Page 1: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

HSEEHealth, Safety, Environment and Energy Efficiency

Energy Efficiency Case Study – PETROBRAS

Claudio RückerEnergy Efficiency Sector

Workshop US-Brazil Binational Energy Working Group (Energy Efficiency)CEPEL – Rio de Janeiro – RJ – Brazil

10 / 08 / 2011

Page 2: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

1.Petrobras Main Figures

2.Petrobras 2020 Strategic Plan

3.Energy Efficiency Context in Petrobras

4.Energy Efficiency Example Cases

5.EZR Cogeneration Case

6.Challenges for Petrobras

Agenda

Page 3: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

1.Petrobras Main Figures

2.Petrobras 2020 Strategic Plan

3.Energy Efficiency Context in Petrobras

4.Energy Efficiency Example Cases

5.EZR Cogeneration Case

6.Challenges for Petrobras

Agenda

Page 4: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

133

15

17225,966 Km7,197

•Investments : R$ 71 billion

•Net Profit: R$ 28.98 billion

•Global Presence: 28 countries

•Reserves: 14.90 billion barrels of oil and gas equiv.

•Net Revenue: R$ 182.71 billion

•Shareholders: 463,870

•Daily Production:

• 2,526,000 barrels per day

52 owned

78 fixed 55 floating

Petrobras Main Figures (2009 data)

Page 5: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

133

15

17225,966 Km7,197

•Production Platforms: 133 (86 fixed; 47 floating)

•Vessel Fleet:172 (52 belonging to Petrobras)

•Biofuels: 5 plants

•Wind Energy: 1 pilot plant

•Fertilizers: 2 plants

•Refineries: 15

•Yield of the Refineries: 2,034,000 bdd

•Pipelines: 25,966 km

•Thermoelectric Plants: 18 plants

•Service Stations: Nearly 8,000

52 owned

78 fixed 55 floating

Petrobras Main Figures (2009 data)

Page 6: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

1.Petrobras Main Figures

2.Petrobras 2020 Strategic Plan

3.Energy Efficiency Context in Petrobras

4.Energy Efficiency Example Cases

5.EZR Cogeneration Case

6.Challenges for Petrobras

Agenda

Page 7: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Petrobras Main Figures

Increased to 6.4 MM boe/d in

2020, as informed in the recent

Business Plan 2011-2015

Page 8: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Petrobras Main Figures

Page 9: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Research and Development

Page 10: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

• Corporate Quinquennial Goals quantified

• Intensity Indexes and goals established for each B.A.

• Board of Directors analyses results quarterly

Energy Efficiency Emissions

Strategic Objectives

Maximize efficiency and minimize the intensity of GHG emissions, reaching levels of excellence in the Oil & Gas industry, contributing

to business sustainability

Energy Annual Report

Energy Performance Challenges

Page 11: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

1.Petrobras Main Figures

2.Petrobras 2020 Strategic Plan

3.Energy Efficiency Context in Petrobras

4.Energy Efficiency Example Cases

5.EZR Cogeneration Case

6.Challenges for Petrobras

Agenda

Page 12: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Source: WEO World Energy Outlook 2009 - IEA

Energy Efficiency and Climate Change

Page 13: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Source: BP Energy Outlook 2030 (January/2011)

Energy Efficiency and Climate Change

Page 14: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Corporate Policies and Guidelines

Corporate Leadership

Leaders in the Operations Units

Design Guidelines

Performance Indicators

Measurement

Goals - Benchmark

Supply Chain Management Energy

Critical Analysis

Correction of Deviations

Modeling Process

Optimization - Advanced Control - "RTO"

Management Process

Page 15: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Corporate Policies and Guidelines

Corporate Leadership

Leaders in the Operations Units

Design Guidelines

Performance Indicators

Measurement

Goals - Benchmark

Supply Chain Management Energy

Critical Analysis

Correction of Deviations

Modeling Process

Optimization - Advanced Control - "RTO"

Management Process

PDCA

Information Management Systems - PRIORITY

PRIORITY

Page 16: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Corporate

Financial Planning and Risk Management

Finance

Accounting

Tax

Investor Relations

Health, Safety, Environment and Energy Efficiency

Materials

Research and Development (Cenpes)

