2007-08 2008-09 2009-10 2010-11 Total 201
1 HP-2 Swan River Flood Management
& Integrated Land Development
Project Phase-II in Distt. Una.
23552.00 18427.00 16584.30 0.00 0.00 2700.00 7425.00 10125.00 446
Himachal Pradesh
Estimated
Cost
Status of Release of Central Share to HP-2, Himachal Pradesh
SNScheme
CodeState / Name of Scheme
Cost under
FMP
Central
Share
CS Released
-
8/3/2019 HP-2 Funds Released to CE(FM)
2/15
2007-08
A
1 Goa-1Improvement of Waterway of Bicholim river in
Bicholim Taluka.
884.00 663.00 0.00
2 Goa -2Improvement of Waterway of Valvanta river in
Bicholim Taluka.
1389.00 1041.75 0.00
2273.00 1704.75 0.00
B
1 Guj - 1
Providing coastal protection/Sea wall to combat
erosion from Sangam Narayan temple to Gayatri
temple at Taluka : Dwarka, Distt.- Jamnagar.
794.31 595.73 0.00
794.31 595.73 0.00
C
1 Har-1 Flood protection works along river Yamuna inthe State of Haryana.
17375.00 13031.25 0.00
17375.00 13031.25 0.00
D
1 HP-2
Swan River Flood Management & Integrated
Land Development Project Phase-II in Distt.
Una.
18427.00 16584.30 0.00
18427.00 16584.30 0.00
E
1 JK-1Master Plan for Flood Protection Works on River
Tawi, Jammu
2282.00 2053.80 125.00
2 JK-2Master Plan for Flood Protection Works on River
Chenab d/s of Akhnoor Barrage, Jammu
1945.00 1750.50 400.00
3 JK-3 Improvements to flood spill channel in Jhelum-Kashmir, Distt-Baramulla, Kashmir
1492.82 1343.54 150.00
4 JK-4
Flood protection works at vulnerable spots u/s &
d/s national Highway along Ujh river from
Jakhole to Pandorian, Distt- Kathua, Jammu
1463.00 1316.70 0.00
5 JK-5
Critical anti-erosion works on river Chenab (Dera
baba Banda) tributary Halyan (Doda) of Tawi,
Tawi bridge
1493.00 1343.70 0.00
6 JK-6Flood Contro/Anti-Erosion works on Lidder
Nallah Phase 2nd ( Distt-Anantnag), Kashmir
547.00 492.30 0.00
7 JK-7Flood Contro/Anti-Erosion works on Veshow
River Phase 2nd in Distt Kulgam/Anantnag,
715.00 643.50 0.00
8 JK-8
Flood Contro/Anti-Erosion works on Kanday and
Vethwathroo nallahs in Distt. Kulgam/Anantnag,Kashmir
333.00 299.70 0.00
9 JK-9
Flood Contro/Anti-Erosion works on Sandran,
Wankran and Sasara nallahs in Distt
Pulwama/Anantnag, Kashmir
672.50 605.25 0.00
10 JK-10Flood Contro/Anti-Erosion works on Vij Nallah in
Rafiabad Constitency, Distt-Baramula, Kashmir
746.60 671.94 0.00
11 JK-11Flood Contro/Anti-Erosion works on Dakil,
Hamal, Hapatnar & Binner Nallahs, Kashmir
743.53 669.18 0.00
Status of Flood Management Schemes approved under Flood Management
SNScheme
CodeState / Name of Scheme
Estimated
CostCentral Share
Goa
Sub-total ( A)
Gujarat
Sub-total ( B)
Haryana
Sub-total (C)
Himachal Pradesh
Sub-total (D )
Jammu & Kashmir
-
8/3/2019 HP-2 Funds Released to CE(FM)
3/15
12 JK-12
Flood Contro/Anti-Erosion works on various
nallahs of Shangus, Bijbehara and Dooru
constituencies in
655.39 589.85 0.00
13 JK-13Flood Control / Anti-Erosion works on various
Nallas of Pahalgam constituency Distt,
698.50 628.65 0.00
14 JK-14
Flood Contro/Anti-Erosion works on Mandoora,
Kehlil, Watalar, Devar, Lam, Satura & AripalNallahs in Distt Pulwama, Kashmir
640.50 576.45 0.00
15 JK-15Flood Protetion works in various rivers and
major/minor nallahs in Rajouri District, Jammu
1391.00 1251.90 0.00
16 JK-16
Construction of anti-erosion protection works for
Ban Ganga at foot hills of Sri Mata Vaishno
Deviji Shrine, Katra, Distt. Reasi, Jammu
1110.00 999.00 0.00
17 JK-17Critical anti-erosion works on river Tawi from
Chinani to Dibber & its tributaries in distt.
