Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 1
Comminution Plant
Surveys
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Why Survey?
Modern grinding circuits are monitoredcontinuously
Operators live with the plant all day, every day
With all this attention why do we need toconduct surveys?
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
2/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 2
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Why Survey? (cont..)
Surveys are required where
Plant improvements are under consideration
Reasons for problems are not obvious
A circuit simulation model is required
Response to an ore type must be defined
Benchmarking
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Definition of a Survey
To measure the operation of the plant undercontrolled conditions and for a specifiedinvestigative purpose
(as opposed to ongoing measurement forproduction accounting)
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
3/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 3
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Survey vs Production Accounting
Surveying
Aimed at defining plantoperation
Typically manual streamcutting
Samples subject to
unusual tests Samples must be inter-
relatable in short term
Accounting
Aimed at measuringproduction and losses
Often automated streamcutting
Standard tests applied
Samples must be inter-relatable in medium tolong term
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Survey vs Production Accounting
Surveying
Happens rarely
Needs to be plannedeach time
Accounting
Happens daily
Part of standardoperating procedures
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
4/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 4
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Collecting Good Samples I
Understand the circuit and its purpose
Understand the aim of the survey
Determine information required and the tests tobe carried out
Minimum sample mass is that required fortesting
Select streams to be sampled
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Collecting Good Samples II
Understand each stream that is to be sampled
Mass flow of solids and water
Particle size distribution
Stream geometry
Stream access
Sample site physical access
Other (temperature, viscosity, toxicity, etc)
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
5/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 5
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Collecting Good Samples III
Required sample mass will depend upon
Test mass requirements (as mentioned)
Particle size distribution, especially the top size
Physical realities
theoretical calculation can be performed usingthe equations of Gy (Ref)
typically for coarse particle streams Gy givesunrealistically larger sample sizes
rules of thumb and experience are often applied
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Mass Requirement Estimation
Calculation - Statistical Base
Simplest based on assumption ofPoisson probability distribution see next
slide More complex Hogg (1988)
Most complex Gy (1982)
Experience
J KTech
MPTech - UCT
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
6/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 6
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Simple Statistical EstimationSample Name: SAG Feed
Solids Density: 2.52 tonnes/m3
Required rel. error: 10.00 %
Sample size: 100.00 Kg
95% Confidence Range
Size Cumulative Kg Sample with 100.00 Kg sample
fraction % for < Cumumlative % Passing
(mm) Passing 10.00 % Low High
Rel. error
400.00 100.00
300.00 99.60 5956056.26 97.16 - 102.04
212.00 98.10 623858.67 95.14 - 101.06
150.00 96.30 182861.00 94.38 - 98.22
106.00 85.00 8754.70 82.36 - 87.64
75.00 74.80 3822.97 73.22 - 76.38
53.00 66.00 1911.70 65.04 - 66.96
26.50 52.30 735.59 51.37 - 53.23
13.20 43.30 551.65 42.77 - 43.83
9.50 39.80 523.51 39.60 - 40.00
6.30 34.50 506.30 34.20 - 34.804.80 31.60 504.46 31.44 - 31.76
3.40 26.00 502.00 25.69 - 26.31
2.40 20.50 501.60 20.19 - 20.81
1.70 16.60 501.49 16.38 - 16.82
1.20 12.50 501.41 12.27 - 12.73
0.90 9.70 501.39 9.54 - 9.86
0.60 7.40 501.38 7.27 - 7.53
0.40 5.50 501.38 5.39 - 5.61
0.30 3.60 501.37 3.49 - 3.71
0.00
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Mass Requirement Estimation
Estimates based on experience
J KTech, hundreds of plant surveys over 20 +
years Effectively particle number (volume) based
Based on typical ores with SG 2.7 to 3.0
mass recommendations will need correctionfor SG values significantly outside this range
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
7/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 7
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Experience Based EstimationLocation Topsize Recommended
Sample Mass
ROM 0.5 2m Not recommended, useimage analysis
PrimaryCrushed Ore
300mm 1500kg & supplementwith image analysis
Secondary
Crushed Ore
100mm 300kg
TertiaryCrushed Ore
30mm 60kg
Fine crushedOre
12mm 20kg
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Experience Based EstimationLocation Topsize Recommended
Sample Mass
SAG Disch.
with Pebbles
100mm 150-200 kg
SAG Disch 25mm 60kgCoarse BallMill Disch.
