Introducción: Resúmen y Recapitulación
Lo que escuchamos
Recursos monetarios
Opciones de diseño para el vecindario
Reubicación
Próximos Pasos
Discusión
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 3/40
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 4/40
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 5/40
Previous work has fallen short of realization.
There is a need to hone in on strategies thatare immediately implementable.
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 6/40
Redevelopment can and should leverage other
revitalization efforts in the area. Getting LymanTerrace right will unlock potential for CenterCity Holyoke.
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 7/40
Units are small, but unit size not a highpriority concern for residents.
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 8/40
Parking for residents and area businesses isan issue.
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 9/40
• Information compiled over 3 days (February 7, 12
and 16)• Teams of interviewers from Casa Latina went door
to door• Interviewers went back again if residents were not
available• A printed copy was left in the mailbox after the
second visit• Over 55% of the residents responded to the survey
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 10/40
96% of respondents chose Kitchens and Bathrooms astheir first or second priority.
56% chose mechanical Systems (heat and hot water)to be improved.
84% of respondents chose Windows, Roof and Doorsas their first or second priority.
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 11/40
79% of respondents indicated playground or toddlerareas as first and second priority.
10% of the households indicated need for
accommodation such as a ramp or accessiblebathroom
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 12/40
Issues raised: response time to maintenance calls,the quality of repairs and communication betweenmanagement and the tenants.
53% thought that the neighborhood was safe orsomewhat safe, whereas 44% thought that theneighborhood was unsafe. Stronger policepresence was requested.
In order of priority: Playground, basketball court,laundry facilities, community building, communitygarden
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 13/40
All of the ideas listed to sustain children andfamilies were supported by more than 50% ofrespondents. The programs most supported were:
- Drug prevention programs- Job Training/Education programs
- After School programs- Domestic Violence programs- Summer programs- Youth Leadership programs
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 14/40
Just over a third of respondents indicated need fora bigger pharmacy and more groceries and stores.
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 15/40
77% of respondents said that they would belikely or very likely to return to Lyman Terraceif the property was rehabilitated.
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 16/40
• Very competitive resourceslike Choice Neighborhoods or9% LIHTCs unlikely to beawarded
(previous HUD applicationswere not successful)
• Long and uncertain timelinefor work to begin
• Less expensive option with morepotential resources available (ex.
historic tax credits)
• Could begin as soon as
resources are assembled
(2014)
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 17/40
• Very competitive resources
like Choice Neighborhoods or9% LIHTCs unlikely to beawarded
(previous HUD applicationswere not successful)
• Long and uncertain timeline
for work to begin
• Less expensive option with morepotential resources available (ex.
historic tax credits)
• Could begin as soon as
resources are assembled
(2014)
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 18/40
•
•
– Operating Resources• Project-based Sec. 8• Other operating subsidy through ACC or RAD
– Capital resources
• Tax exempt financing and 4% Low Income Housing Tax Credits (LIHTC)• Historic Tax Credits• MassWorks infrastructure funding• State Bond soft subsidy• City and HHA funds
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 19/40
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 20/40
CommunityProgram
CommunityProgram
CommunityProgram
$18,687,261 Est. Cost Total
55 units
$ 120,563 per unit
Objectives
• New building systems,
kitchen and bathroomfixtures, equipment, andmillwork
• New flooring, windows,and brick repointing asnecessary
• No ADA upgrades
• New community orientedprogram
• 155 units
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 21/40
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 22/40
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 23/40
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 24/40
CommunityProgram
Objectives
• Strong urban design to
integrate Lyman Terraceinto the neighborhood
• Minor, selectivedemolition to enhanceopen space.
• New CommunityProgram
• 135 units.
• 27 of which are larger,ADA accessibile.
CommunityProgram
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 25/40
Parkspace and Playground
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 26/40
Recreation Space
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 27/40
Community Gardens
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 28/40
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 29/40
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 30/40
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 31/40
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 32/40
New Street
NewCommunity
Building
Objectives
• Strong urban design to
integrate Lyman Terraceinto the neighborhood
• Minor, selectivedemolition to enhanceopen space.
• New CommunityProgram
• 135 units.
• 27 of which are larger,ADA accessibile.
• New street through thedevelopment.
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 33/40
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 34/40
• Conceptual designsresponds to residents
desires and financialrealities.
• Could result in reduction inunits.
• Will result in needing todevelop strategy formoving residents duringconstruction
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 35/40
•
•
•
•
•
•
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 36/40
All residents residing in buildings being removed will be relocated to permanent off-sitelocations. All residents who reside in buildings being rehabbed during phase 1 will betemporarily relocated to either off-site locations or existing HHA units
Once rehab is completed on the phase 1 units, residents residing in phase 2 units will bepermanently relocated into the newly rehabbed phase 1 units. Construction will begin onphase 2 units.
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 37/40
Once rehab is completed on the phase 2 units, residents residing in phase 3 units will be
permanently relocated into the newly rehabbed phase 2 units. Construction will begin onphase 3 units.
Once rehab is completed on phase 3 units all phase 1 residents will be permanentlyrelocated back to Lyman Terrace into the phase 3 units.
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 38/40
All Lyman Terrace residents are eligible for relocation benefits including:
Relocation CounselingMoving Expenses- Two options• Payment for your actual reasonable moving and related expenses, or• Fixed Moving Expense and Dislocation Allowance
Housing Search Assistance
7/29/2019 Holyoke Community Meeting 3-11-13 Presentation Final
http://slidepdf.com/reader/full/holyoke-community-meeting-3-11-13-presentation-final 39/40
Lyman Terrace residents will be eligible for relocation benefits once you receive written notice
explaining your eligibility for relocation assistance.
If a tenant relocates before the notice is issued they will not be eligible for relocationassistance.