hipssa cost model training workshop: sessions 17-18: using the itu training model as a basis to...

11
HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region 1 FORMATION NIVEAU EXPERT EN MODELISATION DES COUTS DES RESEAUX TELECOMS POUR LES REGIONS HIPSSA Dakar 27 au 31 Mai 2013 Abdelmounaim EL HAFFAF Alain SAWADOGO Experts UIT

Upload: goddard-mayer

Post on 04-Apr-2015

113 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA

HIPSSA Cost model training workshop:

Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region

1

FORMATION NIVEAU EXPERT ENMODELISATION DES COUTS DES

RESEAUX TELECOMSPOUR LES REGIONS HIPSSA

Dakar

27 au 31 Mai 2013

Abdelmounaim EL HAFFAF

Alain SAWADOGO

Experts UIT

Page 2: HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA

HIPSSA Cost model training workshop:

Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region

Sessions 17/18:Usage du modèle UIT comme base pour l’estimation des

coûts pour les pays membres de la région HIPSSA

2

Page 3: HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA

HIPSSA Cost model training workshop:

Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region

3

Agenda

Décrire la

tâche

Expliquer ce

qui est deman

Travailler en

groupes

Présenter et

discuter les

résultats

Objectifs de ces sessions

Session 17 Session 18

Page 4: HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA

HIPSSA Cost model training workshop:

Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region

Contexte de l’exercice

Les autres exercices étaient purement hypothétiques; Celui-ci est plus proche de la réalité.

L’objectif est d’essayer de manipuler le modèle UIT et de l’adapter au contexte de votre pays.

Pour cela, il vous faut: Former des groupes de travail relevant du même pays, ou Apprendre des leçons en faisant membre d’un groupe

relevant d’un pays différent du votre.

4

Notez bien qu’il s’agit uniquement d’un modèle de classe – Le modèle ne doit pas être utilisé pour des

propos commerciaux (voir“Notice”)

Page 5: HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA

HIPSSA Cost model training workshop:

Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region

Le modèle CMILT UIT pour le mobile Telco

5

Key CellsSummary Sheets Direct input into the modelInput Sheets Inputs copied from other worksheetsCalculation sheets Calculation cells

Output cells copied to other worksheets

9. LRIC2. Traffic

1.Coverage

8. Routing factors

11. LRIC+

10. Mark-ups

7. Network costing

6. Network design

3. Network design parameters

4. CAPEX and Direct OPEX

A. Model Design

B. Control Panel

C. Reference Lists

5. Indirect OPEX

D. Reconciliation

E. Graphs

Page 6: HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA

HIPSSA Cost model training workshop:

Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region

Approche pour l’édition du modèle

Changer seulement les cellules en jaune

S’il y a un doute, ne

changer rien

Sauvegardez des versions à chaque fois

que vous faites des

changements

6

Page 7: HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA

HIPSSA Cost model training workshop:

Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region

Les champs que vous pouvez changez- 1

B. Control Panel: sensitivity values in B2

C. Reference Lists: provinces, years, currency

1. Subscribers and coverage: Coverage in 1.01 Subscribers and market share in 1.02

2. Traffic: Traffic volumes of specific operator in 2.01 Average non-billed traffic factors (2.02) and split by geo-

type (2.06)

7

The red text highlights the areas that must be changed

Page 8: HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA

HIPSSA Cost model training workshop:

Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region

Les champs que vous pouvez changez- - 2 3. Network design parameters:

3.01 radio network parameters 3.02 BTS cell radii 3.04 -3.07 BTS parameters; Network design capacity;

Transmission parameters; Routing factors

4. Capex and Direct Opex: 4.01 network equipment capex and opex 4.02 and 4.03 transmission costs 4.04 Licence fees

5. Indirect opex 5.01 Telco actuals 5.04 Interconnection charges

8

The red text highlights the areas that must be changed

Page 9: HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA

HIPSSA Cost model training workshop:

Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region

Approche suggérée

1. Changer ce qui se rapporte au contexte de votre pays: Marquer les données changées (couleur différente) et

sauvegarder le modèle.

2. Chercher des données online (exemple: régions, population, nombre d’abonnés) Encore une fois, marquer les données changées (couleur

différente) et sauvegarder le modèle modèle.

3. Estimer au mieux les valeurs de données manquantes (exemple: couverture basée sur la supérficie du pays; changer la valeur du trafic par rapport au nombre d’abonnés) Encore une fois, marquer les données changées Utiliser une autre couleur pour les données qui doivent être

confirmées à postériori.

9

Page 10: HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA

HIPSSA Cost model training workshop:

Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region

Proposition d’outputs

Lorsque vous terminez une version satisfaisante du modèle, préparer une courte présentation pour le groupe

Inclure ce qui suit: Les changements apportés au modèle UIT Un draft des résultats – comparer les résultats en fonction

des coûts actuels des tarifs de terminaison mobile pour chaque opérateur de téléphonie mobile.

A quel point êtes-vous confiant par rapport aux résultats du modèle de coûts– tester la sensibilité de vos hypothèses.

Quelles sont les données que vous souhaitez vérifier avec les opérateurs.

10

Page 11: HIPSSA Cost model training workshop: Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA

HIPSSA Cost model training workshop:

Sessions 17-18: Using the ITU training model as a basis to develop cost estimates for member states in the HIPSSA region

Travail de groupe et présentations

11