STAKEHOLDER MEETING 1SEPTEMBER 14, 2017
VETERANS PARK
2
Introduction
Project Background and Scope
The Monuments
Site Inventory and Analysis
Goals Discussion
Programming
Visual Preference Survey
Questions
AGENDA
SW PENNSYLVANIA WWII MEMORIAL | PITTSBURGH, PA
3
The purpose of tonight’s Veterans Park meeting is to present:
Background information
Existing conditions
Preliminary goals
And to gather stakeholder input to inform the design of the space.
MEET YOUR TEAM
SW PENNSYLVANIA WWII MEMORIAL | PITTSBURGH, PA
4
TEAM EXPECTATIONS AND ROLES
Veterans Park Stakeholders
Austin Parks & Recreation Department
City of Austin
Design Workshop, Inc.Prime Design Consultant
Consultant Team:Structures EngineeringEncotech EngineeringUrban Design Group
Manage, Direct
Fund
Inform, Consent, Input, Feedback
Facilitate, Design, Collaborate
Design, Collaborate
5
PROJECT BACKGROUND
The 2012 Bond initiative provides funding to design space for these memorials and future memorials at Veterans Park
Veterans Park is physically connected to the American Legion Post 76, although not administered as one site
The Post is not part of the City of Austin’s Park and Recreation Department
Site will contain three war memorials previously located at Waterloo Park that honor the:
– Korean War
– Vietnam War
– the Hostile Action in Beirut
6
Accommodate formal and informal veterans events and observances as well as casual use by the public
Plan for potential future memorials
Work with the City of Austin Commission on Veterans Affairs to plan for the needs of the local veterans community
Work with the adjacent American Legion Post 76 to create a seamless and strong relationship between the park and the existing circulation, retaining wall, flagpoles and structure
Maximize accessibility and connect to surrounding context
Utilize the existing concrete sidewalk on Veterans Drive and plan for connectivity to the nearby Capital Metro bus stop and the Roy and Ann Butler Hike and Bike Trail
Address the drainage catch basin area on site
Develop and prepare conceptual, schematic, design development and construction documents
SCOPE
7
THE MONUMENTS | Korean War
IMAGES FROM ORIGINAL LOCATION AT WATERLOO PARK
8
THE MONUMENTS | Vietnam War
IMAGE FROM ORIGINAL LOCATION AT WATERLOO PARK
Dedicated May 26, 1980
9
THE MONUMENTS | Hostile Action in Beirut
IMAGE FROM ORIGINAL LOCATION AT WATERLOO PARK
Dedicated May 28, 1984
10
CONTEXT
Atla
nta
St.
Veterans Dr.
MoP
ac E
xpre
ssw
ay
Deep EddyPool
Zilker Park
Austin Nature + Science Center
Zilker Botanical
Garden
Austin High School
Ann and Roy Butler Hike and Bike
Trail
Cesar Chavez - to downtown
Lady Bird Lake
Park
Lake Austin Boulevard
11
SITE INVENTORY
A
MERICAN
LEGION
VETERANS PARK EXISTING CONDITIONS
MARCH 2015NORTH 0
ORIGINAL SCALE:10 20 40
1"=20'
DESIGNWORKSHOPLandscape Architecture Land Planning Urban Design Tourism Planning
800 Brazos St Suite 490 Austin, TX 78701 512-499-0222 Facsimile 512-499-0229
ATLAN
TA STREET
LAD
YBIRD LA
KE & M
OPAC
LAMAR BEACH & DOWNTOWN AUSTIN
EILERS PARK
TARRYTO
WN
dense undergrowth, exposed limestone,
steep slope, continuous tree
canopy
parking lot
existing sewer line
existing drain inlet
existing sidewalk
existing easement
existing retaining wall
traffi
c no
ise
American Legion
EXISTING CANNON MONUMENT
TRAFFIC
WATER FLOW
EXISTING FLAGPOLE
LEGEND
SITE BOUNDARY
BUILDING
PAVING
0
SCALE: 1”=50’
25 50 100
N
Key Takeaways: –Potential connections –High noise levels –Visibility to surroundings –Drainage and slope
12
SITE INVENTORY
RETAINING WALLS STAIRS TO AMERICAN LEGION FLAGPOLE LOCATION
TREESPATH CIRCULATIONLAWN SPACE
13
SITE ANALYSIS
A
MERICAN
LEGION
VETERANS PARK EXISTING CONDITIONS
MARCH 2015NORTH 0
ORIGINAL SCALE:10 20 40
1"=20'
DESIGNWORKSHOPLandscape Architecture Land Planning Urban Design Tourism Planning
800 Brazos St Suite 490 Austin, TX 78701 512-499-0222 Facsimile 512-499-0229
ATLAN
TA STREET
VETERANS DRIVE
JUNE 21 DECEMBER 21sun’s trajectory
sunrise9 am
sunset
change in sun’s trajectory (1 year)
FULL SHADE
FULL SUN
DECEMBER 21JUNE 21
SUN’S TRAJECTORY
SUNRISE
9 AM
SUNSET
YEARLY CHANGE IN SUN’S TRAJECTORY
0
SCALE: 1”=50’
25 50 100
N
LEGEND
SITE BOUNDARY
BUILDING
PAVING
parking lotAmerican Legion
Key Takeaways: –Lack of shade and vegetation –Low human comfort –View of American Legion & Lady Bird Lake tree canopy
14
PROJECT GOALS
Memorials In what way should the memorials be located? How does the space around the memorials feel?
Experience What is your experience like when you’re at the park?
Use How should the park be used? Where can you enter the park?
15
PROGRAMMING + USE
Active
Passive
Daytime
Nighttime
Everyday
Special Event
Informal
Formal
Individual
Group
Reflective
Stimulating
16
AESTHETIC STYLE
MODERN
CIVILIAN CONSERVATION CORPS (CCC)
OPEN
COUNTRY / RUSTIC
FORMAL
NATURAL
CLASSIC AUSTIN
CURVILINEAR
REFINED
17
MATERIALS
DECOMPOSED GRANITE
STAINLESS STEEL
PAVERS
CONCRETE
IRREGULAR STONE
COLORED CONCRETE
BOARD FORM CONCRETE CORTEN STEEL
REGULAR STONE LARGE BOULDERS
WOOD OR SYNTHETIC WOOD GRAVEL
18
Additional questions or comments?Contact Rey Hernandez
orvisit the project website at
http://www.austintexas.gov/department/veterans-park-plan