Engineering

Information Technology

Shared Services

Corporate

Marketing and Trade

Logistics and Part. in Natural Gas

Operations and Part. in Energy

Energy Development

Gas Chemicals and Liquefaction

Corporate

Technical Support to Businesses

Business Development

South Cone LA

Americas, Africa and Eurasia

Corporate

Production Engineering

Services

Exploration

North-Northeast

South-Southwest

Pre-salt

Corporate

Logistics

Refining

Marketing and Commercialization

Petrochemicals

Major Projects Program

PETROBRAS ORGANIZATION CHART

Business Strategy and Performance

New Businesses

Human Resources

Management Systems Development

Legal Department

Corporate Communication

Internal AuditOmbudsman’s Office

Petrobras Secretary Office

CEO’s Office

CEO

Senior Management

Business Committee

Board of Directors

Audit Committee

Finance ServicesGas and Energy InternationalExploration and Production Downstream

Page 17: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Source: 2009 Petrobras Consumption Report

Energy Efficiency can result in substantial outcome increases for the Company

0

100

200

300

Consumo

28

74

121

23

12

259

0

1000

2000

3000

Produção

2526

Processamento

1988

Consumo

259

(363 boed)

(236 boed)

Thousands b/d, year 2009

Consumption per activity (thousands b/d, year 2009)

Energy consumption in Petrobras totalizes 259,000 b/d and represents about 10% of its total production

Consumption represents

~10% of production

Page 18: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Ratio between a produced good or an accomplished service and the quantity of energy consumed for that

•In case of Petrobras:

Produce more with less energy intensity

What´s Energy Efficiency?

Page 19: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

– Reduce 10% and 5% the energy intensity, between 2009 and 2015, in its Downstream and Thermal Plants, respectively

– Reduce 65% the natural gas flaring, between 2009 and 2015, in its Upstream operations

– Considering R&D and projects of energy efficiency, Petrobras will invest US$ 1.2 billion until 2015

Petrobras Energy Efficiency Goals

Page 20: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

– Downstream: Motorization of large condensate turbines, energy integration, process units optimization, modernization of thermoelectric systems

– Thermal Plants: Convertion symple cycle in combined cycle thermal plants

– Upstream: natural gas compression and logistics investments

Main Projects

Page 21: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

1.Petrobras Main Figures

2.Petrobras 2020 Strategic Plan

3.Energy Efficiency Context in Petrobras

4.Energy Efficiency Example Cases

5.EZR Cogeneration Case

6.Challenges for Petrobras

Agenda

Page 22: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Example of Advanced Control in a Gas Process Unit

• Investiment: US$ 270,000

• Results:– Earnings:

US$ 14 million(in energy efficiency and production)

– Extra production:16,410,000 m³ LGN/year(increase of 9%)

– Energy economy: 2 to 10%

Example of energy efficiency projects

Page 23: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Furnaces and Boilers Soot Blowing Modernization

Projects

• Refinery Case Example:– Investment: US$ 1.74 million– Energy economy: 305 b/d– Carbon emission avoided:

38,000 tons CO2/year

Example of energy efficiency projects

Page 24: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Condensate and Steam Modernization Projects

• Fertilizer Plant Example Case :– Investiment: US$ 1.5 million– Condensate recuperated: 20 t/h– Natural gas economy: 4,920 m3/day– Carbon emissions avoided: 3,700 ton

CO2/year

Example of energy efficiency projects

Page 25: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Fluid Catalytic Cracking (FCC) Turboexpanders

• Recovery energy by substituting pressure reducing valves by a turbine coupled to an electric generator

• 5 refineries• 98 MW of total installed capacity

Example of energy efficiency projects

Page 26: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Variable Speed Driver Projects

• Refinery Example Case (6 pumps)

– Investiment: US$ 1.7 million– Energy Economy: 800 MWh/year– Carbon emissions avoided: 83 ton

CO2/year

Fonte: WEG

Example of energy efficiency projects

Page 27: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Dessalinization Units Projects

Offshore Platforms Dessalinization Example Case :

• 3 production units

• Reducing of potable water transportation by ships

• Dessalinization water capacity: 255 m³/day

• Investment: US$ 1.7 million

• Energy economy: 5.2 b/d

• Carbon emissions avoided: 829 ton CO2/year

Example of energy efficiency projects

Page 28: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Heat Recovery Projects

