highways agencyassets.highways.gov.uk/...documents-memorandum-of... · sector organisations under...
TRANSCRIPT
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Memorandum of Understanding between the
HIGHWAYS AGENCY and
THE BRITISH LAND COMPANY PLC
Memorandum of UnderstandingBritish Land - highways agency
July 2008
1 Introduction1.1 This Memorandum of Understanding (“MOU”) is between the Highways Agency,
an executive agency of the Department of Transport (the “Agency”) of 123 Buckingham Palace Road, London SW1W 9HA and The British Land Company PLC (company number 00621920) (“BL”) of York House, 45 Seymour Street, London W1H 7LX.
1.2 The purpose of this MOU is to establish a framework for the ongoing relationship between the Agency and BL in promoting development.
1.3 This MOU has been prepared because of the parties’ mutual desire to develop a working relationship that will create a strong understanding of the way in which the Agency and BL will work together and the way in which they can co-operate to promote sustainable development and regeneration whilst furthering best practice in sustainable transport and travel patterns.
2 Background2.1 The Agency is responsible for operating, maintaining and improving the strategic
road network (i.e. Motorways and Trunk Roads) in England on behalf of the Secretary of State for Transport. The Agency facilitates safe and reliable long distance journeys on strategic national routes by managing the traffic using England’s roads as well as administering the network as a public asset.
2.2 The Agency’s organisational structure is depicted in Annex 1. The vision, aims and objectives of the Agency are summarised in Annex 2.
2.3 BL is a property investment company which creates value by actively managing, financing and developing prime commercial property to provide the environment in which modern business can thrive.
Memorandum of Understanding between the
HIGHWAYS AGENCY and
THE BRITISH LAND COMPANY PLC
Memorandum of UnderstandingBritish Land - highways agency
July 2008
2.4 BL recognises that the commercial property industry, which accounts for a major part of the built environment, has a special position of influence and responsibility in advancing the cause of sustainability. BL has published a Sustainability Brief as a way of delivering sustainable development. The Sustainability Brief is applied to all new developments and:
(a) guides design, construction and the management of all BL buildings;
(b) supports the planning system - the main mechanism to implement government policies (including PPG13 and Circular 02/2007 ‘Planning and the Strategic Road Network’ (the “Highways Circular”)) and strategies on sustainable development; and
(c) meets market demand for sustainable development.
2.5 BL and the Agency share an objective to promote good development and regeneration which contributes to Government policy objectives to deliver economic growth, promote social inclusion and support environmental goals. A key element of this objective is to promote efficient and effective sustainable transport in the design of new development and to encourage sustainable travel patterns amongst its occupiers.
2.6 BL already has travel plans for many of its properties. BL recognises that by encouraging people to minimise travel and to use sustainable transport it can reduce emissions and make it easier for occupiers, local people and other visitors to travel to and from BL properties.
2.7 BL’s organisational structure is depicted in Annex 3. The corporate strategy of BL is summarised in Annex 4.
3 Purpose and Scope3.1 This document seeks to provide a partnership framework for BL and the Agency.
It includes short-term objectives and proposes other areas of joint interest for BL and the Agency in the longer term.
3.2 It is recognised by both parties that nothing in this MOU shall affect the statutory duties or responsibilities of either party.
3.3 This MOU does not commit either party to the allocation of funds or other resources although both parties will use their reasonable endeavours to deliver against the agreed work areas covered by the schedule(s) subject to their other duties and the financial framework in which they operate.
Memorandum of UnderstandingBritish Land - highways agency
July 2008
3.4 This MOU:
(a) defines service level agreements for BL and the Agency to work together on the promotion of development through the national planning system and the consideration and implementation of developments;
(b) guides the parties to work in partnership with local authorities and transport authorities;
(c) establishes a framework for BL and the Agency to promote best practice in transport and travel planning, traffic management and regeneration; and
(d) identifies policy areas appropriate for BL and Agency collaboration and development and establishes consultation protocols.
3.5 This MOU is not intended by either party to be legally binding.
3.6 The MOU will be reviewed at least annually by both parties and may include meetings to discuss each party’s views and proposals for improvements.
4 Aims of Joint Working between BL and the Agency4.1 BL and the Agency recognise that by joint working they can seek to:
(a) develop a structured working relationship to enable them to understand, in more depth, the issues each face and to provide a framework to manage and resolve them;
(b) develop policies and procedures for discussion and collaboration on BL’s major planning proposals;
(c) develop areas of mutual interest and further areas for joint working;
(d) establish short and long-term actions shared by BL and the Agency; and
(e) promote sustainable regeneration and sustainable development.
5 Joint Working and Actions5.1 BL and the Agency agree to collaborate on planning applications following the
guidelines in Annex 5 and complete the project pro forma guideline document in Annex 6 which will guide all Project planning applications and master plans.
5.2 BL and the Agency have identified topics of mutual interest in Annex 7 which both parties will develop.
5.3 BL and the Agency agree to commence and develop the short and long-term actions identified in Annex 8.
Memorandum of UnderstandingBritish Land - highways agency
July 2008
5.4 BL and the Agency acknowledge and agree that this MOU shall in no way limit their ability or right to disagree with the other party, or third parties, with respect to any matter, including, but not limited to, technical interpretation of the planning system and safety requirements.
