Page 1: How to configure Change management flow Whizible SEM

© Compulink Systems Ltd. All Rights Reserved.

Welcome

Change Management Flow

Page 2: How to configure Change management flow Whizible SEM

2© Compulink Systems Ltd. All Rights Reserved.

Agenda

Basic Definitions

Conceptual Workflow

Configuration

Managing Change Requests

Page 3: How to configure Change management flow Whizible SEM

3© Compulink Systems Ltd. All Rights Reserved.

Basic Definitions

Change Request A change requirement that is posted by any of the resources or the customer of a project is known as a Change Request. A work around suggested by any project resource is known as Internal Change Request and any work around suggested by the customer is known as External Change Request.

Work Product

Work Product is a logical entity that is the constituent of the product of the project e.g. ASP Page, DLL, etc.

Impact Analysis

Impact analysis is the process of identifying work-products that may be affected by proposed changes. This requires a representation model that can formalize the knowledge about the various dependencies between work-products.

Change Management

The Change Management provides the facility to document and track any changes made in the project. The change may be internal (initiated within the Organization) or external (change required by the Customer). The user can also upload documents against the Change Request and conduct an Impact Analysis on the product.

Page 4: How to configure Change management flow Whizible SEM

4© Compulink Systems Ltd. All Rights Reserved.

Agenda

Basic Definitions

Conceptual Workflow

Configuration

Managing Change Requests

Page 5: How to configure Change management flow Whizible SEM

5© Compulink Systems Ltd. All Rights Reserved.

Conceptual Workflow

CONFIGURATION

PROJECTS

Define types of Impact Analysis

Identify Work Product Types

Post Change Requests

Carry out Impact Analysis for Change Requests

Create Tasks for change request mapping

Upload requirement collaterals (documents)

Page 6: How to configure Change management flow Whizible SEM

6© Compulink Systems Ltd. All Rights Reserved.

Configuration : Corporate Level

Define Impact Analysis Type

Define Work Product Types

Page 7: How to configure Change management flow Whizible SEM

7© Compulink Systems Ltd. All Rights Reserved.

• The effects of change requests are evaluated and analyzed by carrying out Impact Analysis for the same.

• All such standard types of Impact Analysis are captured in the Impact master at corporate level.

Define Impact Analysis Type

Page 8: How to configure Change management flow Whizible SEM

8© Compulink Systems Ltd. All Rights Reserved.

• Managing the change is about correctly identifying the work products affected after incorporating those changes.

• Use Work Product master to capture the generic work products that are usually the constituent of the projects across the organization e.g. ASP Page, SP, Trigger, View etc.

Define Work Products

Page 9: How to configure Change management flow Whizible SEM

9© Compulink Systems Ltd. All Rights Reserved.

Managing Change Requests Add Change Request Edit Change Request Carrying Out Impact Analysis Identify Work Products Affected Compute Modification Efforts Creating Tasks Upload Documents Convert To Deliverable Graphs Resource Statistics

Page 10: How to configure Change management flow Whizible SEM

10© Compulink Systems Ltd. All Rights Reserved.

• Any change requests raised by internal resources or customer are added under Change Requests feature.

Add Change Request

Page 11: How to configure Change management flow Whizible SEM

11© Compulink Systems Ltd. All Rights Reserved.

• Populate following required details about change request: Change Request: Enter subject

of change request. Change Requestor: Name of the

person who raised the change. Change Requested Date: The

date on which the change request is posted.

Description: Details of changes to be incorporated.

Benefits: Enter the resultant benefits of the change.

Category: Select the origin of the change request I.e. raised by internal project resource, (external) customer or other source.

Change Status: Select the present status of the change request.

Add Change Request

Page 12: How to configure Change management flow Whizible SEM

12© Compulink Systems Ltd. All Rights Reserved.

• In the edit mode of change request, few more attributes appear on the screen.

• The details about the Approval or Rejection of change requests are captured.

• Some additional tabs also appear on the screen viz.

Impact Analysis,Work Products

AffectedTasksModification EffortsDocuments

Edit Change Request

Page 13: How to configure Change management flow Whizible SEM

13© Compulink Systems Ltd. All Rights Reserved.

• For every change request, Impact Analysis is carried out to evaluate the impact of the changes on the work products.

• The details about the same can be captured under Impact Analysis tab.

• Planned Start Date is the planned date of change implementation.

• Select the Change Size from the drop down which is populated with predefined values.

• Mark the Regression Testing Required(Y/N) checkbox to indicate, if the testing should be conducted to ensure that the change has not affected the existing functionality.

Carrying Out Impact Analysis

Page 14: How to configure Change management flow Whizible SEM

14© Compulink Systems Ltd. All Rights Reserved.

Identify Work Products

• Work Products that will be affected after incorporating the changes can be added under Work Products Affected tab.

• On the Work Product specification page, select the Work Product Type.

• Select the type of Impact Analysis from the Type drop down.

• Specify the name of the affected work product in the Work Products Affected field.

• Specify the modifications that will be made the affected work product in the Modification Details field.

Page 15: How to configure Change management flow Whizible SEM

15© Compulink Systems Ltd. All Rights Reserved.

Modification Efforts

• Specify the phase wise break up of estimated efforts for modifications under Modification Efforts tab.

• Phase drop down is populated with the project phases identified under PROJECTS > Project Management > Plan > WBS > Phases.

Page 16: How to configure Change management flow Whizible SEM

16© Compulink Systems Ltd. All Rights Reserved.

Create Tasks

• For incorporating the changes, the corresponding tasks should be created for the project resources under Tasks tab.

• The same screen for creation of Assigned Tasks appears.

• Populate the required required details for the tasks.

Page 17: How to configure Change management flow Whizible SEM

17© Compulink Systems Ltd. All Rights Reserved.

Upload Documents

• Any reference documents for the change requests can be uploaded under Documents tab.

• Map the Document Category and Sub Category to the uploaded document.

• Use the Attach URL link under the tab, to enclose the URL of the reference sites for the change request.

Page 18: How to configure Change management flow Whizible SEM

18© Compulink Systems Ltd. All Rights Reserved.

Convert To Deliverable

• The approved Change Request can be used for creating project deliverable with the help of Convert To Deliverable link.

• Deliverable creation appears.

• Select the Deliverable Type from the drop down.

• Based on the selected deliverable, the mandatory fields configured for the deliverable type appear on the screen.

• By default, the Change Request subject is mapped to deliverable Title and the description of Change Request is mapped to its Description.

Page 19: How to configure Change management flow Whizible SEM

19© Compulink Systems Ltd. All Rights Reserved.

Graphs

• In the Graphs section following two graphs are displayed…

Planned Tasks vs. Completed Tasks

Open Issues for Change Request

• Planned Tasks vs. Completed Tasks:

This bar graph displays the count of planned tasks against the completed tasks under the change request.

• Open Issues for Change Request:

This Pie graph displays the number of issues that are open and to which the selected change request is mapped.

Page 20: How to configure Change management flow Whizible SEM

20© Compulink Systems Ltd. All Rights Reserved.

Resource Statistics

• Under the Resource Details section, you can view the statistic with respect to the task assignment under the change request to the various project resources.

Page 21: How to configure Change management flow Whizible SEM

© Compulink Systems Ltd. All Rights Reserved.

Thank You