home page : · pdf file · 2015-12-03pim, itp, spec,drawing. pim, itp, spec,drawing...

52
Home Page : http://www.shmt.co.kr

Upload: nguyenanh

Post on 08-Mar-2018

231 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

Home Page : http://www.shmt.co.kr

Page 2: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

We at Shin Hwa M-Tech based in Ulsan, an industrial city in Korea, have accumulated considerable experience as well as expertise by successfullyfulfilling overseas storage tank & plant construction orders. This enabled us to provide customized services to each of our customers with our quality products and thorough product management, making us one of the most advanced corporations in the concerned industry.

With our strategic location, cutting-edge equipment and high-quality human resources we were able to improve our productivity, reduce logistics cost and thus, secure competitive edge over our competitors. However, we will not stop here. We will continue to challenge our selves to become a leading company specializing in the industrial plant construction ranging from chemical plants, power plants to steel plants. In this way, we strongly believe that we can contribute to our society, and moreover, the industrial development of Korea.

CEO Message

President / Bong-cheul Oh

Page 3: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

1. Company History

■ Company Name : Shin Hwa M-Tech Co.,Ltd

■ Company History : 1994 Started “Han Chul Co.,Ltd”2011 Changed “Bo Seong”2014 Changed “Shin Hwa M-Tech Co.,Ltd”2014 ASME “U”,”S”,”PP” (By Loyd’s)2014 OHSAS 18001 (By Loyd’s)

■ Core Product : Module, Chemical Plant.■ Product : Heat Exchanger, Pressure Vessel, Industrial Plant, Pipe Spool.

■ NO. OF Persons : Average 65. (Max : 185)

■ Address : #12, Hwasan 2Gil, Onsan-Eup, Ulju-Gun, Ulsan, South Korea

■ E.Mail / TEL : [email protected]/ +82-52-238-9543

■ Work Shop : Land - 8,687m2, Office - 1,538m2

■ Sub Work Shop : Land - 34,000m2 (With Moving Shelter-3EA)■ Sub Paint Shop : Land - 5,600m2 (Moving Shelter-1EA)

Page 4: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

2. Certificates

< ASME “PP” >< ASME “S” >

Page 5: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

< ISO 9001:2008 >

2. Certificates

< ASME “U” >

Page 6: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

< OHSAS 18001 >

2. Certificates

< Material specialized company >

Page 7: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

3. Organization (1)

Administration

Quality Assurance Dept.

PlanningTeam

TechnicalDept.

ProductionDept.

General AffairsTeam

SalesTeam

DesignTeam

ProcurementTeam

MaterialTeam

QA&QC

ProductionTeam

ASME&ISO

President

Page 8: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

3. Organization (2)

President

Bong-chul Oh

Phone : 010-3875-7647

Fax : +82-52-238-9542

E-Mail : [email protected]

Managing Director

Byung-ju Kim

Phone : 010-2210-4924

Fax : +82-52-238-9542

E-Mail : [email protected]

Technical Dep,t

Jin-hyung Kim

(Deputy General Manager)

Phone : 010-4879-7454

Fax : +82-52-238-9542

E-Mail : [email protected]

Purchasing Dep,t

Mun-gyo Kim

(General Manager)

Phone : 010-4529-5333

Fax : +82-52-238-9542

E-Mail : [email protected]

Bong-Sik Oh

(Manager)

Phone : 010-5270-4817

Fax : +82-52-238-9542

E-Mail : [email protected]

Manufacturing Dep,t

Chan-Jung Byun

(Director)

Phone : 010-3853-8227

Fax : +82-52-238-9542

E-Mail : [email protected]

Jin-hyang Lee

(Assistant Manager)

Phone : 010-8835-4402

Fax : +82-52-238-9542

E-Mail : [email protected]

QC/QA Dep,t

Jae-kwang Kim

(Deputy General Manager )

Phone : 010-8951-5458

Fax : +82-52-238-9542

E-Mail : [email protected]

Seong-ik Park

(Assistant Manager)

Phone : 010-2400-2397

Fax : +82-52-238-9542

E-Mail : [email protected]

Page 9: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

4. Work Process

SCH’Planning

BOM, (Material PO)

Tech’Meeting

Target Day Decision

Clint -> Vender

Drawing Start

Material Receiving

Fabrication Start

Delivery

Final-Work

Technical Meeting

Material Inspection

Drawing,Procedure

Purchaing Order

PIM, ITP, SPEC,Drawing

PIM, ITP, SPEC,Drawing

Inspection & Test

NO

NO-Re Work

NO

Page 10: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

5. 2014 Construction Expenses

4,485,981 $

NO Part Amount ($)

1 Material 20,560,747

2 Man Power 4,485,981

3Pre Fabrication

3,738,317

4Overhead& Profit

5,794,392

5 Etc. 8,411,214

Total 42,990,654

48%

10%

9%

13%

20%

Material

Man Power

Pre Fabrication

Overhead&Profit

etc.