6 Confidentiality Provisions6.1 Either party may request that commercially confidential information provided in
connection with this MOU should not be disclosed to external third parties or the public. If a party advises the other party that any information that has been provided is confidential, the disclosure of that confidential information by the recipient without prior consent will constitute an actionable breach of confidence.
6.2 Any information regarded by either party as commercially confidential by either party should be provided separately, so as not to inhibit the disclosure of other information.
6.3 Any information regarded as commercially confidential should remain confidential only as long as necessary, so that after an agreed period it can also be released.
6.4 It is noted that any person has the right to request information held by public sector organisations under the Freedom of Information Act 2000, which came into force in January 2005. The Freedom of Information Act gives everyone the right to ask any public body for all the information they have on a subject they choose. Also, unless there is a good reason, the organisation must provide the information within a month.
7 Termination7.1 This MOU can be terminated by either party by notice in writing to the other or
by agreement from both if it ceases to be viable. Both parties will use reasonable endeavours to meet its obligations and to discuss termination should this be desired by either party. Each party should provide a three month notice period to meet/agree on any outstanding issues.
Signed by
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Annex 1: Highways Agency - Organisational Structure
Ginny Clarke
Net
wor
k O
pera
tions
Derek Turner
Maj
or P
roje
cts
Mid
land
s an
dSo
uth
Wes
tR
usse
ll W
allis
Sout
hJo
n G
riffit
hsN
orth
John
Bag
ley
Gro
up F
inan
cial
Con
trolle
rN
ick
Sha
rman
Net
wor
k O
pera
tions
Fina
ncia
l Dire
ctor
Ste
phen
Dau
ncey
Maj
or P
roje
cts
Fina
ncia
l Dire
ctor
Pau
l Will
iam
son
Info
rmat
ion
Stra
tegy
and
Plan
ning
Ric
hard
Will
son
Info
rmat
ion
Serv
ice
Del
iver
yS
imon
She
ldon
-Wils
on
Maj
or P
roje
cts
Fina
nce
Mel Zuydam
Net
wor
k Se
rvic
esIn
form
atio
n
Denise Plumpton
Chi
ef E
xecu
tive'
s O
ffice
Ros
ie O
’Nei
ll
Aud
itB
ob P
arso
ns
Chi
ef E
xecu
tive
Graham Dalton
Andrea Gregory
Tracey Barlow
Non
Exe
cutiv
eD
irect
orN
on E
xecu
tive
Dire
ctor
Non
Exe
cutiv
eD
irect
or
Alex Jablonowski
M25
DB
FOIa
n S
chol
ey
Dev
elop
men
t Div
isio
nM
ary
Gos
den
Nirmal Kotecha
Com
mer
cial
Div
isio
nT
im E
aton
Prog
ram
me
Serv
ices
Gro
up
Jane
t Wilk
inso
n
HR
Ope
ratio
nsM
el N
ash
Prop
erty
and
Fac
ilitie
s M
anag
emen
tP
eter
Gru
en
Org
anis
atio
nal D
evel
opm
ent
Ric
hard
Wha
lley
Com
mun
icat
ions
Gill
Ste
vens
Hum
an R
esou
rce
Serv
ices
Steve Williams
Age
ncy
Tran
sfor
mat
ion
Team
Pau
l Boo
th
Net
wor
k Pl
anni
ng a
ndPe
rfor
man
ceD
avid
Gin
gell
Proc
urem
ent
Dav
id P
oole
Tech
nica
l Ser
vice
sD
erek
Dry
sdal
e
Res
earc
h an
d O
pera
tiona
lG
uida
nce
And
rew
Jon
es
Boa
rd S
ecre
taria
tR
osie
O’N
eill
Nat
iona
l Hea
lth a
nd S
afet
yP
aul M
itche
ll
Net
wor
k O
pera
tions
Wes
t Mid
land
sT
im H
arbo
tSo
uth
Wes
tG
raha
m B
owsk
illSo
uth
East
John
Asp
inal
lN
orth
Wes
tD
ave
Gru
nwel
lYo
rksh
ire a
nd th
e N
orth
Eas
tV
anes
sa G
ilber
tEa
stG
wyn
Dra
keEa
st M
idla
nds
Mik
e W
herr
ett
Net
wor
k O
pera
tions
Cen
tral
Jane
