Interior Design Services 56.00 2.00 40.00 98.00
Brand
Max. RFP Cost
Points
Norix 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
INTERIOR DESIGN SERVICES 5,700.00$ 40.00
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
829308-Furniture and Furnishings
Did not provide direct contact provided title of job.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 0.00 53.00
HST Interior Elements 48.00 2.00 32.76 82.76
Nashville Office Interiors 49.00 2.00 40.00 91.00
Brand
Max. RFP Cost
Points
Nucraft 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
NASHVILLE OFFICE INTERIORS 5,000.00$ 40.00
HST 6,200.00$ 32.26
FACILITY PLANNERS 5,294.00$ 0.00
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
N/A
829308-Furniture and Furnishings
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management. Did not provide signed letterhead for Nucraft.
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 40.00 91.00
Facility Planners 51.00 2.00 38.63 91.63
HST Interior Elements 48.00 2.00 35.57 85.57
Brand
Max. RFP Cost
Points
OFM 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
A-Z 3,778.00$ 40.00
HST 4,249.00$ 35.57
FACILITY PLANNERS 3,912.00$ 38.63
A-Z
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Short ship and missing products process; Does not provide inventory management.
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 40.00 91.00
Alfred Williams 52.00 2.00 32.38 86.38
Facility Planners 51.00 2.00 33.77 86.77
Interior Design Services 56.00 2.00 36.29 94.29
Nashville Office Interiors 49.00 2.00 34.46 85.46
Brand
Max. RFP Cost
Points
OFS Brands 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
A-Z 16,390.00$ 40.00
NASHVILLE OFFICE INTERIORS 19,024.00$ 34.46
INTERIOR DESIGN SERVICES 18,064.00$ 36.29
ALFRED WILLIAMS 20,250.00$ 32.38
FACILITY PLANNERS 19,412.00$ 33.77
A-Z
Strengths
Weakness
Alfred Williams
Strengths
Weakness
Facility Planners
Strengths
Weakness
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
Did not provide percentage of time dedicated to Metro on question #4; response to question #12 was not clear.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Did not provide direct contact provided title of job.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 40.00 93.00
Brand
Max. RFP Cost
Points
Palmer Snyder 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 5,151.00$ 40.00
Facility Planners
Strengths
Weakness
829308-Furniture and Furnishings
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Patterson Pope 50.00 2.00 40.00 92.00
BrandMax. RFP Cost
Points
Patterson Pope 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
PATTERSON POPE 8,500.00$ 40.00
Patterson Pope
Strengths Direct manufacturer.
Weakness
829308-Furniture and Furnishings
Generic overall approach and methodology.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Alfred Williams 52.00 2.00 33.63 87.63
Contract Furniture 45.00 2.00 34.16 81.16
Facility Planners 51.00 2.00 34.51 87.51
HST Interior Elements 48.00 2.00 40.00 90.00
Nashville Office Interiors 49.00 2.00 39.13 90.13
BrandMax. RFP Cost
Points
Peter Peppers 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 5,380.00$ 40.00
NASHVILLE OFFICE INTERIORS 5,500.00$ 39.13
ALFRED WILLIAMS 6,400.00$ 33.63
FACILITY PLANNERS 6,235.00$ 34.51
CONTRACT FURNITURE ALLIANCE 6,300.00$ 34.16
Alfred Williams
Strengths
Weakness
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #6-#11 on approach and process.
Did not provide percentage of time dedicated to Metro on question #4; response to question #12 was not clear.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 40.00 93.00
BrandMax. RFP Cost
PointsRuss Bassett 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 7,059.00$ 40.00
Facility Planners
Strengths
Weakness
829308-Furniture and Furnishings
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 37.38 88.38
Contract Furniture 45.00 2.00 40.00 87.00Facility Planners 51.00 2.00 28.33 81.33Nashville Office Interiors 49.00 2.00 34.48 85.48
BrandMax. RFP Cost
Points
Safco 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
CONTRACT FURNITURE ALLIANCE 5,000.00$ 40.00
NASHVILLE OFFICE INTERIORS 5,800.00$ 34.48
A-Z 5,350.00$ 37.38
FACILITY PLANNERS 7,059.00$ 28.33
A-Z
Strengths
Weakness
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
N/A
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2 Points)Cost
(40 Points)
Totals
(100 Points)
Contract Furniture Alliance 45.00 2.00 38.50 85.50
Facility Planners 51.00 2.00 0.00 53.00
Brand Max. RFP Cost Points
Sandler 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount RFP Cost Point Distribution
FACILITY PLANNERS 5,294.00$ 0.00
CONTRACT FURNITURE ALLIANCE 5,500.00$ 38.50
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management. Did not provide signed letterhead for Sandler Brand.