1495.00 1345.50 0.00
18 JK-18
Drainage development / enhancing flood
channel capacity at critical reaches of river
Jhelum bunds Phase-II from Sonwar Ghat to
Dhubji ghat (Gowkadal) -Srinagar, Kashmir
981.00 882.90 0.00
19 JK-19Construction of Flood protection Work at d/s ofsidhra Bank on River Tawi for protection of
Sidhra Town and adjoining areas, Jammu
1466.00 1319.40 0.00
20 JK-20Flood threat of River Jhelum - Urgent Works,
Kashmir
9746.00 8771.40 0.00
30616.84 27555.16 675.00
F
1 Kel-1
floods in Group 1 on River Achenkoli, Pamba,
Manimala & Meenachil in Kuttanad Taluka in
Alappuzha district.
2470.00 1852.50 0.00
2 Kel-2
floods in Group 2 on River Achenkoli, Pamba,
Manimala & Meenachil in Changanasswry
Taluka in Kottayam district.
11891.30 8918.48 0.00
14361.30 10770.98 0.00G
1 OR-1
Protection to Aska town by constructing,
improving left flood bank of river Rushikulya from
Suknai Haz to Harihar High School, Aska
299.00 224.25 0.00
2 OR-2
Construction of Flood Protection Embankment
on River Tel left from Turla to Ratakhandi
186.00 139.50 0.00
3 OR-3Construction of Flood Protection Embkt. on river
"Under" Left at village Telsarei
163.82 122.86 0.00
OR-4
Construction of Marginal Flood Embankment
(MFE) on Ramial right from Bada Berhampur to
Arakhapal
235.00 176.25 0.00
4 OR-5
Flood protection work on Right Bank of river
Rushikulya from village Cheramaria to Pitala
260.00 195.00 0.00
5 OR-6Flood protection work on Left Bank of river
Rushikulya near village Nandighore
120.00 90.00 0.00
6 OR-7
Flood protection work on Rt. Bank of river
Nandini from village Lakhabindha to Khaspa
137.00 102.75 0.00
Sub-total ( E)
Kerala
Sub-total (F)Orissa
-
8/3/2019 HP-2 Funds Released to CE(FM)
4/15
7 OR-8
Protection to Aska town by Constructing &
Strengthening of Left Flood Bank of River
Rushikulya from Harihar High School to
Confluence Point including Rt. Flood Bank of
River Badanadi from Bridge site to Confluence
point
380.00 285.00 0.00
8 OR-9R/S of Nilakanthapur Ghery from RD 00 to 2400M & protection to the scoured bank of river
Brahmani for 190m by lunching and packing
118.65 88.99 0.00
9 OR-10Widering to Chitrotpala Right Embkt. from RD 18
Km to 28.40 Km
138.00 103.50 0.00
10 OR-11
R/S to Chitrotpala Lt. Embkt from RD 17.90 to
30.210 Km at village Madhusasan, Kamala,
Karandia, Korua, Dhia Sahi to Tikanpur
113.00 84.75 0.00
11 OR-12
R/S of Flood Protection Embankment to Daya
Bhargabi System (Daya Left Embkt. from RD
20.00 to 60.00 Km)
297.00 222.75 0.00
12 OR-13
R/S of Flood Protection Embankment to Daya
Bhargabi System ( Bhargavi Right Embkt. from
RD 00.00 to 36.00 Km)
298.00 223.50 0.00
13 OR-14
R/S of Flood protection embkt. To Daya
Bhargabi System (Bhargavi left embankment.)