t But
ler
Spec
ial P
roje
cts
Art
hur
Ash
burn
er
Tech
nolo
gyB
ob C
astle
man
An
Exec
utiv
e A
genc
y of
the
Hig
hw
ays
Ag
ency
Bo
ard
Sep
tem
ber
2008
Desig
n &
Publ
icatio
ns G
roup
S08
0253
BUSI
NESS
SER
VICE
S
Stev
e W
illia
ms
BOAR
D DI
RECT
ORLo
ndon
MAJ
OR P
ROJE
CTS
Nirm
al K
otec
haBO
ARD
DIRE
CTOR
Bedf
ord
PROG
RAM
ME
SERV
ICES
GRO
UPCO
MM
ERCI
ALM
P SO
UTH
MP
MID
LAND
S AN
D SO
UTH
WES
TM
P NO
RTH
STRA
TEGY
IM
PLEM
ENTA
TION
Jane
t Wilk
inso
nSe
nior
Man
ager
Bedf
ord
Tim
Eat
onDi
visio
nal D
irecto
rBe
dfor
d
Pete
r Ada
ms
Divis
iona
l Dire
ctor
Dork
ing
Russ
ell W
allis
Divis
iona
l Dire
ctor
Birm
ingh
am
Andr
ew W
atso
nDi
visio
nal D
irecto
rLe
eds
Davi
d Av
ery
Seni
or M
anag
erBe
dfor
d
Sim
on D
iggl
eSu
pply
Chain
&
Deve
lopm
ent
Leed
s
Neil
Owen
Deliv
ery T
eam
Lea
der
Bedf
ord
Iftik
har M
irSe
nior
Man
ager
Bi
rmin
gham
Mar
k Le
eSe
nior
Man
ager
De
velo
pmen
tLe
eds
Rich
ard
Arth
urs
Prop
erty
& La
nds
Com
pens
ation
Bedf
ord
Mar
tin P
otts
Deliv
ery T
eam
Lea
der
Dork
ing
Davi
d Gr
ant
Seni
or M
anag
erBi
rmin
gham
Jere
my
Bloo
mSe
nior
Man
ager
De
velo
pmen
tLe
eds
Nick
Hop
craf
tM
anag
ed M
otor
ways
Birm
ingh
am
Mic
hael
Div
aris
Seni
or M
anag
erBe
dfor
d
John
Bou
rne
Seni
or M
anag
erBi
rmin
gham
Paul
Arn
old
Seni
or M
anag
erDo
rkin
g
Phili
p El
lisSe
nior
Man
ager
Birm
ingh
am
TRAF
FIC
MAN
AGEM
ENT
Sim
on S
held
on-W
ilson
BOAR
D DI
RECT
ORBi
rmin
gham
YORK
SHIR
E AN
D NO
RTH
EAST
NO
RTH
WES
T EA
ST
EAST
MID
LAND
S SO
UTH
WES
T W
EST
MID
LAND
S SO
UTH
EAST
TR
AFFI
C M
ANAG
EMEN
T IN
FORM
ATIO
N &
TR
AINI
NG
OPER
ATIO
NS
SUPP
ORT
&
DEVE
LOPM
ENT
Step
hen
Cham
berla
inRe
gion
al Op
erati
ons
Man
ager
NE
RCC
Cald
er P
ark
Gre
g Ta
ylor
Regi
onal
Oper
ation
sM
anag
er
NW R
CCRo
b La
ne
Jon
Cald
wel
lRe
gion
al Op
erati
ons
Man
ager
Ea
st RC
CSo
uth
Mim
ms
Jam
es L
owth
Regi
onal
Oper
ation
sM
anag
er
EM R
CC, N
ottin
gham
Bu
sines
s Par
k
Pete
Mar
tinRe
gion
al Op
erati
ons
Man
ager
SW
RCC
St. B
rend
an’s
Cour
t
Mel
anie
Cla
rke
Regi
onal
Oper
ation
sM
anag
er
WM
RCC
Quin
ton
Nic
ky P
otts
Regi
onal
Oper
ation
sM
anag
er
SE R
CCGo
dsto
ne
Stev
e Cr
osth
wai
teHe
ad o
f Tra
ffi c M
anag
emen
t In
form
ation
& Tr
ainin
gNT
CCQu
into
n
Davi
d St
ones
Head
of O
pera
tions
Su
ppor
t & D
evelo
pmen
tM
anch
ester
FINA
NCE
SERV
ICES
Step
hen
Daun
cey
BOAR
D DI
RECT
ORLo
ndon
FINA
NCIA
L CO
NTRO
L DI
VISI
ONM
AJOR
PRO
JECT
SNE
TWOR
K DE
LIVE
RY
& D
EVEL
OPM
ENT
FINA
NCE
DIVI
SION
STRA
TEGI
C DI
RECT
ORAT
ES
FINA
NCE
MAN
AGEM
ENT
AUDI
T IN
SPEC
TION
&CO
NSUL
TANC
Y DI
VISI
ONNi
ck S
harm
anGr
oup
Fina
ncial
Con
trolle
rLo
ndon
Doug
Sin
clai
rFi
nanc
e Dire
ctor
Bedf
ord
Paul
Will
iam
son
Fina
nce D
irecto
rBi
rmin
gham
Cliv
e Fi
nch
Fina
ncial
Man
ager
Birm
ingh
am
Bob
Pars
ons
Head
of D
ivisio
nLo
ndon
Robe
rt Gr
eave
sBu
sines
s Sys
tems M
anag
erBi
rmin
gham
Vaca
ncy
Fina
ncial
Con
trolle
rBi
rmin
gham
Grah
am B
urge
ssSe
nior
Fin
ance
Man
ager
Sout
h Ea
stDo
rkin
g
Lisa
Sco
ttCo
rpor
ate G
over
nanc
e &Pe
rform
ance
Man
ager
Lond
on
Stua
rt Ya
tes
NDD
Fina
ncial
Con
trolle
rBi
rmin
gham
HA
SW
ITC
HB
OA
RD
- 08
459
5565
75 H
AIL
(HA
INFO
RM
ATIO
N L
INE)
- 0
300
123
5000
Info
rmat
ion
corr
ect a
t: Ju
ne
2010
Med
ia Se
rvice
s, Do
rkin
g S1
0005
7
Hig
hw
ays
Ag
ency
Org
anis
atio
n C
hart
2010
NETW
ORK
SERV
ICES
Ginn
y Cl
arke
BOAR
D DI
RECT
ORLo
ndon
Davi
d Hu
ghes
Andr
ea G
rego
ryTr
acey
Bar
low
NON
EXEC
UTIV
E DI
RECT
ORS
CHIE