12mm 20kg
Fine Ball MillDisch.
3mm 10kg
Cyclone U/F 12mm 20kgCyclone O/F 1mm 2kg
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
8/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 8
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Screen Delimited Streams
Special case
Example -20mm + 10mm stream
Typical Screen Delimited Sizings
0
20
40
60
80
100
1 10 100
Size (mm)
CumulativeW
t%Passing
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Screen Delimited Streams
Steep distribution curve
Important to determine proportions of oversize
and undersize Detection of holes and inefficiency
Sample size often determined by the need toknow about fines or to pinpoint top size
Mass requirements reduced - no fine fraction
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
9/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 9
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Screen Delimited Streams
Location Topsize Bottomsize
RecommendedSample Mass
SAG Pebbles 80mm 12mm 100kg
Coarse 100mm 50mm 100kg
Medium 30mm 15mm 250kg
Fine 12mm 6mm 10kg
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Sample Collection
Belt Cuts for Conveyed samples,top size >30mm, stop belt and dig off.
Collect all from a 3 5 m section, and
Collect all +75 mm from a 15 20 msection
Box collectors for screen oversize samplestopsize
-
7/28/2019 How to Taking Samplings
10/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 10
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Slurry Samples
The best results are obtained by takingcuts at regular intervals of time and byso using the cutter, that its operationapproaches that of a properly runmechanical sampler.
Taggart (1945)
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Slurry Sample Cutters
The cutter should be large enough so that
there is no danger of overflow while making
one passage through the stream of pulp. Theaperture should be at least four times the
diameter of the largest grain in the pulp; the
cutter should be smooth inside, watertight,
and designed to clean itself readily.Taggart (1945)
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
11/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 11
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Cutter Requirements
Manufactured to task
Many options
See Sampling High Throughput Grinding andFlotation Circuits Mosher and Alexander
Slot preferably 5 x maximum particle size Volume sufficient to fill maximum of 30% during
a single pass
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Typical Cutter Design
200mm
150mm
12mm
100mm
Length to suit
sampling point
150
mm
30mm
Radius80mm
(A1)
(B1)
(C)
(D)
(A 2)
(B2)
(B3)
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
12/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 12
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Image Analysis Blasted ore
Digital or conventional photographs ofmuckpiles or trucks as they dump at primarycrusher
Analyse with Split Desktop
Conveyed ore
Video for entire survey period Analyse with Split On-Line
Correct with measured fines from belt sample
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Survey Preparations
Plant personnel awareness
Metallurgists
Operators Maintenance
Process control
Management
Agreement, purpose, timing and opportunities
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
13/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 13
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Survey Preparations
Identify desired survey streams
Achieve mass balance
Define a process
Meet modelling needs
Establish feasibility of sampling desired streams
If yes choose cutters
If no, can it be yes or is stream required
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Survey Preparations
Design and acquire cutters
Buy
Build
Borrow
Test cutters
Check design (especially handles and slots)
Establish technique
Educate samplers
Check repeatability
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
14/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 14
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Survey Preparations
Identify equipment in the circuit
Mills
Cyclones
Screens
Crushers
Anything else? Identify equipment measurements required
What is needed to get the measurements
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Detailed Planning
Write a survey document
Survey goal(s)
Brief survey plan
Plant preparations required Survey timing
Detail the samples to be taken and how
Detail the equipment measurements to be takenand how
Detail other data to be collected
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
15/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 15
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Detailed Planning
survey document (cont)
Detail personnel requirements
Analyse the safety issues of sample collection andequipment measurement (in detail issue by issue,
J SAs may be required)
Detail post-survey sample handling and treatment
Detail costs involved
additional personnel, lab services, downtime
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Detailed Planning
Distribute survey document to all stakeholders
Discuss and refine document
Identify synergies Maintenance opportunities that match with Survey
related plant shutdowns
Opportunities for additional measurements
Training opportunities
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
16/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 16
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Detailed Planning
Clearly establish your own role
Control major survey processes
go / no go
plant stability monitor
data collection checker
troubleshooter
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Carry Out the Survey
Month to Week before
Ensure plant is configured as required
Identify survey time window
Ensure instruments are calibrated Check for operational stability issues
Ensure all cutters are tested and OK
Order cutters, shovels, bags, drums, lights, etc
Ensure lab is ready and aware
Establish sample ID method
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
17/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 17
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Carry Out the Survey Month to Week before
Prepare survey spreadsheet
brief survey description
list all samples
space for dates, times and ore sources
space for wet and dry weights
space for all data to be collectedspace for all machine measurements
preliminary calculations
checklist
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Carry Out the Survey
Day before
Label all sample bags, buckets and drums
Check all equipment
Measure available equipment
conveyor speeds
crusher gaps
installed motor powers
screen apertures
anything else?