356.00 267.00 0.00
14 OR-15R/S of Mahanadi Right Embankment to protect
Banki and Kantilo town
455.00 341.25 0.00
15 OR-16Bank protection work on left bank of river
Subarnarekha at Chitimishra
210.00 157.50 0.00
16 OR-17Protection to Sorada Town providing spur on Rt.
Flood Bank of River Rushikulya
291.00 218.25 0.00
17 OR-18
Protection to scoured bank on Chitrotpala Right.(
RD 8.510 at Sani Temple from RD 9.34 to 21.08Km at Parikusamandal from RD 21.51 to 21.84
Km at Babujanga from RD 23.40 to 23.60 Km at
Dulupur from RD 24.33 to 24.70 at Mehendipur).
178.00 133.50 0.00
18 OR-19
Protection to scoured Bank C.E. No. 78 (A) on
Mahanadi Right embankment from RD 80.49 km
to 80.80 km at Chaumuhani.
227.00 170.25 0.00
19 OR-20Protection to scoured bank on Brahmani right at
village Kharagprasad
105.00 78.75 0.00
20 OR-21
Bank protection work (Dumping with Packing) on
left bank of river Subarnarekha near village
Namkana from RD 00 to 200 m & village
Palasahi from RD 00 to 400m
152.00 114.00 0.00
21 OR-22
Protection to S/B on Nuana-Karandia Rt. Near
RD 24.20 Km at Talagan Mahapursa mandir,
Binayak sahi.
128.00 96.00 0.00
22 OR-23Protection to Paika right embankment from RD
16.600 -18.400 Km .
130.00 97.50 0.00
-
8/3/2019 HP-2 Funds Released to CE(FM)
5/15
23 OR-24
Bank protection work on Subarnarekha right
bank near village Benapura, Dhitipura, Teghari,
Kadrayan & at Darabudhi Flood Embankment".
134.00 100.50 0.00
24 OR-25
Bank protection work on right bank of river
Subarnarekha near village Kudmansing Chadda.
131.25 98.44 0.00
25 OR-26Protection to scoured bank on Nuna Right At
Kasoti Narayanpur.
125.00 93.75 0.00
26 OR-27Bank protection work on right bank of river
Subarnarekha near village Ekadpal.
112.00 84.00 0.00
27 OR-28Rehabilitation of Devi Right Embankment at
Kantisal from RD 60.50 to 63.00 km
555.00 416.25 0.00
28 OR-29Bank Protection to scoured Right Bank of River
Hansua near village Bhatapada.
295.00 221.25 0.00
29 OR-30Renovation of Kusabhadra Drainage Channel
including its Link drain
300.00 225.00 0.00
30 OR-31 Improvement to Kadua Drainage System 207.00 155.25 0.00
31 OR-32 Improvement to Prachi Drainage System 282.00 211.50 0.00
32 OR-33Renovation extension and Improvement of PagaNalla System of Balasore Sadar Block. 337.14 252.86 0.00
33 OR-34 Improvement to Teregaon Drainage System 150.00 112.50 0.00
34 OR-35 Improvement to Sara Nalla (RD 00 to 12 km) 150.00 112.50 0.00
35 OR-36
Renovation of Ransal Drain outfalling to river
Badagenguti of Badachana Block, Jajpur district
under Doab No.-IV.
175.00 131.25 0.00
36 OR-37
Widening of Khaljuri, Nahara & Guasul Nallah
and Construction of Structures in Jaleswar Block
.
240.00 180.00 0.00
37 OR-38Improvement to Parvati Nallah in Basta and
Baliapal Block .
281.00 210.75 0.00
38 OR-39Renovation, Extension & Improvement of
Haripur Nallah System of Remuna Block .
250.00 187.50 0.00
39 OR-40
Renovation, Extension & Improvement of
Kankarjodi Drainage System of Balasore Sadar
Block .