F EX
ECUT
IVE
Grah
am D
alto
nLo
ndon
NETW
ORK
DELI
VERY
& D
EVEL
OPM
ENT
Dere
k Tu
rner
BOAR
D DI
RECT
OR&
Dep
uty
Chie
f Exe
cutiv
eBi
rmin
gham
NETW
ORK
DELI
VERY
&
DEVE
LOPM
ENT
CENT
RAL
YORK
SHIR
E AN
D NO
RTH
EAST
NORT
H W
EST
EAST
EAST
MID
LAND
SW
EST
MID
LAND
SSO
UTH
WES
TSO
UTH
EAST
OLYM
PICS
&
PLAN
NING
REL
ATED
PR
OJEC
TS
TRAF
FIC
TECH
NOLO
GY
Jane
t But
ler
Divis
iona
l Dire
ctor
Birm
ingh
am
Vane
ssa
Gilb
ert
Divis
iona
l Dire
ctor
Leed
s
Davi
d Gr
unw
ell
Divis
iona
l Dire
ctor
Man
ches
ter
Jam
ie C
arr
Divis
iona
l Dire
ctor
Bedf
ord
Mik
e W
ilson
Divis
iona
l Dire
ctor
Birm
ingh
am
Tim
Har
bot
Divis
iona
l Dire
ctor
Birm
ingh
am
Grah
am B
owsk
illDi
visio
nal D
irecto
rBr
istol
Jon
Griffi
ths
Divis
iona
l Dire
ctor
Dork
ing
Gwyn
Dra
keDi
visio
nal D
irecto
rBe
dfor
d
Robe
rt Ca
stle
man
Divis
iona
l Dire
ctor
Dork
ing
Mar
tin H
obbs
Netw
ork M
anag
emen
t Gro
up
Lead
erM
anch
ester
Chris
Hol
ehou
seRe
gion
al Pe
rform
ance
M
anag
erLe
eds
Mat
t Sw
eetin
gRe
gion
al Pe
rform
ance
M
anag
erM
anch
ester
Mik
e W
herr
ett
Regi
onal
Perfo
rman
ce
Man
ager
Bedf
ord
Mar
tin F
ello
ws
Regi
onal
Perfo
rman
ce &
Pl
anni
ng M
anag
erBi
rmin
gham
Stev
e Ed
war
dsRe
gion
al Pe
rform
ance
M
anag
erBi
rmin
gham
Mal
colm
Wilk
inso
nRe
gion
al Pe
rform
ance
M
anag
erBr
istol
Barr
y W
estw
ood
Regi
onal
Perfo
rman
ce
Man
ager
Dork
ing
Robe
rt St
ewar
tNa
tiona
l Deli
very
Gro
upBr
istol
Nige
l Gra
yND
DC D
irecto
rate
Serv
ices
Grou
pDo
rkin
g
Dave
Par
ker
Regi
onal
Plan
ning
M
anag
erLe
eds
Ruth
Moy
niha
nRe
gion
al Pl
anni
ng
Man
ager
Man
ches
ter
Cath
erin
e Br
ooke
sRe
gion
al Pl
anni
ng
Man
ager
Bedf
ord
Andr
ew P
age-
Dove
Man
aged
Mot
orwa
ysTe
am L
eade
rBr
istol
Jenn
y M
oten
Regi
onal
Plan
ning
M
anag
erBi
rmin
gham
Chris
Jon
esRe
gion
al Pl
anni
ng
Man
ager
Brist
ol
Arth
ur N
orto
nRe
gion
al Pl
anni
ng
Man
ager
Dork
ing
Rich
ard
Lane
Traffi
c Te
chno
logy
Re
gion
al De
liver
yLe
eds
Rich
ard
Arro
wsm
ith
NDDC
Pro
gram
me a
nd
Perfo
rman
ce G
roup
Birm
ingh
am
Pete
r Cor
mod
eRe
gion
al DB
FO M
anag
erDo
rkin
g
Gary
Sto
ckbr
idge
Ener
gy P
rojec
t Lea
der
Birm
ingh
am
Patri
ck C
arne
yND
DC C
omm
ercia
l Gr
oup
Birm
ingh
am
Sue
Cant
illon
Regi
onal
Busin
ess
Man
ager
Dork
ing
HR D
IREC
TOR
HR P
ROJE
CTS
ORGA
NISA
TION
AL
DEVE
LOPM
ENT
COM
MUN
ICAT
IONS
CUST
OMER
RE
LATI
ONS
GROU
PIC
T SO
LUTI
ONS
STRA
TEGY
&
PLAN
NING
DIV
ISIO
NPR
OPER
TY
& F
ACIL
ITIE
S M
ANAG
EMEN
T
LEAR
NING
CHA
NGE
PROJ
ECTS
Andr
ew P
owle
sHR
Dire
ctor
Birm
ingh
am
Mel
Nas
hHe
ad o
f HR
Proj
ects
Lond
on
Rich
ard
Wha
lley
Head
of O
rgan
isatio
nal
Deve
lopm
ent
Man
ches
ter
Gill
Stev
ens
Head
of C
omm
unica
tions
Lo
ndon
Chris
McM
anus
Head
of C
usto
mer
Re
latio
ns, B
edfo
rd
Chris
Pric
eHe
ad o
f ICT
Sol
utio
ns
Birm
ingh
am
Rich
ard
Will
son
Divis
iona
l Dire
ctor
Birm
ingh
am
Pete
r Gru
enHe
ad o
f PFM
Le
eds
Sue
Broo
kes
Head
of L
earn
ing
Chan
ge
Proj
ects
Bedf
ord
Step
hen
Amor
Rewa
rd/H
R Po
licy
Birm
ingh
am
Nige
l Bal
ders
ton
Recr
uitm
ent
Leed
s
Lind
a Ai
nsbu
ryLe
arni
ng &
Dev
elopm
ent
Birm
ingh
am
Amel
ia Y
eoda
lNe
ws an
d PR
Lond
on
Jill
Will
iam
sCu
stom
er In
sight
&
Evalu
ation
Birm
ingh
am
Vinc
e Je
rris
onHe
ad o
f Int
erna
l Ser
vice
Deliv
ery
Leed
s
Kevi
n Da
vies
Head
Stra
tegy &
Pol
icyBi
rmin
gham
Tony
Grif
fi ths
Secu
rity a
nd
Susta
inab
ility
Leed
s
Nata
sha
Harr
isHR
Bus
ines
s Par
tner
sBi
rmin
gham
Glyn
is C
oles
byNe
xt Ge
nera
tion