Page 11: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

7,476,635 $

NO Part Amount ($)

1 Material 26,168,224

2 Man Power 7,476,635

3Pre Fabrication

3,738,317

4Overhead& Profit

7,476,635

5 Etc. 11,214,953

Total 56,074,766

47%

13%

7%

13%

20%

Material

Man Power

Pre Fabrication

Overhead&Profit

etc.

5. 2015 Construction Expenses

Page 12: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

6. Equipment List

Equipments Name Specification Q’Ty Equipments Name Specification Q’Ty

CNC Gas CuttingMachine

11Touch(5.1Mx30M) 1 CO2 Welding Machine 500A 5

Heat Treating Furnace 75TON 1 CO2 Welding Machine 650A 15

Over head Crane 20TON 3 Submerged ARC Welding Machine 15KW 3

Over head Crane 15TON 1 TIG Welding Machine 650A 5

Over head Crane 10TON 3 Gouging Machine 1000A 3

Over head Crane 5 TON 1 Cutting Machine IR250 1

Over head Crane 2.8 TON 1 AIR Compressor 100HP 2

Turnning Roller 50 Ton 5 Band Saw 450 1

Page 13: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

7. Core Equipment

Heat Treatment room

■ 1) Max. Dia : 600mm■ 1) 6,400Wx6,400Hx17,000L2) Max. Temp : 950℃ (1,742℉)3) Normalizing

CNC Coaster M/C

Page 14: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

ML2012TB PLASMA 600KW

ML13030 ML3015LZP

1) Machining Equipment (Sub Contractor)

7. Fabrication Equipment

Page 15: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ Laser Cutting (Capacity-16T)

■ CNC Plasma Cutting (Capacity-80T)

2) Machining Equipment (Sub Contractor)

7. Fabrication Equipment

Page 16: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ Bending(Capacity-20T)

■ Rolling (Capacity-180T)

2) Machining Equipment (Sub Contractor)

7. Fabrication Equipment

Page 17: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

1 Offshore Facility Concept

8. Core Products (1)

■ Production Facility

Page 18: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ MODULE

8. Core Products (1)

■ FPSO : Floating Production Storage and Offloading

Page 19: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

FPSO Onerosa Membrane SeparexModule

PROJECT

UOP, A Honeywell Company

CLIENT

14,060Wx18,600Lx18,200H –580 Ton

2 Set

Size

2014.10.06 ~ 2015.12.20

Delivery

10. Latest Experience(6)

Page 20: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ Deck Part Fabrication

8. Module Process

Page 21: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ Welding

8. Module Process

Page 22: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ Painting

8. Module Process

Page 23: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ Deck To Deck Erection (1Deck + 2Deck)

8. Module Process

Page 24: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ Pippe Spool Fabrication & Paint

8. Module Process

Page 25: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ Pipe Spool Election

8. Module Process

Page 26: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ Assembly

8. Module Process

Page 27: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

2 Chemical Equipment

8. Core Products (2)

■ Pressure Vessel

Page 28: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

2 Chemical Equipment

8. Core Products (2)

■ Heat Exchanger

Page 29: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

8. Heat Exchanger Process

■ Bundle Assembly

Page 30: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

8. Heat Exchanger Process

■ Shell Welding & Grinder

Page 31: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

8. Heat Exchanger Process

■ Stacking ■ Bundle Insert

Page 32: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

8. Heat Exchanger Process

■ Leak Test ■ Hydro Test

Page 33: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ PIPE-Spool

1 Plant

8. Products (1)

Page 34: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

■ Steel Structure

2 Plant

8. Products (2)

Page 35: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

3 Railway Vehicles

8. Products (3)

■ Oil Tank Freight Car ■ Gondola Car

Page 36: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

4 Railway Vehicles

8. Products (4)

■ Bulk Cement Tank Car ■ Box Car

Page 37: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

9. Major Experience

Client Item Weight(Ton) Amount ($)

SK Engineering & Construction Yanbu Export Refinery Project (YERP) 1,567 Ton 16,109,345

UOP L.L.C Taneco CCR Project-Regeneration 400 Ton 4,112,149

Hyundai OIL Bank HDO #2 HOU Project 340 Ton 3,495,327

Client Item Weight(Ton) Amount ($)

CB & I Construction,INC Cartagena Refinery Expansion Project 520 Ton 5,345,794

Abu DhabiI OIL Refinery Company Ruwais Refinery Expansion Project(RRE) 2,535 Ton 26,060,747

Chevron Austrailia.Ltd Gorgon Project-Barrow Island LNG Plant 304 Ton 3,125,233

1 Tower

2 Vessel

Page 38: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

Client Item Weight(Ton) Amount ($)