200.00 150.00 0.00
40 OR-41
Renovation, Extension & Improvement of Kaonra
Drainage System of Balasore Sadar Block
250.00 187.50 0.00
41 OR-42
Renovation, Extension & Improvement of
Baharda Draiange System of Balasore Sadar
Block
300.00 225.00 0.00
42 OR-43Improvement of Water-logging area near village
Aruahadham in Baliapal Block
266.00 199.50 0.00
43 OR-44
Improvement to Drainage system of Kantejodi
Nalla from RD 7.5 to RD 13.8 km and its
auxiliary drains
125.00 93.75 0.00
44 OR-45
Improvement to Drainage system of Taptapani
Nalla from RD 00 to RD 6.00 km and its auxiliary
drains
200.00 150.00 0.00
45 OR-46 Improvement to Gania Nalla 105.00 78.75 0.00
46 OR-47 Improvement to Siaria Drainage Cut 300.00 225.00 0.00
47 OR-48 Improvement to Gandha Nadi Drainage Cut 130.00 97.50 0.00
-
8/3/2019 HP-2 Funds Released to CE(FM)
6/15
48 OR-49 Improvement to Kushabhadra 282.00 211.50 0.00
49 OR-50Improvement to Luna River (Bijipur to Delanga) 280.00 210.00 0.00
50 OR-51Improvement to Ratnachira drainage RD 0.0 Km
to 8.5 Km
275.00 206.25 0.00
51 OR-53 Improvement to Bhailpur Drainage 285.00 213.75 0.00
52 OR-54Renovation of Rebo drainage channel fromNukuri/Hansapur to Gadiali (from RD 71.00 Km
to 64.00 Km)
295.00 221.25 0.00
53 OR-55
Renovation of Rebo drainage channel from
Gadiali to Mankidia (from RD 64.00 Km to 57.00
Km)
285.00 213.75 0.00
54 OR-56
Renovation of Kapali drainage channel from
village Nukuria/Hansapur Khaparapada (from
RD 64.40 Km to 58.60 Km)
293.00 219.75 0.00
55 OR-57
Renovation of Kansabansa drainage channel
from RD 59.64 Km to 54.50 Km village Biripada
to kanheibanka.
285.00 213.75 0.00
56 OR-58
Renovation of Kansabansa drainage channel
from RD 54.50 Km to 47.50 Km villageKanheibanka to Kabirpur.
290.00 217.50 0.00
57 OR-59
Renovation to Rebo drainaage channel from
mankidia to Bidyadharpur from RD 57.00 Km to
51.50 Km.
205.00 153.75 0.00
58 OR-60
Renovation to Rebo drainaage channel from
Bidyadharpur to Saripapur RD 51.50 Km to
44.50 Km.
286.00 214.50 0.00
59 OR-61
Renovation of Kapali drainage channel from
village Khaparapada to Baurigaon from RD
58.60 Km to 50.80 Km.
293.00 219.75 0.00
60 OR-62
Renovation of Kansabansa drainage channel
from RD 47.50 Km to 39.50 Km village Kabirpur
to Chhaparpada.
280.00 210.00 0.00
61 OR-63
Renovation of Kansabansa drainage channel
from RD 39.50 Km to 31.00 Km village
Chhaparpada to Bhaskarpur.
280.00 210.00 0.00
62 OR-64
Renovation of Kansabansa drainage channel
from RD 31.00 Km to 21.00 Km village
Bhaskarpur to Raikula..
290.00 217.50 0.00
63 OR-65
Renovation of Rebo drainage channel from
Saripapur to Barikpur from RD 44.50 Km to
37.50 K:m.
286.00 214.50 0.00
64 OR-66
Renovation of Kapali drainage channel from
village Khaparapada to Bibhutipur from RD
50.80 Km to 43.00 Km.
200.00 150.00 0.00
65 OR-67Renovation of Kansabansa draiange channelfrom RD 21.00 Km to 10.00 Km village Raikula
to Saradanga.
280.00 210.00 0.00
66 OR-68
Renovation of Kansabansa drainage channel
from RD 10.00 Km to 00 Km village Saradanga
to Dungura.