HRBi
rmin
gham
Gary
Elfl
ett
Reso
urce
Plan
ning
Leed
s/M
anch
ster
Jon
Moo
reIn
terna
l com
mun
icatio
nsLo
ndon
Stua
rt Pa
rrM
edia
Serv
ices
Leed
s
Les
Robi
nson
Seni
or P
rojec
t Man
ager
Deve
lopm
ent
Leed
s
Larr
y So
uth
Head
of G
over
nanc
e Gro
upBi
rmin
gham
Jeff
Mor
gan
Estat
esLe
eds
Rich
ard
Crum
pPe
ople
Man
agem
ent
Supp
ort
Brist
ol
Mar
tin H
oppe
rBu
sines
s Im
prov
emen
tM
anch
ester
Ian
Bick
ley
Busin
ess P
artn
erBi
rmin
gham
Alis
on H
ollid
ayM
arke
ting
& Bu
sines
s En
gage
men
tBi
rmin
gham
Jere
my
Blac
kmor
eSt
rateg
ic Co
mm
unica
tions
Bedf
ord
Isob
el L
ewis
Custo
mer
Eng
agem
ent
Birm
ingh
am
Paul
Boo
thEn
gage
men
t & S
trateg
ic Co
mm
unica
tions
Brist
ol
Kerr
yann
e De
lbrid
geNa
tiona
l Com
mun
icatio
ns
(Majo
r Pro
jects)
Bedf
ord
LEAN
PLAN
NING
&
PERF
ORM
ANCE
M
ANAG
EMEN
T
HA B
OARD
SE
CRET
ARIA
TNA
TION
AL H
EALT
HAN
D SA
FETY
NETW
ORK
PLAN
NING
AN
D PE
RFOR
MAN
CERE
SEAR
CH &
OP
ERAT
IONA
L GU
IDAN
CE
TECH
NICA
L SE
RVIC
ESPR
OCUR
EMEN
T
Dere
k Dr
ysda
leDi
visio
nal D
irecto
rM
anch
ester
Mik
e Fa
rghe
rGr
oup
Man
ager
Bedf
ord
Rosi
e O’
Neill
Boar
d Se
creta
ryLo
ndon
Paul
Mitc
hell
Head
of D
ivisio
nBe
dfor
d
Davi
d Gi
ngel
lDi
visio
nal D
irecto
rLo
ndon
Andr
ew J
ones
Divis
iona
l Dire
ctor
Man
ches
ter
John
Bag
ley
Divis
iona
l Dire
ctor
Leed
s
Davi
d Po
ole
Divis
iona
l Dire
ctor
Birm
ingh
am
Sue
Hous
ley
Grou
p M
anag
erLe
eds
Pare
sh T
ailo
rBu
sines
s Plan
ning
&
Perfo
rman
ceGr
oup
Man
ager
Lond
on
Andr
ew W
inst
anle
yNe
twor
k Ope
ratio
ns &
M
anag
emen
t Pol
icyGr
oup
Man
ager
Birm
ingh
am
Neil
Loud
onTe
chni
cal &
Eng
inee
ring
(Pol
icy)
Grou
p M
anag
erBe
dfor
d
Trev
or S
chofi
eld
Df
T Sh
ared
Ser
vices
Leed
s
Nick
Fen
ton
Traffi
c Ap
prais
al, M
odell
ing
& Ec
onom
icsGr
oup
Man
ager
Dork
ing
Gerr
y Ha
yter
Know
ledge
Man
agem
ent
Grou
p M
anag
erDo
rkin
g
Stev
e Sm
ithTe
chni
cal &
Eng
inee
ring
(Deli
very
)Gr
oup
Man
ager
Birm
ingh
am
Davi
d O’
Neill
Stra
tegy &
Sup
plier
De
velo
pmen
tGr
oup
Man
ager
Leed
s
Mar
tin L
ynch
Safe
Road
s & C
asua
lty
Redu
ction
Grou
p M
anag
erBr
istol
Davi
d Co
wel
lIn
tellig
ent T
rans
port
Syste
ms R
esea
rch
Grou
p M
anag
erBr
istol
Mim
a Ga
rland
Envir
onm
ent
Grou
p M
anag
erBe
dfor
d
Davi
d Ho
ltPr
ocur
emen
t Ser
vices
& M
P Bu
sines
s Par
tner
Grou
p M
anag
erBi
rmin
gham
Bria
n Ba
rton
Man
aged
Mot
orwa
ysDo
rkin
g
Tony
San
gwin
eSe
nior
Prin
ciple
Env
Advis
or (P
olicy
)Le
eds
Geor
ge J
amie
son
M25
Pro
ject
Dork
ing
Godf
rey
Shor
tND
D Bu
sines
s Par
tner
Birm
ingh
am
Nata
lie P
hilp
ott
Serv
ices B
usin
ess P
artn
erLe
eds
An
Exec
utiv
e A
genc
y of
the
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Annex 2: Highways Agency - Vision, Aims and Objectives
HA Strategic Framework
VisionSafe Roads, Reliable Journeys, Informed Travellers
Travelling with Confidence
AimA strategic road network in England that works for everyone.
Objectives1. To deliver a high quality service to all our customers by:
• Improvingroadsafety
• Makingjourney’smorereliable
• Providingbetterinformation
• Respectingtheenvironment
2. To ensure more effective delivery through better working relationships.
3. To implement best practice and innovative solutions to improve service now and in the future.
4. To be a good employer.
5. To be an efficient Agency with effective business processes and resource management systems.
Values
Customer Service We put our customers first