829308-Furniture and Furnishings
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 40.00 93.00
HST Interior Elements 48.00 2.00 38.64 88.64
BrandMax. RFP Cost
Points
Segis 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 5,294.00$ 40.00
HST 5,480.00$ 38.64
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
829308-Furniture and Furnishings
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Contract Furniture 45.00 2.00 36.51 83.51
Facility Planners 51.00 2.00 40.00 93.00
HST Interior Elements 48.00 2.00 34.15 84.15
BrandMax. RFP Cost
Points
Shelby Williams 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 5,294.00$ 40.00
HST 6,200.00$ 34.15
CONTRACT FURNITURE ALLIANCE 5,800.00$ 36.51
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
829308-Furniture and Furnishings
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
HST Interior Elements 48.00 2.00 40.00 90.00
Nashville Office Interiors 49.00 2.00 39.55 90.55
BrandMax. RFP Cost
Points
Sitmatic 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 4,790.00$ 40.00
NASHVILLE OFFICE INTERIORS 4,845.00$ 39.55
HST Interior Elements
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 36.20 87.20
Facility Planners 51.00 2.00 36.92 89.92
HST Interior Elements 48.00 2.00 37.38 87.38Interior Design Services 56.00 2.00 40.00 98.00Nashville Office Interiors 49.00 2.00 34.75 85.75
BrandMax. RFP Cost
Points
Sit-on-It 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
INTERIOR DESIGN SERVICES 4,344.00$ 40.00
NASHVILLE OFFICE INTERIORS 5,000.00$ 34.75
HST 4,649.00$ 37.38
A-Z 4,800.00$ 36.20
FACILITY PLANNERS 4,706.00$ 36.92
A-Z
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness
Nashville Office Interiors
Strengths
Weakness
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
N/A
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Did not provide direct contact provided title of job.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
HST Interior Elements 48.00 2.00 40.00 90.00
BrandMax. RFP Cost
Points
St. Timothy 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 6,200.00$ 40.00
HST Interior Elements
Strengths
Weakness
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
829308-Furniture and Furnishings
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Interior Design Services 56.00 2.00 40.00 98.00
BrandMax. RFP Cost
PointsSteelcase 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
INTERIOR DESIGN SERVICES 5,500.00$ 40.00
Interior Design Services
Strengths Good overall approach and methodology;Strong relationship with manufacturer; Strong responses to questions #7 and #8.
Weakness Did not provide direct contact provided title of job.
829308-Furniture and Furnishings
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 40.00 91.00
Facility Planners 51.00 2.00 37.61 90.61
BrandMax. RFP Cost
Points
St. Timothy 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
A-Z 4,425.00$ 40.00
FACILITY PLANNERS 4,706.00$ 37.61
A-Z
Strengths
Weakness
Facility Planners
Strengths
Weakness
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to
Short ship and missing products process; Does not provide inventory management.
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology (58
Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
A-Z 49.00 2.00 40.00 91.00
Contract Furniture 45.00 2.00 34.63 81.63
Facility Planners 51.00 2.00 37.85 90.85
Nashville Office Interiors 49.00 2.00 37.40 88.40
BrandMax. RFP Cost
Points
Stance Healthcare 40
Offeror's Name
Total Estimated Cost
Based on Submitted
Discount
RFP Cost Point
Distribution
A-Z 4,675.00$ 40.00
NASHVILLE OFFICE INTERIORS 5,000.00$ 37.40
FACILITY PLANNERS 4,941.00$ 37.85
CONTRACT FURNITURE ALLIANCE 5,400.00$ 34.63
A-Z
Strengths
Weakness
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.