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
18/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 18
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Carry Out the Survey
Day before (cont.)
establish operational aims with metallurgist,foreman, shift-boss and operators
establish night shift goals and communicate thesepersonally at the start of nightshift
the survey will be much easier if the plant is
nearly ready after night shift Confirm maintenance and control issues
personnel availability for equipment tag out
collection and capture of data
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Carry Out the Survey
Survey day
check operations and maintenance for issues
distribute samplers, survey equipment and
measurement tools to appropriate locations
establish 100% survey readiness
monitor plant condition
establish an adequate stability level
survey start
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
19/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 19
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Carry Out the Survey Survey day
signal for survey cuts to be taken (eg 15 minuteintervals)
Continue to monitor plant stability, ore changes,control actions
observe sampling if possible
check that manual data is being collectedcyclone pressure
cyclone numbers
Anything else?
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Carry Out the Survey
Survey day
stop survey sampling
call for plant shut down
call for equipment tag out sample from stopped conveyors
measure required equipment
check for 100% completion
de-tag equipment
clearly release plant back to operations
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
20/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 20
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Carry Out the Survey
Survey day
ensure any other data is collected (DCS, etc)
transport all samples to laboratory
weigh all samples wet and in containers
filter and dry all samples
weigh all dry samples
weigh all containers for tare weight
Important - survey in morning, samples all dried andweighed by days end
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Typical Plant SAG followed by discharge screen, recycle crusher,
2 x Ball mills and cyclones
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
21/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 21
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Survey Streams
1
3
4
5
6
9
7
8
2
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
SAG Feed
1
1000tph ConveyorTop size =250mmBelt Cut
600 - 1500kg
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
22/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 22
www.jktech.com.au
Delivering world class solutions
to the minerals industry
SAG Discharge
2X
1200tph Slurrytopsize=80mminaccessible
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
SAG Pebbles
3
200tph ConveyorTop size =80mm80kgBelt Cut or Screen o/s
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
23/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 23
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Recycle Crusher Product
4
200tph ConveyorTop size =20mmBelt Cut 30kg
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
SAG Screen U/S
51000tph slurryTop size =13mmInaccessible / Needs work
?
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
24/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 24
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Cyclone Feed
6
3500tph slurry (200tph/cyclone)Top size =13mm20kg solidsSlurry CutterBlank off 1 cyclone o/f and sample u/f
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Cyclone Underflow
7
2500tph slurryTop size =13mm20kg SolidsSlurry Cutter
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
25/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 25
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Ball Mill Discharge
8
2500tph slurryTop size =13mmSlurry Cutter20kg SolidsSpecial arrangement
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Ball Mill Discharge
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
26/27
Surveying JKSimMet Course - 2009
Transmin - Lima Srvy - 26
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Cyclone Overflow
9
1000tph slurryTop size =1mm2kg SolidsSlurry Cutter
Sampling and Surveying
www.jktech.com.au
Delivering world class solutions
to the minerals industry
Selected Samples
1
3
4
5
6
9
7
8
2X
?
Sampling and Surveying
-
7/28/2019 How to Taking Samplings
27/27
Surveying JKSimMet Course - 2009
www.jktech.com.au
Delivering world class solutions
to the minerals industry
SAG Screen U/S
What can we do ?
Adjust equipment so we can measure !
Use mass balance
Relies on good quality samples of cyclone
feed and ball mill dischargeHas no redundant information
Sampling and Surveying