Himachal Pradesh State Electricity Board Ltd
Notice Inviting Tenders
Sealed item rate tenders are hereby invited on behalf of Chairman cum Managing Director HPSEBL from the approved contractors of appropriate classes registered with HPSEBL HPPWD and HOUSING BOARD for Electrical works for execution of following work The tenders shall be received on prescribed forms clearly super scribed with Tender No and date of opening together with earnest money in shape of cash or demand draft payable at Shimla in favour of Sr Executive Engineer Shimla Electrical Division No II HPSEBL Shimla-9 on the stipulated date and time and shall be opened in the presence of the contractors or their authorized representatives who may wish to be present Tender documents can be had from this office against payment of 5001-( Rs Five Hundred) only in shape of cash or demand draft payable at Shimla in favour of Sr Executive Engineer Shimla Electrical Division NoII HPSEBL Shimla-9 The detailed terms amp conditions can be seen in the HPSEB Ltd website at wwwhpsebcom
S No
Name of work NIT Amount
Earnest Money
Time Sale of tender document
Received of tender
Opening of tender
1 Name of work - SOP to Tube Well stage_2nd
Mehli Pujarli under Electrical section Panthaghati under Electrical Division NoII Shimla Sub-Head - Erection testing and commissioning of 1lO4KV 63KVA SIStn Clo HT Line and Clo LT Line complete the job in all respect
RsS4S120middot only
Rs136501
middotonly Two months
1000AMto 400PM on working days wef 241013 to 28102013
Up to 1230PM on 281013
At 300PM on 28102013
(Er Rum I Singh) I
Sr Execu ive Engineer Shimla Elect Division No II HPSEB Ltd ~imla-171009
o177-262cM2
TERMS AND CONDITIONS
1 The quantities can be increaseddecreased as per site condition and no claim on this account shall be entertained
2 All general terms and conditions mentioned in HPPWD- 78 Form shall be applicable in Toto 3 Earnest money in the shape of cash or bank draft of local bank in the favour of Sr Executive Engineer
Shimla Elect Divn NoII HPSEB Shimla-9 will be accepted otherwise the tender is liable to be rejected 4 Tender form shall be issued on the presentation of proof of enlistment as contractor as described above 5 Telegraphic or conditional tender or tender without earnest money wi) I not be considered and shall be
rejected out rightly
6 Detailed NITdrawingspecifications can be seen in the office of undersigned on any working day after 24lO2013
7 The undersigned reserve the right to reject any or all the tenders without assigning any reason thereof 8 The income tax clearance certificate PAN No amp GSTCST No has to be produced before purchase of
tender document
9 The contractor shall follow the main provisions of Interstate Migrant Workman (RE amp CS) ACT 1970 Payment of wages Act 1936 amp Minimum wages Act 1948
lO The contractor shall fully responsible in case of any accident happened all precautionary measures taken by the contractor to the labour worker at the site of work and no claim on this account shall be entertained by the department
11 The site may be visited before quoting the rates leads and lifts may be verified to avoid any dispute in future
12 The rates should be quoted for all leads and I ifts nothing extra will be paid on this account 13 The rates for all items of work shall unless clearly specified otherwise include cost of all Labour
materials and other inputs involved in the execution of the item 14 The work will be strictly got executed as per HPPWD specifications 15 T ampP required for execution of work will have to be provided by the contractor nothing extra will be
paid on this account 16 All the dispute if any arises will only be settled in the jurisdiction of courts at Shimla 17 At least 70 employment shall be given to bonafide Himachlis by the c( ntractors executing the work 18 The payment of royalty on the works executed through contractors will be deducted from their bills as per
rates notified by the Director Industry HP from time to time
19 Legal Contract The contractorsupplier shall execute a legal contract in duplicate on the judicial stamp paper worth Rs3-(Rs three) charges are to be borne by the supplierContractor with in seven days after receipt of this communication
20 Payments 100 payment shall be made after execution of Contract in full and good condition and completion certificate by the concerned AE
21 Quality of Material All material manufacturedsupplied shall be of the best quality as per standard IS
Specifications and made well furnished (smooth and true form and dimensions) The firm must inspect the site of work to assess the space where the work is to be carried out