290.00 217.50 0.00
67 OR-70
Renovation of Belpal Drainage cum Creek
including link drain of Rajnagar & Pattamundai
Block .
300.00 225.00 0.00
-
8/3/2019 HP-2 Funds Released to CE(FM)
7/15
68 OR-71Renovation of Old Brahmani Drainage Creek
including drain of Pattamundai Block .
300.00 225.00 0.00
69 OR-72Renovation Chota-gengati Drainage Channel
with its link drain outfall to r iver Badagugali.
200.00 150.00 0.00
70 OR-73
Flood protection works to Brahmani-Kelua-
Birupa Doab of Brahmani system, Distt.-Jajpur .
4000.00 3000.00 0.00
Amount adjusted
20637.86 15478.40 0.00
H
1 Pb-1Canalization of Sakki/Kiran Nallah from RD 18000
510000 m in Distt Amritsar & Gurdaspur
11139.00 8354.25 0.00
2 Pb-2
Construction of Flood protection works along 1-R
bandh on River Sutlej and local protection works
along choes in Distt. Nawanshehar.
1167.00 875.25 0.00
3 Pb-3
Plugging & strengthening breaches & bringing to
design section of flood protection embankments
along Mehangerwal choe, Arniala choe &
Ganbowal choe in Distt. Hoshiarpur (Part-I)
805.00 603.75 0.00
4 Pb-4
Plugging & Strengthening breaches and bringing
to design section of flood protection
embankments along Nasrala & Mehlanwali choes
in Distt. Hoshiarpur (Part-I)
1127.00 845.25 0.00
14238.00 10678.50 0.00
I
1 TN-1
Flood Protection Works to Araniyar River at
Upstream and Downstream of A.N.Kuppam
Anicut and Downstream side of Lakshmipuram
Anicut to Pulicat Creek in Thiruvallur District.
1241.00 930.75 0.00
2 TN-2
Comprehensive Flood protection to Cuddalore
Town from River Pennaiyar, Gadilam,Uppanar,
South Mallatar and Paravanar in Cuddalore
6841.00 5130.75 0.00
3 TN-3
Comprehensive Flood protection works to Vellar
Basin in Villupuram and Cuddalore districts of
TamilNadu
16432.00 12324.00 0.00
4 TN-4
Flood protection works in kollidam (Coleroon)
River in Thanjavur, Nagapattinam and Cuddalore
districts in TamilNadu in 3 phases.
37590.00 28192.50 0.00
5 TN-5Flood protection to Koratalaiyar river from
Napalayam to sea mouth in Thiruvallur District.
1450.00 1087.50 0.00
63554.00 47665.50 0.00J
1 UP-7
Widening, strengthening and providing 10m wide
roadway on Alipur Bund on left bank of river
Yamuna in District Baghpat / Ghaziabad,
2852.00 2139.00 0.00
2 UP-21Flood protection Works of River Yamuna Basin in
District Saharanpur.