Teamwork We work together in dynamic
teams and partnerships
Improvement We encourage learning,
innovation and flexibility
Diversity We value people for their
diversity and contribution
Best Value We deliver effective services
that provide value for money
Integrity We build trust by acting with
honesty and fairness
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Highways Agency Customer Promise
HELPING YOU WITH YOUR JOURNEY
• We will help you make your journeys safely and reliably
• We will provide value for money and invest in improved services
• We will provide helpful information to enable you to make choices before and during your journey
• We will clear up incidents quickly and safely
• We will limit any delays when carrying out roadworks and improvements
• We will play our part in protecting the environment
• We will ask you for your views and act on feedback
• We will deal with you promptly, courteously and helpfully
Memorandum of UnderstandingBritish Land - highways agency
Annex 3: British Land - Organisation Chart under review
Chris Grigg Chief Executive Officer
Graham Roberts Finance Director
Steve Smith Chief Investment Officer
Charlie Maudsley Head of Retail
Tony Braine Company Secretary
Tim Roberts Head of Offices
Nigel Webb Head of Development
Miles Price Planning Executive (day to day contact)
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Annex 4: British Land - Corporate Strategy and Building Together
British Land seeks to achieve superior long-term growth in shareholder value by:
• f ocusing on customer needs with prime assets in the office and retail sectors;
• creating exceptional long-term investments with strong covenants, long lease profiles and good growth potential;
• enhancing property returns through active sales, purchases, management and development;
• maximising risk-adjusted returns through optimal financing and partnership with others; and
• taking advantage of opportunities in the property market through entrepreneurial flexibility, deal-doing and financing.
RIDER
Concern for the environment is part of British Land’s corporate culture, encouraging us to focus on a property portfolio that is both commercially attractive and sustainable in its broader context. We aspire to enhance the quality of life for those on whom our activities impact.
Building Together is British Land’s new way of looking at corporate responsibility, engaging with our stakeholders and managing our impact on the environment. Building Together is about:
• building our business around our customers, ensuring that we deliver space to support their success and meet their changing occupational needs;
• engaging with our staff, customers, suppliers and local communities, changing our behaviours and helping them to change theirs - much of what we can achieve can only be done in partnership;
• setting high standards in everything that we do, because we believe that a responsible business is a sustainable business. Those high standards will maintain and enhance our reputation and the value of our exceptional long-term investments;
• providing a simple, easy to understand set of objectives and targets, a roadmap for our efforts so that our people and stakeholders understand where we are going; and
• making sensible business decisions. Our efforts will be driven by our desire to add value. Costs and benefits will continue to drive investment decisions.