POSCO WBF Furnace Fule & Stack ,Hot Air Duct 339 Ton 3,485,046

POSCO Looping Tower Steel Structure For POSCO Kwangyang 208 Ton 2,138,317

POSCO SAE-A Steel Roller Table/Casing Bow 168 Ton 1,727,102

Client Item Weight(Ton) Amount ($)

Abu DhabiI OIL Refinery Company Ruwais Refinery Expansion Project (RRE) 1,754 Ton 18,031,775

BP Product North America,INC Naphtha Integrity Project 311 Ton 3,197,196

Indian OIL Co.Ltd Paradip Refinery Project 225 Ton 2,313,084

4 Steel Structure

3 Heat Exchanger

9. Major Experience

Page 39: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

NO CLIENT TITLEWEIGHT

(Ton)MATERIAL REMARK Amount ($)

1 UOP LLC Tower 25 SA240-316H 2001.05~ 257,009

2 S-OIL Column 205 SA516-70 2001.07~ 2,107,476

3 Hyundai Oil Bank Hopper 376 SA516-70N 2002.04~ 3,865,420

4 N.I.O.C Pars Oil And Gas Separator 18 SA516-70 2002.08~ 185,046

5 Gasco Separator 82 851501-224GR4908 2003.08~ 842,990

6 CB&I Construction.INC Vessel 904 SA516-65N 2003.09~ 9,293,457

7 CB&I Construction.INC Stripper 87 SA516-70N 2004.09~ 894,392

8 Takreer Separator 1,478 SA516-70N 2004.10~ 15,194,392

9 Chevron Australia Separator 304 SA516-60N+316L CLAD 2005.10~ 3,125,233

10 Jacops Engineering Group INC. Column 119 SA516-60N+S5 2005.10~ 1,223,364

11 Indian Oil Corporation LTD., Settler 390 SA516-70N 2005.01~ 4,009,345

12 Abu DhabiI OilRefinery Company(RRE) Vessel 1,754 SA516-60N,SA387-11 2006.02~ 18,031,775

10. Latest Experience(1)

Page 40: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

NO CLIENT TITLEWEIGHT

(Ton)MATERIAL REMARK Amount ($)

13 SK Engineering & Construction(BS-132) Vessel 627 SA516-60 2006.06~ 6,445,794

14 Exxon Naftagas LTD., Interceptor 978 SA516-65N+C-275 CLAD 2007.06~ 10,054,205

15 SK innovation(H-PJT) Vessel 251 SA516-70+Hic 2007.10~ 2,580,373

16 Shevron Column 760 SA516-70N+410S CLAD 2007.11~ 7,813,084

17 Shevron Column 761 SA516-70N+410S CLAD 2008.11~ 7,823,364

18 Kuwait Oil Vessel 150 SA516-60N(HIC)+S5 2008.12~ 1,542,056

19 Kuwait Oil Separator 116 SA516-60N+NO6625 CLAD 2008.12~ 1,192,523

20 CB&I Construction.INC Fractionator 28 SA516-70N+HIC-410S CLAD 2008.01~ 287,850

21 Shell Canada Energy Absorber 184 SA516-70N+S5 347 CLAD 2008.02~ 1,891,588

22 SK innovation(H-PJT) H/EX 69 SA516-70 2009.04~ 709,345

23 Yanbu Export Refinery Project (YERP) H/EX 1,649 SA516-70+410S Clad 2009.06~ 16,952,336

24 Jurong Aromatics Corporation Pte.Ltd Tower 630 SA516-70 2009.06~ 6,476,635

10. Latest Experience(2)

Page 41: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

NO CLIENT TITLEWEIGHT

(Ton)MATERIAL REMARK Location

25 Jurong Aromatics Corporation Pte.Ltd H/EX 33 SA516-70 2010.10~ 339,252

26 Shell Canada Energy Vessel 7 SA516-70N+304L CLAD 2010.11~ 71,962

27 Shell Philippines Receiver 7 SA516-70N 2010.01~ 71,962

28 Shell US Gas & Power LCC Contactor 57 SA516-70N 2011.02~ 585,981

29 Shell US Gas & Power LCC Separator 18 SA516-70N 2011.11~ 185,046

30 Shell US Gas & Power LCC Separator 28 SA516-70N+321 S,S CLAD 2011.11~ 287,850

31 Shell US Gas & Power LCC Regenerator 31 SA240-304L 2012.12~ 318,691

32 Shell US Gas & Power LCC Heat Exchanger 8 SA516-70N 2012.12~ 82,242

33 Shell US Gas & Power LCC Heat Exchanger 3 SA516-70N 2012.12~ 30,841

34 UOP LLC Vessel 103 SA516-70N 2014.04~ 1,058,878

35 UOP LLC(LR2 Refinery Project) Adsorbers 104 SA516-70N 2014.06~ 1,069,158

36 Chiyoda Philippines Corporation Vessel 48 SA516-70N 2014.07~ 493,457

10. Latest Experience(3)

Page 42: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

NO CLIENT TITLEWEIGHT

(Ton)MATERIAL REMARK Amount ($)

