houston southeast neighborhood greenways · houston southeast neighborhood greenways public...
TRANSCRIPT
H O U S TO N S O U T H E A S T N E I G H B O R H O O D G R E E N WAYS P U B L I C M E E T I N GGREATER SOUTHEAST MANAGEMENT DISTRICT
Thursday, September 26, 20195:30 p.m.
Alice McKean Young Neighborhood Library5107 Griggs Road | Houston, TX 77004
PROJECT OVERVIEW
https://houstonse.org/about/public-comment-form/
The Greater Southeast Management District is working to provide a safe andseamless integration of existing trails and greenspace for a safe and scenicpedestrian route to connect from Palm Center to Mac Gregor Park.
Our goal is to support ease of access in, around, and through the District. Thisseries of modifications will invite and engage residents and those whofrequent our community, to explore the pathway from Palm Center toMacGregor Park by walking, jogging, and/or cycling along the trail. Theimprovements will consist of mill and overlay, sidewalks, curbs and ramps,remove and replace pavement markings, sharrow lane markings and signage,crosswalks and pedestrian hybrid signalization.
MASTER PLAN
PHASE I: IMPLEMENTATION
MILART CROSSING
CALHOUN RD – EXISTING CROSS SECTION
CALHOUN RD – PROPOSED CROSS SECTION
CALHOUN RD – PROPOSED CROSS SECTION
ONLINE PUBLIC COMMENT FORM
https://houstonse.org/about/public-comment-form/
VISIT
HOUSTONSE.ORG5445 Almeda, Ste 503, Houston, TX 77004