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Annex 5: Major Project Guidelines
1 Introduction1.1 BL and the Agency work together during Project proposals at four key stages:
(a) during the allocation process for major development proposals through the preparation and consultation stages of Development Plan Documents;
(b) in the lead up to the submission of a planning application;
(c) during the determination period, after a planning application has been submitted; and
(d) should a consent be granted, after determination of the planning application.
1.2 The Agency and BL will develop an agreed approach for the Agency’s consideration of Projects and responses.
1.3 At every stage of the Project, both parties will seek to respond to each other within two weeks of receiving a request or communication.
2 GuidelinesBL and the Agency agree to have regard to the following framework and guidelines when Projects are proposed by BL through a master plan or individual planning applications:
2.1 Development Allocation Guidelines
(a) BL to advise the Agency of potential Projects as soon as possible where these are likely to have a bearing on the development allocation process within Development Plan Documents.
(b) BL and the Agency to identify and communicate to the other party a single contact point to co-ordinate progress.
(c) BL and the Agency will seek to agree key information policy documents and guidance relevant to the Project.
(d) BL and the Agency will identify key elements of applicable planning policy including the Highways Circular, the Regional Spatial Strategy, Regional Transport Strategies, Local Development Frameworks, policy advice notes and Planning Policy Guidance/Statements and any emerging policy/guidance that may be relevant to the Project.
Memorandum of UnderstandingBritish Land - highways agency
July 2008
(e) The Agency will provide BL with early notice of any potential issues of concern identified by the Agency.
(f) BL and the Agency will seek to agree appropriate strategies to enable new Projects to be accommodated on the transport networks.
2.2 Pre-Application Guidelines
(a) BL to advise the Agency of new Projects as soon as practical.
(b) BL and the Agency to identify and communicate to the other party a single contact point to co-ordinate progress.
(c) BL and the Agency to agree at the commencement of Projects key stages milestones, deadlines and development steps.
(d) BL and the Agency will seek to agree key information policy documents and guidance relevant to the Project.
(e) BL and the Agency will identify key elements of applicable planning policy including the Regional Spatial Strategy, Local Development Frameworks, policy advice notes and Planning Policy Guidance/Statements and any emerging policy/guidance that may be relevant to the Project.
(f) The Agency will provide BL with early notice of any potential issues of concern identified by the Agency.
(g) BL and the Agency will seek to agree the scope of work required to assess the transport effects of the Project, and the Transport Strategy, which will establish the post-application processes for implementing sustainable transport measures, monitoring and review.
(h) BL and the Agency will seek to agree appropriate and deliverable trip generation outcomes for the proposed Project that are consistent with sustainable transport goals and the availability of transport capacity for proposed Projects as early as possible.
2.3 Post-Application Guidelines
(a) BL and the Agency will seek to agree an approach to stakeholder consultation on transport issues in consultation with the local planning authority and other parties.
(b) The Agency, on BL’s request, will consider providing Comfort Letters for those seeking to occupy parts of a new Project.
Memorandum of UnderstandingBritish Land - highways agency
July 2008
(c) The Agency will advise BL as soon as practicable if it identifies substantial concerns with the application, for example, but not limited to, the potential for the Secretary of State for Transport to issue a notice pursuant to Article 14 of the Town and Country Planning (General Development Procedure) Order 1995 or for the Secretary of State for Communities and Local Government to call in applications pursuant to Section 77 of the Town and Country Planning Act 1990. The Agency will provide BL with a full and reasoned basis for its concerns.
(d) BL will provide a full and reasoned response to the Agency’s concerns together with proposals to address the concerns and, if appropriate, to provide further sustainable transport solutions to support the Project.
(e) The Agency will be given the opportunity to comment on the planning obligations being negotiated between BL and the local planning authority under Section 106 of the Town and Country Planning Act 1990.
2.4 Post-Consent Guidelines
(a) The Agency and BL will develop an agreed approach for the implementation of BL’s Travel Plans and for the level of monitoring by the Agency in partnership with other interested parties, together with the feedback necessary to establish an effective database of transport measures and outcomes.
(b) BL will engage with potential future occupiers of the development (where known) before implementation to encourage maximum occupier support for sustainable travel options.
(c) The Agency and BL will use reasonable endeavours to promptly agree highways agreements under Section 278 of the Highways Act 1980.
2.5 Appeal Preparation Guidelines
(a) The Agency and BL will seek to agree technical issues, a common policy agenda and a statement of common ground before the commencement of any public inquiry.
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Annex 6: Project Pro forma Guideline Document
Project Name
Project Site
Proposal
BL Lead Contact
Agency Lead Contact
Pre-Application Process
Communication Process (including response times)
Environmental Review
Agency Funding Agreements (for work beyond statutory duties)
Consultation Process
Other
...............................................................On behalf of The BriTish Land Company pLC
...............................................................On behalf of The highways agenCy
Signatures
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Annex 7: Topics of Mutual InterestBL and the Agency have identified the following topics of mutual interest which both parties will develop:
1.1 Location Specific Areas
(a) Lower Don Valley, Sheffield.