37 Chiyoda Philippines Corporation Tower 41.5 SA516-70N 2014.07~ 426,635

38 Chiyoda Philippines Corporation Heat Exchanger 13.6 SA516-60N 2014.07~ 139,813

39 SHELL CANADA ENERGY Heat Exchanger 419 SA516-70N 2014.07~ 4,307,476

40 FOSTER WHEELER Vessel 41 SA516-70N 2014.09~ 421,495

41 Jacobs Nederland Tower 237 SA516-70N 2014.10~ 2,436,448

42 UOP, A Honeywell Company Module 1,160 A572-50 2014.10~ 11,925,233

43 JGC CORPORATION Tower 34 SA-516-70N+304L 2014.11~ 349,532

44 Jacobs Nederland Heat Exchanger 16 SA516-70N 2014.12~ 164,485

45 SHELL CANADA ENERGY Heat Exchanger 90 SA516-70N 2015.02~ 925,233

46 SHELL CANADA ENERGY Vessel 102 SA516-70N 2015.02~ 1,048,598

47 JACOBS Tower 25 SA-516-70N,SA-516-70N+304L 2015.05~ 257,009

48 JACOBS Vessel 41 SA516-70N 2015.05~ 421,495

10. Latest Experience(4)

Page 43: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

NO CLIENT TITLEWEIGHT

(Ton)MATERIAL REMARK Amount ($)

49 JACOBS Vessel 35 SA516-70N(HIC) 2015.05~ 359,813

50 JACOBS Vessel 24 SA516-70N 2015.05~ 246,728

51 Hyundai Chemical Heat Exchanger 301 SA516-60 2015.08~ 3,094,392

52 HAN JU Condensor 22 SS400 2015.08~ 226,168

53 I.T.T Spa(KARBALA PJT) STACK 252 SA36 2015.11~ 2,590,654

10. Latest Experience(5)

Page 44: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

12. Factory Summary

FactoryName. Address Indoor

(㎡)Out Door

(㎡)Total(㎡) Main Product

Factory #1.~ Ulsan, South Korea

5,200 3,600 8,800Heat Exchanger,Pressure Vessel,Reactor

Factory #2.~ Ulsan, South Korea

45,000 45,000 Module,Spool

Factory #3.~ Ulsan, South Korea 7,600 4,400 12,000

Heat Exchanger,Pressure Vessel,Reactor

Factory #4.~ Ulsan, South Korea 1,600 4,000 5,600 Paint

Total 59,400 12,000 71,400

Page 45: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

12. Company Lay out

■ Factory #1.

Page 46: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

12. Company Lay out

■ Factory #1.

Factory #1.~ Ulsan, South Korea

5,200 3,600 8,800Heat Exchanger,Pressure Vessel,Reactor

Factory Name. Address Indoor(㎡) Out Door(㎡) Total(㎡) Main Product

Page 47: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

12. Sub Company Lay out

Factory #2.~ Ulsan, South Korea

4,500 4,500 Module,Spool

FactoryName.

Address Indoor(㎡) Out Door(㎡) Total(㎡) Main Product

■ Factory #2.

Page 48: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

12. Factory Summary

Factory #3.~ Ulsan, South Korea

7,600 4,400 12,000Heat Exchanger,Pressure Vessel,Reactor

FactoryName.

Address Indoor(㎡) Out Door(㎡) Total(㎡) Main Product

■ Factory #3.

Page 49: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

12. Sub Company Lay out

Factory #4.~ Ulsan, South Korea

1,600 4,000 5,600 Paint

FactoryName.

Address Indoor(㎡) Out Door(㎡) Total(㎡) Main Product

■ Factory #4.

Page 50: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

FPSO Onerosa Membrane SeparexModule

PROJECT

UOP, A Honeywell Company

CLIENT

14,060Wx18,600Lx18,200H –580 Ton

2 Set

Size

2014.10.06 ~ 2015.12.20

Delivery

10. Latest Experience(7)

Page 51: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

11. Location

#12, Hwasan 2Gil, Onsan-Eup, Ulju-Gun, Ulsan, South Korea

SHMT

Page 52: Home Page : · PDF file · 2015-12-03PIM, ITP, SPEC,Drawing. PIM, ITP, SPEC,Drawing Inspection & Test. NO. NO-Re Work. NO. 5. 2014 Construction Expenses. 4,485,981 $ NO Part Amount

THANK YOU

Home Page : http://www.shmt.co.kr