HRS Timing & Related Issues. Vincent Sulkosky Massachusetts Institute of Technology SRC Collaboration Meeting February 21 st , 2010. Refresher on Triggers. T1 (RHRS Main) T2 (RHRS Efficiency) T3 (LHRS Main) T4 (LHRS Efficiency) T5 (Coincidence RHRS&&LHRS) T6 (BB E-plane) T7 HAND - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: HRS  Timing &  Related Issues

HRS Timing & Related Issues

Vincent SulkoskyMassachusetts Institute of Technology

SRC Collaboration MeetingFebruary 21st, 2010

Page 2: HRS  Timing &  Related Issues

Refresher on TriggersT1 (RHRS Main)T2 (RHRS Efficiency)T3 (LHRS Main)T4 (LHRS Efficiency)T5 (Coincidence RHRS&&LHRS)T6 (BB E-plane)T7 HANDT8 (1024 Hz clock)

Page 3: HRS  Timing &  Related Issues

HRS Trigger DefinitionsT1/T3: “AND of the OR’s”:

S1-or&&S2-or“AND” of left-right PMTs of S1“AND” of left-right PMTs of S2mTypically S2m right PMTs are delayed 20 ns wrt S2m left PMTs (self-timing)“S2-or” delayed wrt “S1-or”: 20-30 ns

T2/T4: (2 out-of 3 trigger) includes GC and exclusive to T1/T2

HRS retiming (strobe): “S1-or||S2-or”

Page 4: HRS  Timing &  Related Issues

HRS Trigger Diagram

Page 5: HRS  Timing &  Related Issues

Coincidence Trigger Diagram

Page 6: HRS  Timing &  Related Issues

HRS RetimingL1A directly from weldmentStrobe (≥ 60 ns after L1A)Overlap results in retimed L1AIf no overlap, circuit times out and

produces a delayed retimed L1A ~ 200 ns later to force gates and stops, i.e., this happens for T8 triggers.

Page 7: HRS  Timing &  Related Issues

HRS Timing IssuesR-HRS S2m was not setup for self-

timingSome PMTs show considerable after-

pulsingHRS scintillator class by default takes

the latest hit (right before the stop)See multiple peaks in both HRS

scintillators, though appears to be localized more to S2m

Page 8: HRS  Timing &  Related Issues

HRS Self-Timing (g2p)

L-HRS, Dec. 2011Black: Right; Red: Left

Page 9: HRS  Timing &  Related Issues

HRS ‘Not’ Self-Timing (g2p)

R-HRS, Dec. 2011Black: Right; Red: Left

Page 10: HRS  Timing &  Related Issues

After-pulsing LHRS S1L PMTs

Page 11: HRS  Timing &  Related Issues

After-pulsing LHRS S1R PMTs

Page 12: HRS  Timing &  Related Issues

RHRS S1L PMTs

Page 13: HRS  Timing &  Related Issues

RHRS S1R PMTs

Page 14: HRS  Timing &  Related Issues

L-HRS Trigger TDCs

Page 15: HRS  Timing &  Related Issues

R-HRS Trigger TDCs

Page 16: HRS  Timing &  Related Issues

LHRS S2m

Page 17: HRS  Timing &  Related Issues

LHRS S2m: Double Peaks

Clearly not a left-right PMT issue!

Page 18: HRS  Timing &  Related Issues

LHRS S2m: Double Peaks

Page 19: HRS  Timing &  Related Issues

LHRS S2m: 2-to-1 Peak

Page 20: HRS  Timing &  Related Issues

LHRS S2m: Self-timing(?)

Page 21: HRS  Timing &  Related Issues

Plan to Move ForwardDetailed timing diagrams from

Spring 2011Work with Igor and Tai while both are

hereat JLabGoals: understand the data and

develop an algorithm to determine the correct tof