(b) Blythe Valley Park, Solihull.
1.2 Topic Specific Areas
(a) Area Travel Plans - including the development of plans for Lower Don Valley, Sheffield.
(b) Working with Network Operations Division on the form and function of travel plans and strategies to contribute wider benefits from Projects.
(c) Development of pilot programmes to advance thinking, implementation and procurement in travel planning, information and transport technology through case study examples.
(d) Physical measures to manage traffic generated by any development, encourage sustainable travel choices and discourage unnecessary journeys by private car.
1.3 Funding for Transport
(a) Mechanisms for sourcing third party funding for regeneration (for example, tariffs, pooling of resources and planning charges).
(b) Pioneering new methods of funding for regeneration.
(c) Agreement on funding for specific elements in relation to implementing Influencing Travel Behaviour measures which will benefit identified sites. The Agency will commit to contributing funds to implement such measures which may have benefits to the wider area, where appropriate, and in agreement with BL and other stakeholders.
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Annex 8: ActionsBL and the Agency have identified the following actions for mutual implementation:
1.1 Short term Actions
(a ) Use transport strategies for the development in the Lower Don Valley to ensure third party commitment to an Area Wide Travel Plan including encouragement of ‘working business to business’.
1.2 Long term Actions
(a) Work together to identify funding arrangements for development and regeneration in the Lower Don Valley Regeneration Area.
(b) Develop a co-operative approach to intelligent transport solutions.
(c) Share research and lessons learnt on outcomes of specific Travel Plan measures.
(d) Identify opportunities and participate together at industry conferences.
(e) Support the Agency’s Developer Forum.
(f) Consider potential commercial opportunities and possibilities for joint ventures.
1.3 Ongoing Actions
(a) Co-ordinate and share information during the preparation of emerging guidance and policy documents particularly in relation to the consideration of future development sites, sustainable travel objectives, transport capacity and the strategic road network.
(b) Meet to discuss proposed capacity allocations in all levels of emerging guidance.
(c) Discuss opportunities for the Agency to support major strategic infrastructure projects that are proposed by private developers that will benefit the strategic road network.
(d) Investigate opportunities to include Agency information and behavioural influence campaigns within proposed BL developments. Services currently available include the Agency Traffic Information Services and the Agency Road Safety Toolbox. Other user related services are constantly under development.
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Annex 9: Contact Details
1.1 The Agency has identified the following key contact points:
Graham Riley 0113 283 6233
1.2 BL has identified the following key contact points:
Miles Price 0207 467 2956
If the personnel of BL or the Agency change, each will seek to update the other and provide new contact details as soon as practicable.
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Annex 10: Glossary of Terms and Acronyms
Area Wide Travel Plan
A package of measures produced to encourage residents and/or staff to use alternatives to single-occupancy car use.
Comfort LettersA non-binding written assurance that is intended to offer ‘comfort’ to the recipient of the author’s present intention.
Development Plan Documents
A development plan document as defined in section 37(3) of the Planning and Compulsory Purchase Act 2004.
Highways Agency’s Developers’ Forum
Annual forum held by the Highways Agency for major national land development companies and organisations.
Highways Agency Traffic Info Service
Real-time Strategic Road Network traffic data available via the National Traffic Control Centre.
Highways Agency Road Safety Toolbox
Range of information and education tools developed by the Highways Agency and freely available.
Highways Circular Circular 02/2007 - Planning and the Strategic Road Network.
Influencing Travel Behaviour
Highways Agency programme to tackle traffic demand using ‘Smarter Choices’.
Local Development Framework
Framework detailing agreed land development plans in each local authority area.
Network Operations Division
Highways Agency division responsible for strategic planning, operation and maintenance of the strategic road network.
Memorandum of UnderstandingBritish Land - highways agency
July 2008
Planning Policy Guideline Statements (PPG)
Government guidelines affecting all spatial planning issues.
Projects
Any development scheme or project where there is an interface between BL and the Agency, for example, when the Agency is a consultation body or approval authority.
PPG13 Planning Policy Guidance 13: Transport (2001).
PPS11 Planning Policy Statement 11: Regional Spatial Strategies (2004).
Regional Spatial Strategy
Regional spatial strategies prepared pursuant to the Planning and Compulsory Purchase Act 2004, section 1.
Regional Transport Strategies
A strategy prepared as part of a Regional Spatial Strategy that includes how national transport policies and programmes will be delivered in the regions, outlines the transport and related land use policies and measures required to support the spatial strategy and provides a long term framework for transport in the region, as detailed in PPS11.
Sustainability BriefBL’s Sustainability Brief, a copy of which is available at www.britishland.com/images/SustainabilityBrief18-06-07.pdf
Transport Strategy
A strategy that co-ordinates the governance and funding of the transport proposals associated with a Project with the delivery of hard and soft transport measures and the monitoring and review of transport outcomes against agreed targets.