N/A
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time dedicated to Metro on question #4; Did not provide time frame for question #7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology (58
Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Contract Furniture 45.00 2.00 35.80 82.80
Facility Planners 51.00 2.00 40.00 93.00
Interior Design Services 56.00 2.00 33.85 91.85
BrandMax. RFP Cost
Points
Symmetry Office 40
Offeror's Name
Total Estimated Cost
Based on Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 4,654.00$ 40.00
INTERIOR DESIGN SERVICES 5,500.00$ 33.85
CONTRACT FURNITURE ALLIANCE 5,200.00$ 35.80
Contract Furniture Alliance, Inc.
Strengths
Weakness
Facility Planners
Strengths
Weakness
Interior Design Services
Strengths
Weakness
829308-Furniture and Furnishings
Did not provide direct contact provided title of job.
Detailed responses to questions #10, #11,#12 and #17;
Generic response for questions #4; Did not provide percentage of time
dedicated to Metro on question #4; Did not provide time frame for question
#7;Failed to answer questions #8 and #9.
Strong overall approach and process; Strong relationship with manufacturer;
Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory
management.
Good overall approach and methodology;Strong relationship with
manufacturer; Strong responses to questions #7 and #8.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 40.00 93.00
BrandMax. RFP Cost
Points
Teknion 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 18,974.00$ 40.00
Facility Planners
Strengths
Weakness
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
829308-Furniture and Furnishings
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
HST Interior Elements 48.00 2.00 40.00 90.00
BrandMax. RFP Cost
PointsTennsco 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 5,800.00$ 40.00
HST Interior Elements
Strengths
Weakness
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
829308-Furniture and Furnishings
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability
(2 Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 40.00 93.00
HST Interior Elements 48.00 2.00 30.69 80.69
BrandMax. RFP Cost
Points
TMC 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
FACILITY PLANNERS 5,294.00$ 40.00
HST 6,900.00$ 30.69
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness
829308-Furniture and Furnishings
Detailed reporting on questions #9; Strong process response for question #13.
Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
Facility Planners 51.00 2.00 37.53 90.53
Nashville Office Interiors 49.00 2.00 40.00 91.00
BrandMax. RFP Cost
Points
Versteel 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
Nashville Office Interiors 4,967.00$ 40.00
FACILITY PLANNERS 5,294.00$ 37.53
Facility Planners
Strengths
Weakness
Nashville Office Interiors
Strengths
Weakness N/A
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #9, #15 and #17;Years of experience with Metro.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
829308-Furniture and Furnishings
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology
(58 Points)
Sustainability (2
Points)
Cost
(40 Points)
Totals
(100 Points)
HST Interior Elements 48.00 2.00 40.00 90.00
BrandMax. RFP Cost
Points
VIRCO 40
Offeror's Name
Total Estimated
Cost Based on
Submitted
Discount
RFP Cost Point
Distribution
HST 4,900.00$ 40.00
HST Interior Elements
Strengths
Weakness Direct responses to various questions difficult to find.
Detailed reporting on questions #9; Strong process response for question #13.
829308-Furniture and Furnishings
RFQ: 829309-Furniture and Furnishings
Approach and
Methodology (58
Points)
Sustainability
(2 Points)
Cost
(40
Points)
Totals
(100
Points)
A-Z 49.00 2.00 39.37 90.37
Facility Planners 51.00 2.00 36.00 89.00
HST Interior Elements 48.00 2.00 40.00 90.00
BrandMax. RFP Cost
Points
Workrite Ergonomics 40
Offeror's Name
Total Estimated Cost
Based on Submitted
Discount
RFP Cost Point
Distribution
HST 4,500.00$ 40.00
A-Z 4,572.00$ 39.37
FACILITY PLANNERS 5,000.00$ 36.00
A-Z
Strengths
Weakness
Facility Planners
Strengths
Weakness
HST Interior Elements
Strengths
Weakness Direct responses to various questions difficult to find.
Strong overall approach and process; Strong relationship with manufacturer; Detailed response to question #4 and #17;
Short ship and missing products process; Does not provide inventory management.
Detailed reporting on questions #9; Strong process response for question #13.
829308-Furniture and Furnishings
Strong relationship with manufacturer.
Did not provide a time frame for quotes involving design and specifications; does not provide inventory services.