Process Unit Example Case :• Reduce 70% of furnace thermal

demand

• Investments: US$ 15 million

• Energy economy: 55,000 m³/day of natural gas

• Carbon emissions avoided: 40,000 tCO2/year

Example of energy efficiency projects

Page 29: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Thermal Solar Energy Projects

Onshore Oil Well Case Example:• To take the paraffin off from the well column• Energy economy: 0.35 b/d

• Carbon emissions avoided: 35 ton CO2/year

Example of energy efficiency projects

Page 30: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

1.Petrobras Main Figures

2.Petrobras 2020 Strategic Plan

3.Energy Efficiency Context in Petrobras

4.Energy Efficiency Example Cases

5.EZR Cogeneration Case

6.Challenges for Petrobras

Agenda

Page 31: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE EZR Cogeneration Plant

• This project consists of an integration of two different Business Areas of Petrobras (Downstream and Gas & Energy):

– The RPBC Refinery old boilers were with low energy efficiency

– The Gas & Energy was looking for new thermal plants business opportunties

Page 32: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE EZR Cogeneration Plant – Main Equipments

• 1 Gas Turbine: 171.7 MW (ISO)

• 1 HRSG (120 bar; 42 bar; 12 bar)

• 1 Condensate Steam Turbine: 55 MW

• 2 Auxiliary Boilers

• Startup in 2010

• 2011 in pre-operation

Page 33: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Combined Cycle Thermal Plant

SteamElectricity

Steam

415 t/h

415 t/h

196 MW

Fuel

Efficiency = 82%

Efficiency = 77,5%

Fuel

19,541 TJ/year

12,953 TJ/year

Without integrationFuel = 23,360 TJ/a

With integration - cogenFuel = 19,541 TJ/year

Energy Economy3,819 TJ/year1,771 b/d

Electricity196 MW

Fuel

Efficiency = 60%10,407 TJ/year

RPBC Boilers EZR Cogeneration Plant

Global Efficiency = 69% Global Efficiency = 82%

EZR Cogeneration Plant – Energy Economy

Page 34: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Combined Cycle Thermal Plant

SteamElectricity

Steam

415 t/h

415 t/h

196 MW

Fuel

Efficiency = 82%

Efficiency = 77,5%

Fuel

Without integration With integration - cogenCO2 Avoided

Electricity196 MW

Fuel

Efficiency = 60%

RPBC Boilers EZR Cogeneration Plant

EZR Cogeneration Plant – Carbon Emissions

1,532,500 tCO2/year 1,136,500 tCO2/year396,000 tCO2/year

85% FO15% NG

951,500 tCO2/year

100% NG581,000tCO2/year

78% NG22% RG

1,136,500 tCO2/year

CO2 Index = 0,34 tCO2/MWh CO2 Index = 0,26 tCO2/MWh

Page 35: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

• Results:– Energy economy: 1,771 b/d

– Carbon emisisons avoided: 396,000 ton CO2/year

– Lower carbon intensity in Petrobras energy profile– Lower NOx emissions

EZR Cogeneration Plant – Conclusion

Page 36: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

1.Petrobras Main Figures

2.Petrobras 2020 Strategic Plan

3.Energy Efficiency Context in Petrobras

4.Energy Efficiency Example Cases

5.EZR Cogeneration Case

6.Challenges for Petrobras

Agenda

Page 37: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

• Implement a new management model for Energy Efficiency

- Future vision - KPIs and goals- New corporative standards

• Insertion of Energy Efficiency requirements in Petrobras new design models

- More efficient designs- Consider the carbon emission

• Projects of energy efficiency in the actual plants- Priorize energy efficiency projects in the Company portfolio

2

3

Operational Efficiency Increases

Profitability Increases

Company Image

Prepare to Future Scenarios

1

Energy Efficiency Challenges in Petrobras

Page 38: HSEE Health, Safety, Environment and Energy Efficiency Energy Efficiency Case Study – PETROBRAS Claudio Rücker Energy Efficiency Sector Workshop US-Brazil

HSEE

Thanks!

Claudio RückerEnergy Efficiency Sector

[email protected]