23 Warranty The company shall be responsible make guarantee to replace free of cost with no transportation and insurance expenses to the purchaser up to destination of material which under normal and proper use and Mtc proves defective in material or workmanship within 12 months from the date it is completed
The above provision shall also equally apply to the material replaced repaired by the company under this column in case the same is again found to be defective within 12 months of its replacementrepair
24 Electricity Rules All work shall confirm to the rules in force under the Indian electricity supply acts
any other applicable legislation 25 Engineer -In-Charge
The Assistant Engineer Electrical Sub-Division HPSEBL Kasumpti under Sr Executive Engineer Shimla Electrical Division No II HPSEBL Shimla-9 shall be the Engineer -in-charge for the execution of the above work
TERMS AND CONDITIONS
1 The quantities can be increaseddecreased as per site condition and no claim on this account shall be entertained
2 All general terms and conditions mentioned in HPPWD- 78 Form shall be applicable in Toto 3 Earnest money in the shape of cash or bank draft of local bank in the favour of Sr Executive Engineer
Shimla Elect Divn NoII HPSEB Shimla-9 will be accepted otherwise the tender is liable to be rejected 4 Tender form shall be issued on the presentation of proof of enlistment as contractor as described above 5 Telegraphic or conditional tender or tender without earnest money wi) I not be considered and shall be
rejected out rightly
6 Detailed NITdrawingspecifications can be seen in the office of undersigned on any working day after 24lO2013
7 The undersigned reserve the right to reject any or all the tenders without assigning any reason thereof 8 The income tax clearance certificate PAN No amp GSTCST No has to be produced before purchase of
tender document
9 The contractor shall follow the main provisions of Interstate Migrant Workman (RE amp CS) ACT 1970 Payment of wages Act 1936 amp Minimum wages Act 1948
lO The contractor shall fully responsible in case of any accident happened all precautionary measures taken by the contractor to the labour worker at the site of work and no claim on this account shall be entertained by the department
11 The site may be visited before quoting the rates leads and lifts may be verified to avoid any dispute in future
12 The rates should be quoted for all leads and I ifts nothing extra will be paid on this account 13 The rates for all items of work shall unless clearly specified otherwise include cost of all Labour
materials and other inputs involved in the execution of the item 14 The work will be strictly got executed as per HPPWD specifications 15 T ampP required for execution of work will have to be provided by the contractor nothing extra will be
paid on this account 16 All the dispute if any arises will only be settled in the jurisdiction of courts at Shimla 17 At least 70 employment shall be given to bonafide Himachlis by the c( ntractors executing the work 18 The payment of royalty on the works executed through contractors will be deducted from their bills as per
rates notified by the Director Industry HP from time to time
19 Legal Contract The contractorsupplier shall execute a legal contract in duplicate on the judicial stamp paper worth Rs3-(Rs three) charges are to be borne by the supplierContractor with in seven days after receipt of this communication
20 Payments 100 payment shall be made after execution of Contract in full and good condition and completion certificate by the concerned AE
21 Quality of Material All material manufacturedsupplied shall be of the best quality as per standard IS
Specifications and made well furnished (smooth and true form and dimensions) The firm must inspect the site of work to assess the space where the work is to be carried out
23 Warranty The company shall be responsible make guarantee to replace free of cost with no transportation and insurance expenses to the purchaser up to destination of material which under normal and proper use and Mtc proves defective in material or workmanship within 12 months from the date it is completed
The above provision shall also equally apply to the material replaced repaired by the company under this column in case the same is again found to be defective within 12 months of its replacementrepair
24 Electricity Rules All work shall confirm to the rules in force under the Indian electricity supply acts
any other applicable legislation 25 Engineer -In-Charge
The Assistant Engineer Electrical Sub-Division HPSEBL Kasumpti under Sr Executive Engineer Shimla Electrical Division No II HPSEBL Shimla-9 shall be the Engineer -in-charge for the execution of the above work