2811.30 2108.48 0.00
5663.30 4247.48 0.00
Total ( States) 187940.61 148312.04 675.00
Sub-total ( G)
Punjab
Sub-total (H)
Tamil Nadu
Sub-total ( I)Uttar Pradesh
Sub-total ( J)
-
8/3/2019 HP-2 Funds Released to CE(FM)
8/15
K Union Territories
1 Pud-1 Flood protection works in Yanam, Puducherry.13967.00 10475.25 0.00
Total (UTs) 13967.00 10475.25 0.00
201907.61 158787.29 675.00
2007-08
States
A Goa ( 2) 2273.00 1704.75 0.00
B Gujarat ( 1) 794.31 595.73 0.00
C Haryana ( 1) 17375.00 13031.25 0.00
D Himachal Pradesh ( 1) 18427.00 16584.30 0.00
E Jammu & Kashmir ( 20) 30616.84 27555.16 675.00
F Kerala ( 2) 14361.30 10770.98 0.00
G Orissa ( 70) 20637.86 15478.40 0.00
H Punjab ( 4) 14238.00 10678.50 0.00
I Tamil Nadu ( 5) 63554.00 47665.50 0.00
J Uttar Pradesh ( 2) 5663.30 4247.48 0.00
Sub-total ( States ) = 108 187940.61 148312.04 675.00
Union Territories
K Puducherry ( 1) 13967.00 10475.25 0.00
Sub-total ( UTs) = 1 13967.00 10475.25 0.00Total Schemes ( States + Uts) = 109 201907.61 158787.29 675.00
Grand Total ( States + UTs)
Programme" as detailed belo
SN State / Number of SchemesEstimated
Cost
Central
Share
-
8/3/2019 HP-2 Funds Released to CE(FM)
9/15
Rs: lakh
2008-09 2009-10 2010-11 Total
181.50 240.75 240.75 663.00Completed
0.00 0.00 335.00 335.00In progress
181.50 240.75 575.75 998.00
0.00 0.00 200.00 200.00
a
0.00 0.00 200.00 200.00
0.00 4691.00 0.004691.00 In progress
0.00 4691.00 0.00 4691.00
0.00 2700.00 7425.00 10125.00
In progress
0.00 2700.00 7425.00 10125.00
387.50 170.63 546.73 1229.86In progress
250.00 350.00 217.75 1217.75In progress
0.00 440.96 220.48 811.44 In progress
517.50 368.01 49.99 935.50
In progress
550.00 117.50 285.23 952.73
In progress
72.00 207.79 103.89 383.68In progress
135.00 250.02 125.01 510.03In progress
68.00 111.59 51.07 230.66
In progress
161.00 192.73 96.36 450.09
In progress
0.00 93.60 32.21 125.81In progress
0.00 267.84 80.48 348.32In progress
As on 01-08- 2011
Programme During XI Plan ( Coordinated by CWC)
CS ReleasedStatus
-
8/3/2019 HP-2 Funds Released to CE(FM)
10/15
132.00 228.30 114.15 474.45
In progress
144.00 241.43 120.71 506.14In progress
135.00 214.99 107.49 457.48
In progress
225.00 131.25 388.76 745.01In progress
225.00 143.75 256.30 625.05
In progress
0.00 150.00 300.00 450.00In progress
0.00 438.00 222.50 660.50
In progress
0.00 0.00 375.00 375.00In progress
0.00 0.00 2115.00 2115.00In progress
3002.00 4118.39 5809.11 13604.50
0.00 0.00 742.50 742.50
0.00 0.00 1500.00 1500.00
0.00 0.00 2242.50 2242.50
75.00 134.44 14.81 224.25
Completed
60.00 37.44 30.62 128.06
Completed
45.00 73.34 0.00 118.34Completed
75.00 0.00 0.00 75.00Scheme
Dropped
75.00 87.15 32.85 195.00
Completed
37.50 49.32 3.18 90.00Completed
37.50 46.24 19.01 102.75
Completed
In progress
-
8/3/2019 HP-2 Funds Released to CE(FM)
11/15
90.00 0.00 104.75 194.75
In progress
30.00 40.36 18.63 88.99Completed
37.50 59.78 6.22 103.50Completed
37.50 42.53 4.72 84.75
Completed
75.00 105.88 41.87 222.75
Completed
75.00 100.19 37.65 212.84
Completed
90.00 0.00 124.42 214.42
In progress
120.00 86.07 131.69 337.76Completed
60.00 0.00 97.50 157.50Completed
75.00 134.36 8.89 218.25Completed
52.50 63.68 17.32 133.50
Completed
60.00 103.57 6.68 170.25
Completed
37.50 0.00 10.21 47.71In progress
45.00 62.94 0.00 107.94
Completed
37.50 52.65 5.85 96.00
Completed
37.50 60.00 0.00 97.50Completed
-
8/3/2019 HP-2 Funds Released to CE(FM)
12/15
37.50 56.70 0.00 94.20
Completed
37.50 56.87 0.00 94.37
Completed
37.50 26.25 30.00 93.75Completed
30.00 0.00 46.11 76.11Completed
112.50 112.17 183.33 408.00Completed
75.00 145.13 1.12 221.25Completed
75.00 82.70 60.21 217.91Completed
60.00 50.88 26.18 137.06 Completed
75.00 67.05 54.88 196.93 Completed
75.00 0.00 0.00 75.00In progress
37.50 37.23 25.98 100.71 In progress
45.00 34.59 29.57 109.16Completed
45.00 0.00 38.48 83.48
In progress
75.00 0.00 0.00 75.00
In progress
75.00 0.00 54.32 129.32In progress
75.00 0.00 0.00 75.00In progress
52.50 0.00 0.00 52.50
In progress
75.00 0.00 0.00 75.00
In progress
75.00 0.00 60.09 135.09
In progress
75.00 0.00 0.00 75.00In progress
37.50 0.00 56.25 93.75
Completed
60.00 42.32 44.08 146.40
Completed
30.00 30.34 18.41 78.75 Completed
90.00 55.11 59.02 204.13 Completed
37.50 28.19 17.67 83.36 Completed
-
8/3/2019 HP-2 Funds Released to CE(FM)
13/15
75.00 57.66 0.00 132.66 Completed
90.00 50.94 68.24 209.18Completed
0.00 37.50 0.00 37.50In progress
90.00 60.00 28.00 178.00 Completed
75.00 0.00 0.00 75.00In progress
75.00 0.00 0.00 75.00
In progress
75.00 0.00 0.00 75.00
In progress
90.00 0.00 0.00 90.00
In progress
90.00 0.00 0.00 90.00
In progress
60.00 0.00 55.91 115.91
In progress
75.00 0.00 0.00 75.00
In progress
90.00 60.00 0.00 150.00
Completed
90.00 0.00 0.00 90.00
In progress
90.00 0.00 0.00 90.00
Completed
90.00 0.00 0.00 90.00
In progress
90.00 48.75 0.00 138.75
Completed
60.00 0.00 0.00 60.00
In progress
90.00 0.00 0.00 90.00In progress
75.00 0.00 70.28 145.28
In progress
75.00 77.76 72.24 225.00
Completed
-
8/3/2019 HP-2 Funds Released to CE(FM)
14/15
90.00 0.00 0.00 90.00 In Progress
90.00 28.53 26.70 145.23Completed
0.00 0.00 562.50 562.50 In Progress
-108.59 -108.59
4590.00 2586.61 2297.85 9474.46
2151.00 0.00 0.00 2151.00 In Progress
0.00 583.50 0.00 583.50 In Progress
0.00 302.00 0.00 302.00 In Progress
0.00 422.50 0.00 422.50 In Progress
2151.00 1308.00 0.00 3459.00
0.00 111.00 0.00 111.00 In Progress
0.00 0.00 562.00 562.00
0.00 0.00 975.00 975.00
0.00 0.00 4147.00 4147.00
0.00 0.00 187.00 187.00
0.00 111.00 5871.00 5982.00
0.00 1605.00 0.00 1605.00
Completed
0.00 0.00 572.86 572.86
0.00 1605.00 572.86 2177.86
9924.50 17360.75 24994.07 52954.32
In Progress
-
8/3/2019 HP-2 Funds Released to CE(FM)
15/15
0.00 0.00 750.00 750.00 In Progress
0.00 0.00 750.00 750.00
9924.50 17360.75 25744.07 53704.32
Rs: lakh
2008-09 2009-10 2010-11 Total
181.50 240.75 575.75 998.00
0.00 0.00 200.00 200.00
0.00 4691.00 0.00 4691.00
0.00 2700.00 7425.00 10125.00
3002.00 4118.39 5809.11 13604.50
0.00 0.00 2242.50 2242.50
4590.00 2586.61 2297.85 9474.46
2151.00 1308.00 0.00 3459.00
0.00 111.00 5871.00 5982.00
0.00 1605.00 572.86 2177.86
9924.50 17360.75 24994.07 52954.32
0.00 0.00 750.00 750.00
0.00 0.00 750.00 750.009924.50 17360.75 25744.07 53704.32
: