HIGHWAY PROGRAM
FY 2015-2016
SORTED BY PARISH
FOR LEGISLATIVE REVIEW AND APPROVAL
This public document is published at a total cost of $3.02. 290 copies of this public document were published in this first printing at a cost of
$875.80. The total cost of all printings of this document including reprints is $875.80. This document was published by the Louisiana Department of Transportation reproduction unit, 1201 Capitol Access Road, Baton Rouge, LA 70804. This material was printed in accordance
with standards for printing by state agencies established in R.S. 43.31.
INTRODUCTION
1. R.S. 48:229, 230 states that each year “the Department shall provide the Legislature a program of construction to be commenced in the ensuing fiscal year, which shall be based upon anticipated revenues to be appropriated by the Legislature…” The Department shall also provide the Legislature a list of projects “which are in various stages of planning and preparation”.
2. In compliance with this statute, the attached Highway Program identifies the
projects that are scheduled for construction letting in FY 2015-16. These are denoted as being in Stage 4. Projects being developed in the other stages are also included in the document.
3. There are many projects remaining to be let prior to the end of the current
fiscal year, FY 2014-15. For informational purposes, these projects are also listed in this document. In the event any of these projects cannot be let as planned, they will become part of the FY 2015-16 construction program, and will be let as soon as practicable in that fiscal year.
4. The one year construction program and the list of other projects in various
stages are combined into this document which is called the Highway Priority Program or Highway Program. These projects are also submitted to the Federal Highway Administration along with the Transit Program. The two programs together are referred to as the State Transportation Improvement Program (STIP). The Public Hearings held each year in each Highway District fulfill both the State and Federal requirements for public involvement regarding these programs.
5. At this point in time, future funding levels are uncertain. DOTD has based this
preliminary Highway Program on previous allocations of funding. If funding above the expected amount is made available, funding may be used on projects listed in Stages 0, 1, 2, or 3.
6. In the event all of the projects listed for letting in FY 2015-16 cannot be let to
construction due to funding issues or unforeseen problems encountered in the pre-construction process, the affected project(s) will be let as soon as practicable in the following year and other projects listed in Stages 0, 1, 2, or 3 may be advanced into FY 2015-16.
7. Construction estimates are for informational purposes only and are subject to
change.
SUSTAINABILITY NON-INTERSTATE (PAVEMENT) 80.0
(FORMERLY CALLED NON-INTERSTATE (PAVEMENT) (non-federal aid) 30.2
PRESERVATION) ROAD PREVENTIVE MAINTENANCE 7.5INTERSTATE (PAVEMENT) 74.0BRIDGE (ON SYSTEM) 133.1BRIDGE (OFF SYSTEM) 13.0
SUB-TOTAL 337.8
ITS (regular & earmarks) 11.0
OPERATIONS TRAFFIC CONTROL DEVICES 14.8ROADWAY FLOODING 3.7WEIGH STATIONS 1.9TRANSPORTATION SYSTEMS MANAGEMENT 7.4INTERSTATE LIGHTING 2.8REST AREAS 0.0ACCESS MANAGEMENT 8.1FERRIES/MAJOR REPAIRS 3.5MOVABLE BRIDGE PM 1.9INTERMODAL CONNECTOR 7.5ADA PROGRAM 3.0
SUB-TOTAL 65.6
SAFETY HWY. PROGRAM 49.4RR CROSSING UPGRADES & SEPARATIONS 16.0
SUB-TOTAL 65.4
CAPACITY REGULAR PROGRAM 50.6
CORRIDOR UPGRADE 0.0SUB-TOTAL 50.6
TRANSPORTATION ALTERNATIVES PROJECTS 12.0
MISC.
URBAN SYSTEMS, CONGESTION MITIGATION & AIR QUALITY, LOCAL ROAD SAFETY PROGRAM, SAFE ROUTES TO SCHOOLS, URBAN TRANSIT, DEMAND MANAGEMENT 85.0FED EARMARKS (DEMO,...) 20.8
OTHER (BONDS, TOLLS, LOCAL ) 9.3
ROAD TRANSFER 23.1
SUB-TOTAL 150.2
GRAND TOTAL 669.6
Subject to funding availability.
TENTATIVE FY 15-16 BUDGET PARTITION
(COSTS IN MILLION DOLLARS)CONSTRUCTION
PROPOSEDCATEGORY SUB-CATEGORY
FUNDING TYPES FEDERAL NHPP (NATIONAL HIGHWAY PERFORMANCE PROGRAM) STP (SURFACE TRANSPORTATION PROGRAM) STP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,
LAFAYETTE) STP<200K (URBAN AREAS – ALEXANDRIA, HOUMA-THIBODAUX, LAKE CHARLES,
MONROE, SLIDELL, MANDEVILLE-COVINGTON, HAMMOND-PONTCHATOULA) STPFLEX (FLEXIBLE) STP<5K (RURAL AREAS) FBROFF (OFF SYSTEM BRIDGE MAP 21) TAP (TRANSPORTATION ALTERNATIVES PROGRAM) TAP>200K (URBAN AREAS – NEW ORLEANS, BATON ROUGE, SHREVEPORT,
LAFAYETTE) TAP<200K (URBAN AREAS – ALEXANDRIA, HOUMA-THIBODAUX, LAKE CHARLES,
MONROE, SLIDELL, MANDEVILLE-COVINGTON, HAMMOND-PONTCHATOULA) TAPFLEX (FLEXIBLE) TAP<5K (RURAL AREAS) HSIP, SR2S, HRRR, SATRANS (SAFETY FUNDS, SAFE ROUTES TO SCHOOLS, HIGH RISK RURAL ROADS, SAFETY TRANSFER) RAIL HE, RAIL PD (ELIMINATIONS OF HAZARDS AT RAILWAY-HIGHWAY CROSSINGS) CM (CONGESTION MITIGATION AIR QUALITY – EAST BATON ROUGE, WEST BATON ROUGE, LIVINGSTON, ASCENSION, AND IBERVILLE) DEMO (FEDERAL DEMONSTRATION AND HIGH PRIORITY PROJECTS – DEFINED BY U.S. CONGRESS) ER (FEDERAL EMERGENCY RELIEF PROGRAM FUNDING) FEMA (FEDERAL EMERGENCY MANAGEMENT AGENCY FUNDS) STATE / LOCAL NFA (STATE TRANSPORTATION FUNDS FOR NON-FEDERAL AID ROUTES) NFABOND (STATE BONDS FOR NON-FEDERAL AID ROUTES) STCASH (STATE TRANSPORTATON TRUST FUNDS FOR STATE FUNDED CONSTRUCTION) TIME (TRANSPORTATION INFRASTRUCTURE MODEL FOR ECONOMIC DEVELOPMENT) STBONDS (STATE GENERAL OBLIGATION BONDS) STGEN (STATE GENERAL FUNDS CASH) TOLLS LOCAL (FUNDS PROVIDED BY LOCAL GOVERNMENT) OTHER (OTHER SOURCE NOT LISTED) NFI (NO FUNDING IDENTIFIED)
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ACADIA
Project: H.011653 - LA 365: LA 13 - LA 35
Type Impv: MICROSURFACING AND RELATED WORK
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 365 220-01 STPFLEX 987 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
ACADIA LA 365 220-01 STPFLEX 90 SUSTAINABILITYNON-INTERSTATE NFA
Project: H.010150 - S. AVENUE F & NAPP STREET BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA 000-01 FBROFF 732 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
ACADIA 000-01 FBROFF 262 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010222 - LA 97: LA 98 - LA 368
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 97 201-03 STPFLEX 4,130 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010962 - I-10: CABLE BARRIER (LAFAYETTE/ACADIA)
Type Impv: INSTALL MEDIAN CABLE BARRIER
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: PLEASE USE HSIPPEN FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA I-10 450-04 HSIPPEN 4,041 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
LAFAYETTE I-10 450-05 HSIPPEN 1,478 SAFETY
Project: H.011320 - SIDNEY RICHARD RD: BNSF RR XING (ACADIA)
Type Impv: INSTALL ACTIVE WARNING DEVICES.
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA 000-01 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.002123 - RAYNE SIDEWALKS, PH. III
Type Impv:
Project Manager: MEEK, STEPHEN
Remarks: 207-07-0028
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 35 207-07 TAP<200K 434 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.007369 - RAYNE SIDEWALKS, PH. II
Type Impv: CONCRETE WALKS AND DRIVES AND RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks: 744-01-0013
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA US 90 003-10 TAP<200K 265 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
ACADIA LA 35 207-07 TAP<200K 155 ENHANCEMENTS
Project: H.010291 - I-10: TREE REMOVAL
Type Impv: TREE REMOVAL ON I-10 IN ACADIA PARISH
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA I-10 450-04 HSIP 1,096 SAFETY 3-DESIGN/DEVELOPMENT
LAFAYETTE I-10 450-05 HSIP 514 SAFETY
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 1 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ACADIA
Project: H.011541 - NATION ROAD / COULEE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA 000-01 FBROFF 647 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011590 - LA 98: LA 367 - CSLM 5.35
Type Impv: BASE STABILIZATION AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 98 210-04 STPFLEX 1,500 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011829 - IMP@LA13 & LA100 & I-10 ACC.RD (CROWLEY)
Type Impv: WIDENING, CLASS II BASE, BASE REHAB, AND ASPHALT OVERLAY.
Project Manager: ROMEO, ROBIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA I-10 450-04 STPFLEX 2,500 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
ACADIA LA 100 211-01 LOCAL 75 ROAD TRANSFER
Project: H.003756 - NEW INTERCHANGE LA 98 RAYNE
Type Impv: FED EARMARK FOR STUDY
Project Manager: GAUTREAU, COLLEEN
Remarks: 700-01-0112;$993.500(IMD)&$110.000C.O.AVAILABLE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA 000-01 DEMO 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.002729 - GRAND PRAIRIE HWY INTR.&FRONTAGE RD
Type Impv: NEW BRIDGE. NEW CONCRETE PAVEMENT
Project Manager: YANG, LI
Remarks: 389-01-0011;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 98 389-01 NFI 19,734 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
ACADIA I-10 450-04 0 DEMO / HIGH PRIORITY
Project: H.009628 - LA 92: LA 13 - VERMILION P/L
Type Impv: ASPHALT CONCRETE OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 92 385-04 STPFLEX 2,213 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010209 - LA 35: LA 365 - LA 95
Type Impv: COLD PLANE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 35 207-07 STPFLEX 1,054 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010220 - LA 97: BAYOU NEZPIQUE BR. - LA 100
Type Impv: STONE BASE WITH ASPHALT OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 97 201-02 STPFLEX 2,709 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010885 - LA 91: BAYOU PLAQUEMINE BRULE BR REPLACE
Type Impv: REPLACEMENT OF PONTOON BRIDGE
Project Manager: TOURRES, VALERIE
Remarks: CONSTRUCTION FUNDS WILL BE STATE BONDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA LA 91 801-09 0 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 2 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ACADIA
Project: H.011323 - NIGHTHAWK/SPAN TRL:BNSF RR XINGS(ACADIA)
Type Impv: CONSTRUCT A NEW RR XING BETWEEN TWO XINGS THAT WILL CLOS
Project Manager: LUKE, SHAWN
Remarks: 714-01-0120
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ACADIA 000-01 RAIL HE 500 RAILROADS 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 3 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ALLEN
Project: H.009298 - TOWN OF OBERLIN SRTS PROJECT
Type Impv: SIDEWALK IMPROVMENTS, MARKED CROSSINGS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ALLEN 000-02 SR2S 194 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
ALLEN 000-02 SATRANS 28 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010054 - PARK ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ALLEN 000-02 FBROFF 447 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
ALLEN 000-02 FBROFF 308 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010055 - CHERRY WITCHIE & N. CARPENTER RD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ALLEN 000-02 FBROFF 2,510 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
ALLEN 000-02 FBROFF 1,426 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 4 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ASCENSION
Project: H.002370 - LA 42 (US 61 - LA 44)
Type Impv: WIDENING AND IMPROVEMENTS
Project Manager: LANDRY, COREY
Remarks: 260-01-0026; SEE NOTES FOR DETAILS. STGEN MATCH FOR UTIL
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 42 260-01 DEMO 0 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 14-15
ASCENSION LA 42 260-01 HSIP 0 SAFETY
ASCENSION LA 42 260-01 STBONDS 23,631 OTHER / MISCELLANEOUS
ASCENSION LA 42 260-01 TAPFLEX 1,231 ENHANCEMENTS
ASCENSION LA 73 077-03 STBONDS 112 OTHER / MISCELLANEOUS
ASCENSION LA 930 803-14 STBONDS 27 OTHER / MISCELLANEOUS
ASCENSION LA 44 265-02 STBONDS 430 OTHER / MISCELLANEOUS
ASCENSION 000-03 STBONDS 99 OTHER / MISCELLANEOUS
Project: H.010639 - LA 939 AND LA 940 REHAB
Type Impv: MILL AND OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: 10% MATCH FROM ENTITY AND 10% MATCH FROM TTF
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 939 803-23 STP>200K 770 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
ASCENSION LA 940 803-06 STP>200K 660 URBAN SYSTEMS
ASCENSION 000-03 LOCAL 178 URBAN SYSTEMS
Project: H.011269 - I-10 PAVEMENT MARKING REPLACEMENT IV
Type Impv: REMOVE AND REPLACE EXISTING PAVEMENT MARKINGS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION I-10 450-11 NHPP 370 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 14-15
E BATON ROUGE I-10 450-10 NHPP 30 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.002423 - LA44: BLACK BAYOU BRIDGE REPLACEMENT
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 265-02-0016;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 44 265-02 STPFLEX 1,541 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009956 - LA 44: TURN LANES AND MEDIANS
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 44 265-02 HSIP 5,429 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010026 - LA 431: REALIGN CURVE, C/L RUMBLE STRIPS
Type Impv: REALIGN CURVE, CENTER LINE RUMBLE STRIP, RESTRIPE ROAD.
Project Manager: LAI, QUANG
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 431 267-02 SATRANS 3,900 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010640 - LA 3038 (CORNERVIEW): REHAB & TURN LANE
Type Impv: MILL AND OVERLAY
Project Manager: LACOMBE, JASON
Remarks: 10% MATCH FROM ENTITY AND 10% MATCH FROM TTF
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 3038 077-30 STP>200K 660 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 5 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ASCENSION
Project: H.011314 - LA 22: NEAR I-10 GEOMETRIC IMPROV
Type Impv: IMPROVE THE SAFETY OF LA 22 USING ACCESS MGMENT (J-TURNS)
Project Manager: TONEY, PATRICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 22 266-01 HSIPPEN 2,250 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
ASCENSION LA 70 426-03 HSIPPEN 150 SAFETY
Project: H.011450 - LA 70 MILL AND OVERLAY
Type Impv: MILL AND OVERLAY EXISTING ROADWAY
Project Manager:
Remarks: PARISH TO PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 70 426-03 STP>200K 429 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011451 - LA 22 REHABILITATION
Type Impv: PATCH, MILL AND OVERLAY
Project Manager:
Remarks: PARISH TO PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 22 266-01 STP>200K 1,210 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
ASCENSION LA 22 266-02 STP>200K 924 URBAN SYSTEMS
Project: H.000337 - US 61:BAYOU MANCHAC & FRANCOIS BRS.
Type Impv: NEW BRIDGES
Project Manager: HERATH, ANANDA
Remarks: 007-07-0058;JT W/007-08-0040
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION US 61 007-07 STPFLEX 1,700 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
E BATON ROUGE US 61 007-08 STPFLEX 10,300 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.007855 - LA 431 @ LA 934 INTERSECTION IMPROVEMENT
Type Impv: TURNLANES
Project Manager: TONEY, PATRICK
Remarks: 803-20-0006;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 431 267-02 CM 500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ASCENSION LA 934 803-20 CM 250 URBAN SYSTEMS
Project: H.009250 - I-10 HIGHLAND TO LA 73
Type Impv: WIDEN INTERSTATE TO 3 LANES EACH DIRECTION
Project Manager: REVIERE, RYAN
Remarks: LHIP USED FOR ENG
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION I-10 450-11 NFI 50,500 CORRIDOR 3-DESIGN/DEVELOPMENT
E BATON ROUGE I-10 450-10 NFI 16,000 CORRIDOR
Project: H.009266 - I-10: LA 73 TO LA 30
Type Impv: WIDEN INTERSTATE TO 3 LANES EACH DIRECTION
Project Manager: REVIERE, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION I-10 450-11 NFI 46,700 CORRIDOR 3-DESIGN/DEVELOPMENT
Project: H.009276 - I-10: LA 30 TO LA 22
Type Impv: WIDEN INTERSTATE TO 3 LANES EACH DIRECTION
Project Manager: REVIERE, RYAN
Remarks: LHIP USED FOR ENG
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION I-10 450-11 NFI 50,300 CORRIDOR 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 6 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ASCENSION
Project: H.010074 - UP (DONALDSONVILLE) LA 3089 SERVICE RD.
Type Impv: ROAD WORK AROUND CROSSING TO MAKE SAFER
Project Manager: SHREWSBERRY,BILL
Remarks: 426-01-0026
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 3089 426-01 RAIL HE 250 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.011452 - LA 942 REHABILITATION
Type Impv: REHABILITATION
Project Manager:
Remarks: PARISH TO PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 942 256-07 STP>200K 722 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011490 - LA 30: LEFT TURN LANE AT S. PURPERA AVE
Type Impv: CONSTRUCT LEFT TURN LANE FOR EASTBOUND TRAFFIC
Project Manager: GARY, VERTIE
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 30 414-03 CM 304 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT
ASCENSION 000-03 CM 304 CONGESTION MITIGATION
Project: H.011501 - LA 70: GATOR LANDFILL TURN LANE
Type Impv: TURN LANE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 70 426-03 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011502 - US 61: TURN LANE IMPROVEMENTS @ LA 621
Type Impv: TURN LANE IMPROVEMENTS
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION US 61 007-07 NHPP 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011540 - BABIN ROAD / BAYOU NARCISSE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION 000-03 FBROFF 293 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011577 - LA 18: SUNSHINE BR - LA 3120
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 18 063-10 STPFLEX 2,278 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
ST JAMES LA 18 063-09 STPFLEX 222 SUSTAINABILITYNON-INTERSTATE NFA
Project: H.006457 - ROUNDABOUT @ PR 929 & PARKER ROADS
Type Impv: ROUNDABOUT CONSTRUCTION
Project Manager: HOLM, RICK
Remarks: 737-03-0104;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION 000-03 SATRANS 500 SAFETYLOCAL ROADS SAFETY
2-WAITING FOR FUNDING
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 7 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ASCENSION
Project: H.002424 - SUNSHINE BRIDGE - I-10
Type Impv: WIDEN TO 4 LANES
Project Manager: NICKEL, TIM
Remarks: 426-02-0042;(C&G)426-02-52.426-03-05.NO FUNDING
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 22 266-01 NFI 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
ST JAMES LA 70 426-02 NFI 0 OTHER / MISCELLANEOUS
ASCENSION LA 70 426-03 NFI 0 OTHER / MISCELLANEOUS
Project: H.003790 - LA 930: CAUSEY RD TO LA 42
Type Impv: WIDEN LA 930 & ADD OPEN DITCHES
Project Manager: MUSA, ELNUR
Remarks: 803-14-0005;STATE BONDS BEING REQUESTED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 930 803-14 STBONDS 5,300 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.005759 - LA 44 SIGNAL TIMING STUDY
Type Impv:
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 44 265-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.010572 - LA 30 IMPROVEMENTS (LA 3251 TO LA 44)
Type Impv: FEASIBILITY STUDY TO WIDEN LA 30 FROM I-10 TO LA 44
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 30 414-03 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.010795 - JOE SEVARIO/RODDY ROUNDABOUTS STUDY
Type Impv: ROUNDABOUTS
Project Manager: RENARD, APRIL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 42 260-01 0 SAFETY 1-PLANNING/ENVIRONMENTAL
ASCENSION 000-03 0 SAFETY
Project: H.010909 - LA 44: LA 941 TO LA 22
Type Impv: FEASIBILITY STUDY
Project Manager: RENARD, APRIL
Remarks: FEASIBILITY STUDY FUNDED WITH SATRANS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 44 265-01 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.010960 - LA 30 ROUNDABOUTS @ TANGER MALL & I-10
Type Impv: 3 ROUNDABOUTS ON LA 30 INCLUDING 2 AT THE I-10 RAMPS
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 30 414-03 STPFLEX 8,000 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Project: H.011160 - LA 73: LA 74 TO LA 621 CORRIDOR STUDY
Type Impv: CORRIDOR STUDY TO COLLECT DATA AND DEVELOP ALTERNATIVES
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASCENSION LA 73 077-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 8 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ASSUMPTION
Project: H.009316 - LA 1016-2:ELEVATION AND DRAINAGE UPGRADE
Type Impv: RAISE ELEVATIOIIN AND UPGRADE DRAINAGE PIPES
Project Manager: PAINE, PEGGY JO
Remarks: 804-38-0010
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 1016-2 804-38 FEMA 664 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011342 - EB OFF RAMP GIRDER RPL @ US 90 EXIT 182
Type Impv: GIRDER REPLACEMENT AND ASSOCIATED DECK AND RAIL
Project Manager: HERATH, ANANDA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION US 90 424-06 NHPP 392 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010007 - LA 70 PIERRE PART BAY BRIDGE CLN & PAINT
Type Impv: CLEANING & PAINTING
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 70 232-01 STPFLEX 400 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
Project: H.010443 - LA 308: CURVE REALIGN AND SHOULDERS
Type Impv: REALIGN CURVE AND ADD SHOULDERS
Project Manager: GARY, VERTIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 308 407-07 SATRANS 9,760 SAFETY 3-DESIGN/DEVELOPMENT
ASSUMPTION LA 308 407-08 SATRANS 1,900 SAFETY
Project: H.011767 - BAYOU CRAB ROAD BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION 000-04 FBROFF 431 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
Project: H.010571 - LA 70 BYPASS
Type Impv: STUDY FOR BYPASS ROAD FOR LA 70-PIERRE PART TO NEAR LA 69
Project Manager: JONES, MATTHEW
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 70 232-01 NFI 140,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.011289 - LA 70: DETOUR ROAD
Type Impv: CONSTRUCTION OF A DETOUR ROUTE FOR LA 70 IF NECESSARY
Project Manager: FOURNERAT, CHRIS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ASSUMPTION LA 70 232-01 STPFLEX 15,280 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
ASSUMPTION LA 69 406-01 STPFLEX 1,063 OTHER / MISCELLANEOUS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 9 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: AVOYELLES
Project: H.001257 - INTERSECTION LA 114 @ LA 1
Type Impv: REPLACE BRIDGE W/ T-INTERSECTION AND WIDEN ANOTHER BRIDGE
Project Manager: BROWN, JEFF
Remarks: 052-05-0050;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 114 052-05 FBROFF 765 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
AVOYELLES LA 114 052-05 HSIP 89 SAFETY
AVOYELLES LA 1 052-30 HSIP 255 SAFETY
AVOYELLES LA 1 052-30 STPFLEX 249 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.010364 - LA 114: LA 1188 - N JCT LA 115
Type Impv: CTB AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 114 145-01 STPFLEX 788 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010489 - I-49: LA 106 - LA 115 (RAMPS & SIDE RD)
Type Impv: PATCH, COLD PLANE, AND OVERLAY (RAMPS AND SIDE ROAD)
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES I-49 455-04 NHPP 487 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
AVOYELLES LA 106 204-04 STPFLEX 503 SUSTAINABILITYINTERSTATE
AVOYELLES LA 106 204-04 STPFLEX 600 SUSTAINABILITYNON-INTERSTATE
Project: H.009741 - MARKSVILLE SIDEWALK IMPROVEMENTS
Type Impv: SIDEWALK W/ LIGHTING, LANDSCAPE & SUBSURFACE DRAINAGE
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES 000-05 TAP<200K 338 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.009743 - BUNKIE SIDEWALK IMPROVEMENTS
Type Impv: SIDEWALKS AND RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES US 71 008-07 TAP<5K 96 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
AVOYELLES LA 115 805-18 TAP<5K 16 ENHANCEMENTS
AVOYELLES 000-05 TAP<5K 88 ENHANCEMENTS
Project: H.009805 - MOREAUVILLE SIDEWALKS
Type Impv: SIDEWALKS W/ SUBSURFACE DRAINAGE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 114 052-05 TAP<5K 102 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
AVOYELLES 000-05 TAP<5K 102 ENHANCEMENTS
Project: H.011522 - FAITH BAPTIST MISSION & BILL BELT ROADS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES 000-05 FBROFF 308 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
AVOYELLES 000-05 FBROFF 285 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 10 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: AVOYELLES
Project: H.011523 - CARL HUNT & GERMAN BAYOU ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES 000-05 FBROFF 493 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
AVOYELLES 000-05 FBROFF 231 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011524 - KATIE LANE & LEO MORROW ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES 000-05 FBROFF 308 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
AVOYELLES 000-05 FBROFF 223 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.007873 - BAYOU BOEUF & TURNER CANAL BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: HERATH, ANANDA
Remarks: 805-09-0007;2 BRIDGES; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 1176 805-09 FBROFF 2,375 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009493 - LA 107: LA 1179 - LA 1181
Type Impv: CTB AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 107 147-03 STPFLEX 2,322 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009497 - LA 106: BAYOU BOEUF BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 106 204-04 STPFLEX 2,600 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010340 - LA 107: S JCT LA 1 - N JCT LA 1
Type Impv: WIDENING AND OVERLAY OF PCCP
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
AVOYELLES LA 107 052-06 STPFLEX 980 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 11 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: BEAUREGARD
Project: H.011636 - LA 389: MONROE WHITMAN RD - SNYDER RD
Type Impv: ASPHALT SURFACE TREATMENT
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD LA 389 187-04 STPFLEX 113 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.006468 - BEAUREGARD PARISH GUARDRAIL REPLACEMENT
Type Impv: GUARDRAIL REPLACEMENT
Project Manager: HOLM, RICK
Remarks: ENTITY REQUIRED TO MATCH FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD 000-06 0 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010915 - BEEHIVE LP & FIELDING WILLIAMS RD BRDGS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD 000-06 FBROFF 600 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
BEAUREGARD 000-06 FBROFF 308 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.009482 - LA 113: JIM BURNEY BRANCH BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD LA 113 139-03 STPFLEX 950 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009615 - LA 26: US 171 - ALLEN P/L
Type Impv: CP 2", OVERLAY 4", 2" SHLD
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD LA 26 028-04 STPFLEX 8,069 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010244 - LA 113: LA 26 - LA 112
Type Impv: PATCH, CP 2", WIDEN 2.5', OL 4"
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD LA 113 139-04 STPFLEX 2,187 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010245 - LA 389: MONROE WHITMAN RD - US 190
Type Impv: PATCH, CP 2", WIDEN 2.5', OL 4"
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD LA 389 187-04 STPFLEX 7,117 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010246 - LA 112: LA 399 - LA 113
Type Impv: PATCH, CP 2", WIDEN 2.5', OL 4"
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BEAUREGARD LA 112 188-02 STPFLEX 2,163 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 12 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: BIENVILLE
Project: H.001148 - LA 154: LA 792 TO LA 507
Type Impv: WIDENING WITH THIN OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: 043-02-0017;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 154 090-04 STPFLEX 1,855 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010595 - LOUISIANA TRAIL - CASTOR TO JAMESTOWN
Type Impv: CONSTRUCTION OF A MULTI-USE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE 000-07 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011240 - LA 147: UNION CHURCH RD TO LINCOLN P/L
Type Impv: ASPHALTIC OVERLAY
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 147 043-02 STPFLEX 2,600 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.001689 - TOPY CREEK BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: MUSA, ELNUR
Remarks: 088-02-0023;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 153 088-02 STPFLEX 1,831 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009434 - VARIOUS ROADS:SIGNING (BIENVILLE)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE 000-07 SATRANS 10 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010275 - LA 792: CURVE IMPROVEMENT
Type Impv: REALIGN CURVE
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 792 293-02 HSIP 740 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010561 - CASTOR CK RD/BEAR CK RD/DANIEL ST BRDGS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE 000-07 FBROFF 370 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
BIENVILLE 000-07 FBROFF 454 SUSTAINABILITYBRIDGE (OFF SYSTEM)
BIENVILLE 000-07 FBROFF 293 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010977 - US 371: BI-DIRECTIONAL TURN LANE AT LA 4
Type Impv: ADDING LEFT TURN LANES AT LA 4 IN BOTH DIRECTIONS
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE US 371 027-02 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010273 - LA 154: EAST JCT LA 4 TO JCT LA 792
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 154 090-04 STPFLEX 1,450 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 13 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: BIENVILLE
Project: H.010290 - LA 796: LA 508 TO LA 155
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: OSTUNO, BARBARA
Remarks: AC WITH NFA
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 796 090-05 STPFLEX 1,150 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.001537 - LA 4: BEE BRANCH BRIDGE
Type Impv: NEW BRIDGE
Project Manager: YANG, LI
Remarks: 067-03-0014;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 4 067-03 STPFLEX 1,310 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001707 - SALINE BAYOU RELIEF BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 090-05-0030;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BIENVILLE LA 507 090-05 FBROFF 1,178 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 14 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: BOSSIER
Project: H.003244 - DIST 04 BRIDGE BRG REHAB & MISC REPAIRS
Type Impv: BRIDGE BEARING REPAIRS
Project Manager: TULLIER, DANNY
Remarks: 451-01-0135;BRPM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER I-220 451-31 NHPP 2,450 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
DISTRICTWIDE 04 000-94 STPFLEX 1,670 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
Project: H.007085 - SHED ROAD (BENTON - AIRLINE)
Type Impv: RECONSTRUCTION & WIDEN
Project Manager: LAI, QUANG
Remarks: 742-08-0001;CITY IS FUNDING ENGR.&ACQUIRING R/W
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 STP>200K 9,014 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
BOSSIER 000-08 STPFLEX 1,082 ROAD TRANSFER
Project: H.011241 - I-20: AIRLINE DRIVE RAMP EXTENSION
Type Impv: ON-RAMP EXTENSION
Project Manager: MOORE, DARRELL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER I-20 451-02 NHPP 550 SUSTAINABILITYINTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.001795 - RED CHUTE AND OLD CHANNEL BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks: 108-01-0019 AND 108-01-0017;USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 612 108-01 STPFLEX 3,632 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.006738 - KIDS ON THE MOVE PH. 2
Type Impv: SIDEWALK REPAIR,SIGNS AND PAVEMENT MARKINGS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 SR2S 125 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
BOSSIER 000-08 SATRANS 21 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010743 - LA 3: LEFT TURN LANE
Type Impv: INSTALL LEFT TURN LANE
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 3 044-02 HSIP 350 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.000118 - BAYOU FIFI BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: 001-03-0095;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER US 80 001-03 STPFLEX 1,019 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.003263 - I-20: OVERPASSES REHAB. (BOSSIER CITY)
Type Impv: BRIDGES REHAB.;
Project Manager: KEMP, KELLY
Remarks: 451-02-0097;APP SLAB.BACK WALL.REVETMENT.BEARNG
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER I-20 451-02 STPFLEX 4,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 15 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: BOSSIER
Project: H.007087 - HAMILTON ROAD IMPROVEMENTS PHASE I
Type Impv: ROAD IMPROVEMENTS
Project Manager: LACOMBE, JASON
Remarks: 742-08-0003; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 STP>200K 6,078 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.007090 - HAMILTON RD IMPROVEMENTS PH I(C&G)
Type Impv: CLEARING AND GRUBBING
Project Manager: LACOMBE, JASON
Remarks: 742-08-0006; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 STP>200K 520 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.009508 - LA 2: CANEY CREEK BRIDGE TO WEBSTER P/L
Type Impv: ASHPALT OVERLAY, DRAINAGE, PAVEMENT STRIPING, & RELATED W
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 2 083-04 STPFLEX 3,114 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011436 - I-20: EB EXIT RAMP AT LA 3105 EXTENSION
Type Impv: EXTEND EXIT RAMP
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER I-20 451-02 NHPP 600 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011437 - I-220: EB EXIT RAMP IMPROVEMENT AT LA 3
Type Impv: EXTENDING TURN LANE TO PROVIDE ADDITIONAL VEHICLE STORAGE
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER I-220 451-31 NHPP 150 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011484 - US80: RED RIVER BR. TEXAS ST. REHAB (HB)
Type Impv: CLEANING AND PAINTING, AND STRUCTURAL REPAIRS.
Project Manager: CAVALIER, STEPHANIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER US 80 001-03 NHPP 5,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011599 - LA 529: LA 160 TO LA 2
Type Impv: ASPHALTIC CONCRETE PAVEMENT RESURFACING
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 529 808-01 STPFLEX 2,900 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011726 - SWAN LAKE RD (FLAT RIVER TO CROUCH RD)
Type Impv: NEW ALIGNMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: ENTITY WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 STP>200K 14,158 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011727 - SWAN LAKE RD (E-W CORRIDOR TO FLAT RIVER
Type Impv: WIDENING, TWO TO THREE LANES
Project Manager: OLIVIER, NICHOLAS
Remarks: LOCAL ENTITY WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 STP>200K 6,318 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 16 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: BOSSIER
Project: H.003854 - SWAN LAKE RD (I-220 TO E-W CORRIDOR)
Type Impv: WIDENING STUDY
Project Manager: OLIVIER, NICHOLAS
Remarks: 700-08-0129;STAGE 0 COMPLETE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 STP>200K 7,845 URBAN SYSTEMS 2-WAITING FOR FUNDING
BOSSIER 000-08 LOCAL 1,961 URBAN SYSTEMS
Project: H.003855 - BOSSIER PAR CONG RELIEF WINFIELD RD
Type Impv: ROADWAY EXT (WINFIELD RD) STUDY
Project Manager: OLIVIER, NICHOLAS
Remarks: 700-08-0130;STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 NFI 27,900 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.001779 - JIMMIE DAVIS BRIDGE (LA 511)
Type Impv: NEW BRIDGE
Project Manager: ONYEGBUNAM, EZEKIEL
Remarks: 102-03-0010;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 511 102-03 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.003251 - I-20 (HAMILTON RD TO AIRLINE DR)
Type Impv: REMOVE & REPLACE PCC
Project Manager: OLIVIER, NICHOLAS
Remarks: 451-02-0078;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER I-20 451-02 IM 23,500 SUSTAINABILITYINTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.003857 - WAFER ROAD EXTENSION
Type Impv: ROAD EXTENSION (ENGINEERING) STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-08-0132;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.003859 - I-20 (LA 3 - I-220 E.)
Type Impv: STATE FUNDS FOR STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-08-0134;FEASIBILITY STUDY (STAGE 0)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.005184 - HIGH PRIORITY CORRIDOR NO. 18
Type Impv: ENVIRONMENTAL IMPACT STATEMENT
Project Manager: SAVOIE, RICHARD
Remarks: 700-94-0003;NCPD FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER 000-08 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
CADDO 000-09 0 DEMO / HIGH PRIORITY
Project: H.009522 - LA 3105:UNDERPASS@KCS S OF I-20(BOSSIER)
Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 3105 808-07 STPFLEX 9,100 RAILROADSGRADE SEPARATION
1-PLANNING/ENVIRONMENTAL
BOSSIER I-20 451-02 NHPP 300 RAILROADSGRADE SEPARATION
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 17 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: BOSSIER
Project: H.010299 - US 80: EASTRIDGE TO WEBSTER PARISH LINE
Type Impv: COLD-PLANING, INLAY, CHIP SEAL SHOULDERS, PAVEMENT MARKIN
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER US 80 001-03 STPFLEX 2,492 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.011284 - LA 3: CORRIDOR IMPROVEMENTS
Type Impv: LA 3 CORRIDOR FEASIBILITY/STAGE 0 STUDY
Project Manager: ALLAIN, PETER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 3 044-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Project: H.011319 - I-20: AIRLINE DR. TO I-220
Type Impv: INTERSTATE WIDENING
Project Manager: OLIVIER, NICHOLAS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER I-20 451-02 NFI 94,907 SUSTAINABILITYINTERSTATE
1-PLANNING/ENVIRONMENTAL
BOSSIER I-20 451-02 NFI 40,919 CAPACITY
BOSSIER I-20 451-02 NFI 19,977 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.011340 - LA157 @ LA3227 INTERSECTION IMPROVEMENTS
Type Impv: TRAFFIC COUNTS TO LA 157 AT LA 3227 INT. IMPROVE FEAS STUDY
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 157 082-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
BOSSIER LA 3227 808-08 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.011424 - LA157: BOOKER RD TO LA614 CORRIDOR STUDY
Type Impv: ACCESS MANAGEMENT AND SAFETY IMPROVEMENT
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 157 082-04 0 SAFETY 1-PLANNING/ENVIRONMENTAL
BOSSIER LA 157 082-03 0 SAFETY
Project: H.011428 - LA3105:GREENACRES TO LA72 CORRIDOR STUDY
Type Impv: ACCESS MANAGEMENT AND SAFETY IMPROVEMENT
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
BOSSIER LA 3105 808-07 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 18 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CADDO
Project: H.001278 - INTERSECTION IMPR YOUREE DR AT KINGS HWY
Type Impv: INTERSECTION IMPROVEMENT
Project Manager: BORNE, FRED
Remarks: 053-09-0053; USE TTF AS MATCH PER AGREEMENT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 053-09 STP>200K 4,220 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
CADDO LA 1 053-09 STPFLEX 764 URBAN SYSTEMS
CADDO LA 3032 420-01 HSIP 865 SAFETY
CADDO LA 3032 420-01 STPFLEX 270 URBAN SYSTEMS
Project: H.011267 - I-20 & I-49 PAVEMENT MARKING REPL. I
Type Impv: REMOVE AND REPLACE EXISTING PAVEMENT MARKINGS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 NHPP 400 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 14-15
BOSSIER I-20 451-02 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
CADDO I-49 455-08 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011675 - I-20: DIST 04 CABLE BARRIER SPARE PARTS
Type Impv: PROVIDE SPARE PARTS FOR MAINTAINING CABLE BARRIER.
Project Manager: WATTS, RONALD G.
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 SATRANS 43 SAFETY 4-SCHEDULED IN CURRENT FY 14-15
BOSSIER I-20 451-02 SATRANS 43 SAFETY
WEBSTER I-20 451-03 SATRANS 43 SAFETY
BIENVILLE I-20 451-04 SATRANS 43 SAFETY
Project: H.001623 - CREEK BRIDGE & IRISH BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: MOORE, DARRELL
Remarks: 079-01-0034;USE NFA AS MATCH PHASES 1 TO 5
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3049 079-01 NFA 900 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.006472 - CITY OF SHREVEPORT TRAFFIC SIG BKUP
Type Impv: TRAFFIC SIGNAL POWER GENERATOR INST
Project Manager: HOLM, RICK
Remarks: 737-09-0104;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 SATRANS 216 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.006475 - CITY OF SHRVPRT TRAFFIC SIGNAL BKUP
Type Impv: TRAFFIC SIGNAL POWER GENERATOR
Project Manager: HOLM, RICK
Remarks: 737-09-0108;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 SATRANS 158 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009438 - VARIOUS ROADS:SIGNING (CADDO)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 SATRANS 47 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 19 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CADDO
Project: H.009475 - LA 538: ROUNDABOUT AT RAVENDALE
Type Impv: INSTALL SINGLE LANE ROUNDABOUT
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 538 078-02 HSIP 1,500 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.009575 - I-20:TEXAS STATE LINE TO MONKHOUSE DR.
Type Impv: COLD PLANE & OVERLAY AND PCCP PATCHING
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 NHPP 7,000 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009576 - I-49: DESOTO PARISH LINE TO LA 526
Type Impv: PCC PATCHING
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-49 455-08 NHPP 900 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010202 - I-20: EXIT LANE EXTENSION (EXITS 3 & 5)
Type Impv: EXTEND EXIT LANES FOR DECELLERATION. PCC PAVEMENT
Project Manager: JESCLARD, TREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 HSIP 1,127 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010300 - US 80: JCT JEFFERSON PAIGE RD- HEARNE RD
Type Impv: COLD PLANING, ASPHALTIC OVERLAY, PAVEMENT MARKING,
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 80 001-02 STPFLEX 2,350 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011421 - LA 3032: LT TURN LANES AT CAMILLA DR
Type Impv: ADDING LEFT TURN LANES IN THE MEDIAN IN BOTH DIRECTIONS
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3032 420-01 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.001166 - CADDO LAKE BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: FOURNERAT, CHRIS
Remarks: 045-01-0029;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 045-01 STPFLEX 21,398 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.001661 - BLACK BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: YAP, KIAN
Remarks: 085-01-0022;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 530 085-01 FBROFF 2,356 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009744 - OIL CITY MULTI-USE TRAIL, PHASE 2
Type Impv: MULTI-USE TRAIL AND RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 TAP<5K 438 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 20 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CADDO
Project: H.010060 - BLANCHARD FURRH ROAD / CHOCTAW BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 FBROFF 1,047 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010206 - LA 3132 AT LA 523: EXTEND C OF A
Type Impv: EXTEND CONTROL OF ACCESS LA 3132 AT LA 523
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3132 427-01 NHPP 1,183 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
CADDO LA 523 103-01 NHPP 1,147 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.010292 - US 79: TEXAS STATE LINE TO US 80
Type Impv: COLD PLANE, ASPHALTIC OVERLAY, PAVEMENT STRIPING
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 79 048-01 STPFLEX 1,500 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010468 - I-20: WEST END HUDSON ST. BRIDGE TO I-49
Type Impv: REMOVE AND REPLACE PCC
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 NHPP 15,000 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010475 - I-20: MONKHOUSE TO W END OF HUDSON ST BR
Type Impv: REMOVE AND REPLACE PCC
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 NHPP 20,000 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011094 - LA 3094: HEARNE AV BR REHAB
Type Impv: REPLACE SUPERSTRUCTURE, RAISE GRADE, ROADWAY & EMBANKM
Project Manager: D'ANDREA, ARTUR
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3094 025-08 NHPP 2,700 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011112 - LA 1: UP RR XING (CADDO)
Type Impv: UPGRADE RR WARNING DEVICES
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 053-08 RAIL PD 50 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.011420 - LA 3132: EB ENTRANCE LANE EXTENSION
Type Impv: EXTENDING ACCELERATION LANE FROM ENTRANCE RAMP
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3132 427-01 NHPP 250 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011448 - IDA SAFETY REST AREA
Type Impv: DESIGN AND CONSTRUCT NEW REST AREA
Project Manager: GUINN, MICHAEL S
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 NHPP 20,000 OPER EFFICIENCY/MOTORIST ASSISTANCEREST AREAS
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 21 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CADDO
Project: H.011449 - GREENWOOD REST AREA RENOVATIONS
Type Impv: REST AREA RENOVATION
Project Manager: GUINN, MICHAEL S
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 NHPP 4,000 OPER EFFICIENCY/MOTORIST ASSISTANCEREST AREAS
3-DESIGN/DEVELOPMENT
Project: H.011510 - SHREVEPORT ITS PHASE 4
Type Impv: DEPLOY ITS EQUIPMENT AND COMMUNICATIONS.
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 NHPP 100 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
BOSSIER I-20 451-02 NHPP 100 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.011733 - US 80 TRAFFIC CONTROL UPGRADES
Type Impv: SIGNAL UPGRADES
Project Manager: FILLASTRE, ANDRE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 80 001-02 STPFLEX 2,250 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.001618 - JCT LA 173 - MIDDLE SCHOOL
Type Impv: RECONST.W/GEOMETRIC IMP NEED STAGE0
Project Manager: PICARD, TOBY
Remarks: 078-02-0019;NEED FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 538 078-02 NFI 5,604 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
CADDO LA 173 094-01 0 OTHER / MISCELLANEOUS
Project: H.001724 - SHREVEPORT-BLANCHARD HWY.
Type Impv: 4 LANING (CONTINGENT ON BOND FUNDS)
Project Manager: BORNE, FRED
Remarks: 094-01-0029;ORIGINATED BY DEPT OF ECON DEV.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 173 094-01 NFI 25,000 CAPACITY 2-WAITING FOR FUNDING
Project: H.001725 - JCT. LA 3094 - JCT. I-220
Type Impv: WIDENING
Project Manager: BORNE, FRED
Remarks: 094-01-0032;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 173 094-01 NFI 10,000 CAPACITY 2-WAITING FOR FUNDING
Project: H.006447 - I-69: SIU 14 JCT I-20 TO US 82
Type Impv: DESIGN AND ACQUIRE R/W
Project Manager: REVIERE, RYAN
Remarks: 736-99-1032;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 0 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.009913 - LA 1: 1.32 MI N JCT LA 2-TEXAS STA LINE
Type Impv: CHIP SEAL
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 045-03 STPFLEX 430 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
Project: H.000413 - CROSS BAYOU BRIDGE REPLACEMENT
Type Impv: BRIDGE REHAB
Project Manager: YAP, KIAN
Remarks: 011-01-0054;STAGE 0 - FUTURE REHAB PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 71 011-01 NHPP 2,800 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 22 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CADDO
Project: H.001164 - LA 169 - LA 538 (N. OF OIL CITY)
Type Impv: WIDEN TO 4 LANES
Project Manager: BURST, JEFFERY
Remarks: 045-01-0026;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 045-02 NFI 23,223 CAPACITY 1-PLANNING/ENVIRONMENTAL
CADDO LA 1 045-01 STPFLEX 4,000 CAPACITY
Project: H.003915 - I-49 INNER CITY CONNECTOR
Type Impv: STAGE 0 AND ENVIRONMENTAL
Project Manager: BROUSSARD, DAN
Remarks: USE STATE SURPLUS AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO 000-09 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.009213 - LA 3132 (INNER LOOP) EXTENSION
Type Impv: STAGE 0 FEASIBILITY STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 3132 427-01 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.010271 - LA 1: SUNDOWN ROAD TO JCT LA 538
Type Impv: OVERLAY, SHOULDER STABILIZATION AND STRIPING
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 045-01 STPFLEX 1,000 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010278 - LA 173: JCT HEARNE AVE TO I-220
Type Impv: OVERLAY, SHOULDER STABLIZATION, STRIPING, RELATED WORK
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 173 094-01 STPFLEX 1,000 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010279 - LA 173: LA 1 TO US 71
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 173 094-02 STPFLEX 900 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010286 - LA 538: JCT US 71 TO LA 1
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 538 078-04 STPFLEX 1,000 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010288 - LA 789: PRESTON ROAD TO LA 169
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 789 809-07 STPFLEX 2,000 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010428 - US 71: JCT US 80 TO HEARNE AVE
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 71 011-01 NHPP 470 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
CADDO US 71 053-09 NHPP 110 SUSTAINABILITYNON-INTERSTATE
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 23 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CADDO
Project: H.010549 - I20: MP RR (LM 6.5) TO PINES RD (LM 9.7)
Type Impv: WIDEN FROM 4 TO 6 LANES
Project Manager: ALLEN, JEFFREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO I-20 451-01 NHPP 15,000 CORRIDOR 1-PLANNING/ENVIRONMENTAL
Project: H.011099 - DIST. 04 SIGNAL TIMING STUDIES PHASE 2
Type Impv: IMPROVE SIGNAL TIMING FOR DISTRICT 04 CORRIDORS
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 171 025-08 NHPP 64 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
BOSSIER LA 72 010-30 STPFLEX 10 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
CADDO LA 1 053-09 NHPP 37 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
BOSSIER LA 3105 808-07 STPFLEX 42 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
CADDO LA 526 809-08 STPFLEX 37 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
BOSSIER LA 72 010-31 STPFLEX 10 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011281 - US 171: CORRIDOR IMPROVEMENTS
Type Impv: FEASIBILITY STUDY FOR CORRIDOR IMPROVEMENTS TO US 171
Project Manager: ALLAIN, PETER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 171 025-08 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
DESOTO US 171 025-07 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
DESOTO US 171 025-06 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
DESOTO US 171 025-05 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.011283 - LA 1: CORRIDOR IMPROVEMENTS
Type Impv: FEASIBILITY STUDY FOR CORRIDOR IMPROVEMENTS TO LA 1
Project Manager: ALLAIN, PETER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO LA 1 053-08 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Project: H.011392 - US 80 AT LA 169 INTERSECTION IMPROVEMENT
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CADDO US 80 001-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
CADDO LA 169 048-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
CADDO US 79 048-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 24 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CALCASIEU
Project: H.003200 - FRONTAGE ROAD CONST IN LAKE CHARLES
Type Impv: TURNAROUND UNDERNEATH INTERSTATE
Project Manager: PAINE, PEGGY JO
Remarks: 450-91-0171;STAGE 0 COMPLETE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 IM DISCR 1,268 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 14-15
CALCASIEU I-10 450-91 TCSP 631 DEMO / HIGH PRIORITY
CALCASIEU 000-10 TCSP 814 DEMO / HIGH PRIORITY
Project: H.006482 - CITY OF WESTLAKE SIGN REPLACEMENT
Type Impv: SIGN INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-10-0120;ENTITY REQUIRED TO MATCH FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 SATRANS 44 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011425 - BLACK BAYOU PONTOON BR COLLISION REPAIRS
Type Impv: REPAIR DAMAGE CAUSED BY MARINE VESSEL COLLISION
Project Manager: LAMBERT, JARRETT
Remarks: SECRETARY'S EMERGENCY FUND LETTER DATED 7/8/2014
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 384 382-04 STGEN 300 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011554 - I-10 & I-210: PAVEMENT MARKING REPL. II
Type Impv: REMOVE AND REPLACE EXISTING PAVEMENT MARKINGS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 14-15
CALCASIEU I-210 450-30 NHPP 200 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011632 - LA 3059: US 171 - PUJOL RD
Type Impv: ASPHALT SURFACE TREATMENT
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 3059 383-01 STPFLEX 198 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011633 - LA 109: US 90 - N CHARLIE STANLEY LOOP
Type Impv: ASPHALTIC SURFACE TREATMENT
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 109 187-01 STPFLEX 363 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.000870 - YOU WINN RD./ GLORIA DRIVE @ US 171
Type Impv: INTERSECTION REALIGNMENT
Project Manager: BANKSTON, TANYA
Remarks: 742-10-0137;USE LOCAL AS MATCH FOR C.S. 000-10;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STP<200K 1,011 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
CALCASIEU US 171 024-02 STP<200K 511 URBAN SYSTEMS
Project: H.002070 - LA 14 BAYOU BRIDGE
Type Impv: NEW BRIDGE
Project Manager: LAI, QUANG
Remarks: 196-01-0023;MULTI PIPE OR CULVERT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 14 196-01 STPFLEX 579 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 25 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CALCASIEU
Project: H.006484 - CALCASIEU PH.LEGER RD.SIDEWALK SRTS
Type Impv: SIDEWALKS
Project Manager: GROS, SCOTT
Remarks: 737-10-0123;SR2S PROGRAM FUNDING
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 SR2S 202 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
CALCASIEU 000-10 SATRANS 26 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.007130 - JOHN STINE(MYRTLE SPRINGS-SAMPSON)
Type Impv: WIDENING
Project Manager: BANKSTON, TANYA
Remarks: 742-10-0146;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STP<200K 5,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.007939 - LA 378-S: INDIAN BAYOU BRIDGE & APPROACH
Type Impv: BRIDGE REPLACEMENT
Project Manager: MUSA, ELNUR
Remarks: 810-33-0002;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 378-S 810-33 STPFLEX 2,039 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009611 - US 90: EDGERLY - SULPHUR
Type Impv: CP 2", PATCH , OVERLAY 4"
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU US 90 003-03 STPFLEX 3,825 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010192 - LAKE CHARLES ITS PHASE 2
Type Impv: ITS DEPLOYMENT AS PER REGIONAL ARCHITECTURE
Project Manager: BUTLER, KYLE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 NHPP 2,575 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010197 - US 171: J-TURN @ N. PERKINS FERRY RD.
Type Impv: INSTALL TURN LANES (RIGHT, LEFT AND J-TURN)
Project Manager: JESCLARD, TREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU US 171 024-02 HSIP 750 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010240 - LA 12: TEXAS STATE LN - LA 109
Type Impv: CP ROADWAY 2", OL ROADWAY 3.5", OL SHOULDERS 1.5"
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 12 012-02 STPFLEX 2,308 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010670 - LA 27&LA 1256:0.97 MI S LA1133- I-10 INT
Type Impv: PATCH, CP 2", OL 4"
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 1256 031-05 STPFLEX 2,315 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
CALCASIEU LA 1256 031-05 STPFLEX 1,543 SUSTAINABILITYNON-INTERSTATE
Project: H.010865 - I-210: DISTRICT 07 CABLE BARRIER
Type Impv: INSTALLATION OF CABLE BARRIER SYSTEM IN MEDIAN.
Project Manager: CORMIER, CLAYTON
Remarks: USE HSIP FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-210 450-30 HSIP 939 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 26 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CALCASIEU
Project: H.010916 - PRIEN LAKE MAIN SPAN RE-DECKING
Type Impv: REHABILITATION
Project Manager: D'ANDREA, ARTUR
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-210 450-30 NHPP 10,300 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
CALCASIEU I-210 450-30 NHPP 10,000 SUSTAINABILITYINTERSTATE
Project: H.011019 - LA 101: ELEVATE ROADWAY
Type Impv: ELEVATE THE ROADWAY
Project Manager: GOLZ, SARAH
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 101 209-01 STPFLEX 300 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011088 - W PRIEN LAKE RD RELOCATION
Type Impv: NEW ALIGNMENT
Project Manager: NICKEL, TIM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 3088 870-02 STBONDS 13,000 CAPACITY 4-SCHEDULED FOR LETTING FY 15-16
CALCASIEU LA 3088 870-02 LOCAL 2,000 CAPACITY
CALCASIEU LA 1138-2 810-06 LOCAL 100 CAPACITY
CALCASIEU LA 1138-1 810-34 LOCAL 100 CAPACITY
Project: H.011100 - LA 3059: REALIGN @ PARISH LINE
Type Impv: REALIGN CURVE
Project Manager: CORMIER, CLAYTON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 3059 383-01 SATRANS 1,475 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
JEFF DAVIS LA 3059 383-02 SATRANS 1,025 SAFETY
Project: H.011196 - LAKE CHARLES SRTS PROJ. - BARBE ELEM.
Type Impv: SIDEWALKS, STRIPING AND SIGNING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 SR2S 200 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
CALCASIEU 000-10 SATRANS 25 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.011232 - LAKE CHARLES SRTS PROJ. - BARBE ELEM. NI
Type Impv: EDUCATIONAL AND ENCOURAGEMENT ACTIVITIES
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 0 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011296 - LCHD SEVERAL RR XINGS (CALCASIEU)
Type Impv: INSTALL NEW CBAS AT LCHD PASSIVE PUBLIC CROSSINGS.
Project Manager: SHREWSBERRY,BILL
Remarks: 714-10-0117
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 RAIL PD 190 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
CALCASIEU LA 385 195-04 RAIL PD 10 RAILROADS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 27 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CALCASIEU
Project: H.011500 - LAKE CHARLES ITS PHASE 3
Type Impv: THIS PROJECT INCLUDES INSTALLING CAMERAS & DMSS ALONG I-21
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-210 450-30 NHPP 3,000 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.000186 - US 90 OVER I-10 RAMPS @ LOCKMOOR
Type Impv: BRIDGE REPLACEMENT
Project Manager: YANG, LI
Remarks: 003-04-0064;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU US 90 003-04 STPFLEX 12,248 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.000425 - LA 12 SABINE RIVER BRIDGE
Type Impv: NEW BRIDGE
Project Manager: OLIVIER, NICHOLAS
Remarks: 012-01-0004;JOINT PROJECT WITH TEXAS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 12 012-01 STPFLEX 4,346 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.000428 - LA 12 BRIDGES
Type Impv: NEW BRIDGES
Project Manager: BROWN, JEFF
Remarks: 012-02-0036;6 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 12 012-02 STPFLEX 29,903 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002059 - LA 384 @ LA 385
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: LAI, QUANG
Remarks: 195-04-0029;INTR IMP.WIDEN LA 384&385 @MCNEESE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 385 195-04 HSIP 1,000 SAFETY 3-DESIGN/DEVELOPMENT
CALCASIEU LA 384 382-05 NHPP 550 SUSTAINABILITYNON-INTERSTATE
CALCASIEU LA 384 382-05 HSIP 500 SAFETY
Project: H.002075 - PAVEMENT WIDENING-MP42.7-I-10 FR RD
Type Impv: PAVEMENT WIDENING
Project Manager: OSTUNO, BARBARA
Remarks: 197-02-0023;ON GRANDFATHER LIST FOR FED FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 383 197-02 STPFLEX 1,250 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.003184 - I-10: TEXAS STATE LINE-E. OF COONE GULLY
Type Impv: WIDEN TO 6 LANES
Project Manager: THOMAS, BEN
Remarks: 450-91-0078;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 NHPP 24,000 CORRIDOR 3-DESIGN/DEVELOPMENT
CALCASIEU I-10 450-91 NHPP 41,000 SUSTAINABILITYINTERSTATE
Project: H.005967 - NELSON RD EXT & BRIDGE
Type Impv: NEW ROAD & BRIDGE
Project Manager: KENDRICK, BRIAN
Remarks: 706-10-0001;TEA-21. STA 87.USE STGEN$ FOR ENG
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STGEN 2,500 INTERMODAL CONNECTOR 3-DESIGN/DEVELOPMENT
CALCASIEU 000-10 NHPP 10,000 INTERMODAL CONNECTOR
CALCASIEU 000-10 DEMO 18,300 DEMO / HIGH PRIORITY
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 28 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CALCASIEU
Project: H.007113 - J.BENNETT JOHNSTON AVENUE
Type Impv: OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: 742-10-0125; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STP<200K 580 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.007122 - MYRTLE SPRINGS ROAD
Type Impv: SURFACE WIDENING AND OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: 742-10-0136;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STP<200K 1,582 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.007417 - LAKE SHORE DRIVE MULTI-USE PATH
Type Impv: SIDEWALKS, LANDSCAPING AND RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 TAP<200K 700 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.009455 - I-210 BRIDGE CLEANING & PAINTING
Type Impv: CLEANING & PAINTING
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-210 450-30 NHPP 3,400 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
Project: H.009620 - I-10:WEST OF LA 108 TO 1-210 INTERCHANGE
Type Impv: RUBBLIZE & OVERLAY, REPLACE AT UNDERPASS
Project Manager: BALLMER, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 NHPP 15,000 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009621 - I-210: W JCT I-10 - E JCT I-10
Type Impv: OGFC
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-210 450-30 NHPP 3,500 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009750 - TOPSY ROAD SIDEWALK
Type Impv: SIDEWALKS, SUBSURFACE DRAINAGE, & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks: ROW IS 80/20, CONSTRUCTION 95/5
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 TAP<200K 145 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.009751 - BELL CITY SCHOOL SIDEWALK
Type Impv: SIDEWALKS, SUBSURFACE DRAINAGE, WARNING LIGHTS &RELATED
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 14 196-01 TAP<200K 102 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
CALCASIEU 000-10 TAP<200K 13 ENHANCEMENTS
Project: H.010563 - 5TH AVE (SOUTHBOUND) / FIFTH AVE DRAIN
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 FBROFF 439 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 29 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CALCASIEU
Project: H.010564 - PEARL STREET / LATERAL L-3
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 FBROFF 295 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011065 - NELSON INTERCHANGE IMPROVEMENTS
Type Impv: IMPROVEMENTS TO THE NELSON INTERCHANGE
Project Manager: NICKEL, TIM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 1138-2 810-06 STBONDS 6,000 CAPACITY 3-DESIGN/DEVELOPMENT
CALCASIEU I-210 450-30 STBONDS 1,000 CAPACITY
CALCASIEU I-210 450-30 LOCAL 7,800 CAPACITY
Project: H.011326 - LAKE CHARLES TMC
Type Impv: RENOVATION OF EXISTING BUILDING TO HOUSE TMC
Project Manager: DELANEY, ELIZABETH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STCASH 124 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
CALCASIEU 000-10 STPFLEX 76 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.011509 - LAKE CHARLES ITS PHASE 4
Type Impv: THIS PROJECT WILL INSTALL DMSS AND CCTVS.
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 NHPP 1,250 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
Project: H.011546 - NURSERY STREET / BUXTON CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 FBROFF 385 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011563 - GUM COVE RD - .384 MI W SOUTHLAND FIELD
Type Impv: PATCH, WIDEN, COLD PLANE AND OVERLAY
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 108 192-02 STPFLEX 3,555 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011616 - LA 101: LA 14 - JEFFERSON DAVIS P/L
Type Impv: PATCH, COLD PLANE AND OVERLAY
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 101 209-01 STPFLEX 690 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011802 - PINECONE DRIVE SIDEWALK
Type Impv: SIDEWALKS
Project Manager: MEEK, STEPHEN
Remarks: MATCH PROVIDED BY THE CALCASIEU PARISH POLICE JURY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 TAP<200K 358 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 30 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CALCASIEU
Project: H.011837 - HAZEL STREET OVERLAY
Type Impv: COLD PLANE AND OVERLAY, PAVEMENT MARKINGS
Project Manager: BANKSTON, TANYA
Remarks: CITY OF SULPHUR PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 STP<200K 520 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.003740 - STARKS WEIGH STATION BUILDING
Type Impv: NEW WEIGH STATION BUILDING
Project Manager: MCCOY, JANET
Remarks: 697-13-0005;PRIORITY 1
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU 000-10 0 OPER EFFICIENCY/MOTORIST ASSISTANCEWEIGH STATIONS
2-WAITING FOR FUNDING
Project: H.009488 - LA 378 WIDENING (WESTLAKE TO MOSS BLUFF)
Type Impv: STAGE 0 STUDY TO WIDEN LA 378 (WESTLAKE TO MOSS BLUFF)
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 378 810-12 NFI 0 CAPACITY 2-WAITING FOR FUNDING
Project: H.003931 - CALCASIEU RIVER BRIDGE
Type Impv: FEASIBILITY & ENVIRON. STUDY
Project Manager: UMEOZULU, JOE
Remarks: 700-10-0115;INCL. UPRR GRADE SEPARATION
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU I-10 450-91 NFI 0 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
CALCASIEU LA 378 810-12 0 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.009521 - LA 397: NEW BRIDGE AT UPRR
Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 397 193-31 STPFLEX 10,200 RAILROADSGRADE SEPARATION
1-PLANNING/ENVIRONMENTAL
Project: H.009612 - LA 12: LA 109 - BEAUREGARD P/L
Type Impv: CP 2", OVERLAY 4", 2" SHLD
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 12 012-02 STPFLEX 4,863 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009613 - LA 14: MC NEESE ST - E. PRIEN LAKE RD
Type Impv: PCCP RECONSTRUCTION
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 14 193-06 STPFLEX 4,926 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009614 - LA 14: LA 101 - JEFFERSON DAVIS P/L
Type Impv: CP 2", PATCH, OVERLAY 4"
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 14 196-02 STPFLEX 1,181 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010000 - US171 CALCASIEU RVR BRIDGE CLEAN & PAINT
Type Impv: CLEANING & PAINTING & MISC. REPAIRS
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU US 171 024-01 NHPP 1,700 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 31 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CALCASIEU
Project: H.010001 - LA27 ICWW ELLENDERS BRIDGE CLEAN & PAINT
Type Impv: CLEANING & PAINTING & MISC. REPAIRS
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 27 031-04 STPFLEX 1,800 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
Project: H.010234 - LA 14: 0.15 MI S LOGNION RD - LA 101
Type Impv: PATCH, CP 2", 4" OVERLAY RDWY, AGGREGATE SHLDR
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 14 196-01 STPFLEX 1,111 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010241 - LA 12: 0.63 MI NE AIRPORT DR - BUXTON CR
Type Impv: PATCH, CP2", 4" OVERLAY RDWY, 2" PAVED SHOULDER
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 12 012-04 STPFLEX 1,541 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.011242 - LA 384 (BIG LAKE RD TO MCNEESE ST)
Type Impv: TBD BY FEASIBILITY STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALCASIEU LA 384 382-05 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 32 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CALDWELL
Project: H.009610 - LA 133: LA 4 - LA 561
Type Impv: ASPHALT OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 133 166-01 STPFLEX 2,714 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011130 - BOEUF WMA MORENGO SWAMP TRAIL - PHASE 1
Type Impv: RESTORATION OF 4.25 MILES OF MOTORIZED TRAILS IN WMA
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL 000-11 RTP 185 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011188 - RIVERTON CAMP RD: UP RR XING (CALDWELL)
Type Impv: THIS PROJECT PROPOSES TO INSTALL FLASHING LIGHTS AND GATE
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL 000-11 RAIL PD 353 RAILROADS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.007940 - BAYOU LAFOURCHE CUTOFF BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: HERATH, ANANDA
Remarks: 811-01-0009;USE NFA AS MATCH PHASES 1 TO 5
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 847 811-01 NFA 3,083 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011293 - LA 126: UP RR XING (GRAYSON)
Type Impv: RR SIGNAL PREEMPTION
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 126 091-09 RAIL PD 50 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011570 - LA 559: 5 MI. N. PARISH LINE - LA 4
Type Impv: PATCH, OVERLAY & AST
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 559 346-02 NFA 1,480 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011572 - LA 559:DUTY FERRY - 5 MI. N. PARISH LINE
Type Impv: PATCH & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 559 346-02 NFA 1,908 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
CATAHOULA LA 559 346-01 NFA 445 SUSTAINABILITYNON-INTERSTATE NFA
Project: H.001557 - 22' PAVEMENT - JCT. US 165
Type Impv: WIDENING & O'LAY W/CURVE REALIGN.
Project Manager: ZIECKER, MATTHEW
Remarks: 068-04-0030;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 4 068-04 HSIP 1,120 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.002650 - CASTOR,CASTOR RELIEF & DRAIN BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: TONEY, PATRICK
Remarks: 345-03-0029;3 BRIDGES;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 506 345-03 NFA 4,265 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 33 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CALDWELL
Project: H.009602 - LA 557: LA 4 - OUACHITA LINE
Type Impv: MICROSURFACING
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CALDWELL LA 557 159-02 STPFLEX 1,276 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 34 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CAMERON
Project: H.011350 - CAMERON FERRY TRAVELER MESSAGE SIGNING
Type Impv: DYNAMIC MESSAGE SIGNS INSTALLATION
Project Manager: KIMBENG, LUCY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CAMERON LA 27 193-02 STPFLEX 60 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED FOR LETTING FY 15-16
CAMERON LA 27 193-01 STPFLEX 60 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
CAMERON LA 27 031-01 STPFLEX 60 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
CALCASIEU LA 27 031-05 STPFLEX 60 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
CAMERON LA 82 384-01 STPFLEX 60 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.011545 - LITTLE CHENIER RD / LITTLE CHENIER BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CAMERON 000-12 FBROFF 293 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009470 - LA 82: SUPERIOR CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT - MOVEABLE BRIDGE
Project Manager: BUCCI, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CAMERON LA 82 194-02 STPFLEX 11,161 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 35 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CATAHOULA
Project: H.009607 - LA 124/LA 559: ENTERPRISE TO DUTY FERRY
Type Impv: PATCH AND OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 124 041-03 STPFLEX 970 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 14-15
CATAHOULA LA 559 813-29 STPFLEX 88 SUSTAINABILITYNON-INTERSTATE NFA
Project: H.001140 - LA 124: HOOTER CREEK BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BALLMER, SARAH
Remarks: 041-03-0025; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 124 041-03 FBROFF 1,504 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010941 - RATCLIFF ROAD / DUCK CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA 000-13 FBROFF 1,625 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.000762 - JCT LA 28 - JCT LA 3037
Type Impv: WIDEN TO 4 LANES
Project Manager: MOORE, DARRELL
Remarks: 022-06-0038;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA US 84 022-06 NFI 6,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
CATAHOULA US 84 022-06 NFI 6,000 CAPACITY
Project: H.007946 - LA 3102: LA 124 - 4.8 MI NW OF LA 124
Type Impv: PATCH AND OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: 813-24-0024;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 3102 813-24 NFA 1,941 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
Project: H.010815 - LA 124 EXTENSION
Type Impv: CONSTRUCTION ON NEW ALIGNMENT OF AN EXISTING ROUTE
Project Manager: MOORE, DARRELL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 124 143-03 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
Project: H.011029 - LA 559: REPLACE DUTY FERRY WITH BRIDGE
Type Impv: FEASIBILITY STUDY TO REPLACE DUTY FERRY WITH A BRIDGE
Project Manager: MUMPHREY, RAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CATAHOULA LA 559 813-29 STPFLEX 18,000 OTHER / MISCELLANEOUS 0-FEASIBILITY/SCOPING
CATAHOULA LA 559 346-01 STPFLEX 18,000 OTHER / MISCELLANEOUS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 36 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CLAIBORNE
Project: H.010067 - LYONS HILL AND FLAT LICK ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE 000-14 FBROFF 962 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 14-15
Project: H.001763 - LA 520: MIDDLE FORK BAYOU D'ARBONNE BRG.
Type Impv: BRIDGE REPLACEMENT
Project Manager: BALLMER, SARAH
Remarks: 101-01-0012;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 520 101-01 STPFLEX 898 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011581 - LA 154: LA 518 TO LA 9
Type Impv: RESURFACING ASPHALTIC CONCRETE PAVEMENT
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 154 088-06 NFA 375 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009505 - US 79: BILLY SHAW - N END OF PASSING LA
Type Impv: ASPHALT OVERLAY, DRAINAGE, PAVEMENT MARKING & RELATED W
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE US 79 027-06 STPFLEX 1,940 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
CLAIBORNE LA 2 070-02 STPFLEX 3,200 SUSTAINABILITYNON-INTERSTATE
Project: H.010923 - US 79 BYPASS @ LA 9 ROUNDABOUT
Type Impv: DESIGN AND CONSTRUCTION OF ROUNDABOUT
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE US 79 027-05 STPFLEX 2,950 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.001674 - LA 146 BRIDGES NEAR HOMER
Type Impv: NEW BRIDGES
Project Manager: DELATTE, BRIAN
Remarks: 085-08-0032;4 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 146 085-08 STPFLEX 6,068 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010281 - LA 2: WEBSTER P/L TO LA 3062
Type Impv: COLD PLANE, ASPHALTIC OVERLAY, CTB SHOULDERS, PAVEMENT S
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CLAIBORNE LA 2 085-07 STPFLEX 3,350 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 37 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: CONCORDIA
Project: H.006187 - LA 15 @ DEER PARK (S OF US 65 - LEVEE)
Type Impv: LA 15 AT DEER PARK REALIGNMENT
Project Manager: ZIECKER, MATTHEW
Remarks: 177-04-0033
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 15 177-04 HSIP 1,657 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.009587 - US 84: MISS. RIVER BR. - LA 3180
Type Impv: COLD PLANE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA US 84 026-02 NHPP 1,900 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010460 - LA 565: LA 129 - LA 600
Type Impv: PATCH AND OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 565 178-03 STPFLEX 1,305 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010462 - LA 15: LA 131 - US 84
Type Impv: PATCH & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 15 177-05 STPFLEX 3,200 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011561 - LA 129: LEVEE RD - S JCT LA 909
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 129 178-01 STPFLEX 2,100 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011562 - LA 129: N. JCT. LA 909 - LA 907
Type Impv: STABILIZE BASE, OVERLAY & PATCH, OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 129 178-01 STPFLEX 5,710 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.000770 - JCT LA 565 - JCT LA 129
Type Impv: WIDEN TO 4 LANES
Project Manager: MOORE, DARRELL
Remarks: 022-07-0053;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA US 84 022-07 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.000771 - LA 129 - US 65 (FERRIDAY)
Type Impv: WIDEN TO 4 LANES
Project Manager: RABALAIS, NICK
Remarks: 022-07-0054;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA US 84 022-07 NFI 3,000 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.010461 - LA 15: LA 910 - LA 565
Type Impv: PATCH AND OVERLAY, AST
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
CONCORDIA LA 15 177-04 STPFLEX 5,745 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 38 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DESOTO
Project: H.009978 - US 84: PASSING LANES
Type Impv: COLD PLANING, SUPERPAVE ASPHALTIC CONCRETE, PAVEMENT STR
Project Manager: ALLEN, JEFFREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO US 84 021-02 DEMO 1,875 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 14-15
DESOTO US 84 021-02 STPFLEX 558 OTHER / MISCELLANEOUS
Project: H.011009 - US 84: US 171 TO LA 175 SOUTH
Type Impv: MILL AND OVERLAY
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO US 84 021-03 NHPP 525 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011313 - MOUNCE RD: HOWARD RD TO BLUNT MILL RD
Type Impv: ROADWAY REHABILITATION
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 3106 870-04 NFA 627 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 14-15
Project: H.010212 - LA 175: IMPROVEMENT BTWN US 84 & LA 509
Type Impv: LENGTHEN TURN LANE, ADD TURN LANE AND MINOR WIDENING
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 175 035-04 HSIP 900 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010975 - LA 175: NB LEFT TURN LANE AT LA 3015
Type Impv: ADDING LEFT TURN LANE TO IMPROVE TRAFFIC FLOW
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 175 035-04 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011583 - LA 3015: LA 5 TO US 171
Type Impv: RE-SURFACING ASPHALTIC CONCRETE PAVEMENT
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 3015 298-02 NFA 5,000 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
Project: H.001223 - RESURFACING ON US 84 AND LA 5
Type Impv: MILL. OVERLAY
Project Manager: OSTUNO, BARBARA
Remarks: 049-01-0017;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 5 049-01 STPFLEX 2,895 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
DESOTO US 84 021-02 STPFLEX 1,853 SUSTAINABILITYNON-INTERSTATE
Project: H.001749 - LA 5 REALIGNMENT AND CROSS SLOPE IMPROVE
Type Impv: CURVE REALIGNMENT
Project Manager: BAUGH, SAM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 5 098-03 HSIP 1,200 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.009093 - LA 175: TURN LANES @ LA 5
Type Impv: ADD TURN LANES
Project Manager: STURDIVANT, PHILLIP
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 175 035-04 HSIP 800 SAFETY 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 39 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DESOTO
Project: H.010285 - LA 512 & LA 483: US 171 TO LA 175
Type Impv: ASPHALTIC OVERLAY, PAVEMENT STRIPING AND RELATED WORK
Project Manager: OSTUNO, BARBARA
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 483 301-02 STPFLEX 4,600 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.010817 - ROGERS FIELD AND MOUNCE ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO 000-16 FBROFF 285 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
DESOTO 000-16 FBROFF 293 SUSTAINABILITYBRIDGE (OFF SYSTEM)
DESOTO 000-16 FBROFF 1,117 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010978 - US 84: LEFT TURN LANES AT LA 481
Type Impv: ADDING A LEFT TURN LANES IN BOTH DIRECTIONS AT LA 481
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO US 84 021-02 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.001790 - INT. PAPER PLANT - LA 1
Type Impv: RECON W/GEOMETRIC IMPROVEMENTS
Project Manager: BORNE, FRED
Remarks: 105-02-0017;$.5 AVAIL. (ORIGINATED BY DED)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO LA 509 105-02 NFI 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
RED RIVER LA 509 105-03 0 OTHER / MISCELLANEOUS
Project: H.011471 - GRAND BAYOU REST AREA
Type Impv: CREATE A REAST AREA BETWEEN SHREVEPORT AND NATCHITOCHE
Project Manager: GUINN, MICHAEL S
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DESOTO 000-16 NHPP 19,000 OPER EFFICIENCY/MOTORIST ASSISTANCEREST AREAS
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 40 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.002822 - NICHOLSON @ BRIGHTSIDE LANE
Type Impv: INTERSECTION IMPROVEMENT
Project Manager: BORNE, FRED
Remarks: 414-01-0036;SEE NOTES USE TTF AS MATCH FOR R/W ON LA 30
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 30 414-01 CM 3,816 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
E BATON ROUGE 000-17 CM 2,763 URBAN SYSTEMS
Project: H.007961 - LA 410: BLACKWATER BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 817-05-0015;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 410 817-05 STPFLEX 1,202 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED IN CURRENT FY 14-15
Project: H.009290 - LSU LABORATORY SCHOOL SRTS PROJECT
Type Impv: BICYCLE LANES AND EDUCATION AND ENCOURAGEMENT ACTIVITIES
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 SR2S 190 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
E BATON ROUGE 000-17 SATRANS 30 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.009649 - LA 67: US 61/190 - LA 3006
Type Impv: PCCP PATCHING
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 67 060-01 STPFLEX 2,767 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
E BATON ROUGE LA 67 060-02 STPFLEX 2,133 SUSTAINABILITYNON-INTERSTATE
Project: H.010554 - SAINT GABRIEL TRAIL AT THE LEVEE, PH 2
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL ON THE MISS. RIVER LEVEE.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RTP 183 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
E BATON ROUGE 000-17 LOCAL 5 RECREATIONAL TRAILS PROGRAM
Project: H.010650 - OLOL MEDICAL COMPLEX AREA STREETS
Type Impv: REHABILITATE EXISTING ROADWAY
Project Manager: LACOMBE, JASON
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STP>200K 1,000 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.010869 - WARDS CREEK TRAIL - BLUEBONNET EXTENSION
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL ON WARDS CREEK.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RTP 256 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
E BATON ROUGE 000-17 LOCAL 140 RECREATIONAL TRAILS PROGRAM
Project: H.010875 - WARDS CREEK TRAIL - SIEGEN EXTENSION
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL ON WARDS CREEK.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RTP 222 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
E BATON ROUGE 000-17 LOCAL 106 RECREATIONAL TRAILS PROGRAM
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 41 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.011115 - PENNINGTON TRAIL SEGMENT
Type Impv: CONST. OF 12' X 1480' PED-BIKE TRAIL
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
E BATON ROUGE 000-17 LOCAL 397 RECREATIONAL TRAILS PROGRAM
Project: H.011483 - BIKE RACKS - DOWNTOWN BR & SOUTHERN UNIV
Type Impv: PURCHASE & INSTALLATION OF BIKE RACKS
Project Manager: CARNEY, JAMES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 CM 53 CONGESTION MITIGATION 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011757 - I-10 (CONSTITUTION/BUNKER HILL): CURVE
Type Impv: HIGH FRICTION SURFACE COURSE, CENTER-LINE RUMBLE STRIPES
Project Manager: KELLEY, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-10 450-10 SATRANS 130 SAFETY 4-SCHEDULED IN CURRENT FY 14-15
Project: H.002320 - SULLIVAN RD (WAX - HOOPER)
Type Impv: 4 LN DIVIDED CONC HWY RAISED MEDIAN
Project Manager: JESCLARD, TREY
Remarks: 255-30-0014;GREEN LIGHT PROJECT.LET BY CITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3034 255-30 LOCAL 19,000 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 15-16
E BATON ROUGE LA 3034 255-30 STBONDS 3,000 SUSTAINABILITYNON-INTERSTATE
E BATON ROUGE LA 3034 255-30 STPFLEX 3,000 SUSTAINABILITYNON-INTERSTATE
Project: H.006499 - SAFE ROUTES TO WESTDALE MIDDLE SCHOOL
Type Impv: CONSTRUCTION OF BIKEPATH AND PURCHASE OF SPEED FEEDBACK
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 SR2S 180 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
E BATON ROUGE 000-17 SATRANS 23 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.007160 - EBR COMPUTERIZED TRAFFIC SIGNAL
Type Impv: TRAFFIC SIGNAL SYNCHRONIZATION
Project Manager: BROWN, JEFF
Remarks: 742-17-0159;CHOCTAW @ CHIPPEWA ST. & N.CHOCTAW@
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 CM 6,200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010439 - BOYD ST & 21ST ST PUMPING STA IMP I-110
Type Impv: REPLACE PUMP STATION FLOAT SYSTEM
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 NHPP 750 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 15-16
E BATON ROUGE I-110 450-92 NHPP 750 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
Project: H.010585 - DOWNTOWN BATON ROUGE GREENWAY PH. 2
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 15-16
E BATON ROUGE 000-17 LOCAL 13 RECREATIONAL TRAILS PROGRAM
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 42 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.010648 - ACADIAN THRUWAY/N. ACADIAN THRUWAY OVLY
Type Impv: PAVEMENT REHABILITATION
Project Manager: LACOMBE, JASON
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STP>200K 2,900 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010659 - RAFE-MEYER ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 FBROFF 732 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
E BATON ROUGE 000-17 FBROFF 593 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010723 - NORTH BOULEVARD PROMONADE
Type Impv: PED. AND BIKE PATH
Project Manager: FOURNERAT, CHRIS
Remarks: MATCH FROM ENTITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 TCSP 1,431 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 15-16
E BATON ROUGE 000-17 LOCAL 69 DEMO / HIGH PRIORITY
Project: H.011109 - US 61: IC RR XING (BATON ROUGE)
Type Impv: INSTALL NEW CROSSING SURFACE
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 007-90 RAIL HE 500 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011135 - E. PERDUE: IC RR XING (BATON ROUGE)
Type Impv: INSTALLATION OF ACTIVE WARNING DEVICES.
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011186 - DIST. 61 TRAFFIC CONTROL UPGRADE 3
Type Impv: SIGNALS TO BE UPGRADE TO CURRENT DOTD STANDARDS
Project Manager: LEBLANC, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61-X 019-01 STPFLEX 600 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 15-16
E BATON ROUGE US 61-X 013-04 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
E BATON ROUGE LA 67 060-01 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
E BATON ROUGE LA 67 060-01 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011212 - LA 948: EXTEND WB RIGHT TURN LANE
Type Impv: EXTEND WESTBOUND RIGHT TURN LANE FOR ADDITIONAL CAPACITY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 948 258-01 NHPP 600 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011213 - I 12: SOUND BARRIER WALL @ ESSEN LANE
Type Impv: CONSTRUCT SOUND BARRIER WALLS ALONG I-12 WESTBOUND AT E
Project Manager: ISEMANN, ROBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-12 454-01 NHPP 1,250 CAPACITY 4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 43 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.011236 - I-10 OVER LA42 GIRDER REPLACEMENT
Type Impv: REPLACE IMPACT DAMAGED GIRDER
Project Manager: TSAI, CHING
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-10 450-10 REIMB 400 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
E BATON ROUGE I-10 450-10 NHPP 100 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.011295 - LA 73 (GOVT ST) EAST BLVD - LOBDELL AVE
Type Impv: CONVERSION OF 4-LANE UNDIVIDED TO 3-LANE
Project Manager: HANKS, ANNA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 73 077-05 HSIPPEN 4,892 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
E BATON ROUGE 000-17 STPFLEX 4,431 ROAD TRANSFER
Project: H.011322 - US 61-X: FLORIDA STREET - PHLOX AVENUE
Type Impv: PATCH, COLD PLANE, 2" OVERLAY / PATCH PCCP, RESEAL JOINTS
Project Manager: GARY, VERTIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61-X 817-20 NHPP 1,500 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011337 - LA 30, LA 73, AND US 61-X REHAB
Type Impv: PATCH, COLD PLANE, 2" OVERLAY
Project Manager: GARY, VERTIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 30 414-01 NHPP 322 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 15-16
E BATON ROUGE LA 73 077-05 NHPP 1,743 ROAD TRANSFER
E BATON ROUGE US 61-X 013-04 NHPP 316 ROAD TRANSFER
Project: H.011703 - LA 64 & LA 1209: CP, OVERLAY, & PCCP
Type Impv: COLD PLANE & OVERLAY, ASPHALT AND CONCRETE PAVEMENT PA
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 64 253-02 NHPP 2,240 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 15-16
E BATON ROUGE LA 1209 817-30 STPFLEX 325 ROAD TRANSFER
E BATON ROUGE LA 1209 817-43 STPFLEX 525 ROAD TRANSFER
Project: H.011771 - N 19TH ST OVER I-110 GIRDER REPAIR
Type Impv: STEEL GIRDER REPAIR.
Project Manager: TSAI, CHING
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 NHPP 500 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.002301 - NORTH SHERWOOD FOREST DRIVE IMPROVEMENTS
Type Impv: WIDEN FROM 2 TO 5 LANES
Project Manager: LACOMBE, JASON
Remarks: 742-17-0118;ENV DOC. BY CITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STP>200K 14,710 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 37 254-02 0 URBAN SYSTEMS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 44 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.002337 - LA 327-S: BAYOU FOUNTAIN
Type Impv: NEW BRIDGE
Project Manager: MOORE, DARRELL
Remarks: 257-03-0025;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 327-S 257-03 STPFLEX 1,666 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002344 - LA 427: PERKINS RD (SIEGEN - HIGHLAND)
Type Impv: WIDEN TO 4 LANES
Project Manager: PICARD, TOBY
Remarks: 258-01-0033;GREEN LIGHT PROJECT(LET BY CITY); STAGE 0 COM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 427 258-01 LOCAL 44,552 CAPACITY 3-DESIGN/DEVELOPMENT
Project: H.009300 - HOOPER ROAD WIDENING (LA 3034 - LA 37)
Type Impv: FEASIBILITY STUDY TO WIDEN HOOPER ROAD
Project Manager: OLIVIER, NICHOLAS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 408 255-02 NFI 51,000 CAPACITY 3-DESIGN/DEVELOPMENT
Project: H.009651 - US 61/190: MCCLELLAND - MISS RIVER BR
Type Impv: COLD PLANE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 007-90 NHPP 3,100 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009745 - SCOTLANDVILLE PKWY MULTI-MODAL IMPRVMENT
Type Impv: MULTI-USE TRAIL & PED. BRIDGES
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 TAP>200K 234 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.009798 - CITY OF CENTRAL SIDEWALKS
Type Impv: SIDEWALK & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3034 255-30 TAP>200K 274 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
E BATON ROUGE 000-17 TAP>200K 168 ENHANCEMENTS
Project: H.009799 - EBR MISS E BANK MULTI-USE PATH, PHASE 3
Type Impv: MULTI-USE PATH & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 TAP>200K 1,500 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.010020 - I-110 BRIDGE OVER LA 67 CLEAN & PAINT
Type Impv: CLEANING & PAINTING
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 NHPP 650 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
Project: H.010251 - CHIPPEWA ST PUMP STATION IMP US61/190-X
Type Impv: REPLACE/UPGRADE PUMP HOUSE COMPONENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61-X 817-20 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 45 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.010253 - LUEBONNET BLVD. PUMP STAT. IMP LA 1248
Type Impv: REPLACE PUMP STATION FLOAT SYSTEM
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 1248 258-33 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.010319 - I-110: NORTH ST. - PLANK RD.
Type Impv: RECONSTRUCT JCP @ GRADE
Project Manager: MOORE, DARRELL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 NHPP 21,000 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010560 - ESSEN LANE WIDEN: PERKINS RD TO I-10
Type Impv: WIDEN TO 6 LANES SECTION W/16'CURB & GUTTER MEDIAN
Project Manager: TSAI, LOONG SHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3064 258-32 STBONDS 5,980 CAPACITY 3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 3064 258-32 STPFLEX 500 CAPACITY
Project: H.010565 - ACADIAN STREET PUMPING STATION
Type Impv: REPLACE/UPGRADE PUMPHOUSE COMPONENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 427 258-02 STPFLEX 650 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.010649 - EBR PARISHWIDE SIGNAL MODIFICATIONS
Type Impv: SIGNAL MODIFICATIONS
Project Manager: LACOMBE, JASON
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 DEMO 1,439 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENT
Project: H.010660 - TUCKER RD/DYER RD/DENHAM RD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 FBROFF 732 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
E BATON ROUGE 000-17 FBROFF 593 SUSTAINABILITYBRIDGE (OFF SYSTEM)
E BATON ROUGE 000-17 FBROFF 739 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010661 - N. FLANNERY/FIREWOOD/CLOVERLAND BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 FBROFF 601 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
E BATON ROUGE 000-17 FBROFF 439 SUSTAINABILITYBRIDGE (OFF SYSTEM)
E BATON ROUGE 000-17 FBROFF 439 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 46 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.010729 - TRAFFIC SIGNAL COORD & SYNCH PH VI (EBR)
Type Impv: TRAFFIC SIGNAL COORDINATION & SYNCHRONIZATION
Project Manager: BROWN, JEFF
Remarks: EBR WILL PROVIDE 20% MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 67 060-01 CM 4,413 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 73 077-05 CM 232 CONGESTION MITIGATION
E BATON ROUGE US 61-X 013-04 CM 697 CONGESTION MITIGATION
E BATON ROUGE 000-17 CM 2,787 CONGESTION MITIGATION
Project: H.010792 - US 61 & LA 73: IMPROV'S AT PECUE LANE
Type Impv: INTERSECTION MODIFICATIONS
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 007-08 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 73 077-04 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
Project: H.011261 - LA427: S.ACADIAN TWY;PERKINS RD-LA73(BR)
Type Impv: INTERSECTION IMPRS, MEDIAN MODS, OVERLAY
Project Manager: PICARD, TOBY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 427 258-02 HSIP 1,500 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011363 - SHERWOOD (AIRLINE HWY TO OLD HAMMOND)
Type Impv: REHABILITATE AND RECONSTRUCT
Project Manager: LACOMBE, JASON
Remarks: EBR CITY-PARISH TO PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STP>200K 3,864 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011364 - GOODWOOD BLVD REHAB (LOBDELL - AIRLINE)
Type Impv: RECONSTRUCT AND REHABILITATE
Project Manager: LACOMBE, JASON
Remarks: EBR CITY-PARISH TO PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STP>200K 1,527 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011496 - QUAIL DR: TURN LANE AT PERKINS (LA 427)
Type Impv: CONSTRUCT RIGHT TURN LANE ON NORTHBOUND QUAIL DR.
Project Manager: LAI, QUANG
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 CM 233 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 427 258-02 CM 233 CONGESTION MITIGATION
Project: H.011518 - I-10 RAMP METERS BATON ROUGE
Type Impv: INSTALLING I-10 RAMP METERS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-10 450-10 NHPP 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 47 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.011543 - TRAFFIC SIGNAL COORD & SYNCH PH VII(EBR)
Type Impv: TRAFFIC SIGNAL COORDINATION AND SIGNAL SYNCHRONIZATION
Project Manager: HANKS, ANNA
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3164 019-01 CM 3,421 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT
E BATON ROUGE US 61 019-02 CM 540 CONGESTION MITIGATION
E BATON ROUGE LA 408 255-01 CM 398 CONGESTION MITIGATION
E BATON ROUGE 000-17 CM 1,852 CONGESTION MITIGATION
E BATON ROUGE LA 37 254-01 CM 1,014 CONGESTION MITIGATION
E BATON ROUGE LA 37 254-02 CM 1,022 CONGESTION MITIGATION
Project: H.011682 - LA 30: SOUTH BOULEVARD - LA 42
Type Impv: PATCH, COLD PLANE, 2" OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 30 414-01 NHPP 1,716 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
Project: H.011684 - LA 327 SPUR: STARING LANE EXTENSION
Type Impv: EXTEND 4-LANE DIVIDED ROADWAY
Project Manager: WAGUESPACK, BRENT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 LOCAL 7,350 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
E BATON ROUGE LA 327-S 257-03 LOCAL 2,450 ROAD TRANSFER
Project: H.011773 - HANKS DR/LANDIS DR PED IMPROVEMENTS
Type Impv: SIDEWALKS
Project Manager: MEEK, STEPHEN
Remarks: BATON ROUGE/PARISH OF EAST BATON ROUGE WILL PROVIDE M
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 TAP>200K 2,008 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.011774 - LA 327-S: GARDERE LANE PED IMPROVEMENTS
Type Impv: SIDEWALK/MULTI-USE PATH
Project Manager: RIGGS, LAURA
Remarks: MATCH PROVIDED BY CITY OF BATON ROUGE/EAST BATON ROU
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 327-S 257-03 TAP>200K 864 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.002358 - ESSEN LANE INTERCHANGE
Type Impv: (PHASE 2)(REQ DEMO FUNDS)
Project Manager: PICARD, TOBY
Remarks: 454-01-0068;IM-D $250K FY03.REQ MORE DEMO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3064 258-32 DEMO 14,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
E BATON ROUGE I-12 454-01 0 DEMO / HIGH PRIORITY
Project: H.007973 - OLD HAMMOND (BLVD DE PROV-MILL)
Type Impv: CLEARING AND GRUBBING
Project Manager: PICARD, TOBY
Remarks: 817-09-0040; GREEN LIGHT PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 426 817-09 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 48 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.007974 - OLD HAMMOND HWY(MILLERVILLE-O'NEAL)
Type Impv: NEW CONC PAVEMENT
Project Manager: PICARD, TOBY
Remarks: 817-09-0042;LET BY CITY. GREEN LIGHT PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 426 817-09 LOCAL 9,681 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.009327 - I-10/110 EPOXY BR DECK OVERLAY-BTN ROUGE
Type Impv: EXPOXY BRIDGE DECK OVERLAY
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-10 450-10 NHPP 8,250 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
E BATON ROUGE I-110 450-92 NHPP 750 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
Project: H.011098 - LA 30: CORRIDOR IMPROVEMENTS
Type Impv: ACCESS MANAGMENT LA 30 - NICHOLSON DR.
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 30 414-01 NHPP 1,319 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
2-WAITING FOR FUNDING
Project: H.001606 - JEFFERSON HWY @ STUMBERG LN EXT
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: PICARD, TOBY
Remarks: 077-04-0025;GREEN LIGHT PROJECT (AA)LET BY CITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 73 077-04 LOCAL 11,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.002297 - MAGNOLIA BRIDGE RD - INDIAN MOUND
Type Impv: RECON W/GEOMETRIC IMPROVEMENTS
Project Manager: RICHARD, RYAN
Remarks: 254-02-0040;SAFETY TRANSFER FUNDS-4 MILLION MAX
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 37 254-02 NFI 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
E BATON ROUGE LA 37 254-03 0 OTHER / MISCELLANEOUS
Project: H.002313 - HOOPER RD.(BLKWATER BAYOU - DEVALL)
Type Impv: WIDEN TO 5 LANES
Project Manager: PICARD, TOBY
Remarks: 255-02-0027;HOLD - SEWER & FUNDING PROBLEM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 408 255-02 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.002317 - LA 408: HOOPER RD (JOOR RD-SULLIVAN RD)
Type Impv: NEW 4 LANE DIVIDED CONCRETE HIGHWAY WITH RAISED MEDIAN
Project Manager: PICARD, TOBY
Remarks: GREEN LIGHT PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 408 255-02 LOCAL 10,928 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.002361 - ESSEN LANE AT I-10
Type Impv: CONCRETE NEW PAVEMENT
Project Manager: PICARD, TOBY
Remarks: 258-32-0022;GREEN LIGHT PROJ(G) LET BY CITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3064 258-32 LOCAL 2,400 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 49 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.003047 - PECUE LANE/I-10 INTERCHANGE
Type Impv: NEW INTERCHANGE
Project Manager: KENDRICK, BRIAN
Remarks: 450-10-0161;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-10 450-10 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
E BATON ROUGE I-10 450-10 STGEN 0 DEMO / HIGH PRIORITY
Project: H.004100 - I-10: LA 415 TO ESSEN ON I-10 AND I-12
Type Impv: INCREASE CAPACITY(STAGE 0/1 STUDIES)
Project Manager: NGUYEN, WAYNE
Remarks: 700-17-0209;STAGE 0 & 1; ADVANCE CONSTRUCT STAGE 0 & 1
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-10 450-10 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.005403 - LA408(HOOPER RD EXT)LA37-LA16
Type Impv: EXTENSION OF HOOPER ROAD FROM LA 37 TO LA 16
Project Manager: OLIVIER, NICHOLAS
Remarks: 700-99-0527;GEN.OBLIGATION BOND(PR2=$100K & PR5=$900K)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 NFI 108,100 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.007963 - BLACKWATER BAYOU BRIDGE
Type Impv: NEW BRIDGE
Project Manager: GAUDRY, CARL
Remarks: 817-05-0017;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 410 817-05 STPFLEX 1,811 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.007970 - OLD HAMMOND (BLVD DE PROV-MILL)
Type Impv: WIDEN TO 4 LANES
Project Manager: PICARD, TOBY
Remarks: 817-09-0035;INCLUDES I'SECT @ FLANNERY; GREEN LIGHT PROJ
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 426 817-09 NFI 8,658 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.008415 - INFORMATION CENTER @ SOUTHERN UNIVERSITY
Type Impv: FEDERAL EARMARK
Project Manager: UMEOZULU, JOE
Remarks: DEMO$ & $ FROM SOUTHERN;AUTHORIZED;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 DEMO 600 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
E BATON ROUGE 000-17 OTHER 1,773 OTHER / MISCELLANEOUS
Project: H.008732 - STUDY OF BATON ROUGE LOOP
Type Impv: EIS
Project Manager: NGUYEN, WAYNE
Remarks: EIS IS DEMO WITH MATCH FROM LOCALS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.009489 - US 61: JEFFERSON HIGHWAY OVERPASS
Type Impv: BRIDGE REPLACEMENT
Project Manager: YAP, KIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 007-90 NHPP 6,854 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009725 - LA 3034: SULLIVAN RD @ WAX RD
Type Impv: PERMIT PROJECT WITH CEA
Project Manager: JESCLARD, TREY
Remarks: 255-30-0012
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 3034 255-30 LOCAL 4,500 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 50 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.009783 - BR DOWNTOWN GREENWAY MULTI-USE PATH
Type Impv: MULTI-USE PATH W/LIGHTING, LANDSCAPING & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 TAP>200K 401 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
E BATON ROUGE I-10 450-10 TAP>200K 320 ENHANCEMENTS
E BATON ROUGE 000-17 TAP>200K 332 ENHANCEMENTS
Project: H.010051 - LSU HIGHLAND RD PED CORRIDOR, PHASE I
Type Impv: SIDEWALKS W/LIGHTING & LANDSCAPING
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 TAP>200K 267 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Project: H.010211 - I-110 NB RAMP AT CAPITOL ACCESS ROAD
Type Impv: I-110 NB RAMP IMPROVEMENTS AT CAPITOL ACCESS ROAD
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE I-110 450-92 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.010320 - LA 42: JCT. HIGHLAND RD - LA 30
Type Impv: PCC PATCH
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 42 258-31 STPFLEX 2,400 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
E BATON ROUGE LA 42 257-04 STPFLEX 4,100 SUSTAINABILITYNON-INTERSTATE
Project: H.010652 - LA 73: US 61 (AIRLINE) - ESSEN LANE
Type Impv: PCCP PATCHING
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 73 077-05 NHPP 3,500 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.011226 - US190/US61: LA 415 TO I-12 STUDY
Type Impv: CORRIDOR STUDY ON US 190 / US 61
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 007-90 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
E BATON ROUGE US 61 007-90 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
W BATON ROUGE US 190 008-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.011683 - PICARDY PERKINS CONNECTOR: FEASIBILITY
Type Impv: NEW ROADWAY CONNECTOR AND BRIDGE
Project Manager: PICARD, TOBY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
Project: H.011690 - PORT HUDSON PRIDE RD: LA 964-LA 19 STUDY
Type Impv: FEASIBILITY STUDY TO WIDEN PORT HUDSON PRIDE RD
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 51 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST BATON ROUGE
Project: H.011691 - LA 64: ROUNDABOUT AT MCHUGH ROAD
Type Impv: MULTI-LANE ROUNDABOUT AT INTERSECTION OF LA 64 AND MCHUG
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 64 253-02 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
E BATON ROUGE 000-17 0 ROAD TRANSFER
Project: H.011695 - LA 19 WIDENING: LA 64 - SUNSET BLVD
Type Impv: WIDENING OF LA 19
Project Manager: TONEY, PATRICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE LA 19 250-01 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
Project: H.011708 - US 61 AT US 190 INTERCHANGE SIGNING
Type Impv: REPLACE EXISTING SIGNS AND RELATED WORKS
Project Manager: NGO, DUC
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61-X 013-04 NHPP 200 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
E BATON ROUGE US 190 013-05 NHPP 200 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
E BATON ROUGE US 61 007-90 NHPP 200 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011718 - BR URBAN RENEWAL & MOBILITY PLAN PROJECT
Type Impv: IMPROVE EXISTING US 190/US61 TO FREEWAY TYPE
Project Manager: NGUYEN, WAYNE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE US 61 007-90 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
W BATON ROUGE US 190 008-01 0 CAPACITY
E BATON ROUGE US 190 007-10 0 CAPACITY
E BATON ROUGE US 61 007-08 0 CAPACITY
Project: H.011791 - CAL RD AND MOSS SIDE LN BR REPLACEMENTS
Type Impv: BRIDGE REPLACEMENT
Project Manager: LACOMBE, JASON
Remarks: EAST BATON ROUGE WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 STP>200K 1,025 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
E BATON ROUGE 000-17 STP>200K 1,025 URBAN SYSTEMS
Project: H.011310 - FORD ST. EXT. & NEW CONNECTION TO LA 408
Type Impv: CONSTRUCTION OF NEW ROADWAY (DETAILS TBD BY STUDY)
Project Manager: ISEMANN, ROBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E BATON ROUGE 000-17 0 ROAD TRANSFER 0-FEASIBILITY/SCOPING
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 52 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST CARROLL
Project: H.011035 - LA 580: JONES BAYOU - US 65
Type Impv: MAINTENANCE RESURFACING, 6" OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E CARROLL LA 580 818-01 STPFLEX 3,441 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011606 - LA 596: US 65 TO DELTA ROAD
Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E CARROLL LA 596 183-02 STPFLEX 200 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011607 - LA 580: LA 877 TO US 65
Type Impv: ASPHALT OVERLAY OVER IN PLACE STABILIZED BASE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E CARROLL LA 580 818-01 STPFLEX 6,880 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.001961 - JOES BAYOU & CARRAWAY LAKE BRIDGES
Type Impv: NEW BRIDGES
Project Manager: WINDMANN, ANDREW
Remarks: 161-08-0022;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E CARROLL LA 134 161-08 STPFLEX 2,873 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.007992 - LA 883-1 - US 65
Type Impv: ASPHALT OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: 818-12-0004;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E CARROLL LA 883-2 818-12 STPFLEX 307 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010390 - US 65: PANOLA PLANT ROAD TO ARK. LINE
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E CARROLL US 65 020-09 NHPP 3,600 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 53 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EAST FELICIANA
Project: H.009012 - WIDEN INTERSECTIONS AT LA 67 & LA 10
Type Impv: SAFETY - WIDEN INTERSECTION
Project Manager: LAI, QUANG
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E FELICIANA LA 67 060-03 HSIP 125 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
E FELICIANA LA 67 060-04 HSIP 125 SAFETY
E FELICIANA LA 10 061-05 HSIP 50 SAFETY
Project: H.011315 - IC SEVERAL RR XINGS (EBR & E. FELICIANA)
Type Impv: UPGRADE ACTIVE WARNING DEVICES
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E FELICIANA LA 412 819-11 RAIL PD 500 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
E FELICIANA LA 964 019-31 RAIL PD 200 RAILROADS
E FELICIANA LA 68 252-02 RAIL PD 200 RAILROADS
E FELICIANA US 61 019-03 RAIL PD 150 RAILROADS
E BATON ROUGE 000-17 RAIL PD 150 RAILROADS
E BATON ROUGE LA 64 253-02 RAIL PD 200 RAILROADS
Project: H.002365 - LA 63 BRIDGES NEAR BLUFF CREEK
Type Impv: NEW BRIDGES
Project Manager: BRAUNER, KURT
Remarks: 259-01-0011;3 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E FELICIANA LA 63 259-01 STPFLEX 5,497 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010562 - BANK STREET & SINGLETARY STREET BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E FELICIANA 000-19 FBROFF 539 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
E FELICIANA 000-19 FBROFF 300 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.009633 - LA 67: LA 10 - MISSISSIPPI STATE LINE
Type Impv: STABILIZE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
E FELICIANA LA 67 060-04 STPFLEX 8,813 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 54 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: EVANGELINE
Project: H.010036 - FUSELIER ROAD & JEAN DUOS ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE 000-20 FBROFF 666 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010208 - LA 104: CSLM 0.8(END CURB/GUTR)-LA 1161
Type Impv: COLD PLANE AND OVERLAY
Project Manager: RAY, JARED
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 104 202-01 STPFLEX 541 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010219 - LA 104: ALLEN P/L - LA 3277
Type Impv: STABLIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 104 200-02 STPFLEX 2,275 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.002101 - BAYOU DES CANNES BR NEAR VILLE PLATTE
Type Impv: BRIDGE REPLACEMENT
Project Manager: ISEMANN, ROBERT
Remarks: 202-01-0019;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 104 202-01 FBROFF 1,381 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011586 - LA 3277: LA 1158 - LA 757
Type Impv: BASE STABILIZATION AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 3277 820-26 NFA 1,600 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.001524 - OAKDALE-LA 106
Type Impv: RECONSTRUCT
Project Manager: MOORE, DARRELL
Remarks: 066-05-0016;INCL204-01-0010 LM 0-0.38
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 10 066-06 NFI 14,500 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
ALLEN LA 10 066-05 0 OTHER / MISCELLANEOUS
EVANGELINE LA 106 204-01 0 OTHER / MISCELLANEOUS
Project: H.010223 - LA 106: LA 10 - US 167
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
EVANGELINE LA 106 204-01 STPFLEX 6,426 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
EVANGELINE LA 106 204-02 STPFLEX 3,136 SUSTAINABILITYNON-INTERSTATE
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 55 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: FRANKLIN
Project: H.011578 - FRANKLIN PARISH AST
Type Impv: ASPHALTIC SURFACE TREATMENT
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN LA 135 165-04 STPFLEX 225 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
FRANKLIN LA 618 167-01 STPFLEX 121 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
FRANKLIN LA 130 169-01 STPFLEX 185 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
FRANKLIN LA 578 821-07 STPFLEX 57 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
Project: H.009586 - LA 4: LA 578 - BAYOU MACON BRIDGE
Type Impv: ASPHALT CONCRETE OVERLAY OVER IN PLACE STABILIZATION
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN LA 4 036-04 STPFLEX 1,218 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010068 - BUSH ROAD AND LISHMAN ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN 000-21 FBROFF 662 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
FRANKLIN 000-21 FBROFF 447 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.009784 - WINNSBORO: ADAMS&COMMON ST STREETSCAPING
Type Impv: SIDEWALKS W/LIGHTING, & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN 000-21 TAP<200K 229 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.011564 - LA 857: LA 15 - LA 132
Type Impv: PATCH & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN LA 857 168-01 STPFLEX 1,684 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.009583 - LA 4: LA 562 - LA 128
Type Impv: PATCHING & SINGLE LIFT OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN LA 4 036-02 STPFLEX 452 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009605 - LA 4: LA 128 - LA 15
Type Impv: CHIP SEAL
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
FRANKLIN LA 4 036-03 STPFLEX 1,716 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 56 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: GRANT
Project: H.010861 - KATELAND GIN ROAD / DARROW BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT 000-22 FBROFF 1,168 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010592 - WILLET LOOP RD & ROCK HILL RD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT 000-22 FBROFF 585 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
GRANT 000-22 FBROFF 470 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011596 - LA 471: LA 122 TO WINN PARISH LINE
Type Impv: PATCHING, COLD PLANING, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT LA 471 123-02 STPFLEX 285 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.001842 - LA 471: DARTIGO CREEK & CREEK BRIDGES
Type Impv: NEW BRIDGE
Project Manager: PAINE, PEGGY JO
Remarks: USE NFA FUNDS TO PAY FOR MITIGATION UNTIL FEMA REIMBURS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT LA 471 123-01 FEMA 3,534 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010362 - LA 8: JCT US 167 - N JCT US 165
Type Impv: PATCH & INLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
GRANT LA 8 040-02 STPFLEX 2,300 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 57 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: IBERIA
Project: H.009892 - LDRR (NEW IBERIA) US 90 FR
Type Impv: NEW XING PER DISTRICT 03 & NEW IBERIA
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA US 90 424-04 STPFLEX 340 RAILROADS 4-SCHEDULED IN CURRENT FY 14-15
IBERIA US 90 424-04 LOCAL 10 RAILROADS
Project: H.010850 - SIGN SAFETY IMPROVEMENTS
Type Impv: PURCHASE AND INSTALL REGULATORY & WARNING SIGNS
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 SATRANS 23 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED IN CURRENT FY 14-15
Project: H.009142 - LA 86 & LA 320: ROUNDABOUT
Type Impv: ROUNDABOUT
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 86 237-01 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
IBERIA LA 320 823-12 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.010100 - PESSON ELEM. SAFE ROUTES PHASE I
Type Impv: SIDEWALK CONSTRUCTION, MARKINGS,
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 SR2S 190 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
IBERIA 000-23 SATRANS 28 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010155 - US 90 RAILROAD OVERPASS SE OF LA 85
Type Impv: BRIDGE OVERPASS
Project Manager: RABALAIS, NICK
Remarks: STBONDS AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA US 90 424-04 DEMO 15,000 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010256 - LA 182:BRUNER ST - VINE ST DRAINAGE IMP.
Type Impv: INSTALL NEW DRAINAGE STRUCTURES, CONCRETE CURB AND GUTT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 182 004-04 STPFLEX 900 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011291 - DALE, LA 677 &344:LDRR XINGS(NEW IBERIA)
Type Impv: RR ACTIVE WARNING
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 344 823-14 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
IBERIA LA 677 823-15 RAIL PD 150 RAILROADS
IBERIA 000-23 RAIL PD 100 RAILROADS
Project: H.011587 - LA 87: CSLM 1.89 - CSLM 5.56
Type Impv: COLD PLANE, PATCH, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 87 823-27 STPFLEX 2,600 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 58 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: IBERIA
Project: H.011655 - LA 675: 0.41 MI SE US 90 - LA 674
Type Impv: MICROSURFACING AND RELATED WORK.
Project Manager: RAY, JARED
Remarks: 823-02 LM 0.41 TO 1.19 NFA AS MATCH (DETIAL 2)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 675 823-02 STPFLEX 155 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 15-16
IBERIA LA 675 823-02 STPFLEX 85 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
Project: H.011781 - LA 675 & LA 87 IMP. IN NEW IBERIA (RT)
Type Impv: COLD PLANE, PATCH, OVERLAY, AND RELATED WORK.
Project Manager: ROMEO, ROBIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 675 823-02 NHPP 450 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 15-16
IBERIA LA 87 823-26 STPFLEX 350 ROAD TRANSFER
Project: H.000212 - LA 182: COUPLET - LA 3195 (EB & WB)
Type Impv: ASPHALT OVERLAY, CONCRETE REHABILITATION, AND RELATED WO
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: 004-04-0025 AND 004-05-0032
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 182 004-04 STPFLEX 1,150 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
IBERIA LA 182 004-04 STPFLEX 563 SUSTAINABILITYNON-INTERSTATE
IBERIA LA 182 004-05 STPFLEX 1,713 SUSTAINABILITYNON-INTERSTATE
Project: H.002893 - US 90 BRIDGE OVER LA 14
Type Impv: BRIDGE REPLACEMENT
Project Manager: KEMP, KELLY
Remarks: 424-04-0059;EAST AND WEST BOUND LANES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA US 90 424-04 NHPP 5,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002896 - US90 FRTG ROAD DRAIN BR NEAR JEANERETTE
Type Impv: NEW BRIDGE
Project Manager: TONEY, PATRICK
Remarks: 424-04-0064;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA US 90 424-04 NHPP 1,180 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
IBERIA LA 668 399-02 STPFLEX 5 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.006128 - VIDA SHAW BRIDGE OVER BAYOU TECHE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-23-0001;MOVEABLE BRIDGE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 FBROFF 4,177 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009843 - BNSF (NEW IBERIA) LA 14/CENTER ST.
Type Impv: INSTALLING NEW F/L'S AND GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 055-07-0077
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 14 055-07 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENT
IBERIA LA 14 055-07 LOCAL 70 RAILROADS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 59 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: IBERIA
Project: H.009856 - BNSF (NEW IBERIA) JULIA ST.
Type Impv: INSTALL FLASHING LIGHTS & GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0100
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENT
IBERIA 000-23 LOCAL 70 RAILROADS
Project: H.009857 - BNSF (NEW IBERIA) IBERIA ST.
Type Impv: INSTALL FLASHING LIGHTS & GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0101
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENT
IBERIA 000-23 LOCAL 70 RAILROADS
Project: H.009860 - BNSF (NEW IBERIA) RR XINGS ALONG THE BNS
Type Impv: INSTALL RAILROAD CROSSING FLASHING LIGHTS & GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0102
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENT
IBERIA 000-23 LOCAL 70 RAILROADS
Project: H.009861 - BNSF (NEW IBERIA) LA 14/CENTER/FRENCH ST
Type Impv: TRACK WORK FROM LA 14 TO FRENCH ST. (RAIL HE)
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0105
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL HE 889 RAILROADS 3-DESIGN/DEVELOPMENT
IBERIA 000-23 LOCAL 311 RAILROADS
Project: H.009862 - BNSF (NEW IBERIA) CAROLINE ST.
Type Impv: INSTALL RAILROAD CROSSING FLASHING LIGHTS & GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0108
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 215 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.009891 - BNSF (NEW IBERIA) WEEKS ST.
Type Impv: INSTALL F/L'S AND GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-23-0099
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 RAIL PD 280 RAILROADS 3-DESIGN/DEVELOPMENT
IBERIA 000-23 LOCAL 70 RAILROADS
Project: H.010004 - BAYOU TECHE MOVABLE BRIDGES REHAB
Type Impv: MOVABLE BRIDGE REHABILITATION
Project Manager: HINGLE, STEWART
Remarks: NFA AS MATCH TO C.S. 823-12; TTF AS MATCH TO C.S 400-30
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 320 823-12 STPFLEX 3,642 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
ST MARTIN LA 350 400-30 STPFLEX 4,199 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.010922 - LA 88: REALIGN CURVES IN COTEAU
Type Impv: REALIGN 2 CURVES ON LA 88 IN COTEAU
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: USE HSIP FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 89 397-05 SATRANS 4,900 SAFETY 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 60 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: IBERIA
Project: H.011026 - LA 182 WB: LASALLE ST. - VINE ST.
Type Impv: DRAINAGE STRUCTURE REMOVAL AND REPLACEMENT, ROADWAY W
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 182 004-04 STPFLEX 342 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011495 - US 90: RAMPS @ LA 88 ROUNDABOUTS
Type Impv: ROUNDABOUTS, J-TURNS, U-TURNS, AND RELATED WORK.
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 88 397-05 HSIP 2,800 SAFETY 3-DESIGN/DEVELOPMENT
IBERIA US 90 424-04 HSIP 2,000 SAFETY
Project: H.011542 - PELLERIN ROAD / DELAHOUSSAYE CANAL
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA 000-23 FBROFF 439 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002762 - LA 86: LA 3242 - LA 347
Type Impv: STABILIZE BASE AND OVERLAY
Project Manager: RAY, JARED
Remarks: 400-01-0007; 400-01 NFA MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 86 400-01 STPFLEX 4,229 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.002765 - LA 86: LA 347 - LA 31
Type Impv: STABILIZE BASE AND OVERLAY
Project Manager: RAY, JARED
Remarks: 400-31-0013; 400-31 MATCH TTF
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA LA 86 400-31 STPFLEX 1,008 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010267 - US 90: LEWIS ST. LEFT TURN LANE
Type Impv: CONSTRUCT LEFT TURN LANE
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERIA US 90 424-04 NHPP 125 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 61 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: IBERVILLE
Project: H.010598 - DERRICK ROAD BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE 000-24 FBROFF 493 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010602 - LA 1: LA 69 - LA 75
Type Impv: PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 1 050-06 STBONDS 10,000 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
IBERVILLE LA 1 050-06 NHPP 100 SUSTAINABILITYNON-INTERSTATE
Project: H.011343 - I-10 WHISKEY BAY FIRE REPAIR
Type Impv: FIRE DAMAGE REPAIR
Project Manager: CAVALIER, STEPHANIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE I-10 450-07 REIMB 500 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED IN CURRENT FY 14-15
IBERVILLE I-10 450-07 NHPP 50 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.011704 - LA 1 & LA 69: CONCRETE PATCHING
Type Impv: CONCRETE PATCHING
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 69 405-01 STPFLEX 858 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
IBERVILLE LA 1 050-06 NHPP 242 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
Project: H.002333 - LA 327: BAYOU PAUL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: ISEMANN, ROBERT
Remarks: 257-02-0014;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 327 257-02 NFA 1,397 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010945 - LA 30 & LA 74: INTERSECTION IMPROVS
Type Impv: TURN LANE ADDITIONS AND CLOSURE OF SELECTED CROSSOVERS
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 30 414-02 STPFLEX 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
IBERVILLE LA 74 264-01 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
Project: H.009485 - LA 404: BAYOU CHOCTAW BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 404 405-01 STPFLEX 1,992 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009762 - ENTERPRISE BLVD MULTI-USE PATH
Type Impv: SIDEWALKS & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE 000-24 TAP<200K 288 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 62 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: IBERVILLE
Project: H.009769 - ROSEDALE GATEWAY ENHANCEMENT
Type Impv: SIDEWALK & GATEWAYS W/LIGHTING,LANDSCAPE&SUBSURFACE D
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 77 219-03 STPENH 73 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
IBERVILLE LA 77 219-02 STPENH 24 ENHANCEMENTS
IBERVILLE LA 76 228-04 STPENH 73 ENHANCEMENTS
IBERVILLE LA 76 228-05 STPENH 24 ENHANCEMENTS
Project: H.010924 - LA 75 ROUNDABOUTS
Type Impv: DESIGN AND CONSTRUCTION OF 2 ROUNDABOUTS
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 75 824-02 STPFLEX 4,000 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011617 - LA 75 & LA 141: CP, OVLAY & STAB, OVLAY
Type Impv: STABILIZE, COLD PLANE, & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 75 257-02 STPFLEX 2,420 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
IBERVILLE LA 141 256-10 STPFLEX 1,500 SUSTAINABILITYNON-INTERSTATE NFA
IBERVILLE LA 141 256-10 NFA 408 SUSTAINABILITYNON-INTERSTATE NFA
Project: H.011806 - GRACIE LANE BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE 000-24 FBROFF 830 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
Project: H.009484 - LA 75: BAYOU BREAUX BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: TOURRES, VALERIE
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 75 257-01 FBROFF 1,381 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009952 - LA 1: MEDIAN CLOSURES
Type Impv: MEDIAN CLOSURE WITH HSIP FUNDS
Project Manager: BEAUVAIS, HEWITT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 1 050-06 HSIP 250 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011686 - LA 3066 REPAIR REALIGN: LA 3066-S -LA 75
Type Impv: REPAIR AND REALINGMENT OF LA 3066. A PORTION SLID INTO GIWW
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
IBERVILLE LA 3066 230-02 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
IBERVILLE LA 3066 230-01 0 ROAD TRANSFER
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 63 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JACKSON
Project: H.010420 - LA 505 ROADWAY FLOODING .9 MI N WINN P/L
Type Impv: REPLACE EXISTING CMP CROSS DRAIN WITH RCB CROSWS DRAIN
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON LA 505 321-03 NFA 131 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010471 - LA 542: LA 811 - LA 155
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON LA 542 319-01 STPFLEX 1,376 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011680 - LA 147: LAS RR XING (NORTH HODGE)
Type Impv: REPLACE RAILROAD CROSSING SURFACE.
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON LA 147 043-01 RAIL HE 222 RAILROADS 4-SCHEDULED IN CURRENT FY 14-15
JACKSON LA 147 043-01 LOCAL 178 RAILROADS
Project: H.006511 - GUARDRAIL & ROAD ALLIGNMENT CHANGES
Type Impv: SITE DISTANCE IMPROVEMENTS
Project Manager: HOLM, RICK
Remarks: 737-25-0002;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON 000-25 SATRANS 402 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
JACKSON 000-25 LOCAL 45 SAFETYLOCAL ROADS SAFETY
Project: H.010039 - BEAR KNOLL DRIVE & ZOAR ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON 000-25 FBROFF 578 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010388 - LA 155: US 167 - LA 542
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON LA 155 319-30 STPFLEX 1,200 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010964 - US 167:TURN LANE IMPROVEMENT AT HODGE
Type Impv: TURN LANE IMPROVEMENT
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON US 167 023-06 NHPP 250 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.001553 - LA 146 BRIDGES NEAR KELLEYS
Type Impv: NEW BRIDGES
Project Manager: WINDMANN, ANDREW
Remarks: 068-02-0017;3 BRIDGES & JT W/068-03-0021 2BRS.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON LA 146 068-02 STPFLEX 4,696 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
JACKSON LA 4 068-03 STPFLEX 2,954 SUSTAINABILITYBRIDGE (ON SYSTEM)
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 64 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JACKSON
Project: H.010452 - LA 144: EROS (LA 34) - OUACHITA P/L
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JACKSON LA 144 318-01 STPFLEX 1,500 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
JACKSON LA 144 319-04 STPFLEX 500 SUSTAINABILITYNON-INTERSTATE
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 65 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON
Project: H.008046 - LA 3152 : CLEARVIEW OPERATIONAL IMPRV.
Type Impv: INTERSECTION IMPROVEMENTS, INCLUDING ADDITIONAL TURN LANES
Project Manager: BORNE, FRED
Remarks: USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3152 826-03 STP>200K 1,588 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.009406 - LA 48 @ EVANS DR.
Type Impv: DRAINAGE STRUCTURE REPLACEMENTS AND ADDITIONS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 48 006-30 NHPP 451 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011182 - ITS DYNAMIC MESSAGE SIGNS (KENNER)
Type Impv: INSTALL 4 DYNAMIC MESSAGE SIGNS.
Project Manager: BUTLER, KYLE
Remarks: ENTITY WILL PROVIDE MATCH FOR LOYOLA AND POWER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 49 283-30 STPFLEX 512 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED IN CURRENT FY 14-15
JEFFERSON 000-26 STPFLEX 251 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.011201 - KENNER SRTS PROJECT - CHATEAU ELEM
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 0 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011658 - US 90 BUS SIGNING UPGRADE-WEST BANK
Type Impv: SIGNING UPGRADES
Project Manager: NGO, DUC
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90-Z 283-09 NHPP 767 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 14-15
ORLEANS US 90-Z 283-08 NHPP 190 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.001439 - LA 1 BRIDGES NEAR GRAND ISLE
Type Impv: NEW BRIDGE
Project Manager: BUCCI, MARK
Remarks: 064-01-0047;STRU.IN POOR COND. JT W/064-02-0030
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 1 064-01 STPFLEX 800 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
LAFOURCHE LA 1 064-02 NHPP 2,900 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.002262 - DRAIN CANAL BRIDGE ON LA 45
Type Impv: BRIDGE REPLACEMENT
Project Manager: MUSA, ELNUR
Remarks: 249-90-0037;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 45 249-90 STPFLEX 1,592 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.006441 - LA 23 (ENGINEERS RD. - LAPALCO)
Type Impv:
Project Manager: LACOMBE, JASON
Remarks: 736-38-0002;TRAFFIC STUDY FOR BELLE CHASE HWY.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 23 062-01 STP>200K 3,345 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
PLAQUEMINES LA 23 062-02 STP>200K 2,900 URBAN SYSTEMS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 66 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON
Project: H.006524 - CITY OF GRETNA SAFE ROUTES TO SCHOOL - M
Type Impv: SIDEWALKS, CROSSWALKS, SIGNS, ETC.
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 SR2S 247 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.006525 - CITY OF GRETNA SAFE ROUTES TO SCHOOLS -
Type Impv: SIDEWALKS, CROSSWALKS, AND SIGNING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 SR2S 188 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
JEFFERSON 000-26 SATRANS 30 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.007214 - EAST AMES BOULEVARD IMPROVEMENTS
Type Impv: WIDEN FROM 2 TO 3 LANES
Project Manager:
Remarks: 742-26-0080;OREGON DR.-BLANCHE DR.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 7,400 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.007476 - FAT CITY STREETSCAPES
Type Impv:
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 TAP>200K 1,165 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.009028 - AIRLINE PARK BLVD: W METAIRIE AV-0.4 M N
Type Impv: PANEL REPLACEMENT AND DRAINAGE
Project Manager: LACOMBE, JASON
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 2,430 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.009570 - US 61:TRANSCONTINENTAL DR - DAVID DR
Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 61 007-02 NHPP 1,469 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010402 - I-10: WILLIAMS BLVD - VETERANS BLVD
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON I-10 450-15 NHPP 4,000 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010673 - US90Z:HARVEY CANAL TUNNEL REHABILITATION
Type Impv: CLEANING, MECHANICAL, ELECTRICAL AND STRUCTURAL REHABILIT
Project Manager: REVIERE, RYAN
Remarks: SEE NOTES FOR FUNDING INFO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90-Z 283-09 NHPP 12,700 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010985 - US 90: IMP @ US 90B & NEAR LA 18
Type Impv: EXTEND ACCELERATION LANE AT THE INTERSECTION OF US 90B
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90 005-10 NHPP 550 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 67 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON
Project: H.011158 - LA 3139: RAMP-A OVER LA 3152 REPAIR
Type Impv: REPLACE TWO PRESTRESSED CONCRETE GIRDERS AND ASSOCIATE
Project Manager: DELATTE, BRIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3139 430-01 STPFLEX 375 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
JEFFERSON LA 3139 430-01 REIMB 375 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.011276 - NEW ORLEANS AIRPORT CONNECTOR ROAD
Type Impv: NEW AIRPORT ACCESS ROAD IN NEW ORLEANS
Project Manager: YANG, LI
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 0 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011339 - W ESPLANADE @ HOMESTEAD TRAFFIC SIGNAL
Type Impv: INSTALL TRAFFIC SIGNALS
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 250 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011482 - US 90 HUEY P. LONG BRIDGE CLEAN & PAINT
Type Impv: CLEANING & PAINTING BRIDGE STEEL NOT PART OF THE WIDENING.
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90 006-01 NHPP 20,100 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011499 - DMS LADDER SYSTEM PHASE 5
Type Impv: THIS PROJECT INCLUDES INSTALLING LADDERS ON EXISTING DMSS.
Project Manager: BUTLER, KYLE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON I-10 450-15 NHPP 550 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED FOR LETTING FY 15-16
ORLEANS I-10 450-90 NHPP 150 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
ORLEANS I-610 450-34 NHPP 150 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
ORLEANS US 90-Z 283-08 NHPP 150 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.011778 - LA 45: BARATARIA BLVD SAFETY IMPROVEMENT
Type Impv: RECONSTRUCTION WITH NO ADDED CAPACITY
Project Manager: GAUDET, COREY
Remarks: LETTERBID IN DISTRICT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 45 249-01 SATRANS 100 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011794 - NEW ORLEANS AIRPORT CONNECTOR ROAD SEG.B
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: YANG, LI
Remarks: CITY OF KENNER WILL PROVIDE MATCH.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 1,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 68 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON
Project: H.001413 - LA 18(4TH ST.EXT.-BURMASTER(GRETNA)
Type Impv: CONSTRUCT 2 LANES
Project Manager: LACOMBE, JASON
Remarks: 063-02-0048;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 18 063-02 STP>200K 4,850 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
JEFFERSON LA 18 063-02 STGEN 0 OTHER / MISCELLANEOUS
JEFFERSON LA 18 063-02 TOLLS 0 CCC TOLL PROJECTS
JEFFERSON LA 18 063-02 STPFLEX 1,250 OTHER / MISCELLANEOUS
Project: H.002260 - GOOSE BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: TSAI, LOONG SHEN
Remarks: 249-90-0035;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 45 249-90 STPFLEX 3,836 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002263 - JEAN LAFITTE: DOWNTOWN SIDEWALK, PHASE 1
Type Impv:
Project Manager: MEEK, STEPHEN
Remarks: 249-90-0040
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 45 249-90 TAPFLEX 188 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.003074 - I 10: WILLIAMS BLVD - VETERANS BLVD
Type Impv: MAJOR WIDENING - ADD TRAVEL LANES
Project Manager: YANG, LI
Remarks: 450-15-0124
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON I-10 450-15 NFI 70,000 CORRIDOR 3-DESIGN/DEVELOPMENT
Project: H.007175 - LAPALCO (VICTORY - WESTWOOD)
Type Impv: WIDEN TO 4 LANES
Project Manager: LACOMBE, JASON
Remarks: 742-26-0033;FUND WITH DEMO FUNDS.PH.PUR.R/W
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 DEMO 3,600 DEMO / HIGH PRIORITY 3-DESIGN/DEVELOPMENT
JEFFERSON 000-26 STP>200K 8,578 URBAN SYSTEMS
Project: H.007181 - L&A ROAD IMPROVEMENTS
Type Impv: NEW ROADWAY AND ALIGNMENT
Project Manager:
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 4,500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.007208 - HARVEY BLVD EXT(PETERS RD-MANHATTAN
Type Impv: NEW ROADWAY EXTENSION
Project Manager: LACOMBE, JASON
Remarks: 742-26-0073;SEE NOTES.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3017 826-11 STP>200K 876 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
JEFFERSON 000-26 STP>200K 9,597 URBAN SYSTEMS
Project: H.007223 - HARVEY BLVD (MANHATTAN - WALL)
Type Impv: WIDEN TO 4 LANE URBAD SECT W MEDIAN
Project Manager: LACOMBE, JASON
Remarks: 742-26-0090; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 7,100 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 69 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON
Project: H.008065 - HICKORY/DOCK ROUNDABOUT
Type Impv: ROUNDABOUT INSTALLATION
Project Manager: HARROUCH, JOSHUA
Remarks: 826-44-0032;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3154 826-44 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.009087 - I-10: LOYOLA DR. TO WILLIAMS BLVD.
Type Impv: MAJOR WIDENING - ADD TRAVEL LANES
Project Manager: YANG, LI
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON I-10 450-15 NFI 10,000 CORRIDOR 3-DESIGN/DEVELOPMENT
Project: H.009753 - JEAN LAFITTE: DOWNTOWN SIDEWALK, PHASE 2
Type Impv: SIDEWALK W/LIGHTING, LANDSCAPE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 TAP>200K 336 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.009804 - KENNER: S WILLIAMS BLVD STREETSCAPING
Type Impv: SIDEWALKS W/ LIGHTING, STREETSCPAING & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 TAP>200K 446 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.010626 - SAUVE ROAD / SONIAT CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 FBROFF 1,033 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010973 - VETERANS BLVD LIGHTING(AIRPORT-LOYOLA)
Type Impv: ROADWAY LIGHTING
Project Manager: LACOMBE, JASON
Remarks: CITY OF KENNER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 660 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011007 - CHATEAU BLVD RESURFACING
Type Impv: RE-SURFACING
Project Manager: LACOMBE, JASON
Remarks: CITY OF KENNER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 1,470 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011309 - MACARTHUR INTERCHANGE COMPLETION PH. II
Type Impv: RELOCATE THE EXIT RAMP AND CONSTRUCT AN ENTRANCE RAMP
Project Manager: YANG, LI
Remarks: USE CCCD TOLL CREDITS AS MATCH FOR 1.6 MIL. PRELIMINARY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90-Z 283-09 NFI 40,000 CAPACITY 3-DESIGN/DEVELOPMENT
Project: H.011457 - WILLIAMS/US61 INTERSECTION IMPROVEMENTS
Type Impv: INTERSECTION ENHANCEMENTS
Project Manager:
Remarks: CITY OF KENNER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 61 007-02 STP<200K 487 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
JEFFERSON 000-26 STP<200K 487 URBAN SYSTEMS
JEFFERSON LA 49 283-30 STP<200K 487 URBAN SYSTEMS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 70 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON
Project: H.011463 - KENNER TRAFFIC SIGNALS UPGRADE
Type Impv: RESTRIPING AND UPGRADING EXISTING SIGNALS
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 395 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011534 - WEST LOYOLA & METAIRIE HEIGHTS BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 FBROFF 462 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
JEFFERSON 000-26 FBROFF 447 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011547 - LA 541 & LA 560-2: JESSIE ST. - LA 18
Type Impv: ADD DRAINAGE STRUCTURES
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 560-2 826-49 STPFLEX 800 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
JEFFERSON LA 541 826-13 STPFLEX 200 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
Project: H.011556 - LA 541: E JCT LA 18 - W JCT LA 18
Type Impv: ASPHALT OVERLAY, PATCHING, GUARD RAIL, STRIPING
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 541 826-05 STPFLEX 550 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011611 - I-10: CAUSEWAY BLVD. - ORLEANS P/L
Type Impv: COLD PLANE AND OVERLAY
Project Manager: FOSTER, AMANDA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON I-10 450-15 NHPP 2,250 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011731 - W. ESPLANADE BRIDGES @ DUNCAN CANAL
Type Impv: BRIDGE REPLACEMENT
Project Manager: LACOMBE, JASON
Remarks: CITY OF KENNER PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 5,500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
JEFFERSON 000-26 LOCAL 5,500 URBAN SYSTEMS
Project: H.011732 - JEFFERSON PARISH: CANAL ST. IMPROVEMENTS
Type Impv: BIKE LANES; SIDEWALKS AND CROSSWALKS
Project Manager: LACOMBE, JASON
Remarks: JEFFERSON PARISH PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 6,557 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011779 - POWER BLVD MEDIAN IMPROVEMENTS
Type Impv: MULTI-USE PATH
Project Manager: RIGGS, LAURA
Remarks: MATCH PROVIDED BY CITY OF KENNER.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 TAP>200K 2,011 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 71 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON
Project: H.011780 - LAKEFRONT PEDESTRIAN PATH
Type Impv: PEDESTRIAN PATH
Project Manager: MEEK, STEPHEN
Remarks: MATCH PROVIDED BY JEFFERSON PARISH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 TAP>200K 429 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.011795 - SB WESTWOOD DRIVE (WB EXPY TO LAPALCO)
Type Impv: CONCRETE REHABILITATION
Project Manager: LACOMBE, JASON
Remarks: JEFFERSON PARISH WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 1,800 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011796 - NB WESTWOOD DRIVE (WB EXPY TO LAPALCO)
Type Impv: REHABILITATION
Project Manager: LACOMBE, JASON
Remarks: JEFFERSON PARISH WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 1,800 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011797 - AMES BLVD (WB EXPY - HAPPY ST)
Type Impv: COLD-MILL AND OVERLAY
Project Manager: LACOMBE, JASON
Remarks: JEFFERSON PARISH WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 1,200 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011798 - AIRLINE PARK BLVD (CAMPHOR - W NAPOLEON)
Type Impv: CONCRETE REHABILITATION WITH DRAINAGE IMPROVEMENTS
Project Manager: LACOMBE, JASON
Remarks: JEFFERSON PARISH WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 3,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011805 - JEFFERSON WB MISS RIVER MU PATH 3B & 3C
Type Impv: MULTI-USE PATH
Project Manager: RIGGS, LAURA
Remarks: MATCH PROVIDED BY JEFFERSON PARISH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 TAP>200K 481 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
JEFFERSON LA 541 826-13 TAP>200K 141 ENHANCEMENTS
Project: H.002955 - EARHART EXPRESSWAY
Type Impv: ACCESS IMPROVEMENTS
Project Manager: LACOMBE, JASON
Remarks: 430-01-0016
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3139 430-01 STP>200K 5,000 URBAN SYSTEMS 2-WAITING FOR FUNDING
Project: H.002956 - EARHART AT DAKIN
Type Impv: RAMP CONNECTOR (EB EARHART - DAKIN)
Project Manager: LACOMBE, JASON
Remarks: 430-01-0020; USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3139 430-01 STP>200K 2,375 URBAN SYSTEMS 2-WAITING FOR FUNDING
Project: H.004359 - HICKORY (LA 48 - MOUNES)
Type Impv: RELOCATION AND 4-LANING
Project Manager: YANG, LI
Remarks: 826-44-0027;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3154 826-44 STBONDS 7,296 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
JEFFERSON LA 3154 826-44 OTHER 2,673 OTHER / MISCELLANEOUS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 72 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON
Project: H.004367 - LA3139:EARHART EXPRESSWAY EXT TO US 61
Type Impv: ENVIRONMENTAL. LINE & GRADE STUDY
Project Manager: YANG, LI
Remarks: 700-26-0242;HP NO.1600 (SEE ALSO 736-92-0003)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 NFI 125,000 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
ORLEANS 000-36 0 DEMO / HIGH PRIORITY
Project: H.002258 - LA 45 (FLOOD GATE - LA 560-4)
Type Impv: COLD PLANE AND OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: 249-01-0056;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 45 249-01 STPFLEX 1,551 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.002264 - BAYOU BARATARIA BRIDGE@JEAN LAFITTE
Type Impv: BRIDGE REPL.(KERNER'S)
Project Manager: YANG, LI
Remarks: 249-90-0041;TEA-21 KERNER'S FERRY BRIDGE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 45 249-90 DEMO 546 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
JEFFERSON LA 45 249-90 STPFLEX 4,305 SUSTAINABILITYBRIDGE (ON SYSTEM)
JEFFERSON LA 302 826-39 FBROFF 67,978 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.002861 - CAUSEWAY BLVD - EARHART EXPRESSWAY INTER
Type Impv: NEW INTERCHANGE
Project Manager: YANG, LI
Remarks: 430-01-0013;JEFF. PH CONSULTANT WORKING (E)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 3139 430-01 NFI 60,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
JEFFERSON LA 3046 423-01 0 DEMO / HIGH PRIORITY
Project: H.006442 - AIRPORT - CBD COMMUTER RAIL STUDY
Type Impv: STUDY
Project Manager: GAUTREAU, COLLEEN
Remarks: 736-92-0003;HP 1600 (SEE ALSO 700-26-0242)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
ORLEANS 000-36 0 DEMO / HIGH PRIORITY
ST CHARLES 000-45 0 DEMO / HIGH PRIORITY
Project: H.006513 - US 61 CORRIDOR PRESERVATION
Type Impv: ABANDONED RR R/W ACQ. (HP NO 1600)
Project Manager: GAUTREAU, COLLEEN
Remarks: 737-26-0001;HP=$0.5M. >2OOK=$0.3M IN FY 2001
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 DEMO 6,750 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
ORLEANS 000-36 0 DEMO / HIGH PRIORITY
ST CHARLES 000-45 0 DEMO / HIGH PRIORITY
Project: H.009571 - US 61:DAVID DR - WILLIAMS BLVD
Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 61 007-02 NHPP 1,998 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 73 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON
Project: H.009794 - GRETNA BICYCLE ACCESS IMPROVEMENTS
Type Impv: SIGNING, PAVEMENT MARKINGS, M/U PATH & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 TAP>200K 170 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
JEFFERSON US 90-Z 283-09 TAP>200K 75 ENHANCEMENTS
JEFFERSON LA 466 063-02 TAP>200K 50 ENHANCEMENTS
JEFFERSON LA 466 063-02 TAP>200K 25 ENHANCEMENTS
Project: H.010017 - US 90Z: WESTBANK EXPRESSWAY REHAB
Type Impv: MAJOR BRIDGE REHABILITATION
Project Manager: THOMAS, HOLLY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90-Z 283-09 NHPP 12,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010418 - LA 611-1 & LA 611-3:COLD PLANE & OVERLAY
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 611-1 826-14 STPFLEX 200 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
JEFFERSON LA 611-1 826-16 STPFLEX 500 SUSTAINABILITYNON-INTERSTATE
JEFFERSON LA 611-1 826-16 STPFLEX 100 SUSTAINABILITYNON-INTERSTATE
JEFFERSON LA 611-1 826-17 STPFLEX 325 SUSTAINABILITYNON-INTERSTATE
Project: H.010570 - LA 49 (WILLIAMS BLVD) CORRIDOR STUDY
Type Impv: SAFETY/ACCESS MANAGEMENT
Project Manager: RENARD, APRIL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON LA 49 283-30 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011311 - US 90: WESTWOOD DR - ELEVATED WB EXPY
Type Impv: WIDEN RDWY FOR NEW TURN LANE; CONVERT EX. TL INTO THRU LA
Project Manager: ROONEY, BRITTANY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 90-Z 283-09 STGEN 1,000 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.011514 - INTERSECT IMPROV ALONG US 61 & LA 3154
Type Impv: INTERSECTION IMPROVEMENT STUDY
Project Manager: HOYT, RYAN
Remarks: FEASIBILITY STUDY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 61 007-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
JEFFERSON LA 3154 826-44 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011647 - US61, LA611 & LA3152 CORRIDOR IMPROVE
Type Impv: CORRIDOR IMPROVEMENT STUDY
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON US 61 007-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
JEFFERSON LA 3152 826-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
JEFFERSON LA 611-9 826-04 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 74 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON
Project: H.011670 - I-10 / LOYOLA INTERCHANGE IMPROVEMENT
Type Impv: FEASIBILITY STUDY, IMR AND ENVIRONMENTAL ASSESSMENT
Project Manager: YANG, LI
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON I-10 450-15 0 INTERMODAL CONNECTOR 1-PLANNING/ENVIRONMENTAL
Project: H.011752 - SEVERN AVE: VETERANS - W. ESPLANADE
Type Impv: SIDEWALKS AND BIKELANES
Project Manager: LACOMBE, JASON
Remarks: JEFFERSON PARISH WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFFERSON 000-26 STP>200K 7,962 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 75 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON DAVIS
Project: H.006528 - FENTON ELEMENTARY
Type Impv: SIDEWALK CONSTRUCTION AND CROSSWALKS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS 000-27 SR2S 81 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
JEFF DAVIS 000-27 SATRANS 10 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010269 - LA 1131: ARDOIN COVE RD - US 90
Type Impv: ASHPALT SURFACE TREATMENT
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 1131 827-07 NFA 101 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 14-15
Project: H.000517 - US 165 BRIDGES NEAR FENTON
Type Impv: BRIDGE REPLACEMENT
Project Manager: KEMP, KELLY
Remarks: 014-02-0025;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS US 165 014-02 STP<5K 5,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.002076 - LA 383: LA 101 - ALLEN PARISH LINE
Type Impv: PATCH & OVERLAY
Project Manager: OSTUNO, BARBARA
Remarks: 197-03-0016; NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 383 197-03 NFA 3,275 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009319 - I-10 OVERPASS BRIDGES CLEAN & PAINT
Type Impv: BRIDGE PAINTING
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS I-10 450-03 FBR-ON/OFF 345 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 15-16
ACADIA I-10 450-04 FBR-ON/OFF 957 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
CALCASIEU I-10 450-91 FBR-ON/OFF 1,268 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
Project: H.010864 - I-10: DISTRICT 07 CABLE BARRIER
Type Impv: INSTALLATION OF CABLE BARRIER SYSTEM IN MEDIAN.
Project Manager: CORMIER, CLAYTON
Remarks: USE HSIP FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS I-10 450-03 HSIP 3,219 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
CALCASIEU I-10 450-91 HSIP 2,541 SAFETY
Project: H.002980 - I-10 OVERPASS OVER US 165 & MP R.R
Type Impv: NEW BRIDGES
Project Manager: DELATTE, BRIAN
Remarks: 450-03-0085;PARALLEL BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS I-10 450-03 NHPP 30,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010079 - MOUTON RE/W DIVISION ST/POWELL RD BRDGS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS 000-27 FBROFF 1,317 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
JEFF DAVIS 000-27 FBROFF 732 SUSTAINABILITYBRIDGE (OFF SYSTEM)
JEFF DAVIS 000-27 FBROFF 439 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 76 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: JEFFERSON DAVIS
Project: H.002091 - LA 97 OVERPASS (I-10)
Type Impv: BRIDGE REPLACEMENT
Project Manager: BROWN, JEFF
Remarks: 201-01-0008;PROJECT TO BE SCOPED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 97 201-01 STPFLEX 6,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009420 - US 165: INSTALL J-TURN @ LA 101
Type Impv: INSTALL J-TURN ON US 165 @ LA 101
Project Manager: CORMIER, CLAYTON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS US 165 014-02 HSIP 1,000 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.009486 - US 90: BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: CAVALIER, STEPHANIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS US 90 003-07 STPFLEX 1,370 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010238 - LA 26: US 90 - RACCA RD(JENNINGS)
Type Impv: PATCH, CP 2", OVERLAY 3", 3" SHLD
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 26 054-05 STPFLEX 1,156 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010243 - LA 26: HOSPITAL RD - JCT US 90
Type Impv: PATCH, CP 2", OVERLAY 3"
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
JEFF DAVIS LA 26 054-04 STPFLEX 576 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 77 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LAFAYETTE
Project: H.006538 - LAFAYETTE SAFE ROUTES TO SCHOOL PROJECT
Type Impv: CONSTRUCTION OF SIDEWALKS AND CROSSWALKS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 SR2S 126 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
LAFAYETTE LA 92 213-05 SR2S 112 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.009494 - I-49 FRONTAGE ROADS:I-10 - ST.LANDRY P/L
Type Impv: COLD PLANE, PATCH, AND OVERLAY
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE I-49 455-01 STPFLEX 9,230 SUSTAINABILITYINTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010870 - ATAKAPA-ISHAK BREAUX BRIDGE TRAIL
Type Impv: CONSTRUCTION OF A 8.2 PED-BIKE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 RTP 128 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
LAFAYETTE 000-28 LOCAL 12 RECREATIONAL TRAILS PROGRAM
Project: H.010878 - ACADIANA HILLS TRAIL
Type Impv: CONSTRUCTION OF 900' OF PED-BIKE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 RTP 78 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
LAFAYETTE 000-28 LOCAL 14 RECREATIONAL TRAILS PROGRAM
Project: H.011652 - LA 92: VERMILION P/L - LA 339
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 92 213-05 STBONDS 2,235 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 14-15
LAFAYETTE LA 92 213-05 STPFLEX 965 OTHER / MISCELLANEOUS
Project: H.011761 - I-49: CORRIDOR PLAN
Type Impv: PLANNING TO FOCUS ON CONNECTIVITY AND CORRIDOR IMPROVEME
Project Manager: REVIERE, RYAN
Remarks: LAFAYETTE CONSOLIDATED GOVERNMENT TO PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 0 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.002163 - ROUNDABOUT ON LA 342 AT LA 724
Type Impv: ROUNDABOUT
Project Manager: PICARD, TOBY
Remarks: 218-01-0019;PRIORITY 3
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 342 218-01 HSIP 1,595 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
LAFAYETTE LA 724 218-30 HSIP 367 SAFETY
Project: H.005508 - VEROT SCHOOL RD (VINCENT - EX. 5-L)
Type Impv: RECONST. & ADD LANES
Project Manager: SMITH, DAVID
Remarks: 828-12-0014;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 339 828-12 STPFLEX 24,355 CAPACITY 4-SCHEDULED FOR LETTING FY 15-16
LAFAYETTE LA 339 828-12 STP>200K 2,256 URBAN SYSTEMS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 78 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LAFAYETTE
Project: H.006530 - ROUNDABOUT AT GEN. MOUTON/TAFT STREET
Type Impv: CONSTRUCTION OF A ROUNDABOUT
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 SATRANS 419 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
LAFAYETTE 000-28 LOCAL 47 SAFETYLOCAL ROADS SAFETY
Project: H.007229 - LAFAYETTE CON.GOV. SR2S PROJECT
Type Impv: SIDEWALKS. ETC.
Project Manager: GROS, SCOTT
Remarks: 742-28-0003;SR2S PROGRAM FUNDING
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 SR2S 178 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
LAFAYETTE 000-28 SATRANS 22 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.007232 - LAFAYETTE MPO NON STATE PVT MARKING
Type Impv: PAVEMENT MARKINGS
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: 742-28-0006;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STP>200K 1,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010442 - LA 3073: INTERSECT IMPROVE @ JCT LA 89
Type Impv: CONSTRUCT TURN LANES
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 3073 828-39 NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
LAFAYETTE LA 89-1 216-03 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
Project: H.011018 - CHEMIN METAIRIE PARKWAY BIKE LANES
Type Impv: STRIPING, PAVEMENT MARKINGS AND SIGNING OF BIKE LANES.
Project Manager: BANKSTON, TANYA
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STP>200K 116 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.002151 - BAYOU PARC PEROU AND CREEK BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks: 216-02-0016; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 734 216-02 FBROFF 1,525 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.003003 - I-10: E. JCT. I-49 TO LA 328
Type Impv: RUBBLIZE AND OVERLAY AND WIDEN TO 3 LANES IN EACH DIRECTIO
Project Manager: OLIVIER, NICHOLAS
Remarks: 450-05-0062;450-06-0068
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE I-10 450-05 NHPP 34,666 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
LAFAYETTE I-10 450-05 NHPP 14,058 SUSTAINABILITYBRIDGE (ON SYSTEM)
LAFAYETTE I-10 450-05 NHPP 29,791 CORRIDOR
ST MARTIN I-10 450-06 NHPP 17,504 CORRIDOR
ST MARTIN I-10 450-06 NHPP 5,133 SUSTAINABILITYBRIDGE (ON SYSTEM)
ST MARTIN I-10 450-06 NHPP 20,109 SUSTAINABILITYINTERSTATE
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 79 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LAFAYETTE
Project: H.003459 - ROUNDABOUT @ LA 726 AND I-49 FRONTAGE RD
Type Impv: CONSTRUCT ROUNDABOUT
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: 455-01-0054 AND 828-44-0015
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE I-49 455-01 HSIP 850 SAFETY 3-DESIGN/DEVELOPMENT
LAFAYETTE LA 726 828-44 HSIP 850 SAFETY
Project: H.006531 - ROUNDABOUT AT HOSPITAL DRIVE AND GIRARD
Type Impv: CONSTRUCTION OF A ROUNDABOUT
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 SATRANS 500 SAFETYLOCAL ROADS SAFETY
3-DESIGN/DEVELOPMENT
LAFAYETTE 000-28 LOCAL 56 SAFETYLOCAL ROADS SAFETY
Project: H.007233 - LAFAYETTE MPO NON STATE PVT MARKING
Type Impv: PAVEMENT MARKINGS
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: 742-28-0007;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STP>200K 500 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.009181 - US167(JOHNSTON ST)@LA3073(AMB CAFF PKWY)
Type Impv: INTERSECTION IMPROVEMENT
Project Manager: BANKSTON, TANYA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 167 080-02 STP>200K 2,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
LAFAYETTE LA 3073 828-39 STP>200K 500 URBAN SYSTEMS
Project: H.009795 - LA 182: US 90-MLK DRIVE SIDEWALKS
Type Impv: SIDEWALKS & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 182 032-01 TAP>200K 571 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.010557 - LAJAUNIE RD / LATERAL 1 BAYOU ST. CLAIR
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 FBROFF 447 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010713 - LA 89: ROUNDABOUT AT FORTUNE RD.
Type Impv: RECONSTRUCTION, ADDED CAPACITY
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 89-1 216-03 HSIP 1,175 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
Project: H.010995 - LA 724:[email protected](LAFAYETTE)
Type Impv: CONSTRUCT ROUNDABOUT
Project Manager: ISEMANN, ROBERT
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 724 828-28 CM 490 CONGESTION MITIGATION 3-DESIGN/DEVELOPMENT
LAFAYETTE 000-28 CM 490 CONGESTION MITIGATION
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 80 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LAFAYETTE
Project: H.011235 - I-49 SOUTH @ VEROT SCHOOL ROAD
Type Impv: CONSTRUCT NEW INTERSECTION - CONCRETE
Project Manager: LANDRY, COREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 90 424-02 NFI 97,000 CAPACITY 3-DESIGN/DEVELOPMENT
Project: H.011307 - US 90: LA 92 @ YOUNG ST INTERCHANGE
Type Impv: WIDENING OF US 90 AND CONSTRUCTION OF INTERCHANGE
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 90 424-02 STGEN 39,000 CAPACITY 3-DESIGN/DEVELOPMENT
LAFAYETTE LA 92 213-06 STGEN 1,000 CAPACITY
Project: H.011748 - LA 731 & LA 731-S IMPROVEMENTS
Type Impv: ASPHALT OVERLAY AND RELATED WORK.
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 731 828-21 STPFLEX 675 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
LAFAYETTE LA 731-S 828-47 STPFLEX 150 ROAD TRANSFER
Project: H.011830 - LA 93: APOLLO RD OVERLAY
Type Impv: OVERLAY WITH ISOLATED RECONSTRUCTION WHERE NECESSARY
Project Manager: BANKSTON, TANYA
Remarks: CITY OF SCOTT PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 93 433-01 STP>200K 300 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011831 - FORTUNE ROAD OVERLAY
Type Impv: OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: LAFAYETTE CONSOLIDATED GOVERNMENT WILL PROVIDE MATC
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STP>200K 850 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011832 - US 90: CAMERON ST. OVERLAY
Type Impv: OVERLAY WITH ISOLATED RECONSTRUCTION WHERE NECESSARY
Project Manager: BANKSTON, TANYA
Remarks: CITY OF SCOTT PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 90 003-11 STP>200K 2,000 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011833 - ST. MARY STREET SIDEWALKS
Type Impv: SIDEWALKS
Project Manager: BANKSTON, TANYA
Remarks: CITY OF SCOTT PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STP>200K 3,600 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011834 - LA 93: WESTGATE RD OVERLAY
Type Impv: OVERLAY WITH ISOLATED RECONSTRUCTION WHERE NECESSARY
Project Manager: BANKSTON, TANYA
Remarks: CITY OF SCOTT PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 93 828-15 STP>200K 750 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 81 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LAFAYETTE
Project: H.000201 - LA 182 AT BENDEL ROAD
Type Impv: GEOMETRIC IMPR. (INCL PINHOOK IMPR)
Project Manager: BANKSTON, TANYA
Remarks: 004-01-0039;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 182 004-01 LOCAL 4,252 URBAN SYSTEMS 2-WAITING FOR FUNDING
LAFAYETTE LA 182 004-01 HSIP 731 SAFETY
Project: H.009625 - LA 182: LA 89 - 0.36 MI. N. US 90 UPASS
Type Impv: COLD PLANE, PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 182 004-02 STPFLEX 2,159 SUSTAINABILITYNON-INTERSTATE
2-WAITING FOR FUNDING
Project: H.009629 - US 90 (EB):RR JCT-JCT US 90BUS (PINHOOK)
Type Impv: P.C.C.P. REHABILITATION
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 90 424-02 NHPP 8,813 SUSTAINABILITYNON-INTERSTATE
2-WAITING FOR FUNDING
Project: H.002735 - BAYOU VERMILION BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: LAI, QUANG
Remarks: 391-04-0018; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 1252 391-04 FBROFF 2,335 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.002868 - I-49 S:AMB CAFFERY/US90 INTERCHANGE
Type Impv: NEW INTERCHANGE
Project Manager: RABALAIS, NICK
Remarks: 424-02-0090;ENG DEMO. RW/UTL S9$1.2M AVAILABLE.NFI FOR C
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 90 424-02 NFI 57,970 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.003454 - LAFAYETTE CONNNECTOR
Type Impv: IN LAFAYETTE NEW INTERSTATE
Project Manager: WEDGE, ED
Remarks: 455-01-0035;ENGR 700-24-0073. R/W 455-01-0034
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE I-49 455-01 DEMO 400,000 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.004490 - STAGE 0 STUDY FOR VARIOUS ROUNDABOUTS
Type Impv: STAGE 0 STUDY
Project Manager: BROUSSARD, DAN
Remarks: 700-28-0221; MATCH BY LAF MPO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 STP<200K 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.004492 - I-10 INTERCHANGE AT N AMBASSADOR CAFFERY
Type Impv: INTERCHANGE DESIGN
Project Manager: PORTER BETTS, CONNIE
Remarks: 700-28-0223;STUDY FED FY2013.ENGR FED FY2014
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.009335 - LA 182: I-10 TO WEST PONT DES MOUTON RD
Type Impv: WIDENING AND ADDING TRAVEL LANES TO PROVIDE 4 LANE HIGHWA
Project Manager: BABIN, TEDDY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 182 032-01 NFI 40,200 CAPACITY 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 82 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LAFAYETTE
Project: H.009500 - 2040PLAN IMPLEMENTATION&I-49 ACTION PLAN
Type Impv: PLAN IMPLEMENTATION AND ACTION PLAN
Project Manager: BROUSSARD, DAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE 000-28 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.009520 - LA 3168:NEW BRIDGE@BNSF-US 90(LAFAYETTE)
Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 3168 433-01 STPFLEX 24,700 RAILROADSGRADE SEPARATION
1-PLANNING/ENVIRONMENTAL
Project: H.009639 - LA 343: LA 342 - 1.0 MI. N. LA 342
Type Impv: COLD PLANE, PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 343 393-03 STPFLEX 619 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009997 - US 167 CORRIDOR STAGE 0 STUDY
Type Impv: ACCESS MANAGEMENT AND OTHER SAFETY COUNTERMEASURES
Project Manager: RENARD, APRIL
Remarks: STUDY FUNDED WITH SAFETY TRANSFER FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 167 080-02 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.010005 - VERMILLION RIVER MOVABLE BRIDGES REHAB
Type Impv: MOVABLE BRIDGE REHABILITATION
Project Manager: BRAUNER, KURT
Remarks: CONTROL SECTION 828-14 IS IN URBANIZED AREA, THE OTHER N
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 733 828-14 STPFLEX 4,568 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
VERMILION LA 82 194-07 STPFLEX 3,418 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.010207 - LA 94: LA 353 - ST. MARTIN PL
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 94 080-03 STPFLEX 127 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.011303 - US 90:ALBERTSON TO SOUTHPARK FRONTAGE RD
Type Impv: FRONTAGE RD CONSTRUCTION
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 90 424-02 STGEN 6,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.011408 - US90(EVANG THWY)@US167(JOHNSTON ST)
Type Impv: INTERSECTION STUDY
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE US 90 424-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
LAFAYETTE US 167 080-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
LAFAYETTE LA 94 828-43 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 83 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LAFAYETTE
Project: H.009214 - LA 339: WIDENING (LA 82 TO LA 3073)
Type Impv: WIDENING
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 339 828-11 0 CAPACITY 0-FEASIBILITY/SCOPING
LAFAYETTE LA 339 828-12 0 CAPACITY
Project: H.009215 - LA182:WIDENING(W PONT DES MOUTON RD-I49)
Type Impv: WIDENING
Project Manager: LANDRY, COREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFAYETTE LA 182 032-01 0 CAPACITY 0-FEASIBILITY/SCOPING
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 84 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LAFOURCHE
Project: H.001491 - LA 20 WIDENING: LA 308 - ST PATRICK ST
Type Impv: COLD PLANE AND OVERLAY
Project Manager: PAINE, PEGGY JO
Remarks: 065-06-0046;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 20 065-06 STBONDS 2,190 SAFETY 4-SCHEDULED IN CURRENT FY 14-15
LAFOURCHE LA 20 065-06 HSIPPEN 4,878 SAFETY
LAFOURCHE LA 20 065-06 HSIPPEN 182 ROAD TRANSFER
Project: H.010169 - KRAEMER LIFT BRIDGE MECHANICAL REPAIRS
Type Impv: MECHANICAL REPAIR
Project Manager: LAMBERT, JARRETT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 307 829-15 STPFLEX 650 OPER EFFICIENCY/MOTORIST ASSISTANCEMOVABLE BRIDGE REHABILITATION
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011464 - LA 3090: LA 1 - FOURCHON CITY
Type Impv: ROADWAY REHABILITATION
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 3090 064-30 STPFLEX 4,009 INTERMODAL CONNECTOR 4-SCHEDULED IN CURRENT FY 14-15
Project: H.002780 - LA 308 CURVE IMPROVEMENT
Type Impv: STRAIGHTEN CURVE IN ROADWAY
Project Manager: PICARD, TOBY
Remarks: 407-04-0043;407-04-0044
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 308 407-04 SATRANS 2,073 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.008145 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2C
Type Impv: ROUTE LA 1 RELOCATION
Project Manager: NICKEL, TIM
Remarks: 829-32-0010;NEW BRIDGE.NEW ALIGNMENT; AC-ING WITH STBON
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 STBONDS 40,000 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 15-16
LAFOURCHE LA 1 829-32 LOCAL 6,600 OTHER / MISCELLANEOUS
Project: H.010109 - RACELAND SRTS PROJECT
Type Impv: SIDEWALK IMPROVMENTS, CROSSWALK, SPEED DETECTION DEVICES
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE 000-29 SR2S 202 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
LAFOURCHE 000-29 SATRANS 26 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010403 - LLA 182/LA 1: US 90 - GUIDRY LN
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 182 005-06 STPFLEX 2,750 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011239 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2E
Type Impv: CONSTRUCT LEEVILLE MAIN LINE INTERSECTION
Project Manager: NICKEL, TIM
Remarks: AC-ING WITH STBONDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 STBONDS 8,584 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 15-16
LAFOURCHE LA 1 829-32 LOCAL 1,416 OTHER / MISCELLANEOUS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 85 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LAFOURCHE
Project: H.011493 - LA 1: ITS EQUIPMENT UPGRADE
Type Impv: UPGRADING AND PROVIDING NEW ITS EQUIPMENT
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 NHPP 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011763 - LA 1 TOLL VIOLATION ENFORCEMENT SYSTEM
Type Impv: UPGRADE TO VIOLATION ENFORCEMENT SYSTEM EQUIPMENT.
Project Manager: DELANEY, ELIZABETH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 STCASH 300 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.002794 - VALENTINE CANAL BR. NEAR RACELAND
Type Impv: BRIDGE REPLACEMENT
Project Manager: ISEMANN, ROBERT
Remarks: 407-90-0018; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 308 407-90 FBROFF 1,421 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.008118 - BAYOU DUMAR & DRAIN CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 829-12-0021;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 653 829-12 FBROFF 670 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009320 - ACADIAN ROAD ROUNDABOUT
Type Impv: 5 LEGGED ROUNDABOUT
Project Manager: BANKSTON, TANYA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 20 065-05 HSIP 1,570 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.009658 - US 90: LA 182 - LA 1
Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE US 90 424-08 NHPP 3,938 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009742 - ACADIA RD: AUDUBON-CARDINAL PED PATHS
Type Impv: SIDEWALK WITH LIGHTING
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE 000-29 TAP<200K 204 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.010324 - LA 1: GOLDEN MEADOW - LEEVILLE
Type Impv: RAISING ROADWAY GRADE TO CONSISENT ELEVATION BY ADDING
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 064-90 NHPP 900 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011444 - LA 308: TURN LANES AT TIGER DRIVE BRIDGE
Type Impv: ADD TURN LANES FORM LA 308 TO TIGER DRIVE BRIDGE (LA 3266)
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 308 407-05 STPFLEX 300 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 86 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LAFOURCHE
Project: H.011516 - US 90 @ LA 182
Type Impv: RAISING ROADWAY ELEVATION
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE US 90 005-07 NHPP 250 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011517 - LA 654: LA 308 - GREENS S. CUT RD.
Type Impv: RAISING ROADWAY ELEVATION BY ADDING ASPHALT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 654 829-10 NFA 350 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011552 - LA 307: LA 20 - LA 182
Type Impv: ASPHALT OVERLAY, PATCHING, GUARD RAIL, STRIPING
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 307 829-15 STPFLEX 1,750 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011559 - LA 308: 0.53 MI W DUET DRIVE - LOCKPORT
Type Impv: ASPHALT OVERLAY, PATCHING, GUARD RAIL, STRIPING
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 308 407-90 NFA 950 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011665 - LA 308:BELLVIEW BRIDGE TO RITA BRIDGE
Type Impv: LA 308 REALIGNMENT.
Project Manager: MOORE, DARRELL
Remarks: 407-90 LOGMILE 13.115 TO 13.52 NFA MATCH (DETAIL 1)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 308 407-90 HSIP 832 SAFETY 3-DESIGN/DEVELOPMENT
LAFOURCHE LA 308 407-90 HSIP 242 SAFETY
Project: H.007234 - ACADIAN RD-WEST (CANAL TO LA 3185)
Type Impv: 4-LANE
Project Manager: BANKSTON, TANYA
Remarks: 742-29-0001;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE 000-29 STP<200K 9,359 URBAN SYSTEMS 2-WAITING FOR FUNDING
Project: H.010469 - EMERG CONT F/REPAIR TO ELMER'S ISLAND RD
Type Impv: FURNISH, PLACE, AND COMPACT AGGREGATE SURFACE COURSE MA
Project Manager: GISCLAIR, GARY
Remarks: LETTER BID 9/17/2012
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE 000-29 STCASH 300 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.009662 - LA 308: GOLDEN MEADOW BR - GALLIANO BR
Type Impv: ASPHALTIC CONCRETE OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 308 407-01 STPFLEX 2,115 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009664 - LA 20: TERREBONNE P/L - JACKSON ST.
Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 20 065-05 STPFLEX 1,116 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 87 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LAFOURCHE
Project: H.010006 - LA 182 & LA 58: MOVABLE BRIDGE REHAB
Type Impv: MOVABLE BRIDGE REHABILITATION
Project Manager: BRAUNER, KURT
Remarks: BOTH CONTROL SECTIONS IN HOUMA MPO AREA.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 182 005-07 STPFLEX 5,089 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
TERREBONNE LA 58 247-30 STPFLEX 4,253 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.010152 - LA 1: CONSTRUCTION CANAL DREDGING
Type Impv: DREDGE CANAL AND MITIGATION FOR LA 1 ELEVATED CONSTRUCTIO
Project Manager: NICKEL, TIM
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 064-90 NHPP 2,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.010404 - US 90: 2.5 MI E LA 182 - ST CHARLES P/L
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE US 90 005-07 NHPP 4,000 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010408 - LA 1: VALENTINE BR - LA 655
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 064-05 STPFLEX 2,300 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010409 - LA 1: LA 655 - CHAMPAGNE-HARRELSON BR
Type Impv: COLD PLANE AND SUPERPAVE ASPHALTIC CONCRETE OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 064-06 STPFLEX 1,500 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010688 - LA 3235 FEASIBILITY STUDY
Type Impv: ACCESS MANAGEMENT
Project Manager: RENARD, APRIL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 3235 829-26 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011207 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2A
Type Impv: CONSTRUCT RELOCATED LA 1 ON ELEVATED STRUCTURE
Project Manager: NICKEL, TIM
Remarks: SEE NOTES FOR FUNDING INFO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 NFI 43,400 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.011208 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2B
Type Impv: ELEVATED RELOCATED LA 1 -LEEVILLE TO GOLDEN MEADOW LEVEE
Project Manager: NICKEL, TIM
Remarks: SEE NOTES FOR FUNDING INFO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 NFI 230,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.011209 - LA 1: LEEVILLE TO GOLDEN MEADOW PHASE 2D
Type Impv: NEW TOLL FACILITY FOR LA 1 SOUTHBOUND AND APPROACH.
Project Manager: NICKEL, TIM
Remarks: SEE NOTES FOR FUNDING INFO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LAFOURCHE LA 1 829-32 NFI 10,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 88 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LASALLE
Project: H.011423 - LA 3159: US 84 - END OF MAINTENANCE
Type Impv: STABILIZE AND OVERLAY
Project Manager: ZIECKER, MATTHEW
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 3159 830-19 NFA 1,706 ROAD TRANSFER 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011634 - LA 124: US 165 - .7 MI. W OF LA 506
Type Impv: ASPHALTIC SURFACE TREATMENT
Project Manager: DEVILLE, JACQUES
Remarks: C.S. 125-03 FROM 1.14 TO 1.58 MATCH WITH TTF (DETAIL 2)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 124 125-03 STPFLEX 475 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
LASALLE LA 124 125-03 STPFLEX 130 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
Project: H.009588 - LA 125: LA 3259 - ALPS ROAD
Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 125 131-01 STPFLEX 1,518 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.000754 - UNION PACIFIC R.R.OPASS NEAR TULLOS
Type Impv: BRIDGE REPLACEMENT
Project Manager: MUSA, ELNUR
Remarks: 022-04-0033;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE US 84 022-04 NHPP 3,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.001133 - LA MIDLAND RR OVERPASS REPLACEMENT
Type Impv: REPLACE RR OVERPASS/BRIDGE REMOVAL
Project Manager: HICKS, MELVIN
Remarks: 040-04-0030;DOES NOT QUALIFY FOR BR FUNDS.WANT TO REMO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 772 040-04 STPFLEX 687 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009589 - LA 28: RAPIDES LINE - DIVERSION CANAL
Type Impv: ASPHALT CONCRETE OVERLAY OVER IN PLACE STABILIZATION
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 28 074-03 NHPP 1,604 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009765 - JENA: MULTI-MODAL CONNECTIVITY
Type Impv: MULTI-USE PATH W/LIGHTING, LANDSCAPE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE 000-30 TAP<5K 787 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
LASALLE LA 8 830-08 TAP<5K 120 ENHANCEMENTS
Project: H.011571 - .7 MI. W. OF LA 506 - W. JCT LA 126
Type Impv: PATCH & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 124 125-03 NFA 2,100 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011676 - GULDE ROAD BRIDGE
Type Impv: BRIDGE REPLACEMENT - NO ADDED CAPACITY
Project Manager: PENTEK, GARY
Remarks: TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE 000-30 FBROFF 347 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 89 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LASALLE
Project: H.000758 - LA 772 - HAIR CREEK(JENA)
Type Impv: WIDENING
Project Manager: BROADBENT, RONALD
Remarks: 022-05-0045;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE US 84 022-05 NFI 50,000 CORRIDOR 1-PLANNING/ENVIRONMENTAL
Project: H.009603 - LA 3259: LA 125 - US 165
Type Impv: ASPHALT OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 3259 830-21 STPFLEX 294 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009644 - LA 125: US 165-PENTECOSTAL CHURCH ROAD
Type Impv: ASPHALT OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LASALLE LA 125 131-01 STPFLEX 1,384 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 90 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LINCOLN
Project: H.011638 - LA 3061: US 167 - LA 146
Type Impv: MAINTENANCE RESURFACING
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 3061 831-13 STPFLEX 477 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.003298 - ROAD INTERCHANGE & I-20 FRONTAGE RD
Type Impv: NEW CONC PVMT TARBUTTON RD OVERPASS
Project Manager: REVIERE, RYAN
Remarks: 451-05-0115;STAGE 3
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN I-20 451-05 TCSP 0 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
LINCOLN I-20 451-05 IM DISCR 0 SUSTAINABILITYINTERSTATE
LINCOLN I-20 451-05 DEMO 3,186 DEMO / HIGH PRIORITY
LINCOLN I-20 451-05 STGEN 250 SUSTAINABILITYINTERSTATE
LINCOLN I-20 451-05 STBONDS 10,864 SUSTAINABILITYINTERSTATE
Project: H.006548 - LINER & ROUGH EDGE ROAD IMPROVEMENT
Type Impv: SITE DISTANCE AND ALIGNMENT
Project Manager: HOLM, RICK
Remarks: 737-31-0003;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 HRRR 168 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
LINCOLN 000-31 LOCAL 16 SAFETYLOCAL ROADS SAFETY
Project: H.007492 - CHOUDRANT SIDEWALK PROJECT
Type Impv: SIDEWALK AND BIKE PATH
Project Manager: MEEK, STEPHEN
Remarks: 15% OF MATCH IS TOLL CREDITS 5% IS LOCAL MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 145 157-03 TAP<5K 204 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 15-16
LINCOLN US 80 001-08 TAP<5K 146 ENHANCEMENTS
LINCOLN LA 145 157-02 TAP<5K 35 ENHANCEMENTS
Project: H.009277 - GRAMBLING SR2S PROJECT
Type Impv: SIDEWALK, CROSSWALKS, MARKINGS ETC.
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 SR2S 180 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
LINCOLN 000-31 SATRANS 26 SAFETYSAFE ROUTES TO SCHOOLS
LINCOLN LA 149 831-16 SR2S 11 SAFETYSAFE ROUTES TO SCHOOLS
LINCOLN LA 149 831-16 SATRANS 3 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010066 - I A LEWIS ELEM. SRTS SIDEWALK PROJECT
Type Impv: SIDEWALK IMPROVEMENT, TRAFFICE CALMING, SPEED REDUCTION IM
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 SR2S 200 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
LINCOLN 000-31 SATRANS 25 SAFETYSAFE ROUTES TO SCHOOLS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 91 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LINCOLN
Project: H.010424 - LA 823 ROADWAY FLOODING 1.8 MI E LA 151
Type Impv: RAISE THE ROADWAY ELEVATION
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 823 314-01 NFA 500 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010432 - US 167 & US 63: TURN LANE @ REYNOLDS DR
Type Impv: US 167 ADD RT TURN LANE AT REYNOLDS RD
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN US 63 023-10 NHPP 700 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009746 - RUSTON DOWNTOWN REVITALIZATION PHASE 6
Type Impv: SIDEWALK W/ LIGHTING, STREETSCAPING, & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 150 831-07 TAP<200K 895 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
LINCOLN LA 150 831-07 LOCAL 190 OTHER / MISCELLANEOUS
LINCOLN 000-31 TAP<200K 1,569 ENHANCEMENTS
LINCOLN 000-31 LOCAL 284 OTHER / MISCELLANEOUS
Project: H.009871 - KCS(SIMSBORO) WOODLAND DR.
Type Impv: INSTALL F/L'S AND GATES
Project Manager: SHREWSBERRY,BILL
Remarks: 714-31-0110
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.010009 - LA 507 OVER I-20 BRIDGE REHABILITATION
Type Impv: REPLACEMENT OF SUPERSTRUCTURE
Project Manager: BUCCI, MARK
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 507 308-04 FBROFF 3,247 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010056 - EAVES ROAD & JEFFERSON AVENUE BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 FBROFF 693 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011627 - I-20: BIENVILLE P/L - 1 MILE WEST LA 149
Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT.
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN I-20 451-05 NHPP 11,900 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011772 - LA 824-3: TOWN OF DUBACH SIDEWALKS
Type Impv: SIDEWALKS
Project Manager: RIGGS, LAURA
Remarks: MATCH BY THE TOWN OF DUBACH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 824-3 831-21 TAPFLEX 41 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 92 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LINCOLN
Project: H.011803 - RUSTON DOWNTOWN REVITALIZATION PHASE VII
Type Impv: SIDEWALKS AND STREETSCAPING
Project Manager: RIGGS, LAURA
Remarks: MATCH PROVIDED BY THE CITY OF RUSTON.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 TAP<200K 660 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.011804 - RUSTON DOWNTOWN REVITALIZATION PHASE IX
Type Impv: SIDEWALKS AND STREETSCAPING
Project Manager: RIGGS, LAURA
Remarks: MATCH PROVIDED BY CITY OF RUSTON
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 TAP<200K 675 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.001550 - CHATHAM RD. (RUSTON)
Type Impv: WIDEN TO 5 LANES
Project Manager: JESCLARD, TREY
Remarks: 068-01-0009;$200 BONDS AVAIL. FOR PE (E?)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 146 068-01 0 CAPACITY 2-WAITING FOR FUNDING
Project: H.000133 - US 80 OVERPASS @ KCS RR
Type Impv: BRIDGE REPLACEMENT
Project Manager: FOURNERAT, CHRIS
Remarks: 001-07-0026;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN US 80 001-07 STPFLEX 22,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001679 - LA 146 BRIDGES NEAR VIENNA
Type Impv: NEW BRIDGES
Project Manager: UMEOZULU, JOE
Remarks: 085-09-0017;3 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 146 085-09 STPFLEX 3,569 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.004608 - CHOUDRANT I-20 SERVICE ROAD
Type Impv: NEW SERVICE ROAD
Project Manager: PAINE, PEGGY JO
Remarks: 700-31-0121;STAGE 0 COMPLETED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN 000-31 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.008157 - JCT US 80 - JCT LA 150
Type Impv: RECON W/GEOMETRIC IMPROVEMENTS
Project Manager: BORNE, FRED
Remarks: 831-12-0008;$4.0 M SAFETY TRANSFER FUNDS MAX
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 150 831-07 SATRANS 4,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
LINCOLN LA 818 831-12 NFI 5,000 OTHER / MISCELLANEOUS
Project: H.008159 - JCT US 80 - JCT LA 150
Type Impv: RECON W/GEOMETRIC IMPROVEMENTS
Project Manager: BORNE, FRED
Remarks: 831-12-0008;$4.0 M SAFETY TRANSFER FUNDS MAX
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 818 831-12 SATRANS 350 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
LINCOLN LA 818 831-12 NFI 5,000 OTHER / MISCELLANEOUS
LINCOLN LA 150 831-07 0 OTHER / MISCELLANEOUS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 93 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LINCOLN
Project: H.008161 - CALVIN CREEK BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks: 831-14-0005; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 3072 831-14 FBROFF 1,199 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010389 - LA 507: US 80 - S. END OVERPASS I-20
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 507 308-04 STPFLEX 735 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010453 - US 80: RIVER OAK DR - 0.92 E OF LA 818
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN US 80 001-07 STPFLEX 2,000 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010472 - US 80: 0.9 MILES E. OF LA 818 - US 167
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN US 80 001-07 STPFLEX 700 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010616 - I 20: LA 544 OVERPASS REPLACEMENT
Type Impv: OVERPASS REHABILITATION
Project Manager: BUCCI, MARK
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LINCOLN LA 544 296-03 FBROFF 4,807 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 94 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LIVINGSTON
Project: H.000466 - US 190: ROUNDABOUT AT EDEN CHURCH ROAD
Type Impv: CONSTRUCT 4-LEGGED SINGLE LANE ROUNDABOUT
Project Manager: PAINE, PEGGY JO
Remarks: 013-06-0054
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON US 190 013-06 HSIP 2,160 SAFETY 4-SCHEDULED IN CURRENT FY 14-15
LIVINGSTON 000-32 HSIP 240 SAFETY
Project: H.005693 - LA 447/I-12 INTERCHANGE
Type Impv: CONSTRUCTING ROUNDABOUTS @ I-12 AND LA 447 WB AND EB RAM
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 447 268-01 STPFLEX 5,000 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
4-SCHEDULED IN CURRENT FY 14-15
Project: H.008193 - LA 1034 - US 190
Type Impv: COLD PLANE. PATCH AND OLAY
Project Manager: DEVILLE, JACQUES
Remarks: 832-32-0015
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 3002 832-32 HSIP 1,300 SAFETY 4-SCHEDULED IN CURRENT FY 14-15
LIVINGSTON LA 3002 832-32 NHPP 774 SUSTAINABILITYNON-INTERSTATE
Project: H.009179 - WAX ROAD
Type Impv: OVERLAY AND WIDENING
Project Manager: LACOMBE, JASON
Remarks: USE LOCAL OF MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 1,296 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.009180 - PLANTATION AVE/ENTERPRISE DR
Type Impv: OVERLAY AND WIDENING
Project Manager: LACOMBE, JASON
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 555 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011197 - DENHAM SPRINGS SRTS PROJ - NORTHSIDE
Type Impv: SIDEWALKS, STRIPING AND SIGNING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 SR2S 170 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
LIVINGSTON 000-32 SATRANS 25 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.009140 - LA 1026 AT LA 1030 ROUNDABOUT
Type Impv: ROUNDABOUT
Project Manager: LAI, QUANG
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1026 273-03 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
LIVINGSTON LA 1030 832-15 STPFLEX 750 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
LIVINGSTON 000-32 LOCAL 750 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.009548 - E. BATON ROUGE PARISH LINE - W JCT LA 16
Type Impv: MAINTENANCE RESTORATION & REHABILITATION
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON US 190 013-06 NHPP 1,211 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 95 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LIVINGSTON
Project: H.009595 - I-12:LIVINGSTON PAR APPROACH SLAB REP P2
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON I-12 454-02 NHPP 12,810 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011694 - LA 1027: E. END W. COLYELL BR - LA 447
Type Impv: PVMNT PATCHING, SUPERPAVE ASPHALTIC CONC., DRAINAGE, STRIP
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1027 273-03 STPFLEX 450 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011762 - LA 449: IC RR XING (WALKER)
Type Impv: INSTALL RR GATES
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 449 271-01 STPFLEX 225 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011821 - MARTIN LUTHER KING JR DRIVE OVERLAY
Type Impv: OVERLAY
Project Manager: LACOMBE, JASON
Remarks: DENHAM SPRINGS WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 837 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.000470 - HOLDEN SIDEWALK PROGRAM
Type Impv: ENHANCEMENT
Project Manager: MEEK, STEPHEN
Remarks: 744-32-0011;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON US 190 013-07 TAP<200K 235 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
LIVINGSTON LA 441 270-02 0 ENHANCEMENTS
LIVINGSTON LA 441 270-01 0 ENHANCEMENTS
Project: H.002381 - LA 43 CREEK BRIDGE NEAR ALBANY
Type Impv: NEW BRIDGE
Project Manager: ISEMANN, ROBERT
Remarks: 260-07-0025;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 43 260-07 STPFLEX 651 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.003425 - I-12: LA 63 - TANGIPAHOA PARISH LINE
Type Impv: C.P. AND OVERLAY
Project Manager: THOMAS, BEN
Remarks: 454-02-0077;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON I-12 454-02 NHPP 7,000 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.004634 - JUBAN RD WIDENING (I-12 - US 190)
Type Impv: WIDENING (CONC PAVEMENT)
Project Manager: PAINE, PEGGY JO
Remarks: 832-13-0019;700-32-0122 ENGINEERING ($800.000)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1026 832-13 STBONDS 5,980 CAPACITY 3-DESIGN/DEVELOPMENT
LIVINGSTON US 190 013-06 STBONDS 2,070 CAPACITY
LIVINGSTON US 190 013-06 HSIP 3,530 SAFETY
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 96 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LIVINGSTON
Project: H.008190 - LA 1025: CREEK BR. NEAR FRIENDSHIP
Type Impv: NEW BRIDGE
Project Manager: BALLMER, SARAH
Remarks: 832-29-0012;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1025 832-29 STPFLEX 571 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009749 - WALKER SIDEWALKS, PH 3
Type Impv: SIDEWALKS & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1027 273-03 TAP>200K 323 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
LIVINGSTON LA 447 268-02 TAP>200K 31 ENHANCEMENTS
LIVINGSTON 000-32 TAP>200K 223 ENHANCEMENTS
Project: H.010124 - LA 16: ROUNDABOUT @ LA 447
Type Impv: ROUNDABOUT
Project Manager: BALLMER, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 262-01 HSIP 1,000 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.010558 - I-12 WDN: .5 M W SATSUMA-SATSUMA RAMPS
Type Impv: WIDEN I-12 TO 3 LANES
Project Manager: TSAI, LOONG SHEN
Remarks: CAN'T ADD TO TIP & STIP UNTIL COMPLETE NEW CONFORMITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON I-12 454-02 NHPP 12,000 CORRIDOR 3-DESIGN/DEVELOPMENT
Project: H.010625 - PEA RIDGE AND JOHN BARBER ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 FBROFF 370 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
LIVINGSTON 000-32 FBROFF 254 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010992 - I-12: I-12 INTERSTATE RAMP REPAIR
Type Impv: PATCHING AND STRIPING
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON I-12 454-02 NHPP 5,000 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011014 - LA 3002: J-TURN
Type Impv: ADD SOUTH BOUND J-TURN FOR LEFT TURNING VEHICLES EXITING C
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 3002 832-32 NHPP 600 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011189 - LA 1026 @ DUNN & EDEN CHURCH ROUNDABOUTS
Type Impv: ROUNDABOUT INTERSECTION IMPROVEMENTS
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1026 273-03 STPFLEX 4,000 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 97 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LIVINGSTON
Project: H.011248 - JULIA STREET OVERLAY AND WIDENING
Type Impv: OVERLAY AND WIDENING
Project Manager: LACOMBE, JASON
Remarks: CITY PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 425 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011249 - MAPLE STREET OVERLAY AND WIDENING
Type Impv: OVERLAY AND WIDENING
Project Manager: LACOMBE, JASON
Remarks: CITY OF DENHAM SPRINGS PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 611 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011278 - I-12:MEDIAN CABLE BARRIER
Type Impv: MEDIAN CABLE BARRIER INSTALLATION
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON I-12 454-02 HSIP 3,836 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011520 - LA 1019: LA 16-CALMES RD DRAINAGE
Type Impv: REMOVE AND REPLACE PIPES, CATCH BASINS, AND/OR ASPHALT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1019 832-02 STPFLEX 300 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011528 - GEORGE MASHON RD & TRAVIS STREET BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 FBROFF 716 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
LIVINGSTON 000-32 FBROFF 223 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011687 - LA 447: LA 1029 - WESTCOLL RD TURN LANES
Type Impv: WIDENING FOR LEFT TURN LANES
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 447 268-02 STPFLEX 617 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011790 - RIVER ROAD NORTH OVERLAY
Type Impv: PAVEMENT PRESERVATION - COLD PLANING, PATCHING AND OVERL
Project Manager: LACOMBE, JASON
Remarks: CITY OF DENHAM SPRINGS PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 703 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011824 - LA 1026: ROUNDABOUT AT BUDDY ELLIS RD
Type Impv: ROUNDABOUT INTERSECTION IMPROVEMENT
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STPFLEX 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
LIVINGSTON LA 1026 832-13 STPFLEX 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.011825 - BUDDY ELLIS ROAD IMPROVEMENTS
Type Impv: OVERLAY
Project Manager: LACOMBE, JASON
Remarks: LIVINGSTON PARISH WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 2,565 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 98 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LIVINGSTON
Project: H.011826 - LINDER ROAD IMPROVEMENTS
Type Impv: OVERLAY
Project Manager: LACOMBE, JASON
Remarks: LIVINGSTON PARISH PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 2,211 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011827 - DUNN ROAD IMPROVEMENTS
Type Impv: OVERLAY
Project Manager: LACOMBE, JASON
Remarks: LIVINGSTON PARISH PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 2,499 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011828 - FORREST DELATTE ROAD IMPROVEMENTS
Type Impv: OVERLAY
Project Manager: LACOMBE, JASON
Remarks: LIVINGSTON PARISH PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON 000-32 STP>200K 1,446 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.002375 - AMITE R.BR. NEAR FRENCH SETTLEMENT
Type Impv: NEW BRIDGE
Project Manager: BROWN, JEFF
Remarks: 260-02-0040;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 260-02 STPFLEX 23,124 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.002397 - PETE'S HWY(LA 16)INTERCHANGE @ I-12
Type Impv: INTERCHANGE IMPROVEMENTS
Project Manager: BROADBENT, RONALD
Remarks: 262-01-0037;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 262-01 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
LIVINGSTON I-12 454-02 0 DEMO / HIGH PRIORITY
Project: H.008170 - LA 1024 CREEK BRS. NEAR FRIENDSHIP
Type Impv: BRIDGE REPLACEMENT
Project Manager: ISEMANN, ROBERT
Remarks: 832-10-0019;2 BRIDGES; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 1024 832-10 FBROFF 1,302 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009549 - E. JCT. LA 16 - JCT. LA 447
Type Impv: MAINTENANCE RESTORATION & REHABILITATION
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON US 190 013-06 STPFLEX 2,322 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009552 - JCT. LA 1034 - JCT. US 190
Type Impv: MAINTENANCE RESTORATION & REHABILITATION
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 262-01 STPFLEX 1,405 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010383 - LA 441: LA 442 - ST. HELENA PARISH LINE
Type Impv: COLD PLANE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 441 270-03 STPFLEX 2,480 SUSTAINABILITYNON-INTERSTATE NFA
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 99 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: LIVINGSTON
Project: H.010384 - LA 442: LA 63 - W. JCT. LA 441
Type Impv: COLD PLANE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 442 269-01 STPFLEX 2,420 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010551 - LA 16: LA 64/LA 1026 - AMITE CHURCH RD.
Type Impv: ASPHALT SURFACE TREATMEENT
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 262-02 STPFLEX 199 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
Project: H.010672 - LA 3002 & LA 16 CORRIDOR STUDY
Type Impv: TRAFFIC STUDY ON LA 3002, LA 16, AND LA 1034
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 3002 832-32 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
LIVINGSTON LA 16 262-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
LIVINGSTON LA 1034 832-14 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.011645 - LA3002:LA16:LA1034:CORRIDOR STUDY PHASE2
Type Impv: CORRIDOR STUDY FOR ACCESS MANAGEMENT IMPROVEMENTS
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 16 262-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
LIVINGSTON LA 3002 832-32 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
LIVINGSTON LA 1034 832-14 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.009837 - LA 64 MOBILITY IMP. (LA 1019 TO LA 16)
Type Impv: FEASIBILITY STUDY FOR MOBILITY IMPROVEMENTS OF LA 64
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
LIVINGSTON LA 64 273-03 0 CAPACITY 0-FEASIBILITY/SCOPING
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 100 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: MADISON
Project: H.003353 - I-20 DRAINAGE CANAL BRIDGE
Type Impv: BRIDGE REHAB
Project Manager: CAVALIER, STEPHANIE
Remarks: 451-08-0086;REHAB ABUTMENT WALLS. & APP. SLABS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 1,750 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011047 - LA 577: LA 860 - NEW BOYS ROAD
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: NFA WILL BE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON LA 577 164-02 STPFLEX 3,093 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010455 - US 80: JCT LA 577 TO QUBEC
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON US 80 002-04 STPFLEX 4,000 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011250 - I-20: DELTA SCALES - MS RIVER BRIDGE
Type Impv: REPLACE CONCRETE ROADWAY
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 4,000 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011620 - I-20: WALNUT BAYOU - EAST OF US 65 RAMPS
Type Impv: CONCRETE PAVEMENT REHABILITATION AND UNDERDRAIN SYSTEM
Project Manager: MCMILLAN, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 7,500 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010038 - TENDAL NORTH RD / DRAIN TO TENSAS BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON 000-33 FBROFF 1,001 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010612 - I-20 MRB SOIL AND SCOUR STABILIZATION
Type Impv: IMP SLOPE & SOIL STABILITY AROUND PIERS E1 & E2 ADD RIP RAP
Project Manager: D'ANDREA, ARTUR
Remarks: OTHER IS $ FROM MDOT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-09 NHPP 13,973 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
MADISON 000-33 OTHER 13,973 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.010897 - I-20: MRB ISLAND ANCHORING PIER E1
Type Impv: REHABILITATION
Project Manager: D'ANDREA, ARTUR
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-09 NHPP 13,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
MADISON 000-33 OTHER 13,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.011077 - I-20: MOUND TO DELTA SCALES PHASE 2
Type Impv: COLD PLANE AND OVERLAY
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 6,000 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 101 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: MADISON
Project: H.011446 - MOUND REST AREA RENOVATIONS
Type Impv: REST AREA RENOVATION
Project Manager: GUINN, MICHAEL S
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON 000-33 NHPP 11,100 OPER EFFICIENCY/MOTORIST ASSISTANCEREST AREAS
3-DESIGN/DEVELOPMENT
Project: H.011602 - LA 577: NEW BOYS ROAD - SHWART ROAD
Type Impv: ASPHALT OVERLAY OF EXISTING ASPHALT PAVEMENT
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON LA 577 164-02 NFA 3,000 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011623 - I-20: LA 577 - WALNUT BAYOU
Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 14,200 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011628 - I-20: LA 17 - LA 577
Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON I-20 451-08 NHPP 6,395 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
RICHLAND I-20 451-07 NHPP 1,305 SUSTAINABILITYINTERSTATE
Project: H.008200 - US 65 - FRONTAGE ROAD
Type Impv: ASPHALT OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: 833-06-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MADISON LA 601 833-06 STPFLEX 0 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 102 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: MOREHOUSE
Project: H.010040 - BUD ROAD & BONNE IDEE ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE 000-34 FBROFF 585 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
MOREHOUSE 000-34 FBROFF 416 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.002631 - LA 834: OVERFLOW CREEK BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 329-03-0014; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 834 329-03 FBROFF 1,555 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010277 - LA 593: INTER. IMPRV. NAFF @ COLLINGSTON
Type Impv: INTERSECTION IMPROVEMENT
Project Manager: HICKS, MELVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 593 162-01 HSIP 800 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011532 - MOTT LANE / DRAIN TO LAKE ERWIN
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE 000-34 FBROFF 239 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011613 - US 425: DRAINAGE IMPROV AT EAST PINE AVE
Type Impv: SUBSURFACE DRAINAGE IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE US 425 038-03 NHPP 320 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.000665 - UP R.R. OVERPASS NEAR BONITA
Type Impv: NEW BRIDGE
Project Manager: BROADBENT, RONALD
Remarks: 016-05-0031;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE US 165 016-05 STPFLEX 8,926 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.008203 - LA 835 CREEK BRIDGES
Type Impv: NEW BRIDGES
Project Manager: BROWN, JEFF
Remarks: 834-07-0022;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 835 834-07 STPFLEX 2,892 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009538 - US 165: S LA 599 - N LA 599
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE US 165 016-05 STPFLEX 1,220 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010470 - LA 138: JCT LA 593 TO JCT LA 2
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
MOREHOUSE LA 138 330-01 STPFLEX 5,600 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 103 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: NATCHITOCHES
Project: H.010594 - LOUISIANA TRAIL: GOLDONNA TO CHESTNUT
Type Impv: CONSTRUCTION OF A MULTI-USE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011145 - LOUISIANA TRAILS RESTORATION PHASE 2
Type Impv: RESTORATION, NON-ROUTINE MAINT & CONS. OF 30 MILES OF TRAIL
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES 000-35 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011324 - LA 495: CLOUTIERVILLE FLOODGATE X-DRAIN
Type Impv: REPAIR DRAINAGE STRUCTURE AND ROADWAY
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 495 053-30 NFA 1,170 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 14-15
NATCHITOCHES LA 495 053-30 LOCAL 130 OTHER / MISCELLANEOUS
Project: H.003476 - LA 8 TO LA 6 (I-49 SIGNING)
Type Impv: INTERSTATE SIGNING
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES I-49 455-06 NHPP 1,211 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 15-16
RAPIDES I-49 455-05 NHPP 358 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.009559 - LA 156: MAMMY TRAIL - LA 479
Type Impv: CTB AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 156 092-01 STPFLEX 2,813 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010178 - LA 120: CURVE REALIGNMENT
Type Impv: REALIGNMENT OF LA 120 TO ELIMINATE SHARP REVERSE CURVE
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 120 042-05 HSIP 1,572 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010901 - LA 1265: FIVE FORKS ROAD REALIGNMENT
Type Impv: RECONSTRUCTION WITH GEOMETRIC IMPROVEMENTS
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 1265 835-23 NFA 1,900 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011776 - NATCHITOCHES SIGNING
Type Impv: PURCHASE AND INSTALL REGULATORY & WARNING SIGNS, ETC.
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES 000-35 SATRANS 20 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.001145 - LA 120: SABINE PARISH LINE TO LA 6
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks: USE AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 120 042-05 STPFLEX 3,812 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 104 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: NATCHITOCHES
Project: H.001146 - LA120: BRIDGES NEAR PROVENCAL
Type Impv: BRIDGE REPLACEMENT
Project Manager: YANG, LI
Remarks: 042-07-0022;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 120 042-07 FBROFF 2,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010357 - LA 153: JCT LA 9 - FIVE FORKS ROAD
Type Impv: STALIZE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 153 088-01 STPFLEX 1,600 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010943 - CLARK/GOOD HOPE/ROBELINE-PROVENCAL BRDGS
Type Impv: BRIDGE REPLACEMENTS
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES 000-35 FBROFF 1,224 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
NATCHITOCHES 000-35 FBROFF 601 SUSTAINABILITYBRIDGE (OFF SYSTEM)
NATCHITOCHES 000-35 FBROFF 447 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011594 - LA 485: 570' N OF ALLEN-BUELAH RD - LA 1
Type Impv: PATCHING, COLD PLANING, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 485 115-02 STPFLEX 2,527 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.001809 - AJAX - I-49
Type Impv: CURVE REALIGNMENT
Project Manager: MOORE, DARRELL
Remarks: 112-06-0008;PROJECT TO BE RE-SCOPED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 174 112-06 STPFLEX 2,410 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.001061 - EL CAMINO EAST/WEST COR (EAST SEG )
Type Impv: MAJOR WIDENING LA 117 TO I 49
Project Manager: TSAI, LOONG SHEN
Remarks: 034-05-0035;USING STBONDS AS MATCH TO DEMO TO ACQUIRE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 6 034-05 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
NATCHITOCHES LA 6 034-05 NFI 25,000 DEMO / HIGH PRIORITY
Project: H.001270 - NATCH. BY-PASS - KEYSER AVE
Type Impv: WIDEN TO 5 LANES
Project Manager: TONEY, PATRICK
Remarks: 053-04-0025;(NO FUNDING)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 1-X 053-04 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.001271 - CANE RIVER BRIDGE AT CHURCH STREET
Type Impv: BRIDGE REPLACEMENT
Project Manager: YAP, KIAN
Remarks: 053-04-0031;STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 1-X 053-04 STPFLEX 4,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 105 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: NATCHITOCHES
Project: H.001820 - LA 485 BRIDGES NEAR ALLEN
Type Impv: BRIDGE REPLACEMENT
Project Manager: YANG, LI
Remarks: 115-01-0017;4 NEW BRIDGES.JT W/115-02-0011
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 485 115-01 FBROFF 5,159 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
NATCHITOCHES LA 485 115-02 FBROFF 2,085 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.010342 - LA 155: RED RIVER P/L - S JCT LA 153
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 155 091-02 STPFLEX 1,939 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010343 - LA 174: DESOTO P/L - I-49 INTERCHANGE
Type Impv: PATCH. COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 174 112-06 STPFLEX 1,925 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010346 - LA 487: LA 120 - LA 174
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 487 113-03 STPFLEX 3,844 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010359 - LA 9: JCT US 71 - JCT LA 156
Type Impv: PATCH. COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 9 089-01 STPFLEX 1,509 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010365 - LA 117: BELLWOOD - LA 478
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
NATCHITOCHES LA 117 114-03 STPFLEX 1,288 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 106 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ORLEANS
Project: H.003182 - IHNC AND ALGIERS CUTOFF BRIDGE REHAB
Type Impv: FINGER JOINTS,ROCKER BEARINGS & DECK OVERLAY
Project Manager: KEMP, KELLY
Remarks: 450-90-0246;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 7,578 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
ORLEANS LA 407 836-08 NHPP 754 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
Project: H.006196 - WISNER BLVD BRIDGE REPLACEMENT
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-36-0108;SEE LONG TEXT FOR FUNDING INFORMATION
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 FBROFF 12,705 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED IN CURRENT FY 14-15
ORLEANS 000-36 TAP>200K 3,176 ENHANCEMENTS
Project: H.007265 - ST CHARLES AVE (LA AVE-CALLIOPE ST)
Type Impv: OVERLAY
Project Manager: MOORE, DARRELL
Remarks: 742-36-0126; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 3,666 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.007277 - LAKE FOREST BOULEVARD
Type Impv: MINOR WIDENING
Project Manager: LACOMBE, JASON
Remarks: 742-36-0142;ADD ENGINEERING TO FY 10
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 768 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.009069 - TRI-CENTENNIAL PL PARKING, CITY PARK NO
Type Impv: PARKING LOT
Project Manager: RIGGS, LAURA
Remarks: SEE NOTES FOR FUNDING INFORMATION
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 1,837 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.009354 - BROAD STREET CORRIDOR BIKEWAY
Type Impv: CONSTRUCTION OF BIKE LANES, A MULTI-USE PATH AND CROSSING
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 RTP 89 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
ORLEANS 000-36 LOCAL 11 RECREATIONAL TRAILS PROGRAM
Project: H.009838 - SAFE ROUTES TO ARISE ACADEMY
Type Impv: NON-INFRASTRUCTURE SRTS PROJECT ONLY
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 50 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
Project: H.009949 - ESPERANZA SAFE ROUTES TO SCHOOL
Type Impv: NON-INFRASTRUCTURE SRTS PROJECT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 18 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 107 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ORLEANS
Project: H.010636 - US 90 OVER MISS RVR (GNO2)-CLEAN & PAINT
Type Impv: BRIDGE REPAIRS, CLEANING & PAINTING
Project Manager: REVIERE, RYAN
Remarks: CCCD TOLL CREDITS AS MATCH PHASE 6
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90-Z 283-08 NHPP 16,581 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010872 - EARHART CORRIDOR BIKEWAY LINKAGE
Type Impv: CONSTRUCTION OF 2.3 MILES OF BIKE LANE.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 RTP 146 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
ORLEANS 000-36 LOCAL 30 RECREATIONAL TRAILS PROGRAM
Project: H.011078 - NO RTMC BUILDING SECURITY
Type Impv: BUILDING SECURITY SYSTEM FOR THE NO RTMC
Project Manager: SMITH, ERIK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STPFLEX 94 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED IN CURRENT FY 14-15
ORLEANS 000-36 STCASH 26 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.011199 - NEW ORLEANS SRTS PROJ. - EINSTEIN II NI
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 50 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011200 - NEW ORLEANS SRTS PROJ. - AUDUBON N.I.
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 74 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011271 - I-10 PAVEMENT MARKING REPLACEMENT II
Type Impv: REMOVE AND REPLACE EXISTING PAVEMENT MARKINGS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 800 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011646 - US 90 - US 61 - LA 611-9 CORRIDOR IMPROV
Type Impv: INTERSECTION IMPROVEMENT STUDY
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 14-15
ORLEANS US 61 007-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ORLEANS 000-36 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ORLEANS LA 611-9 836-05 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.006567 - PEDESTRIAN CROSSWALK ENHANCEMENTS
Type Impv: SIGNS & PVMT.MARKINGS INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-36-0016;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SATRANS 276 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 108 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ORLEANS
Project: H.007259 - FLEUR DE LIS (30TH ST - OLD HAMMOND HWY)
Type Impv: RECONSTRUCTION
Project Manager: LACOMBE, JASON
Remarks: 742-36-0118;(HARRISON - OLD HAMMOND HWY)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 6,100 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.007271 - CANAL BLVD (R.E. LEE - AMETHYST)
Type Impv: RECONSTRUCT EXISTING 4 LANE DIVIDED
Project Manager: LACOMBE, JASON
Remarks: 742-36-0135; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.007273 - MAGAZINE ST (BROADWAY - CALHOUN)
Type Impv: REHABILITATION
Project Manager: LACOMBE, JASON
Remarks: 742-36-0137; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 3,500 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.007274 - MAGAZINE ST (CALHOUN TO NASHVILLE)
Type Impv: REHABILITATION
Project Manager: LACOMBE, JASON
Remarks: 742-36-0139; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.007275 - ST CHARLES AVENUE (NASHVILLE TO LA AVE)
Type Impv: OVERLAY
Project Manager: ISEMANN, ROBERT
Remarks: 742-36-0140; USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 1,700 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.009308 - NEW ORLEANS DPW - EP HARNEY SCHOOL PROJ.
Type Impv: BICYCLE & PEDESTRAIN CROSSING IMPROVEMENTS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 175 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
ORLEANS US 90 006-03 SATRANS 20 SAFETYSAFE ROUTES TO SCHOOLS
ORLEANS US 90 006-03 SR2S 25 SAFETYSAFE ROUTES TO SCHOOLS
ORLEANS US 90 006-03 SATRANS 5 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.009572 - LA 39:JUDGE SEEBER BR-ST BERNARD P/L
Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 39 046-31 NHPP 1,406 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009661 - LA 406: DONNER CANAL BR - STANTON RD
Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 406 409-02 STPFLEX 823 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 109 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ORLEANS
Project: H.009663 - LA 47: I-10 - BULLARD RD.
Type Impv: PCC PATCHING AND JOINT SEALING
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 47 148-03 STPFLEX 1,000 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010016 - US 11: LAKE PONTCHARTRAIN BR. REHAB PH 1
Type Impv: MAJOR BRIDGE REHABILITATION
Project Manager: BRAUNER, KURT
Remarks: PRIORITY BRIDGE PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 11 018-02 STPFLEX 25,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010086 - E.P. HARNEY SCHOOL SRTS NON-INFRASTRUCT
Type Impv: SRTS NON-INFRASTRUCTURE
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 0 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010111 - AUDUBON CHARTER SCHOOL SRTS INFRASTRUCT
Type Impv: SIDEWALK IMPROVMENTS, TRAFFIC CALMING, STRIPING AND MARKIN
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 174 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
ORLEANS 000-36 SATRANS 28 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010112 - AUDUBON CHARTER SCHOOL SRTS NON-INFRAST
Type Impv: BIKE AND PED SAFETY TRAINING,PURCHASES, ENFORCEMENT ACTIV
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 125 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010113 - EINSTEIN CHARTER SCHOOL SRTS NON-INFRAST
Type Impv: BIKE/PED SAFETY TRAINING, PURCHASES, ENCOURAGEMENT ACTIVI
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 100 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010114 - EINSTEIN CHARTER SCHOOL INFRASTRUCTURE
Type Impv: SIDEWALK IMPROVEMENTS, TRAFIC CALMING, MARKINGS AND STRIP
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 190 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
ORLEANS 000-36 SATRANS 30 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010331 - US 90: FLOODWALL - CHEF PASS BRIDGE
Type Impv: RAISING ROADWAY GRADE TO CONSISENT ELEVATION BY ADDING
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-90 STPFLEX 600 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 110 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ORLEANS
Project: H.011198 - NEW ORLEANS SRTS PROJ. - EINSTEIN II
Type Impv: SIDEWALKS, STRIPING AND SIGNING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 SR2S 200 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
ORLEANS 000-36 SATRANS 25 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.011503 - I-10 TWIN SPAN ITS
Type Impv: THIS PROJECT INVOLVES INSTALLING A DMS AND CAMERAS.
Project Manager: BUTLER, KYLE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-17 NHPP 450 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011609 - I-10: US 11 DECELERATION LANE EXTENSION
Type Impv: EXTENDING THE EXISTING DECELERATION EXIT LANE TO US 11 FROM
Project Manager: FOSTER, AMANDA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 300 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011622 - I-910: RAMPS NEAR SUPERDOME/CLAIBORNE
Type Impv: PCC REHABILITATION; RESURFACING ASPHALTIC CONCRETE
Project Manager: FOSTER, AMANDA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90-Z 283-08 NHPP 500 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011759 - PATHS TO PROGRESS (GROUP 40)
Type Impv: COLD MILL AND OVERLAY, RE-GRADING, PATCHING, STRIPING
Project Manager: BURST, JEFFERY
Remarks: STBOND AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 3,642 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
ORLEANS 000-36 STP>200K 1,366 URBAN SYSTEMS
Project: H.011760 - PATHS TO PROGRESS (GROUP 41)
Type Impv: REMOVE/REPLACE FAILED/DAMAGED CONC RDWY/CURBS, PERM ST
Project Manager: BURST, JEFFERY
Remarks: CITY OF NEW ORLEANS WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 897 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.000304 - I 10 - US 61 OVERPASS
Type Impv: BRIDGE REHABILITATION
Project Manager: D'ANDREA, ARTUR
Remarks: 007-01-0022;STAGE 0 PROJECT FEASIBILITY STUDY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 61 007-01 NHPP 4,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.007250 - ALMONASTER BRIDGE AND APPR.
Type Impv: BRIDGE REPLACEMENT
Project Manager: YANG, LI
Remarks: 742-36-0104;OTHER FUNDS - PORT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STPFLEX 20,000 INTERMODAL CONNECTOR 3-DESIGN/DEVELOPMENT
ORLEANS 000-36 STPFLEX 20,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
ORLEANS 000-36 OTHER 22,000 OTHER / MISCELLANEOUS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 111 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ORLEANS
Project: H.009764 - NO CITY PARK: MARCONI MULTI-USE PATH
Type Impv: MULTI-USE PATH, LANDSCAPING & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 TAP>200K 727 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.009938 - MAGNOLIA CONVERTED PED BRIDGE REHAB
Type Impv: REHAB OF EXISTING PED BRIDGE (CONVERTED VEHICLE) & REL. WOR
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 TAP>200K 889 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.011108 - NS SEVERAL RR XINGS (NEW ORLEANS)
Type Impv: RAIL/HIGHWAY CROSSING WARNING IMPROVEMENTS
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 RAIL PD 1,000 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.011219 - I-10: NO CBD1 I610-CARROLLTON
Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 4,000 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.011220 - I-10: NO CBD2 CARROLLTON - POYDRAS
Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 8,000 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.011447 - US 90: INTERSECTION IMP AT MLK BLVD
Type Impv: INTERSECTION IMPROVEMENTS ON US 90 AT MLK BLVD
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-03 NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011705 - US 11: LAKE PONTCHARTRAIN BR. REHAB PH 2
Type Impv: REHAB THE MOVABLE SPANS ON THE US 11 BRIDGE OVER LAKE PO
Project Manager: BRAUNER, KURT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 11 018-02 STPFLEX 25,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011823 - NO CITY PARK: HARRISON AVENUE TRAILHEAD
Type Impv: TRAILHEAD
Project Manager: RIGGS, LAURA
Remarks: MATCH PROVIDED BY CITY PARK IMPROVEMENT ASSOCIATION
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 TAP>200K 287 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.011836 - NEW ORLEANS: LAKE VISTA, SIDEWALKS
Type Impv: SIDEWALKS
Project Manager: MEEK, STEPHEN
Remarks: MATCH PROVIDED BY NON-FLOOD PROTECTION MANAGEMENT A
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 TAP>200K 499 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 112 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ORLEANS
Project: H.004721 - TCHOUPITOULAS SIGNAGE AND STRIPING PLAN
Type Impv: STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-36-0176;$48K H.P.DEMO. $12K MATCH BY RPC
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 DEMO 200 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.007272 - HOWARD AVENUE EXTENSION
Type Impv: NEW 2-LANE ROADWAY
Project Manager: NICKEL, TIM
Remarks: 742-36-0136;CITY OWNS R/W
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 DEMO 3,226 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
Project: H.000263 - CHEF MENTEUR PASS BRIDGE & APPROACH
Type Impv: BRIDGE REPLACEMENT
Project Manager: RABALAIS, NICK
Remarks: 006-05-0067;STAGE 1 PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-05 STPFLEX 85,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.004738 - I-610 - TWIN SPANS AND I-10 @ RR
Type Impv: STATE FUNDS FOR STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-36-0198;(STAGE 0.PHASE1)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.005720 - FLORIDA AVENUE EXPRESSWAY
Type Impv: FLORIDA AVENUE EXPRESSWAY - ENVIRONMENTAL ASSESSMENT
Project Manager: UMEOZULU, JOE
Remarks: TTF AS MATCH TO PHASE 2
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 0 TIME 1-PLANNING/ENVIRONMENTAL
Project: H.008220 - LA406/WOODLAND HWY (LA23 - LA407)
Type Impv: WIDENING
Project Manager: LACOMBE, JASON
Remarks: 836-14-0002;JT W 838-06-0002
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 406 836-14 STP>200K 1,500 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
PLAQUEMINES LA 406 838-03 0 URBAN SYSTEMS
PLAQUEMINES LA 406 838-06 0 URBAN SYSTEMS
Project: H.009499 - LEAKE AVENUE IMPROVEMENTS
Type Impv: PLANNING STUDY
Project Manager: BROUSSARD, DAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.009939 - ST CHARLES AVE: STREETSCAPING IMP., PH 1
Type Impv: STREETSCAPING, DECORATIVE LIGHTING, & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 TAP>200K 1,053 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
Project: H.010018 - I-10: NO EAST DRAIN CANAL BRIDGE REPLACE
Type Impv: BRIDGE REPLACEMENT
Project Manager: YAP, KIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 11,758 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 113 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ORLEANS
Project: H.010405 - US 90: CAMELOT DR - FLOOD GATE
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-90 STPFLEX 1,400 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010414 - LA 1253: DOWMAN RD - I-10 FRONTAGE RD
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 1253 419-02 STPFLEX 250 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010634 - CCCD-US90BUS SIGN UPGRADE-EAST/WEST BANK
Type Impv: UPGRADING SIGNS ENTIRE LIMITS. UPGRADING STRUCTURES AS NEE
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90-Z 283-08 NHPP 3,500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
JEFFERSON US 90-Z 283-09 NHPP 3,500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011221 - I-10: NO CBD3 POYDRAS - LOUISA
Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 8,000 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.011222 - I-10: NO CBD4 LOUISA - I-510
Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT & UPGRADE IN NO C
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS I-10 450-90 NHPP 5,000 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.011460 - I-10: LA47 & 3021 INTERSEC IMPROV
Type Impv: INTERSECTION IMPROVEMENT STUDY
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 47 148-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
ORLEANS 000-36 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011642 - LA39, LA46 & LA3021 CORRIDOR IMPROVEMENT
Type Impv: TRAFFIC COUNTS
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 39 046-31 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
ORLEANS LA 46 046-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ORLEANS LA 3021 419-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ORLEANS 000-36 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011644 - US90: NASHVILLE - S PETERS IMPROVEMENTS
Type Impv: CORRIDOR IMPROVEMENTS
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
ORLEANS US 90-Z 283-08 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 114 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ORLEANS
Project: H.011648 - LA39, 46 & 47 CORRIDOR IMPROVE
Type Impv:
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS LA 39 046-31 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
ST BERNARD LA 39 046-32 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ORLEANS LA 46 046-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST BERNARD LA 46 046-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST BERNARD LA 47 148-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011649 - I-610, US 90 & LA3021 CORRIDOR IMPROVE
Type Impv: CORRIDOR IMPROVEMENT STUDY
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS US 90 006-90 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
ORLEANS I-610 450-34 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ORLEANS LA 3021 419-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ORLEANS 000-36 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011651 - I-10: LOYOLA DR-BONNABEL CORRIDOR IMPROV
Type Impv: CORRIDOR IMPROVEMENT STUDY
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
JEFFERSON LA 3152 826-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
JEFFERSON I-10 450-15 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.009920 - REMOVE TOLL BOOTHS/RECONFIG TRAVEL LANES
Type Impv: REMOVE TOLL BOOTHS/RECONFIGURATION OF TRAVEL LANES/SIGN
Project Manager: REVIERE, RYAN
Remarks: USE FEDERAL CCC TOLL CREDITS AS MATCH TO STP>200K
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ORLEANS 000-36 STP>200K 3,000 URBAN SYSTEMS 0-FEASIBILITY/SCOPING
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 115 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: OUACHITA
Project: H.009297 - OUACHITA PAR. POLICE JURY SRTS PROJECT
Type Impv: SIDEWALKS/PED PATHS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 SR2S 172 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
OUACHITA 000-37 SATRANS 27 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010115 - JACK HAYES ELEM. SRTS NON-INFRASTRUCTURE
Type Impv: PURCHASES, INCENTIVES, BICYCLE RACKS, TRAINING.
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 SR2S 100 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011106 - SOUTH GRAND STREET TRAIL
Type Impv: CONST. OF 10' X 1,000' BOARDWALK ALONG THE RIVERFRONT
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
OUACHITA 000-37 LOCAL 14 RECREATIONAL TRAILS PROGRAM
Project: H.011192 - OUACHITA SRTS PROJECT JACK HAYES II N.I.
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 0 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011193 - OUACHITA SRTS PROJECT - RISER N.I.
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 0 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011614 - LA 15: DRAINAGE IMPROV 1.0 MI N OF US 80
Type Impv: REMOVE AND REPLACE EXISTING CROSS DRAIN W/ LARGER STRUCT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 15 156-01 STPFLEX 117 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011635 - LA 557: CALDWELL PARISH LINE - LA 34
Type Impv: MAINTENANCE RESURFACING
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 557 159-03 STPFLEX 1,537 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.000169 - UNION PACIFIC RAILROAD BRIDGE AT SICARD
Type Impv: BRIDGE REPLACEMENT
Project Manager: RABALAIS, NICK
Remarks: 002-01-0047;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 002-01 STPFLEX 7,780 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 116 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: OUACHITA
Project: H.002622 - ARKANSAS ROAD: (CALDWELL ROAD - LA 143)
Type Impv: WIDENING
Project Manager: BORNE, FRED
Remarks: 324-02-0008;CONVERTED FROM BOND TO FED AID-2001
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 616 324-02 STPFLEX 25,000 CAPACITY 4-SCHEDULED FOR LETTING FY 15-16
OUACHITA LA 616 324-02 STBONDS 0 CAPACITY
Project: H.009433 - OUACHITA SRTS PROJECT - JACK HAYES II
Type Impv: SIDEWALKS, SIGINING AND STRIPING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 SR2S 181 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010092 - SRTS JACK HAYES ELEM., OUACHITA PARISH
Type Impv: CONSTRUCT SIDEWALKS AND CROSSWALKS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 SR2S 200 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
OUACHITA 000-37 SATRANS 5 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010287 - LA 3249: ROUNDABOUT @ I-20/WELL RD.
Type Impv: ROUNDABOUT AT I-20/WELL RD.
Project Manager: HICKS, MELVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 3249 837-19 HSIP 1,400 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010352 - OUACHITA SRTS PROJECT - RISER
Type Impv: SIDEWALKS, SIGINING AND STRIPING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 3033 837-12 SR2S 42 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
OUACHITA LA 3033 837-12 SATRANS 7 SAFETYSAFE ROUTES TO SCHOOLS
OUACHITA 000-37 SR2S 100 SAFETYSAFE ROUTES TO SCHOOLS
OUACHITA 000-37 SATRANS 11 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010430 - LA 594: TURN LANE @ OUACHITA PAR HIGH
Type Impv: THROUGH LANE WITH RIGHT TURN LANE AT HIGH SCHOOL
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 594 326-01 STPFLEX 1,200 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011486 - I-20: BRIDGE REHABILITATION (MONROE)
Type Impv: BEARING REHABILITATION,STRUCTURAL REPAIRS, AND SPOT PAINTI
Project Manager: YAP, KIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA I-20 451-06 NHPP 13,000 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011722 - GLENWOOD DRIVE REHABILITATION
Type Impv: REHABILITATION
Project Manager: BANKSTON, TANYA
Remarks: WEST MONROE WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 194 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 117 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: OUACHITA
Project: H.011738 - US 165-Y:VERNON STREET-HIPPOLYTE AVENUE
Type Impv: PAVEMENT PRESERVATION
Project Manager: HICKS, MELVIN
Remarks: CITY OF MONROE WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 165-Y 015-08 STP<200K 1,145 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011741 - HADLEY STREET REHABILITATION
Type Impv: REHABILITATION
Project Manager: BANKSTON, TANYA
Remarks: CITY OF MONROE WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 435 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011742 - OLE HIGHWAY 15 (ARKANSAS RD - US 80)
Type Impv: MILL, PATCH AND OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: OUACHITA PARISH POLICE JURY WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 765 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.000163 - US 80 STEEP BAYOU BRIDGE
Type Impv: NEW BRIDGE
Project Manager: MOORE, DARRELL
Remarks: 001-09-0089;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 001-09 STPFLEX 1,280 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.003331 - ROUNDABOUT @ GARRETT RD INTERCHANGE
Type Impv: SAFETY AND TRAFFIC FLOW
Project Manager: COLQUETTE, PAUL
Remarks: 451-06-0161;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA I-20 451-06 HSIP 900 SAFETY 3-DESIGN/DEVELOPMENT
OUACHITA I-20 451-06 LOCAL 300 OTHER / MISCELLANEOUS
Project: H.006202 - BREARD STREET BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: 713-37-0109;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 FBROFF 400 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.007288 - MONTGOMERY ST (LA 34 - I-20)
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: 742-37-0015
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 4,295 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.007300 - KANSAS LANE-GARRETT RD CONNECTOR
Type Impv: RD CONNECTOR & INTERCHANGE IMPRVMNT
Project Manager: BROADBENT, RONALD
Remarks: 742-37-0028;4TH FUND SOURCE US $300K STP<200K
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STPFLEX 10,000 INTERMODAL CONNECTOR 3-DESIGN/DEVELOPMENT
OUACHITA 000-37 DEMO 6,616 DEMO / HIGH PRIORITY
OUACHITA 000-37 NFI 7,431 OTHER / MISCELLANEOUS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 118 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: OUACHITA
Project: H.008226 - CHENIERE SPILLWAY & BRIDGE REPLACEMENT
Type Impv: BRIDGE REPLACEMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: 837-12-0026;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 3033 837-12 STPFLEX 1,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009752 - DESIARD ST: STREETSCAPING S GRAND-6TH ST
Type Impv: SIDEWALK W/ LIGHTING, LANDSCAPE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 TAP<200K 513 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.010012 - I-20: US 80 OVERPASS BRIDGE REPLACEMENT
Type Impv: REPLACEMENT OF BRIDGE OVERPASS
Project Manager: CAVALIER, STEPHANIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 001-09 STPFLEX 3,414 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010698 - RIVERBARGE ST: UP RR XING (MONROE)
Type Impv: INSTALL F/L'S & GATES AT UP RIVERBARGE ST. CROSSING
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.010989 - I-20: LINCOLN/OUACHITA P. RAMP REHAB
Type Impv: RE-SURFACE SELECTED I-20 RAMPS IN LINCOLN & OUACHITA PARISH
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA I-20 451-06 NHPP 2,500 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
LINCOLN I-20 451-05 NHPP 1,500 SUSTAINABILITYINTERSTATE
Project: H.011144 - ALM SEVERAL RR XINGS (OUACH & MOREHOUSE)
Type Impv: INSTALL CROSSBUCK ASSEMBLIES AT ALM'S PASSIVE PUBLIC XING
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 RAIL PD 100 RAILROADS 3-DESIGN/DEVELOPMENT
MOREHOUSE 000-34 RAIL PD 100 RAILROADS
Project: H.011507 - MONROE ITS PHASE 3
Type Impv: THIS PROJECT WILL INSTALL CCTVS ALONG US 80.
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 001-09 NHPP 1,250 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
OUACHITA US 80 002-01 NHPP 1,250 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.011508 - MONROE ITS PHASE 4
Type Impv: THIS PROJECT WILL INSTALL CCTVS.
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 617 837-17 NHPP 1,400 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
OUACHITA LA 840-6 837-04 NHPP 1,400 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 119 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: OUACHITA
Project: H.011513 - MONROE ITS PHASE 2
Type Impv: THIS PROJECT WILL INSTALL CCTVS, DMSS, AND A RR WARNING.
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 165 015-31 NHPP 600 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
OUACHITA US 165 016-01 NHPP 600 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.011615 - LA 151: DRAINAGE IMPROV 0.02 MI N US 80
Type Impv: REMOVE AND REPLACE THE EXISTING DRAINAGE STRUCTURE
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 151 317-02 STPFLEX 85 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011724 - COLEMAN AVENUE REHABILITATION
Type Impv: REHABILITATION, PATCH AND OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: WEST MONROE WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 208 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011725 - 4TH STREET REHABILITATION
Type Impv: REHABILITATION
Project Manager: BANKSTON, TANYA
Remarks: WEST MONROE WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 166 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011729 - NATCHITOCHES STREET REHABILITATION
Type Impv: REHABILITATION
Project Manager: BANKSTON, TANYA
Remarks: WEST MONROE WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 432 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011739 - US 165 SOUTH LIGHTING
Type Impv: LIGHTING
Project Manager: BANKSTON, TANYA
Remarks: CITY OF MONROE WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 165 015-31 STP<200K 337 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011740 - WALNUT STREET OVERLAY
Type Impv: REHABILITATION
Project Manager: BANKSTON, TANYA
Remarks: CITY OF MONROE WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 520 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011743 - 40 OAKS FARM RD (ARK RD - STANDARD REED)
Type Impv: MILL, PATCH, AND OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: OUAHCITA PARISH POLICE JURY WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 520 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011745 - SANDAL STREET (LA 3033 - LA 34)
Type Impv: MILL, PATCH AND OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: OUACHITA PARISH POLICE JURY WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 460 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 120 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: OUACHITA
Project: H.011747 - EDWARDS RD (LA 3033 - PINE RIDGE ROAD)
Type Impv: MILL, PATCH AND OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: OUACHITA PARISH POLICE JURY WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 282 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011783 - PARKER RD (MOORE RD - GARRETT RD)
Type Impv: MILL, PATCH AND OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: OUACHITA PARISH POLICE JURY PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 959 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011784 - STUBBS VINSON RD(STUBBS RITCHIE - US 80)
Type Impv: MILL, PATCH AND OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: OUACHITA PARISH POLICE JURY PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 1,193 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011785 - STUBBS VINSON RD (LA 139-STUBBS RITCHIE)
Type Impv: MILL, PATCH AND OVERLAY
Project Manager: BANKSTON, TANYA
Remarks: MATCH PROVIDED BY OUACHITA PARISH POLICE JURY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 STP<200K 635 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.001952 - US 165 - MOREHOUSE PH. LINE
Type Impv: DOUBLE CHIP SEAL
Project Manager: DEVILLE, JACQUES
Remarks: 160-01-0012;JTW/318-03-07.325-01-24.831-15-03
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 554 160-01 STCASH 106 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
Project: H.002624 - US 165 - W.JCT. LA 2
Type Impv: DOUBLE CHIP SEAL
Project Manager: DEVILLE, JACQUES
Remarks: 325-01-0024;JTW/160-01-12
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 553 325-01 STCASH 461 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
Project: H.007289 - KANSAS LANE EXTENSION
Type Impv: ASPHALT NEW PAVEMENT
Project Manager: BROADBENT, RONALD
Remarks: 742-37-0016;US 80 - US 165. R/W & UTIL BY CITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 DEMO 4,531 DEMO / HIGH PRIORITY 2-WAITING FOR FUNDING
OUACHITA 000-37 LOCAL 15,470 OTHER / MISCELLANEOUS
Project: H.004782 - LA 143 - US 165 CONNECTOR& OUACH
Type Impv: CONNECTOR & OUACHITA R. BR.(ENGR)
Project Manager: PAINE, PEGGY JO
Remarks: 700-37-0129;STAGE O
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.006578 - FAIRWAY DRIVE SIGN IMPROVEMENTS
Type Impv: SIGN & FLASHING BEACON INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-37-0013;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA 000-37 HRRR 16 SAFETYLOCAL ROADS SAFETY
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 121 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: OUACHITA
Project: H.008230 - LA 838 STEEP BAYOU BRIDGE
Type Impv: NEW BRIDGE
Project Manager: HICKS, MELVIN
Remarks: 837-14-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 838 837-14 STPFLEX 1,055 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009932 - US 80 WIDENING: WELL ROAD - AVANT ROAD
Type Impv: WIDEN LANES 4-12' DIVIDED, CURB & GUTTER,SUBSURFACE DRAINA
Project Manager: LANDRY, COREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 001-09 NFI 4,800 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.010015 - LA 143: BAYOU D'ARBONNE BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 143 315-02 STPFLEX 626 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010391 - US 80: GILBERT ST TO JCT LA 139
Type Impv: MILL & OVERLAY; OFGC WITH SAFETY FUNDS
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 80 002-01 NHPP 1,500 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.011440 - US 165 PEDESTRIAN CROSSING STUDY
Type Impv: PEDESTRIAN CROSSING IMPROVEMENTS
Project Manager: RENARD, APRIL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 165 015-31 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011643 - LA 617: COUNTS FOR TRAFFIC STUDY
Type Impv: ACCESS MANAGEMENT FEASIBILITY STUDY
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA LA 617 837-17 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
OUACHITA LA 34 067-09 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.011688 - US 165: CORRIDOR STUDY US 165 BUS - LA 2
Type Impv: CORRIDOR STUDY
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA US 165 015-31 0 SAFETY 1-PLANNING/ENVIRONMENTAL
OUACHITA US 165 016-01 0 SAFETY
Project: H.010550 - I 20: LA 546 TO LA 594
Type Impv: WIDEN FROM 4 TO 6 LANES
Project Manager: WINCHESTER, CHAD
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
OUACHITA I-20 451-06 NHPP 200,000 CORRIDOR 0-FEASIBILITY/SCOPING
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 122 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: PLAQUEMINES
Project: H.011777 - PLAQUEMINES PH MESSAGE BOARD PURCHASE
Type Impv: PURCHASE 2 MESSAGE BOARDS
Project Manager: HOLM, RICK
Remarks: PROJECT FUNDED 95% SATRANS AND 5% LOCAL MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES 000-38 SATRANS 38 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
PLAQUEMINES 000-38 LOCAL 2 SAFETYLOCAL ROADS SAFETY
Project: H.001399 - HAPPY JACK - N.PORT SULPHUR
Type Impv: WIDEN TO 4 LANES
Project Manager: UMEOZULU, JOE
Remarks: 062-04-0029;$1M GS9$ FOR STUDY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES LA 23 062-04 NFI 30,000 CORRIDOR 3-DESIGN/DEVELOPMENT
Project: H.004791 - REPL.BRIDGE AND TUNNEL BELLE CHASSE
Type Impv: STATE FUNDS FOR STUDY
Project Manager: TSAI, LOONG SHEN
Remarks: 700-38-0108;FEASIBILITY STUDY STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES 000-38 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.010590 - EMERG ELEC REP&DEBR REM OSTRICA LK&CANAL
Type Impv: EMERGENCY ELECTRICAL REPAIR AND DEBRIS REMOVAL
Project Manager: MILLER, DAVID
Remarks: SECRETARY EMERGENCY LETTER 9/5/2012
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES 000-38 STGEN 400 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010912 - MISSIPPIPPI RIVER TRAIL-PLAQUEMINES PAR
Type Impv: STAGE 0 FEASIBILITY STUDY
Project Manager: NGUYEN, WAYNE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
PLAQUEMINES 000-38 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 123 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: POINTE COUPEE
Project: H.010263 - LA 1: DRAINAGE IMPROVEMENTS
Type Impv: CROSS DRAIN IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE LA 1 052-04 STPFLEX 88 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011224 - US 190: GUARDRAIL/RUTTING REP. (PHASE 1)
Type Impv: REPLACE GUARDRAIL.
Project Manager: RICHARD, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE US 190 008-03 HSIPPEN 3,123 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
POINTE COUPEE US 190 008-02 HSIPPEN 2,082 SAFETY
Project: H.010724 - PECAN ISLAND ROAD BRIDGE OVER THE CHENAL
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE 000-39 FBROFF 1,109 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011575 - LA 417 & LA 10: STAB, OVLAY & MAT ACQ
Type Impv: STABLIZE, OVERLAY & MATERIAL ACQUISITION
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE LA 417 223-02 NFA 4,880 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
POINTE COUPEE LA 417 223-30 NFA 1,375 SUSTAINABILITYNON-INTERSTATE NFA
POINTE COUPEE LA 10 219-06 NFA 80 SUSTAINABILITYNON-INTERSTATE NFA
POINTE COUPEE LA 10 219-30 NFA 20 SUSTAINABILITYNON-INTERSTATE NFA
Project: H.002184 - BAYOU CHENAL & BAYOU DISCHARGE BRS.
Type Impv: NEW BRIDGES
Project Manager: MOORE, DARRELL
Remarks: 227-04-0019;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE LA 413 227-04 STPFLEX 4,395 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010434 - LA 15: LA 1 - W. FELICIANA P/L
Type Impv: STABILIZE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
POINTE COUPEE LA 15 177-01 STPFLEX 4,200 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 124 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: RAPIDES
Project: H.004823 - 3RD ST ENHANCEMENTS-ST JAMES TO BROADWAY
Type Impv: ENHANCEMENT
Project Manager: RACHAL, JASON
Remarks: 700-40-0143;STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 DEMO 2,850 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 14-15
Project: H.009555 - LA 1199: LA 112 - LA 121
Type Impv: CTB AND OVERLAY
Project Manager: RAY, JARED
Remarks: NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1199 840-27 STPFLEX 3,479 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010488 - I-49: 0.32 MI S LA 181-0.44 MI N US 167
Type Impv: PATCH,COLD PLANE, & OVERLAY(MAINLINE SHOULDERS & RAMPS)
Project Manager: THOMAS, BEN
Remarks: USE NFA AS MATCH FOR C.S. 372-05
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES I-49 455-05 NHPP 1,650 SUSTAINABILITYINTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
RAPIDES LA 181 372-05 STPFLEX 215 SUSTAINABILITYINTERSTATE
RAPIDES LA 181 372-05 STPFLEX 370 SUSTAINABILITYNON-INTERSTATE
Project: H.010777 - US 71: TURN LANES FOR LEE ST & RANDOM DR
Type Impv: CONSTRUCTION OF POSITIVE OFFSET LEFT TURN LANE ON US 71
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 008-09 HSIP 385 SAFETY 4-SCHEDULED IN CURRENT FY 14-15
RAPIDES US 71 008-30 HSIP 125 SAFETY
Project: H.011203 - PINEVILLE SRTS PROJ - PINEVILLE ELEM NI
Type Impv:
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 0 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011204 - ALEXANDRIA SRTS PROJECT - MARTIN PARK NI
Type Impv: EDUCATION AND ENCOURAGEMENT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 0 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011292 - ER REPLACEMENT RPMS - I-49 & US 167
Type Impv: REPLACEMENT OF RAISED PAVEMENT MARKINGS
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES I-49 455-05 SATRANS 135 SAFETY 4-SCHEDULED IN CURRENT FY 14-15
RAPIDES US 167 023-01 SATRANS 19 SAFETY
AVOYELLES I-49 455-04 SATRANS 47 SAFETY
Project: H.000577 - US 165-X: KCS RAILWAY OVERPASS
Type Impv: BRIDGE REMOVAL. REPLACE WITH AT GRADE CROSSING
Project Manager: RABALAIS, NICK
Remarks: 015-01-0049;SCOPE CHANGED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 165-X 015-01 STPFLEX 1,763 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 125 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: RAPIDES
Project: H.001923 - FLAGON BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: DELATTE, BRIAN
Remarks: 149-02-0011;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 623 149-02 STPFLEX 1,916 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.008259 - LA 1204: 0.369 MI E SPRINGHILL RD-US 165
Type Impv: AC OVERLAY/INPLACE BASE
Project Manager: BANKSTON, TANYA
Remarks: 840-31-0014; USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1204 840-31 STP<200K 764 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.008265 - SUGARHOUSE RD. RECONSTRUCTION
Type Impv: RECONSTRUCT
Project Manager: BANKSTON, TANYA
Remarks: 840-37-0001;ON STATE SYSTEM (WAS 742-07-0040)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 3250 840-37 STP<200K 4,953 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.009299 - RAPIDES PARISH SCHOOL DIST. SRTS PROJECT
Type Impv: SIDEWALK CONSTRUCTION, MARKINGS, ADA IMPROVEMENTS
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 SR2S 193 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
RAPIDES 000-40 SATRANS 28 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.009707 - LA 112: LA 113 - E DAVIS ROAD
Type Impv: STABILIZE AND OVERLAY
Project Manager: RAY, JARED
Remarks: APPLIED FOR STBONDS. DID NOT MAKE LIST.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 112 141-03 NFI 3,400 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010014 - LA 1 OVER I-49 BRIDGE REHABILITATION
Type Impv: BRIDGE OVERPASS REHABILITATION
Project Manager: YAP, KIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1 053-01 STPFLEX 5,201 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010070 - RUGG ELEM. SAFE ROUTES TO SCHOOL PH. II
Type Impv: SIDEWALKS, STRIPING AND MARKINGS.
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 SR2S 203 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
RAPIDES 000-40 SATRANS 26 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010821 - US 71:WIDENING OF SERVICE RD CONNECTIONS
Type Impv: WIDEN EXISTING SERVICE ROAD CONNECTIONS
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 008-30 NHPP 270 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 126 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: RAPIDES
Project: H.010894 - US 165: RIGHT TURN LANE AT LA 112
Type Impv: CONSTRUCT RIGHT TURN LANE ON US 165 TO THE INTERSECT LA 11
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 165 014-05 HSIP 260 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
RAPIDES US 165 014-05 NHPP 65 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
Project: H.011154 - US 71 AND LA 3170 TURN LANES
Type Impv: ADD TURN LANE AND INSTALL CONCRETE ISLAND
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 008-09 NHPP 225 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
RAPIDES LA 3170 840-35 STPFLEX 175 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
Project: H.011194 - PINEVILLE SRTS PROJECT - PINEVILLE ELEM.
Type Impv: SIDEWALKS, SIGNING AND STRIPING
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 165-X 015-01 SR2S 150 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
RAPIDES US 165-X 015-01 SATRANS 18 SAFETYSAFE ROUTES TO SCHOOLS
RAPIDES 000-40 SR2S 47 SAFETYSAFE ROUTES TO SCHOOLS
RAPIDES 000-40 SATRANS 6 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.011195 - ALEXANDRIA SRTS PROJECT - MARTIN PARK
Type Impv: SIDEWALKS, STRIPING AND SIGNAGE
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 SR2S 231 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
RAPIDES 000-40 SATRANS 29 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.011302 - LA 28: LEFT TURN LANES AT LA 116
Type Impv: LEFT TURN LANE ON LA 28 AT THE INTERSECTION OF LA 116
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 28 074-02 HSIP 650 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011354 - LA 107: STILLEY RD & PINEGROVE INT IMP
Type Impv: RE-STRIPE LA 107 AT PINEGROVE FOR RIGHT TURN LN AND CONST R
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 107 142-04 STPFLEX 290 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011361 - US 71: TURN LANES FOR EMERG STAGING AREA
Type Impv: MILL, CONSTRUCT TURN LANES, AND INSTALL PAVEMENT STRIPING
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 008-09 STBONDS 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011659 - LA 28: TURN LANE IMPROVEMENTS
Type Impv: TURN LANE IMPS AT HEYMAN LANE AND GEORGETOWN DRIVE
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 28 417-02 HSIP 700 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 127 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: RAPIDES
Project: H.011768 - ALEXANDRIA MPO AERIAL PHOTOGRAPHY
Type Impv: AERIAL PHOTOGRAPHY
Project Manager: SHOLMIRE, DAWN
Remarks: RAPIDES AREA PLANNING COMMISON WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 0 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.002672 - JACKSON(LA 1208-3) @ HORSESHOE
Type Impv: INTERSECTION IMPROVEMENT
Project Manager: BANKSTON, TANYA
Remarks: 368-03-0030
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1208-3 368-03 STPFLEX 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
RAPIDES LA 1208-3 368-03 STP<200K 15 URBAN SYSTEMS
RAPIDES 000-40 STPFLEX 600 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
RAPIDES 000-40 STP<200K 15 URBAN SYSTEMS
Project: H.008263 - LA 3144/SUSEK DRIVE ROUNDABOUT
Type Impv: ROUNDABOUT
Project Manager: RACHAL, JASON
Remarks: 840-34-0008;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 3144 840-34 HSIP 1,500 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.008278 - US 71:UP RR OVERPASS NEAR TIOGA
Type Impv: BRIDGE REPLACEMENT
Project Manager: RABALAIS, NICK
Remarks: 840-43-0016;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 840-43 NHPP 15,862 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009122 - LA1204:BAYOU FLAGON & KITCHEN CR BRIDGES
Type Impv: NEW BRIDGES
Project Manager: YANG, LI
Remarks: 840-31-0015; 3 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1204 840-31 STPFLEX 3,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009720 - LA 1250: PINEVILLE URBAN STREETSCAPING
Type Impv: SIDEWALK WITH LIGHTING, LANDSCAPE & SUBSURFACE DRAINAGE
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1250 142-01 TAP<200K 227 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.009723 - WOODWORTH SIDEWALK IMPROVEMENTS PH 3
Type Impv: SIDEWALKS AND REALTED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 TAP<5K 251 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.009852 - MASONIC DRIVE CORRIDOR ENHANCEMENT, PH 3
Type Impv: SIDEWALK W/LIGHTING & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 TAP<200K 575 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 128 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: RAPIDES
Project: H.011306 - ROBBINS RD: UP RR XING (FOREST HILL)
Type Impv: INSTALL FLASHING LIGHTS, GATES & BELLS
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.011504 - ALEXANDRIA ITS PHASE 2
Type Impv: INSTALLING BRIDGE ADVISORIES, CCTVS, AND DMSS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 167 023-01 NHPP 1,800 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
Project: H.011505 - ALEXANDRIA ITS PHASE 3
Type Impv: THIS PROJECT INCLUDES INSTALLING CCTVS AND DMSS.
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 008-09 NHPP 320 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
RAPIDES US 71 008-30 NHPP 320 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
RAPIDES US 71 840-43 NHPP 320 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
RAPIDES US 165 015-30 NHPP 320 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
RAPIDES US 165 015-02 NHPP 320 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.011506 - ALEXANDRIA ITS PHASE 4
Type Impv: THIS PROJECT INVOLVES INSTALLING CCTVS AND DMSS.
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES I-49 455-05 NHPP 1,300 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
Project: H.011526 - CASTOR PLNGE/H.STRANGE/PALMER CHPL BRDGS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 FBROFF 539 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
RAPIDES 000-40 FBROFF 408 SUSTAINABILITYBRIDGE (OFF SYSTEM)
RAPIDES 000-40 FBROFF 300 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011531 - DIXIE CHURCH & SETLIFF ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 FBROFF 454 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
RAPIDES 000-40 FBROFF 377 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011536 - I-49: 0.44 MI N US 167 TO EXIT 80
Type Impv: PATCH, COLD PLANE, & OVERLAY I-49 SHOULDERS AND RAMPS
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES I-49 455-05 NHPP 4,000 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 129 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: RAPIDES
Project: H.011565 - I-49: N OF LA 498 TO 0.66 MI E LA 1200
Type Impv: PATCH, MILL, OLY (I-49 MAINELINE, SHOULDERS & RAMPS) & SIDE
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES I-49 455-05 NHPP 7,400 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
RAPIDES 000-40 NHPP 340 SUSTAINABILITYINTERSTATE
Project: H.011569 - I-49: NORTH OF LA 8 TO NATCHITOCHES P/L
Type Impv: PATCH, MILL, & OLY (I-49 MAINLINE SHOULDERS, RAMP & SIDE RD)
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES I-49 455-05 NHPP 1,700 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
RAPIDES 000-40 NHPP 350 SUSTAINABILITYINTERSTATE
Project: H.011580 - LA 181: EVANGELINE PARISH LINE TO US 71
Type Impv: STABILIZE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 181 372-05 NFA 1,752 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011597 - LA 8: VERNON PARISH LINE TO LA 119
Type Impv: PATCHING, COLD PLANING, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 8 134-03 STPFLEX 2,210 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011598 - LA 8: LA 119 TO LA 1
Type Impv: PATCHING, COLD PLANING, STABILIZING, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 8-S 134-04 STPFLEX 4,626 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011660 - LA 3225: TURN LANES AT LA 623
Type Impv: CONSTRUCTION OF TURN LANES ON LA 3225 AT LA 623
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 3225 840-36 HSIP 1,120 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011753 - HIGHLAND DRIVE ROADWAY IMPROVEMENTS
Type Impv: REHABILITATION
Project Manager: BANKSTON, TANYA
Remarks: CITY OF PINEVILLE WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 STP<200K 570 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011754 - ALEXANDRIA STREET IMPROVEMENTS PHASE 2
Type Impv: REHABILITATION
Project Manager: BANKSTON, TANYA
Remarks: CITY OF ALEXANDRIA WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 STP<200K 3,106 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.008251 - LA456:RDWY CLOSURE@UPRR CROSSING (MEEKER
Type Impv: RDWY CLOSURE@UPRR CROSSING
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 456 840-07 RAIL HE 34 RAILROADS 2-WAITING FOR FUNDING
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 130 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: RAPIDES
Project: H.000582 - US 165 WIDENING @ PINEVILLE EXPRESSWAY
Type Impv: WIDENING
Project Manager: RACHAL, JASON
Remarks: 015-30-0013;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 165 015-30 NHPP 5,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
RAPIDES US 165 015-02 0 CAPACITY
Project: H.000790 - US 167 BRIDGE MAINTENANCE
Type Impv: BRIDGE MAINTENANCE
Project Manager: RACHAL, JASON
Remarks: 023-01-0069;BRPM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 167 023-01 NHPP 3,000 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
1-PLANNING/ENVIRONMENTAL
Project: H.004825 - WIDENING LA 28 EAST (LIBUSE TO HOLLOWAY)
Type Impv: WIDEN FROM 3 TO 4 LANES
Project Manager: MUSA, ELNUR
Remarks: 700-40-0145;FEASIBILITY/STAGE 0 WIDEN TO 4 LANE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 28 074-02 NFI 29,185 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.008271 - SUGARHOUSE RD EXTENSION
Type Impv: NEW CONSTRUCTION, 2-LANE WITH PAVED SHOULDERS
Project Manager: BANKSTON, TANYA
Remarks: 840-37-0007;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 STP<200K 2,500 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
RAPIDES 000-40 LOCAL 2,500 URBAN SYSTEMS
Project: H.008277 - FT. BUHLOW BR (US 71/US 165)
Type Impv: RED RIVER BRIDGE
Project Manager: UMEOZULU, JOE
Remarks: 840-43-0014;PHASE 3 OF FORT BUHLOW RED RIVER BR
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 840-43 NFI 32,500 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009498 - LA 121: CALCASIEU RIVER BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 029-05 USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 121 029-05 FBROFF 8,900 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009543 - LA 113: VERNON LINE - LA 112
Type Impv: BASE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 113 140-02 STPFLEX 3,449 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009556 - LA 107: LA 454 - 320' S OF ESTATE DRIVE
Type Impv: STABLIZE BASE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 107 142-04 STPFLEX 3,251 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010341 - LA 115: LA 1207 - LA 28
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 115 033-04 STPFLEX 1,928 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 131 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: RAPIDES
Project: H.010355 - LA 113: LA 112 - CALCASIEU RIVER
Type Impv: CTB AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 113 140-03 STPFLEX 1,679 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010482 - US167 FRONT: HICKORY HILL - KIWANIS CAMP
Type Impv: STABILIZE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 167 023-01 STPFLEX 526 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010824 - US 71 CORRIDOR STUDY
Type Impv: CONDUCT CORRIDOR STUDY ALONG US 71
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES US 71 008-09 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
RAPIDES US 71 840-43 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
RAPIDES US 71 008-30 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.011004 - ALEX MPO TRAVEL DEMAND MANAGEMENT 2013
Type Impv: PROMOTE COMMUTER CARPOOLING AND VANPOOLING/FLEX TIME
Project Manager: JOHNS, MATT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.011072 - CENTRAL LA BELTWAY FEASIBILITY STUDY
Type Impv: PLANNING STUDY
Project Manager: BROUSSARD, DAN
Remarks: RAPIDES AREA PLANNING COMMISSION
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES 000-40 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.011403 - LA1208-3 TRAFFIC STUDY:VERSAILLES- LA488
Type Impv: CORRIDOR STUDY FOR SAFETY & ACCESS MANAGEMENT IMPROVEM
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 1208-3 368-03 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011438 - US 71@LA 28: TRAFFIC SIGNAL TIMING STUDY
Type Impv: SIGNAL TIMING STUDY OF US 71 @ LA 28 INTERCHANGE
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RAPIDES LA 28 417-02 0 SAFETY 1-PLANNING/ENVIRONMENTAL
RAPIDES US 71 008-30 0 SAFETY
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 132 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: RED RIVER
Project: H.011087 - WESTDALE PLANTATION ROAD / BAYOU PIERRE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks: DOTD PROVIDES THE MATCH FOR THE OFF-SYSTEM HWY BR PR
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RED RIVER 000-41 FBROFF 1,794 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011600 - LA 514 & 507: US 371 TO BIENVILLE PL
Type Impv: ASPHALTIC CONCRETE PAVEMENT RESURFACING WITH MINOR WIDEN
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RED RIVER LA 514 100-02 STPFLEX 1,260 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.001761 - LA 507 CREEK BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: YANG, LI
Remarks: 100-02-0013;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RED RIVER LA 507 100-02 FBROFF 2,133 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009402 - RDWY DRAINAGE IMP.-US 71 @ US 371 PH III
Type Impv: SUBSURFACE DRAINAGE AND OUTFALL CHANNEL IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RED RIVER US 371 021-30 STPFLEX 535 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 133 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: RICHLAND
Project: H.011624 - LA 576: DRAINAGE IMPROV 0.4 MI N LA 135
Type Impv: REMOVE AND REPLACE EXISTING DRAINGE STRUCTURE
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 576 341-02 NFA 264 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 14-15
Project: H.000974 - BOUEF RIVER BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: MUSA, ELNUR
Remarks: 026-09-0024;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 15 026-09 STPFLEX 7,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.003328 - I-20: GARRETT RD. TO MADISON
Type Impv: INTERSTATE SIGNING REHAB
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND I-20 451-07 NHPP 1,226 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 15-16
OUACHITA I-20 451-06 NHPP 423 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.010395 - US 425: JCT I-20 TO JCT US 80
Type Impv: MILL & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND US 425 071-01 STPFLEX 750 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010204 - US 425: ROUNDABOUT @ JULIA & LOUISA
Type Impv: INSTALL ROUNDABOUT
Project Manager: JESCLARD, TREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND US 425 071-01 HSIP 1,200 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011021 - LA 17: SHARON STREET TO TENNESSEE STREET
Type Impv: REMOVE AND REPLACE EXISTING SUBSURFACE DRAINAGE STRUCTU
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 17 051-04 STPFLEX 1,114 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011603 - LA 132: LA 135 TO WHITEHALL ROAD
Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 132 166-05 NFA 913 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011604 - LA 132: US 425 TO BIG CREEK
Type Impv: ASPHALT OVERLAY OF EXISTING ASPHALT PAVEMENT
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 132 348-01 NFA 343 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011621 - I-20: LA 133 - US 425
Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT
Project Manager: MCMILLAN, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND I-20 451-07 NHPP 7,400 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 134 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: RICHLAND
Project: H.001970 - BOEUF RIVER BRIDGE NEAR HEBERT
Type Impv: BRIDGE REPLACEMENT
Project Manager: HERATH, ANANDA
Remarks: 166-03-0015;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 561 166-03 FBROFF 7,011 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001972 - MUDDY BAYOU BRIDGE
Type Impv: NEW BRIDGE
Project Manager: BROWN, JEFF
Remarks: 167-02-0016;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 135 167-02 STPFLEX 1,128 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.008288 - BOEUF RIVER BRIDGE NEAR BUCKNER
Type Impv: BRIDE REPLACEMENT
Project Manager: HERATH, ANANDA
Remarks: 842-13-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 132 842-13 FBROFF 3,672 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.008793 - FRANKLIN FARMS MEGA SITE
Type Impv: INTERCHANGE IMPROV., NEW ROADWAY, ROADWAY WIDENING
Project Manager: LANDRY, COREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND LA 183 185-01 NFI 95,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009530 - US 80: OUACHITA PL TO 1.32 MILES EAST
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND US 80 002-02 STPFLEX 6,204 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010457 - US 80: LA 133 TO US 425
Type Impv: MILL AND OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
RICHLAND US 80 002-02 STPFLEX 2,058 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
RICHLAND US 80 002-03 STPFLEX 1,442 SUSTAINABILITYNON-INTERSTATE
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 135 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: SABINE
Project: H.009451 - VARIOUS ROADS:SIGNING (SABINE)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE 000-43 SATRANS 10 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010032 - SHUTEYE ROAD & MARTHAVILLE ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE 000-43 FBROFF 393 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
SABINE 000-43 FBROFF 593 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010033 - PIONEER ROAD & LAKESIDE LOOP BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE 000-43 FBROFF 193 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
SABINE 000-43 FBROFF 585 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010344 - LA 174: LA 175 - DESOTO P/L
Type Impv: STABILIZE BASE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE LA 174 112-04 STPFLEX 1,888 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011678 - US 171: HORNBECK TO WHITFIELD ROAD
Type Impv: PATCHING AND GRINDING OF EXISTING CONCRETE PAVEMENT
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE US 171 025-02 NHPP 700 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 15-16
VERNON US 171 025-01 NHPP 100 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
Project: H.010696 - BROWN & GANDY: KCS RR XINGS (SABINE)
Type Impv: INSTALL F/L'S & GATES AT BROWN AND GANDY XINGS
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE 000-43 RAIL PD 600 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.011525 - SNEED ROAD / TORO CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE 000-43 FBROFF 246 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011595 - LA 473: LA 191 TO VERNON PARISH LINE
Type Impv: PATCHING AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE LA 473 357-01 STPFLEX 1,795 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 136 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: SABINE
Project: H.010345 - LA 175: N JCT LA 120 - RAY CANTO RD
Type Impv: STABILIZE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE LA 175 035-02 STPFLEX 1,973 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010366 - LA 175: 300' S OF SHIRWILLIS DR - LA 120
Type Impv: CTB AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
SABINE LA 175 035-01 STPFLEX 2,456 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 137 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST BERNARD
Project: H.007331 - PACKENHAM DR (LA46 - LA39)
Type Impv: RECONSTRUCT
Project Manager: ISEMANN, ROBERT
Remarks: 742-44-0006;WAS 742-07-0079
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD 000-44 STP>200K 5,120 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.009834 - ST BERNARD PARISH STREET REHAB PROGRAM
Type Impv: OVERLAYS/PANEL REPAIR/PANEL REPLACEMENT
Project Manager: LACOMBE, JASON
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD 000-44 STP>200K 4,668 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.010406 - LA 46: ORLEANS P/L - PARIS RD
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 46 046-03 STP>200K 3,000 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.010586 - ST BERNARD P MISSISSIPPI RIVER TRAIL PH3
Type Impv: CONSTRUCTION OF A PED-BIKE TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD 000-44 RTP 112 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
ST BERNARD 000-44 LOCAL 425 RECREATIONAL TRAILS PROGRAM
Project: H.002562 - BAYOU LALOUTRE BRIDGE REHABILITATION
Type Impv: STRUCTURAL/ELECTRICAL REPAIRS, CLEANING & PAINTING
Project Manager: KEMP, KELLY
Remarks: 284-02-0032;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 46 284-02 STPFLEX 3,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
ST BERNARD LA 46 284-02 ER 800 OTHER / MISCELLANEOUS
Project: H.011118 - ST. BERNARD PARISH MRT TRAILHEADS
Type Impv: CONST. OF 1600' OF LEVEE ACCESS RAMPS ALONG MS RIVER TRAIL
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD 000-44 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 15-16
ST BERNARD 000-44 LOCAL 44 RECREATIONAL TRAILS PROGRAM
Project: H.011555 - LA 46:FLORRISANT HWY - GULF OUTLET CANAL
Type Impv: ASPHALT OVERLAY, PATCHING, GUARD RAIL, STRIPING
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 46 284-02 STPFLEX 300 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011557 - LA 300: LA 1245 - END LA 300 (DELACROIX)
Type Impv: ASPHALT OVERLAY, PATCHING, GUARD RAIL, STRIPING
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 300 284-30 STPFLEX 2,000 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 138 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST BERNARD
Project: H.011800 - ST. BERNARD MISS RIVER TRAIL PH III
Type Impv: SHARED USE PATH ON LEVEE TOP
Project Manager: RIGGS, LAURA
Remarks: MATCH PROVIDED BY ST. BERNARD PARISH GOVERNMENT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD 000-44 TAP>200K 1,022 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.011820 - JEAN LAFITTE PKWY: SW & SHARED USE PATH
Type Impv: SIDEWALKS AND SHARED USE PATH
Project Manager: RIGGS, LAURA
Remarks: MATCH PROVIDED BY ST. BERNARD PARISH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD 000-44 TAP>200K 433 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.002567 - REGGIO CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: 284-30-0023;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 300 284-30 FBROFF 1,834 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009573 - LA 39:LAKE BORGNE CANAL BR - LA 46
Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST BERNARD LA 39 046-32 STPFLEX 2,614 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 139 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST CHARLES
Project: H.009359 - BONNET CARRE'S SPILLWAY ATV RIDING AREA
Type Impv: RESTORATION AND CONSTRUCTION OF A MOTORIZED TRAIL SYSTEM
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 RTP 199 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
Project: H.010498 - I-310: LULING BR DECK OVERLAY & REPAIR
Type Impv: REMOVE AND REPLACE BRIDGE DECK OVERLAY & STRUCTURAL REP
Project Manager: GUIDRY, CHRIS
Remarks: PRIORITY BRIDGE PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES I-310 450-37 NHPP 28,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011010 - LA 628: ST. CHARLES PL - AIRLINE OVERLAY
Type Impv: THIN LIFT OVRLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 628 845-02 STPFLEX 584 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011022 - US 61 @ EVANGELINE RD.
Type Impv: RAISING ROADWAY GRADE
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES US 61 007-03 STPFLEX 786 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011312 - US 90: MEDIAN CROSSOVER IMPROVEMENTS
Type Impv: ADD LEFT TURN LANES AT MEDIAN CROSSOVERS AND CLOSING OT
Project Manager: ROONEY, BRITTANY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES US 90 005-08 STGEN 1,080 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
ST CHARLES US 90 005-09 STGEN 84 SUSTAINABILITYNON-INTERSTATE
Project: H.009176 - LULING INTERSECTION SAFETY IMPROVEMENTS
Type Impv: PURCHASE AND INSTALL SIGNS AND SOLAR BEACONS
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 SATRANS 40 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009453 - VARIOUS ROADS:SIGNING (ST. CHARLES)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 SATRANS 5 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010843 - ORMOND BLVD PAVEMENT REHAB
Type Impv: COLD PLANE, ASPHALT PATCHING, OVERLAY EXISTING ASPHALT, N
Project Manager: LACOMBE, JASON
Remarks: ST. CHARLES PARISH TO PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 STP>200K 4,284 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011230 - LA 48: I-310 - ORMOND BLVD
Type Impv: INTERSECTION IMPROVEMENTS AT RIVER OAKS DRIVE
Project Manager: BRASSET, DAVID
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 48 282-02 STP>200K 950 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 140 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST CHARLES
Project: H.011305 - US 61: LEFT TURN LANE AT LOG MILE 6.0
Type Impv: ADD LEFT TURN LANE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES US 61 007-03 STPFLEX 430 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011442 - LA 3127: RIGHT TL @ ASPHALT PLANT RD
Type Impv: ADD RIGHT TURN LANE AND ACCELERATION LANE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 3127 428-03 STPFLEX 400 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011472 - I-10 BONNET CARRE EMERGENCY CROSSINGS
Type Impv: EMERGENCY CROSSING UPGRADES
Project Manager: KIMBENG, LUCY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES I-10 450-14 NHPP 420 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011630 - LA 626: LA 48 TO US 61
Type Impv: ULTRA THIN OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 626 282-31 STPFLEX 210 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011631 - LA 3060: US 90 TO LA 18
Type Impv: ULTRA THIN OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 3060 845-18 STPFLEX 95 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009763 - ST CHARLES EBANK LEVEE MU PATH, PHASE 6
Type Impv: MULTI-USE PATH & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 TAP>200K 1,025 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.011548 - LA 48: LOWERLINE ST. - PROSPECT AVE.
Type Impv: ADDING DRAINAGE STRUCTURES
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 48 282-02 STPFLEX 250 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011553 - LA 632: LA 306 - LA 631
Type Impv: ASPHALT OVERLAY, PATCHING, STRIPING
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 632 845-09 STPFLEX 500 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011801 - ST. CHARLES WB LEVEE PATH PH IV AND V
Type Impv: SHARED USE PATH
Project Manager: MEEK, STEPHEN
Remarks: MATCH PROVIDED BY ST. CHARLES PARISH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 TAP>200K 2,602 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 141 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST CHARLES
Project: H.000320 - JEFFERSON PARISH LN. - LA 50
Type Impv: ULTRATHIN HMAC WEARING COURSE
Project Manager: DEVILLE, JACQUES
Remarks: 007-03-0060;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES US 61 007-03 NHPP 1,688 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.004876 - LA 52: LA 18 - N OAK COURT
Type Impv: SAFETY AND TSM IMPROVEMENTS
Project Manager: LACOMBE, JASON
Remarks: DTSGE O COMPLETED UNDER DESIGN PHASE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES 000-45 STP>200K 1,850 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
ST CHARLES 000-45 OTHER 1,850 URBAN SYSTEMS
Project: H.010413 - LA 48: ORMOND PLANTATION - WESCO ST
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 48 282-02 STPFLEX 1,750 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010416 - LA 3127: ST. JOHN P/L - 3700' W I-310
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 3127 428-03 STPFLEX 5,500 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010417 - LA 306: LA 18 - LA 632
Type Impv: COLD PLANE, GEOGRID & 4" OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES LA 306 845-07 STPFLEX 3,600 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010753 - US 90/I-310 INTERCHANGE
Type Impv: RECONSTRUCTION OF INTERCHANGE OR NEW FLYOVER RAMP
Project Manager: LANDRY, COREY
Remarks: MATCH FOR ENVIRONMENTAL FROM DOTD SURPLUS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST CHARLES I-310 450-38 NFI 0 CAPACITY 1-PLANNING/ENVIRONMENTAL
ST CHARLES US 90 005-08 NFI 0 CAPACITY
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 142 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST HELENA
Project: H.002311 - LA 38 - MISSISSIPPI STATE LINE
Type Impv: COLD PLANE.BASE.DRAINAGE & OLAY
Project Manager: DEVILLE, JACQUES
Remarks: 254-07-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST HELENA LA 43 254-07 STPFLEX 3,790 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.002407 - PIGEON CREEK
Type Impv: NEW BRIDGE
Project Manager: YAP, KIAN
Remarks: 262-30-0008;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST HELENA LA 63 262-30 STPFLEX 1,611 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.008312 - LA 1042 BRIDGES NEAR GREENSBURG
Type Impv: BRIDGE REPLACEMENT
Project Manager: UMEOZULU, JOE
Remarks: 846-03-0014;2 BRIDGES; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST HELENA LA 1042 846-03 FBROFF 2,161 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010382 - LA 441: LA 16 - LA 10
Type Impv: COLD PLANE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST HELENA LA 441 260-09 STPFLEX 3,972 SUSTAINABILITYNON-INTERSTATE NFA
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 143 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST JAMES
Project: H.011176 - INSTALL SE LA PERM CONTRAFLOW SIGNING
Type Impv: SE LA - PERMANENT SIGNING FOR CONTRAFLOW EVACUATION EVEN
Project Manager: NGO, DUC
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES I-10 450-12 NHPP 18 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 14-15
JEFFERSON I-10 450-15 NHPP 64 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST JOHN I-10 450-13 NHPP 38 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ASCENSION I-10 450-11 NHPP 22 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST JOHN US 61 007-04 NHPP 18 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST JAMES US 61 007-05 NHPP 17 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST CHARLES I-310 450-36 NHPP 36 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST TAMMANY I-59 453-01 NHPP 29 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST TAMMANY I-12 454-04 NHPP 25 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST TAMMANY US 190 013-12 NHPP 15 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011190 - LA3213: MISS RIVER BR REHAB (GRAMERCY)
Type Impv: REHABILITATE SUPERSTRUCTURE OF THE MAIN TRUSS
Project Manager: D'ANDREA, ARTUR
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES LA 3213 434-02 STPFLEX 1,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009481 - LA 20 BAYOU CHEVREVIL BRIDGE
Type Impv: BRIDGE REHABILITATION
Project Manager: YAP, KIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES LA 20 065-07 STPFLEX 821 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009724 - ST JAMES MISS EBANK MULTI-USE TRAIL PH 1
Type Impv: MULTI-USE PATH AND RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES 000-47 TAP<200K 1,259 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.002426 - SUNSHINE BRIDGE - I-10
Type Impv: CLEARING AND GRUBBING
Project Manager: TONEY, PATRICK
Remarks: 426-02-0052;(CONST)426-02-42.426-03-04.NO FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES LA 70 426-02 NFI 0 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
ASCENSION LA 22 266-01 NFI 0 OTHER / MISCELLANEOUS
Project: H.009483 - LA HIGHWAY 44 RE-ROUTE
Type Impv: ADDING TURN LANES ON LA 3125 AND REALIGNING LA 44
Project Manager: WAGUESPACK, BRENT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES LA 3125 426-31 LOCAL 775 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
ST JAMES LA 44 256-05 LOCAL 620 OTHER / MISCELLANEOUS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 144 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST JAMES
Project: H.011717 - LA 70: SUNSHINE BRIDGE PIER PROTECTION
Type Impv: PIER PROTECTION SYSTEM
Project Manager: GUIDRY, CHRIS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JAMES LA 70 426-02 0 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 145 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST JOHN
Project: H.000326 - HEMLOCK ST.(LA 3224) @ US 61
Type Impv: SAFETY & CAPACITY MODIFICATIONS
Project Manager: LAI, QUANG
Remarks: 848-19-0007;STP>200K FUNDS, USE TTF AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 3224 848-19 DEMO 364 DEMO / HIGH PRIORITY 4-SCHEDULED IN CURRENT FY 14-15
ST JOHN LA 3224 848-19 STP>200K 141 URBAN SYSTEMS
Project: H.008318 - LA 636-3 (LA 628 - LA 44)
Type Impv: COLD PLANE, PATCH, AND OVERLAY
Project Manager: LACOMBE, JASON
Remarks: 848-04-0010
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 636-3 848-04 STP>200K 597 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.009282 - ST. JOHN THE BAPTIST PARISH PROJECT
Type Impv: SIDEWALKS,MARKINGS,SIGNALS,EDUCATION&ENCOURAGEMENT AC
Project Manager: GROS, SCOTT
Remarks: ST. JOHN THE BAPTIST PH.LAPLACE ELEMENTARY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN 000-48 SR2S 193 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
ST JOHN 000-48 SATRANS 28 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.009770 - ST JOHN MISS EASTBANK MU PATH, PH 3/3A
Type Impv: MULTI-USE PATH ON EB MISS. RIVER LEVEE
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN 000-48 TAP<200K 855 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011128 - I-10 @ LA 3188 OVERPASS GIRDER REPAIR
Type Impv: REPAIR. TRUCK IMPACTED GIRDERS
Project Manager: TSAI, CHING
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 3188 848-15 REIMB 250 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 14-15
ST JOHN LA 3188 848-15 NHPP 250 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.011455 - LA 3179 (LA 44 - US 61)
Type Impv: ULTRA THIN OVERLAY
Project Manager: LACOMBE, JASON
Remarks: DOTD TO PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 3179 848-14 STP>200K 511 URBAN SYSTEMS 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011497 - LA 18: ST CHARLES P/L - GRAMMERCY BR
Type Impv: 1" THIN ASPHALTIC CONCRETE OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 18 063-07 STPFLEX 1,700 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.009391 - LA 3188 DRAINAGE IMPROVEMENTS
Type Impv: DRAINAGE IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 3188 848-15 STPFLEX 1,800 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 146 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST JOHN
Project: H.010110 - EAST ST. JOHN ELEM SCHOOL SRTS PROJECT
Type Impv: SIDEWALK IMPROVMENTS, TRAFFIC CALMING, STRIPING AND MARKIN
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN 000-48 SR2S 193 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
ST JOHN 000-48 SATRANS 28 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010257 - GRADE RAISING I-10 RAMPS @ LA 3188 INT.
Type Impv: RAISING THE EXISTING GRADE OF THE I-10 RAMPS AT LA 3188
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN I-10 450-13 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011477 - I-55 EMERGENCY CROSSINGS
Type Impv: EMERGENCY CROSSOVER UPGRADES
Project Manager: KIMBENG, LUCY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN I-55 452-01 NHPP 70 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED FOR LETTING FY 15-16
TANGIPAHOA I-55 452-90 NHPP 35 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.002960 - LA 3213:GRAMERCY BRIDGE OVER UP RAILROAD
Type Impv: GRADE SEPARATE EXISTING AT GRADE CROSSING
Project Manager: LACOMBE, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 3213 434-01 STPFLEX 20,000 RAILROADSGRADE SEPARATION
3-DESIGN/DEVELOPMENT
Project: H.009594 - I-10:RESERVE RELIEF CANAL - I-55 NB RAM
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN I-10 450-13 NHPP 10,000 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010076 - IC (RESERVE) W. 19TH ST.
Type Impv: RAILROAD SIGNALIZATION
Project Manager: SHREWSBERRY,BILL
Remarks: 714-48-0001
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN 000-48 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.011515 - LA 44: PALM ST & BEECH ST DRAINAGE
Type Impv: ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 44 256-01 STPFLEX 50 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.004895 - LA 44 (ELM - HEMLOCK)
Type Impv: FEASIBILITY STUDY
Project Manager: LACOMBE, JASON
Remarks: 700-48-0106;RPC LOCAL SHARE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN 000-48 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.010385 - LA 3127: ST. JAMES P/L - ST. CHARLES P/L
Type Impv: COLD PLANE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 3127 428-02 STPFLEX 3,115 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 147 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST JOHN
Project: H.010902 - US 61 FEASIBILITY STUDY
Type Impv: FEASIBILITY STUDY
Project Manager: RENARD, APRIL
Remarks: FEASIBILITY STUDY FUNDED WITH SATRANS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN US 61 007-04 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011136 - MRT EXTENSION ST. JOHN PARISH
Type Impv: STAGE 0 FEASIBILITY STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 20% NON-FEDERAL MATCH PROVIDED BY RPC
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST JOHN LA 44 256-02 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 148 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST LANDRY
Project: H.002112 - LA 29: LA 182 - AVOYELLES P/L
Type Impv: ASPHALTIC SURFACE TREATMENT AND RELATED WORK
Project Manager: RAY, JARED
Remarks: 205-02-0014;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 29 205-02 STPFLEX 350 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010593 - BAYOU TECHE PADDLE TRAIL
Type Impv: CONSTRUCTION OF A PADDLE AND ATV TRAIL.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY 000-49 RTP 104 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
ST LANDRY 000-49 LOCAL 13 RECREATIONAL TRAILS PROGRAM
Project: H.008335 - LA 91 DRAINAGE CANAL BRIDGE
Type Impv: NEW BRIDGE
Project Manager: HERATH, ANANDA
Remarks: 849-23-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 91 849-23 STPFLEX 1,032 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010034 - JOE W ROAD & GALLOW ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY 000-49 FBROFF 570 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
ST LANDRY 000-49 FBROFF 246 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010035 - ANDREPONT RD & BAYOU GERMOND RD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY 000-49 FBROFF 293 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
ST LANDRY 000-49 FBROFF 601 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011550 - I-49:LA 93 OPASS - 0.26 MI N LA 93 OPASS
Type Impv: CONCRETE REMOVAL & REPLACEMENT, STONE BASE, SHLDER UNDE
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY I-49 455-02 NHPP 75 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011584 - LA 103: LA 359 - 3.20 MILES SOUTH
Type Impv: COLD PLANE, PATCH, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 103 380-04 NFA 2,200 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
Project: H.008332 - ROGUE BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: KEMP, KELLY
Remarks: 849-11-0010; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 360 849-11 FBROFF 3,062 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 149 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST LANDRY
Project: H.011511 - US 190 ITS DEPLOYMENT
Type Impv: DEPLOY ITS EQUIPMENT AND COMMUNICATIONS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY US 190 012-13 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
ST LANDRY US 190 008-04 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
POINTE COUPEE US 190 008-03 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
POINTE COUPEE US 190 008-02 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
W BATON ROUGE US 190 008-01 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.011544 - ROZENA AND BILLEAUX ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY 000-49 FBROFF 477 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
ST LANDRY 000-49 FBROFF 400 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011549 - US 190 EB: DRAINAGE IMPROVEMENTS
Type Impv: REMOVE BASE & SURFACING, RECONSTRUCT AT HIGHER ELEV
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY US 190 012-12 STPFLEX 800 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011808 - LA 10: PALMETTO COMPANY CANAL BR
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 10 219-07 STPFLEX 1,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.000445 - MISSOURI PACIFIC R.R. OVERPASS
Type Impv: BRIDGE REHAB.REDECK & MAYBE WIDEN
Project Manager: GAUDRY, CARL
Remarks: 012-13-0101;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY US 190 012-13 NHPP 6,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.002176 - BAYOU HA HA & PALMETTO CO.CANAL BRS
Type Impv: NEW BRIDGES
Project Manager: BUCCI, MARK
Remarks: 219-07-0025;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 10 219-07 STPFLEX 4,950 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009626 - US 190 (WB):MPRR OPASS-BAYOU COURTABLEAU
Type Impv: COLD PLANE, PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY US 190 012-13 NHPP 6,863 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010214 - US 71: LA 10 - AVOYELLES P/L
Type Impv: COLD PLANE, PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY US 71 008-06 STPFLEX 6,000 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 150 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST LANDRY
Project: H.010225 - LA 178: ACADIA P/L - LA 357
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY LA 178 208-02 STPFLEX 700 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.011243 - I-49 INTERCHANGE IMP. AT US 190 & LA 31
Type Impv: TBD BY FEASIBILITY STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY US 190 012-13 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011358 - US 190 (VINE STREET) RECONSTRUCTION
Type Impv: STAGE 0/FEASIBILITY STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST LANDRY US 190 012-12 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
ST LANDRY US 190 012-13 0 OTHER / MISCELLANEOUS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 151 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST MARTIN
Project: H.001306 - ST MARTINVLLE PEDESTRIAN IMPROVEMENTS
Type Impv: RECONSTRUCTION OF SIDEWALKS
Project Manager: RIGGS, LAURA
Remarks: FEDERAL SHARE IS 80%. 15% MATCH TOLL CREDITS & 5% LOCA
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN 000-50 TAP>200K 195 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 14-15
ST MARTIN LA 31 056-02 TAP>200K 122 ENHANCEMENTS
ST MARTIN LA 96 238-03 TAP>200K 93 ENHANCEMENTS
ST MARTIN 000-50 LOCAL 63 ENHANCEMENTS
ST MARTIN LA 31 056-02 LOCAL 18 ENHANCEMENTS
ST MARTIN LA 96 238-03 LOCAL 24 ENHANCEMENTS
Project: H.007485 - CADE FARM SEEDBANK BLDG RENOVATION
Type Impv: RENOVATION OF EXISTING BUILDING
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN 000-50 TAP>200K 975 ENHANCEMENTS 4-SCHEDULED IN CURRENT FY 14-15
ST MARTIN 000-50 LOCAL 75 ENHANCEMENTS
Project: H.008345 - BAYOU ALEXANDRE
Type Impv: BRIDGE REPLACEMENT
Project Manager: DELATTE, BRIAN
Remarks: 850-29-0005;USE NFA AS MATCH PHASES 1 TO 5
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 3083 850-29 NFA 1,219 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010828 - PARC DES PONTS TRAILHEAD
Type Impv: CONSTRUCTION OF MULTI-USE TRAILHEAD.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN 000-50 RTP 200 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011656 - LA 31: 0.12 MI N LA 96-LOCAL RD (LEVERT)
Type Impv: ASPHALT OVERLAY AND RELATED WORK.
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 31 056-02 STPFLEX 250 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.009143 - LA 31 & LA 92: ROUNDABOUT
Type Impv: ROUNDABOUT
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 31 056-02 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
ST MARTIN LA 92 213-08 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.010559 - BAYOU MERCIER ROAD / BERARD CANAL BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN 000-50 FBROFF 1,178 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 152 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST MARTIN
Project: H.011476 - I-10 ATCHAFALAYA EMERGENCY CROSSINGS
Type Impv: EMERGENCY CROSSOVERS UPGRADE
Project Manager: KIMBENG, LUCY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN I-10 450-06 NHPP 70 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED FOR LETTING FY 15-16
IBERVILLE I-10 450-07 NHPP 35 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.011612 - LA 347: CSLM 1.59 - LA 350
Type Impv: BASE STABILIZATION AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 347 400-04 NFA 4,800 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011786 - RAILROAD ST: BNSF RR XING (CADE)
Type Impv: INSTALL F/L'S, GATES AND BELLS
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN 000-50 RAIL PD 480 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
ST MARTIN 000-50 LOCAL 120 RAILROADS
Project: H.003014 - I-10: LA 347 TO ATCHAFALAYA FLDWY BR
Type Impv: REHABILITATION
Project Manager: OLIVIER, NICHOLAS
Remarks: 450-06-0068;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN I-10 450-06 NHPP 23,184 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
ST MARTIN I-10 450-06 NHPP 169 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.009456 - LA 347: ROUNDABOUT @ MELANCON RD.
Type Impv: INSTALL ROUNDABOUT
Project Manager: PICARD, TOBY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 347 056-04 HSIP 2,134 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.009461 - I-10 ATCHAFALAYA FLDWY CLEAN & PAINT
Type Impv: CLEANING & PAINTING
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN I-10 450-06 NHPP 4,000 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
IBERVILLE I-10 450-07 NHPP 6,520 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
Project: H.009747 - LA 31: PEDESTRIAN IMPROVEMENTS, PH 2
Type Impv: SIDEWALK W/ LANDSCAPING & RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 31 056-02 TAP<200K 467 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.010216 - LA 31: LA 351 - BEG. OF CURB & GUTTER
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 31 056-03 STPFLEX 1,771 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 153 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST MARTIN
Project: H.010601 - I-10: LA 328 TO LA 347
Type Impv: RUBBLIZE AND OVERLAY AND WIDEN TO 3 LANES IN EACH DIRECTIO
Project Manager: OLIVIER, NICHOLAS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN I-10 450-06 NHPP 38,571 CORRIDOR 3-DESIGN/DEVELOPMENT
ST MARTIN I-10 450-06 NHPP 19,386 SUSTAINABILITYBRIDGE (ON SYSTEM)
ST MARTIN I-10 450-06 NHPP 43,882 SUSTAINABILITYINTERSTATE
Project: H.011298 - US 90: CAPT CADE TO AMB CAFF FRONTAGE RD
Type Impv: NEW CONSTRUCTION OF FRONTAGE RDS
Project Manager: PAINE, PEGGY JO
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN US 90 424-03 STGEN 3,500 CAPACITY 3-DESIGN/DEVELOPMENT
LAFAYETTE US 90 424-02 STGEN 2,500 CAPACITY
IBERIA US 90 424-04 STGEN 1,500 CAPACITY
Project: H.011485 - LA336-1: BAYOU TECHE BRIDGE REHAB (HB)
Type Impv: CLEANING AND PAINTING, AND STRUCTURAL REPAIRS
Project Manager: MUMPHREY, RAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 336-1 056-04 NHPP 1,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.004924 - DEV.& CONST ST. MARTINVILLE BYPASS
Type Impv: FEDERAL EARMARK FOR STUDY
Project Manager: YANG, LI
Remarks: 700-50-0112;STAGE 0 COMPLETED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN 000-50 NFI 0 URBAN SYSTEMS 2-WAITING FOR FUNDING
Project: H.011279 - LA 328: LATIOLAIS DRIVE TO JULIE STREET
Type Impv: STAGE 0/FEASIBILITY STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN LA 328 404-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Project: H.011640 - I-10 ATCHAFALAYA SPEED LIMIT SIGNS
Type Impv: REPLACE SPEED LIMIT SIGNS AND RELATED WORKS
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARTIN I-10 450-06 NHPP 125 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
IBERVILLE I-10 450-07 NHPP 125 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 154 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST MARY
Project: H.004932 - INTERCHANGE US 90 @ LA 318
Type Impv: NEW INTERCHANGE. DESIGN-BUILD PROJECT
Project Manager: NICKEL, TIM
Remarks: 700-51-0110; STGEN IS UNCLAIMED PROPERTY FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY US 90 424-05 STGEN 44,965 CAPACITY 4-SCHEDULED IN CURRENT FY 14-15
ST MARY US 90 424-05 DEMO 15,035 DEMO / HIGH PRIORITY
Project: H.010877 - PHARR ESTATES TRAIL, PHASE 2
Type Impv: CONSTRUCTION OF 850' OF PED-BIKE TRAIL
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 RTP 223 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
ST MARY 000-51 LOCAL 107 RECREATIONAL TRAILS PROGRAM
Project: H.011641 - US 90: PAVEMENT MARKING REPLACEMENT II
Type Impv: RAISED PAVEMENT MARKERS, PLASTIC PAVEMENT MARKINGS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY US 90 424-05 NHPP 900 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 14-15
LAFAYETTE US 90 424-02 NHPP 200 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST MARTIN US 90 424-03 NHPP 100 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
IBERIA US 90 424-04 NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ASSUMPTION US 90 424-06 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.002798 - BAYOU TECHE BRIDGE(OAKLAWN)
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks: 408-30-0008;CG PERMIT SURV ORDERED IN METRIC (M
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY LA 323 408-30 STPFLEX 9,342 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.004929 - IMP RALPH DARDEN PKWY B/W LA182 MLK
Type Impv: LA 182 & MLK IMPROVEMENTS
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: 700-51-0107;STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 DEMO 160 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.006713 - DIST 03 BRIDGE JT REPAIRS & OVERLAY
Type Impv: DECK JT REPAIRS & DECK OVERLAY
Project Manager: TULLIER, DANNY
Remarks: 737-93-0074;BRPM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY US 90 424-05 NHPP 400 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 15-16
DISTRICTWIDE 03 000-93 NHPP 600 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
ST LANDRY US 190 008-04 NHPP 200 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
ASSUMPTION LA 182 005-02 NHPP 1,250 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
Project: H.010268 - US 90: CURVE IMPROVEMENTS
Type Impv: INCREASE VERTICAL GRADE
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY US 90 424-05 HSIP 604 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
ASSUMPTION US 90 424-06 HSIP 498 SAFETY
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 155 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST MARY
Project: H.010829 - ST. MARY PARISH BAYOU TECHE TRAILHEADS
Type Impv: CONSTRUCTION OF MULTI-USE TRAILHEADS.
Project Manager: RIGGS, LAURA
Remarks: NATIONAL RECREATIONAL TRAILS PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 RTP 125 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED FOR LETTING FY 15-16
ST MARY 000-51 LOCAL 38 RECREATIONAL TRAILS PROGRAM
Project: H.011327 - US 90: J-TURNS - ST. MARY PARISH
Type Impv: INTERSECTION IMPROVEMENTS AND MEDIAN CROSSOVERS CONSTR
Project Manager: DOMINGUE, CHRISTOPHER
Remarks: REF. H.005171 FEASIBILITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY US 90 424-05 SATRANS 4,500 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.002901 - CAJUN COAST TRAILHEAD
Type Impv: CONSTRUCTION OF A TRAILHEAD
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 TAP<200K 1,205 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
ST MARY US 90 424-05 TAP<200K 269 ENHANCEMENTS
Project: H.009748 - BERWICK DOWNTOWN SIDEWALKS
Type Impv: SIDEWALKS AND RELATED WORK
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 TAP<200K 73 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.011487 - LA 182: BERWICK BAY BRIDGE REHAB
Type Impv: BRIDGE CLEANING, PAINTING AND STRUCTURAL REPAIRS.
Project Manager: MUMPHREY, RAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY LA 182 005-01 STPFLEX 15,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011494 - US 90: ATCHAFALAYA RIVER BRIDGE REHAB
Type Impv: BRIDGE CLEANING, PAINTING AND STRUCTURAL REPAIRS.
Project Manager: MUMPHREY, RAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY US 90 424-05 NHPP 21,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011706 - BNSF SEVERAL RR XINGS (BALDWIN)
Type Impv: NEW ROAD CONSTRUCTION TO CLOSE THREE BNSF & LDRR CROSSIN
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 DEMO 585 RAILROADS 3-DESIGN/DEVELOPMENT
ST MARY 000-51 RAIL HE 452 RAILROADS
ST MARY 000-51 LOCAL 63 RAILROADS
Project: H.011723 - COTTON & SILO: BNSF RR XINGS (ST MARY)
Type Impv: NEW ROAD CONSTRUCTION, RR CROSSING UPGRADE & RR CLOSURE
Project Manager: SHREWSBERRY,BILL
Remarks: 714-51-0010
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY 000-51 RAIL HE 350 RAILROADS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 156 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST MARY
Project: H.011328 - US 90: WAX LAKE OUTLET TO BERWICK
Type Impv: UPGRADING US 90 FOR FUTURE I-49 SOUTH
Project Manager: LANDRY, COREY
Remarks: REF. H.005171 FEASIBILITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST MARY US 90 424-05 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 157 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST TAMMANY
Project: H.009341 - LA 1085 & LA 1077: ROUNDABOUT
Type Impv: CONSTRUCT ROUNDABOUT
Project Manager: HARROUCH, JOSHUA
Remarks: PARISH ACQUIRE R/W
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1085 852-02 STPFLEX 822 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
4-SCHEDULED IN CURRENT FY 14-15
ST TAMMANY LA 1085 852-02 STP<200K 500 URBAN SYSTEMS
ST TAMMANY LA 1077 852-03 STPFLEX 1,410 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.011117 - WEST HALL TRAIL
Type Impv: CONSTRUCTION OF 1,746' PED-BIKE TRAIL EXTENSION
Project Manager: RIGGS, LAURA
Remarks: CRT IS THE PROJECT MANAGER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 RTP 116 RECREATIONAL TRAILS PROGRAM 4-SCHEDULED IN CURRENT FY 14-15
ST TAMMANY 000-52 LOCAL 20 RECREATIONAL TRAILS PROGRAM
Project: H.011711 - US190: LA 22 TO LONESOME ROAD (PHASE II)
Type Impv: LANDSCAPING, BULB-OUTS, RETAINING WALL
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 013-12 STGEN 500 CAPACITY 4-SCHEDULED IN CURRENT FY 14-15
Project: H.000506 - LA 22 (DALWILL BLVD - US 190)
Type Impv: WIDENING AND DRAINAGE IMPROVEMENT
Project Manager: BANKSTON, TANYA
Remarks: 013-12-0060;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 22 261-06 STP<200K 5,900 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.000687 - I-12 @ US 11 INTERCHANGE LIGHTING
Type Impv: INTERSECTION LIGHTING IMPROVEMENTS
Project Manager: LEBOURGEOIS, CHRISTOPHER
Remarks: 018-04-0048;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 898 OPER EFFICIENCY/MOTORIST ASSISTANCEINTERSTATE LIGHTING
4-SCHEDULED FOR LETTING FY 15-16
Project: H.002394 - LA 22: W END TCHEFUNCTE RB-MARINA BEAU C
Type Impv: COLD PLANE.PATCH AND OLAY
Project Manager: BANKSTON, TANYA
Remarks: 261-06-0041;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 22 261-06 STP<200K 2,755 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.003451 - I-12: LA 434 INTCHG LIGHTING (LACOMBE)
Type Impv: INTERSTATE LIGHTING
Project Manager: FOSTER, RICHARD
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 943 OPER EFFICIENCY/MOTORIST ASSISTANCEINTERSTATE LIGHTING
4-SCHEDULED FOR LETTING FY 15-16
ST TAMMANY LA 434 852-12 0 OPER EFFICIENCY/MOTORIST ASSISTANCEINTERSTATE LIGHTING
Project: H.003452 - I-12 @ NORTHSHORE BLVD INTER. LIGHTING
Type Impv: ROADWAY LIGHTING
Project Manager: LEBOURGEOIS, CHRISTOPHER
Remarks: 454-04-0089;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 1,082 OPER EFFICIENCY/MOTORIST ASSISTANCEINTERSTATE LIGHTING
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 158 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST TAMMANY
Project: H.006599 - TAMMANY TRACE CAMP SALMEN CONNECTOR
Type Impv: CONSTRUCT PEDESTRIAN AND BIKE PATH
Project Manager: RIGGS, LAURA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 DEMO 144 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 15-16
ST TAMMANY 000-52 TAP<200K 231 ENHANCEMENTS
Project: H.009460 - VARIOUS ROADS:SIGNING (ST. TAMMANY)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 SATRANS 20 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009596 - I-10&I-12:ST.TAMMAY PAR APR SLAB REPAIRS
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 NHPP 750 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
ST TAMMANY I-12 454-04 NHPP 750 SUSTAINABILITYINTERSTATE
Project: H.010184 - LA 59: CURVE REALIGN AND TUNNEL AT TRACE
Type Impv: REALIGN CURVE & PROVIDE A TUNNEL FOR TAMMANY TRACE CROS
Project Manager: FOURNERAT, CHRIS
Remarks: ENG & R/W BY ST TAMMANY PARISH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 59 281-03 TAP<200K 1,900 ENHANCEMENTS 4-SCHEDULED FOR LETTING FY 15-16
ST TAMMANY LA 59 281-03 HSIP 750 SAFETY
Project: H.010720 - I-12: LA 1088 INTCHG LIGHTING
Type Impv: INTERSTATE LIGHTING
Project Manager: FOSTER, RICHARD
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 850 OPER EFFICIENCY/MOTORIST ASSISTANCEINTERSTATE LIGHTING
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010728 - LA 1090: US 190 TO I-10 WIDENING
Type Impv: THREE LANE BY WIDENING.
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1090 852-26 STPFLEX 1,135 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010982 - LA 25 : JACKSON ST. - HAY HOLLOW RD.
Type Impv: WIDENING & RE-STRIPING FOR CENTER TURN LANE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 25 059-02 STPFLEX 550 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010987 - LA 433: BYU BONFOUCA - US 11 CENTER TURN
Type Impv: CENTER TURN LANE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 433 852-21 STPFLEX 450 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 159 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST TAMMANY
Project: H.011024 - I-10: OAK HARBOR RAMPS
Type Impv: RAISING EXISTING GRADE WITH EMBANKMENT IN EXISTING CROWN.
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011138 - COVINGTON SRTS PROJ. - PINE VIEW MIDDLE
Type Impv: SIDEWALKS, DRAINAGE, STRIPING AND SIGNAGE
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 SR2S 188 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
ST TAMMANY 000-52 SATRANS 30 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.011216 - CITY OF SLIDELL PAVEMENT MARKINGS
Type Impv: PURCHASE AND INSTALL PAVEMENT MARKINGS ON 12 LOCAL ROAD
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 SATRANS 60 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011217 - DEMOLISH NINE MILE TURNAROUND
Type Impv: PROVIDE FOR THE DEMOLITION OF THE NINE MILE TURNAROUND.
Project Manager: KENDRICK, BRIAN
Remarks: DIR NUMBER LA-2012-1-051-010 USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 ER 1,073 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011435 - US 11 IMPROVEMENTS AT SCHNEIDER CANAL
Type Impv: LEVEE IMPROVEMENT AND ROADWAY WIDENING WITH ACCESS MGM
Project Manager: OLIVIER, NICHOLAS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 11 018-03 DEMO 2,300 DEMO / HIGH PRIORITY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.000497 - US190: BAYOU CASTINE-SE LA HOSPITAL
Type Impv: WIDEN TO 4 LANES
Project Manager: BORNE, FRED
Remarks: 013-12-0039;PROJ ON XXX PER LIST FROM F.BORNE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 013-12 NFI 12,000 CORRIDOR 3-DESIGN/DEVELOPMENT
Project: H.000689 - LA 433: SALT BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 018-30-0024;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 433 018-30 FBROFF 2,250 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002446 - LA 40: TCHEFUNCTE RIVER BRIDGE
Type Impv: NEW BRIDGE
Project Manager: BUCCI, MARK
Remarks: 269-07-0012;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 40 269-07 STPFLEX 3,260 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
TANGIPAHOA LA 40 269-06 0 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.004113 - LA 3241: LA 435 TO LA 40/LA 41
Type Impv: NEW 4-LANE
Project Manager: BURST, JEFFERY
Remarks: 852-33-0001;BL DATE 10-08 404 RE-SUBMITTED 3-96
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 3241 852-33 NHPP 63,000 TIME 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 160 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST TAMMANY
Project: H.004435 - LA 3241: LA 36 TO LA 435
Type Impv: NEW 4-LANE
Project Manager: BURST, JEFFERY
Remarks: 852-33-0003;BL DATE 7-08
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 3241 852-33 NHPP 92,000 TIME 3-DESIGN/DEVELOPMENT
Project: H.004957 - LA 3241:I-12/LA 434 INTERCHANGE TO LA 36
Type Impv: NEW 4-LANE
Project Manager: BURST, JEFFERY
Remarks: 852-33-0002;BL DATE 7-08
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 3241 852-33 NHPP 70,000 TIME 3-DESIGN/DEVELOPMENT
Project: H.008369 - US 11 @ CLEO ROAD
Type Impv: CONSTRUCT A ROUNDABOUT
Project Manager: HARROUCH, JOSHUA
Remarks: 852-26-0021;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 852-26 STPFLEX 950 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.009597 - I-10: W PEARL RIVER BR - PEARL RIVER BR
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 NHPP 3,000 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.009793 - SLIDELL: OLDE TOWN STREETSCAPING
Type Impv: SIDEWALKS W/LIGHTING, LANDSCAPING, & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 TAP<200K 954 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.010668 - MIL DOLLAR/HOSMER MILL/HWY 41 SPUR BRDGS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 FBROFF 3,389 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010993 - I-10: TWIN SPANS - FRENCH BRANCH
Type Impv: MILL, OVERLAY, GUARDRAIL AND PAVEMENT MARKINGS
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 NHPP 10,993 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.010994 - I-12: BAYOU LACOMBE - NORTHSHORE BLVD.
Type Impv: MILL, OVERLAY, GUARDRAIL AND PAVEMENT MARKINGS
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 5,830 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011030 - LA 59:ROUNDABOUT @ LONESOME RD.
Type Impv: CONSTRUCT ROUNDABOUT
Project Manager: FOURNERAT, CHRIS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 59 281-03 HSIP 1,709 SAFETY 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 161 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST TAMMANY
Project: H.011075 - LA 59:ROUNDABOUT @ SHARP RD.
Type Impv: CONSTRUCT ROUNDABOUT
Project Manager: FOURNERAT, CHRIS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 59 281-03 HSIP 1,914 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011137 - I-12: LA 21 TO US 190
Type Impv: ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEM
Project Manager: OLIVIER, NICHOLAS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 21,041 CAPACITY 3-DESIGN/DEVELOPMENT
ST TAMMANY I-12 454-04 NHPP 13,220 SUSTAINABILITYINTERSTATE
ST TAMMANY I-12 454-04 NHPP 14,913 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.011152 - I-12: US 190 TO LA 59
Type Impv: ROADWAY WIDENING AND OVERLAY, BRIDGE WIDENING/REPLACEM
Project Manager: OLIVIER, NICHOLAS
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 NHPP 39,557 CAPACITY 3-DESIGN/DEVELOPMENT
ST TAMMANY I-12 454-04 NHPP 4,395 SUSTAINABILITYINTERSTATE
Project: H.011260 - US 190B @ JEFFERSON AVE. ROUNDABOUT
Type Impv: ROUNDABOUT CONSTRUCTION
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190-X 013-10 HSIP 600 SAFETY 3-DESIGN/DEVELOPMENT
ST TAMMANY 000-52 HSIP 600 SAFETY
Project: H.011308 - I-10:MED PROTECTION TWIN SPANS-I-12/I-59
Type Impv: CONCRETE & CABLE MEDIAN BARRIER AND LIGHTING
Project Manager: LANDRY, COREY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 HSIPPEN 8,500 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011721 - US 190/LA 22 IMPROVEMENTS
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: BANKSTON, TANYA
Remarks: ENTITY WILL PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 013-12 STP<200K 2,134 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
ST TAMMANY LA 22 261-06 STP<200K 1,066 URBAN SYSTEMS
Project: H.011775 - US 11 & US 190 BICYCLE AND PED CROSSINGS
Type Impv: PED/BICYCLE CROSSWALKS, SIGNS AND SIGNALS
Project Manager: RIGGS, LAURA
Remarks: CITY OF SLIDELL PROVIDES MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 11 018-03 TAP<200K 372 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.011799 - SPARTAN DRIVE SHARED USE PATH
Type Impv: SHARED USE PATH
Project Manager: MEEK, STEPHEN
Remarks: MATCH PROVIDED BY CITY OF SLIDELL.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 TAP<200K 986 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 162 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST TAMMANY
Project: H.011822 - LA21: LA1085 - PINNACLE, SHARED USE PATH
Type Impv: SHARED USE PATH
Project Manager: RIGGS, LAURA
Remarks: MATCH PROVIDED BY ST. TAMMANY PARISH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 TAP<200K 783 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
ST TAMMANY LA 21 059-01 TAP<200K 363 ENHANCEMENTS
Project: H.000494 - LA 433 - US 11
Type Impv: WIDEN TO 4 LANES
Project Manager: JESCLARD, TREY
Remarks: 013-12-0031;404 REQ.(E?). PUB.MT.TO BE HELD.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 013-12 0 CORRIDOR 2-WAITING FOR FUNDING
Project: H.002391 - TCHEFUNCTE - CAUSEWAY APPROACH
Type Impv: WIDEN TO 4 LANES
Project Manager: BROADBENT, RONALD
Remarks: 261-06-0030;CITY/STATE AGREEMENT REQUIRED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 22 261-06 0 CAPACITY 2-WAITING FOR FUNDING
ST TAMMANY LA 22 261-06 0 OTHER / MISCELLANEOUS
Project: H.010446 - EMERGENCY BR REPLACE: LA 1077-ST TAMMANY
Type Impv: CONT TO FURNISH ALL MATERIALS AND LABOR TO RECONSTRUCT B
Project Manager: SIBLEY, STEVEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1077 852-13 STCASH 200 OTHER / MISCELLANEOUS 2-WAITING FOR FUNDING
Project: H.000284 - US 90: PEARL RIVER BRIDGES
Type Impv: NEW BRIDGES
Project Manager: OLIVIER, NICHOLAS
Remarks: 006-07-0048;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 90 006-07 STPFLEX 24,382 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.000286 - EAST PEARL RIVER BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: 006-08-0031;STAGE 0 PROJECT
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 90 006-08 STPFLEX 15,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
ST TAMMANY US 90 006-07 0 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.000688 - US 11 NORFOLK SOUTHERN R.R.OVERPASS
Type Impv: BRIDGE REPLACEMENT
Project Manager: OLIVIER, NICHOLAS
Remarks: 018-04-0049;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 11 018-04 STPFLEX 21,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001006 - E. JCT. LA 40 - LA 16
Type Impv: RUBBLIZE AND OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: 030-02-0029;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 21 030-02 NHPP 7,575 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 163 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST TAMMANY
Project: H.001344 - JCT LA 25 - JCT US 190 BUS
Type Impv: WIDENING
Project Manager: LANDRY, COREY
Remarks: 059-30-0008;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 059-30 NFI 58,000 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.004937 - US 11 - US 190
Type Impv: 2 LANE RECONSTRUCTION
Project Manager: JESCLARD, TREY
Remarks: 852-21-0030;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 433 852-21 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.004981 - LA 434 CORRIDOR
Type Impv: PHASES 1 AND 2 ENVIRONMENTAL STUDY
Project Manager: BANKSTON, TANYA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 0 URBAN SYSTEMS 1-PLANNING/ENVIRONMENTAL
Project: H.004983 - US HIGHWAY 11 WIDENING
Type Impv: WIDENING WITH BIKE PATH
Project Manager: OLIVIER, NICHOLAS
Remarks: 700-52-0196
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 11 018-03 DEMO 3,517 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
ST TAMMANY US 11 018-03 NFI 15,829 DEMO / HIGH PRIORITY
Project: H.008358 - BLACK BAYOU BR. NEAR MADISONVILLE
Type Impv: BRIDGE REPLACEMENT
Project Manager: GAUDRY, CARL
Remarks: 852-13-0017; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1077 852-13 FBROFF 1,391 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009934 - ABITA SPRINGS TOWN CTR SIDEWALK LIGHTING
Type Impv: SIDEWALK LIGHTING & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY 000-52 TAP<200K 218 ENHANCEMENTS 1-PLANNING/ENVIRONMENTAL
ST TAMMANY LA 435 281-04 TAP<200K 82 ENHANCEMENTS
Project: H.010116 - LA 1088 CORRIDOR STUDY
Type Impv: TRAFFIC STUDY ON LA 1088
Project Manager: BROWN, JEFF
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1088 852-11 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Project: H.010274 - US 190: US 11 TO LA 433
Type Impv: STAGE 0 FEASIBILITY STUDY FOR INTERIM CAPACITY IMPROVEMENT
Project Manager: NGUYEN, WAYNE
Remarks: DUE TO HURRICANE ISAAC MPO CAN'T FORMALLY APPROVE PR
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 190 013-12 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.010375 - LA 1077: LA 21 - U.S. 190
Type Impv: COLD PLANE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1077 852-03 STPFLEX 2,484 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 164 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST TAMMANY
Project: H.010377 - LA 36: LA 41 - IGC RAILROAD
Type Impv: COLD PLANE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 36 280-03 STPFLEX 1,120 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010380 - LA 433: U-PASS I-10 - BEHRMAN STREET
Type Impv: COLD PLANE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 433 018-30 STPFLEX 740 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010387 - U.S. 90: LA 433 - U.S. 190
Type Impv: RUBBILIZE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY US 90 006-07 STPFLEX 3,323 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010441 - GRADE RAISING ON LA 1077
Type Impv: DRAINAGE
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 1077 852-13 NFA 2,000 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
1-PLANNING/ENVIRONMENTAL
Project: H.010473 - ISAAC, I-10, FLOOD PROTECT ST. TAMMANY
Type Impv: PROVIDE TEMPORARY SAND BERM LEVEE FOR PROTECTION OF I-10
Project Manager: MURRAY, WILL
Remarks: SECRETARY EMERGENCY LETTER DATED 9/2/2012
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 STGEN 130 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010823 - LA 21: ROUNDABOUT @ US 190
Type Impv: FEASIBILITY STUDY FOR ROUNDABOUT
Project Manager: RENARD, APRIL
Remarks: FEASIBILITY STUDY FUNDED WITH SATRANS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 21 030-01 SATRANS 0 SAFETY 1-PLANNING/ENVIRONMENTAL
ST TAMMANY US 190-X 013-10 SATRANS 0 SAFETY
Project: H.011223 - I-10: NO CBD5 I-510 - STATELINE
Type Impv: SIGNING & SIGNING STRUCTURES REPLACEMENT &UPGRADE
Project Manager: COURTIER, KAY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-10 450-18 NHPP 2,412 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
ORLEANS I-10 450-90 NHPP 1,578 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ORLEANS I-10 450-17 NHPP 1,010 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011356 - I-12 RAMP METERS (NORTH SHORE)
Type Impv: FEASIBILITY STUDY (I-12 RAMP METERS (NORTH SHORE))
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY I-12 454-04 0 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 165 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: ST TAMMANY
Project: H.011454 - LA22:DALWILL-RODGER STORME CORRIDOR STUD
Type Impv: ACCESS MANAGEMENT AND SAFETY IMPROVEMENT
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
ST TAMMANY LA 22 261-06 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 166 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: TANGIPAHOA
Project: H.009598 - I-55: END OF ELEVATED ROADWAY - US 51
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-55 452-90 NHPP 4,693 SUSTAINABILITYINTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.000673 - US 51 BRIDGE REHABILITATION
Type Impv: TEMP. SUPPORT, REPAIR CONCRETE, INSTALL POST-TENSIONING
Project Manager: D'ANDREA, ARTUR
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51 017-04 STPFLEX 380 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.002474 - LA 1061: LA 10 - LA 440
Type Impv: COLD PLANE, IN PLACE STABILIZATION, OVERLAY AND STRIPING
Project Manager: DEVILLE, JACQUES
Remarks: 278-05-0006;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 1061 278-05 NFA 2,043 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009547 - JCT US 190 - S. JCT LA 40
Type Impv: MAINTENANCE RESTORATION & REHABILITATION
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 445 278-02 STPFLEX 3,000 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010061 - N. RIVER ROAD AND DURBIN ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 FBROFF 731 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010062 - WEINBERGER RD & JERUSALEM CH RD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 FBROFF 878 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010108 - INDEPENDENCE SRTS - PHASE II
Type Impv: SIDEWALK IMPROVMENTS, CROSSING AND STRIPING, NON-INFRASTR
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 SR2S 190 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
TANGIPAHOA 000-53 SATRANS 27 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010289 - LA 22: ROUNDABOUT DUNSON/RIDGEDELL RDS.
Type Impv: CONSTRUCT ROUNDABOUT @ LA 22/DUNSON/RIDGEDELL
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 22 261-04 HSIP 1,000 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010379 - LA 40: N. JCT. LA 445 - ST. TAMMANY P/L
Type Impv: COLD PLANE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 40 269-06 STPFLEX 1,782 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 167 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: TANGIPAHOA
Project: H.010645 - IC(KENTWOOD) LA 38 RR X-ING IN KENTWOOD
Type Impv: RAILROAD SIGNALS AND SURFACE WORK
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 38 263-04 RAIL HE 500 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010683 - I-55: MEDIAN CABLE BARRIER
Type Impv: INSTALL MEDIAN CABLE BARRIER
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-55 452-90 HSIPPEN 5,936 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010983 - I-55: RAMP WIDENING, NB OFF RAMP @ LA 16
Type Impv: RAMP WIDENING, ADDITIONAL TURN LANE ON EXIT RAMP
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-55 452-90 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011113 - LA 1064: IC RR XING (TANGIPAHOA)
Type Impv: REPLACE THE SURFACING OF THE CROSSING.
Project Manager: LUKE, SHAWN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 1064 853-09 RAIL HE 83 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
TANGIPAHOA LA 1064 853-09 LOCAL 67 RAILROADS
Project: H.011393 - I-55: LA 38 (KENTWOOD) INTCHG LIGHTING
Type Impv: INTERSTATE LIGHTING
Project Manager: FUNG, AGNES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-55 452-90 NHPP 800 OPER EFFICIENCY/MOTORIST ASSISTANCEINTERSTATE LIGHTING
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011671 - LA 22: IC RR XING (PONCHATOULA)
Type Impv: NEW RR SURFACE AND LEDS FOR RR FLASHING LIGHTS.
Project Manager: SHREWSBERRY,BILL
Remarks: RR CROSSING IS FEDERAL DOT NO. 300203H.
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 22 261-04 STP<200K 200 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011792 - LA 1065 & LA 3260: HAMMOND ROAD TRANSFER
Type Impv: COLD PLANE, OVERLAY, PATCHING & STRIPING
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 3260 853-41 STPFLEX 350 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 15-16
TANGIPAHOA LA 1065 853-33 NHPP 150 ROAD TRANSFER
Project: H.009425 - LA 16 AMITE DRAINAGE IMPROVEMENTS
Type Impv: DRAINAGE IMPROVEMENTS
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 16 047-01 STPFLEX 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.010702 - IC SEVERAL RR XINGS (HAMMOND)
Type Impv: INSTALL F/L'S & GATES AT SEVERAL IC CROSSINGS IN HAMMOND
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 RAIL PD 600 RAILROADS 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 168 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: TANGIPAHOA
Project: H.010703 - IC SEVERAL RR SPUR XINGS (HAMMOND)
Type Impv: INSTALL F/L'S AT LA 443 & CBA'S AT SEVERAL OTHER SPUR XINGS
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 443 853-27 RAIL PD 300 RAILROADS 3-DESIGN/DEVELOPMENT
TANGIPAHOA 000-53 RAIL PD 100 RAILROADS
Project: H.010991 - I-12: LIVINGSTON P/L - US 51 BUS OPASS
Type Impv: MILL, OVERLAY AND PAVEMENT MARKINGS
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-12 454-03 NHPP 10,000 SUSTAINABILITYINTERSTATE
3-DESIGN/DEVELOPMENT
Project: H.011025 - LA 40: NATALBANY RIVER TO I-55
Type Impv: ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 40 415-02 STPFLEX 50 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011439 - LA 22:TURN LN@WAGNER,DRUDE,& KRAFT RDS
Type Impv: LT & RT TURN LN @ WAGNER AND DRUDE RD. LT TURN LN @ KRAFT
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 22 261-03 STP<200K 900 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
Project: H.011512 - US 51 @ SYCAMORE ST AMITE CITY DRAINAGE
Type Impv: ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51 017-05 STPFLEX 50 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011519 - LA 1063: GLENDALE DR - US 51 DRAINAGE
Type Impv: ADDITIONAL PIPE(S), CATCH BASINS, AND/OR ASPHALT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 1063 853-34 NFA 100 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
3-DESIGN/DEVELOPMENT
Project: H.011527 - RANDALL / BROWN / VITRANO ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 FBROFF 447 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
TANGIPAHOA 000-53 FBROFF 447 SUSTAINABILITYBRIDGE (OFF SYSTEM)
TANGIPAHOA 000-53 FBROFF 400 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011573 - LA 1061: LA 440 - SPRING CREEK BRIDGE
Type Impv: 1" THIN ASPHALTIC CONCRETE OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 1061 278-06 STPFLEX 1,010 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 169 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: TANGIPAHOA
Project: H.011574 - LA 1048: ST HELENA P/L - ROCH ROAD
Type Impv: 1" THIN ASPHALTIC CONCRETE OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 1048 853-37 STPFLEX 580 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.003672 - KENTWOOD WEIGH STATION REHAB.
Type Impv: DEMO..CONST. AND PIT SCALE REHAB
Project Manager: MCCOY, JANET
Remarks: 690-29-0008;PRIORITY 7
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA 000-53 NHPP 2,901 OPER EFFICIENCY/MOTORIST ASSISTANCEWEIGH STATIONS
2-WAITING FOR FUNDING
Project: H.008399 - US 51 (LA 22 TO CLUB DELUXE RD)
Type Impv: WIDEN TO 4 LANES
Project Manager: OLIVIER, NICHOLAS
Remarks: 853-36-0031;PORTION OF PROJECT COMPLETED UNDER
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51-X 853-36 NFI 40,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
Project: H.010378 - LA 38: U.S. 51 - WASHINGTON PARISH LINE
Type Impv: COLD PLANE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 38 263-04 STPFLEX 6,487 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.011401 - US 51: W UNIV AVE TO I55 CORRIDOR STUDY
Type Impv: CORRIDOR/TRAFFIC STUDY FOR ACCESSMAN AND SAFETY IMPROV
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51 017-04 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011402 - US 51 BUS: I12 TO COLEMAN CORRIDOR STUDY
Type Impv: TRAFFIC/CORRIDOR STUDY FOR ACCESS MGMT AND SAFETY IMPVE
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51-X 853-36 0 SAFETY 1-PLANNING/ENVIRONMENTAL
Project: H.011618 - LA 22 CORRIDOR STUDY: ROU MAR NEI TO 1ST
Type Impv: CORRIDOR STUDY FOR ACCESS MGMNT/TRAFFIC OP IMPROVEMENTS
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51-X 853-36 STPFLEX 90 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
TANGIPAHOA LA 22 261-03 STPFLEX 80 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
TANGIPAHOA LA 22 261-04 STPFLEX 80 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 170 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: TANGIPAHOA
Project: H.011750 - INTERSTATE HIGHWAY SPEED STUDIES
Type Impv: SPEED STUDIES CONDUCTED ALONG STATEWIDE INTERSTATE SYSTE
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA I-55 452-90 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
ST TAMMANY I-59 453-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
E BATON ROUGE I-110 450-92 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
CALCASIEU I-210 450-30 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
BOSSIER I-220 451-31 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST CHARLES I-310 450-36 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ORLEANS I-510 450-43 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ORLEANS I-610 450-34 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
CADDO I-220 451-30 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.008915 - LA3234 EXT FROM LA1065 - HAMMOND AIRPORT
Type Impv: FEASIBILITY STUDY FOR LA 3234 EXTENSION
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA LA 3234 853-40 0 INTERMODAL CONNECTOR 0-FEASIBILITY/SCOPING
Project: H.009321 - DISTRICT 62 TRAFFIC CONTROL
Type Impv: INTERSECTION IMPROVEMENTS - STUDY
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TANGIPAHOA US 51 017-05 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
0-FEASIBILITY/SCOPING
TANGIPAHOA LA 38 263-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
ST TAMMANY US 190 059-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
WASHINGTON LA 436 859-09 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
TANGIPAHOA LA 16 262-07 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
WASHINGTON LA 10 047-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
WASHINGTON LA 3124 030-32 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
WASHINGTON LA 60 279-04 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
WASHINGTON LA 16 058-05 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 171 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: TENSAS
Project: H.011076 - LA 605 & LA 607 PATCH AND OVERLAY
Type Impv: STABILIZE & OVERLAY/PATCH & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: 854-23/LA 605 USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TENSAS LA 605 854-23 STPFLEX 1,856 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED IN CURRENT FY 14-15
TENSAS LA 605 854-23 STPFLEX 65 SUSTAINABILITYNON-INTERSTATE
Project: H.011734 - LA 568, LA573: US 65 - BIG CHOCTAW BAYOU
Type Impv: PATCH & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TENSAS LA 573 186-04 STPFLEX 1,235 SUSTAINABILITYNON-INTERSTATE
3-DESIGN/DEVELOPMENT
TENSAS LA 568 075-03 STPFLEX 336 SUSTAINABILITYNON-INTERSTATE
Project: H.009585 - LA 128: LA 573 - US 65
Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TENSAS LA 128 036-06 STPFLEX 1,772 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.009591 - LA 4: US 65 - LA 605
Type Impv: ASPHALT OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TENSAS LA 4 173-01 STPFLEX 541 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 172 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: TERREBONNE
Project: H.009569 - LA 182: MAIN ST - LA 316
Type Impv: COLD PLANE AND OVERLAY EXISTING ASPHALTIC CONCRETE PAVE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 182 005-05 STPFLEX 2,025 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.007351 - COUNTRY DRIVE WIDENING PHASE A
Type Impv: WIDENING
Project Manager: BANKSTON, TANYA
Remarks: 742-55-0102;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE 000-55 STP<200K 4,000 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.009659 - US 90: 1.5 MI E LA 20 - 0.3 MI W LA 309
Type Impv: 3/4" THIN OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE US 90 424-07 NHPP 643 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009660 - LA 311/312: US 90 - LA 24
Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 312 413-30 STPFLEX 844 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010398 - LA 57:LA 3011-LA 56
Type Impv: SUPERPAVE ASPHALTIC CONCRETE OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: AC WITH NFA AND USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 57 246-01 STPFLEX 1,299 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011441 - LA 3185: RIGHT TURN LANE AT LA 20
Type Impv: ADD RIGHT TURN LANE ON LA 3185 AT LA 20
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 3185 855-17 STPFLEX 100 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011443 - LA 56: RIGHT TURN LANE AT LA 24
Type Impv: ADD RIGHT TURN LANE ON LA 56 AT LA 24
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 56 247-03 STPFLEX 150 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011560 - LA 55:1.65 MI S MADISON CANAL - EXXON RD
Type Impv: ASPHALT OVERLAY, PATCHING, GUARD RAIL, STRIPING
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 55 248-02 NFA 1,600 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
Project: H.001498 - LA 24 & LA 316: COMPANY CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: PAINE, PEGGY JO
Remarks: 065-91-0017;STAGE 0 FEASIBILITY STUDY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 24 065-91 STPFLEX 16,700 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 173 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: TERREBONNE
Project: H.002238 - ROBINSON CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: CAVALIER, STEPHANIE
Remarks: 247-01-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 56 247-01 NFA 1,200 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.005043 - LA311: LA 664 (ST CHARLES ST)-SAVANNE RD
Type Impv: WIDEN TO 4 LANES
Project Manager: BROWN, JEFF
Remarks: 700-55-0122
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 311 413-01 NFI 38,000 CAPACITY 3-DESIGN/DEVELOPMENT
Project: H.009766 - WPARK AVE: ROYCE ST-MARIETTA PL SIDEWALK
Type Impv: SIDEWALKS, SUBSURFACE DRAINAGE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 24 065-04 TAP<200K 959 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.010890 - LA 182: ROUNDABOUT AT HOLLYWOOD RD
Type Impv: ADD ROUNDABOUT
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 182 005-05 STPFLEX 600 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.010997 - LA 3185: IMP @ MAIN PROJECT RD
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 3185 855-17 STPFLEX 150 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011159 - CAROLL STREET AND BUQUET STREET BRIDGES
Type Impv: BRIDGE REPLACEMENT - NO ADDED CAPACITY
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE 000-55 FBROFF 939 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
TERREBONNE 000-55 FBROFF 585 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011187 - DISTRICT 02H: SIGNAL TIMING
Type Impv: SIGNAL TIMING
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 24 065-04 STPFLEX 2 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
TERREBONNE LA 3040 065-30 STPFLEX 1 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
TERREBONNE LA 24 065-91 STPFLEX 1 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
LAFOURCHE LA 1 064-06 STPFLEX 2 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011533 - N. BAYOU BLACK DRIVE / HANSON CANAL
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE 000-55 FBROFF 524 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 174 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: TERREBONNE
Project: H.011720 - US 90 DRAINAGE CANAL NO.2 EROSION REPAIR
Type Impv: DRIVING SHEET PILES AND REPAIRING FAILED EMBANKMENT
Project Manager: CAVALIER, STEPHANIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE US 90 424-07 NHPP 500 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.002244 - BOUDREAUX CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: FOURNERAT, CHRIS
Remarks: 247-02-0030;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 56 247-02 STPFLEX 30,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.005039 - LA 3040 (REPLACE TUNNEL)
Type Impv: STATE FUND FOR STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-55-0118;FEASIBILITY STUDY STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE 000-55 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.008411 - BAYOU TERREBONNE BR (LA 660)
Type Impv: BRIDGE REPLACEMENT
Project Manager: PICARD, TOBY
Remarks: 855-07-0010;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 660 855-07 STPFLEX 507 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009568 - LA 660:US 90 - LA 316
Type Impv: COLD PLANE AND OVERLAY OF EXISTING ASPHALTIC CONCRETE PA
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 660 855-07 STPFLEX 1,125 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010328 - LA 659: HOWARD BRIDGE-DAIGLEVILLE BRIDGE
Type Impv: CB-06 TOP MODIFICATIONS, CROSS DRAIN REMOVAL AND REPLACEM
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 659 855-04 STPFLEX 200 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
1-PLANNING/ENVIRONMENTAL
Project: H.010410 - LA 24: LA 20 - LA 664 (SB)
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 24 065-04 NHPP 4,000 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010411 - LA 24: LA 55 - PROSPECT STREET BRIDGE
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 24 065-91 STPFLEX 4,500 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010412 - LA 57: THOMPSON RD - CEDAR GROVE RD
Type Impv: COLD PLANING AND SUPERPAVE ASPHALTIC CONCRETE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE LA 57 246-01 STPFLEX 1,750 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 175 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: TERREBONNE
Project: H.011005 - HOUMA MPO TRAVEL DEMAND MANAGEMENT 2013
Type Impv: PROMOTE COMMUTER CARPOOLING AND VANPOOLING/FLEX TIME
Project Manager: JOHNS, MATT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
TERREBONNE 000-55 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 176 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: UNION
Project: H.009278 - BERNICE SR2S PROJECT
Type Impv: SIDEWALK, CROSSWALKS, HANDICAP RAMPS, ETC
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION 000-56 SR2S 162 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
UNION 000-56 SATRANS 23 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.011530 - CYPRESS CREEK ROAD / BOATWRIGHT CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION 000-56 FBROFF 239 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011661 - INTERSECTION IMPROVEMENT LA 33 @ LA 15
Type Impv: WIDEN INTERSECTION WITH ASPHALTIC CONCRETE
Project Manager: HICKS, MELVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION LA 33 069-03 STPFLEX 210 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011662 - INTERSECTION IMPROVEMENT LA 2 @ LA 15
Type Impv: INTERSECTION IMPROVEMENTS
Project Manager: HICKS, MELVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION LA 2 070-04 STPFLEX 200 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011770 - FARMERVILLE DOWNTOWN SW IMPROVEMENTS
Type Impv: RECONSTRUCTION OF EXISTING SIDEWALKS
Project Manager: MEEK, STEPHEN
Remarks: TOWN OF FARMERVILLE PROVIDING MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION LA 2 069-02 TAPFLEX 202 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
UNION LA 2 070-05 TAPFLEX 51 ENHANCEMENTS
UNION 000-56 TAPFLEX 563 ENHANCEMENTS
Project: H.009532 - LA 2: E END D'ARBONNE BRIDGE TO LA 15
Type Impv: COLD PLANE AND OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION LA 2 070-04 STPFLEX 2,250 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010392 - LA 550: LA2 - LA 15
Type Impv: OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
UNION LA 550 311-01 STPFLEX 3,000 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 177 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: VERMILION
Project: H.011639 - LA 35: LA 700 - LA 699
Type Impv: THIN ASPHALT OVERLAY AND RELATED WORK.
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 35 395-01 STPFLEX 564 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.002048 - LA 82 BRIDGES NEAR ESTHER
Type Impv: BRIDGE REPLACEMENT
Project Manager: LAI, QUANG
Remarks: 194-07-0056;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 82 194-07 STPFLEX 2,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.002133 - BAYOU QUEUE DE TORTUE
Type Impv: BRIDGE REPLACEMENT
Project Manager: CAVALIER, STEPHANIE
Remarks: 213-02-0007; NFA AS MATCH PHASES 1 TO 5
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 705 213-02 NFA 2,628 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009463 - VARIOUS ROADS:SIGNING (VERMILION)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION 000-57 SATRANS 30 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.002747 - LA 335 BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: TONEY, PATRICK
Remarks: 396-02-0008;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 335 396-02 FBROFF 1,735 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009761 - LA 14: DOWNTOWN ABBEVILLE STREETSCAPING
Type Impv: SIDEWALKS W/LIGHTING, LANDSCAPE & RELATED WORK
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 14 055-06 TAP<200K 500 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.009792 - LA 35: KAPLAN SIDEWALKS, PHASE 1
Type Impv: SIDEWALKS W/ LANDSCAPING, SUBSURFACE DRAINAGE & RELATED
Project Manager: MEEK, STEPHEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 35 207-03 TAP<200K 324 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
Project: H.010353 - US 167: ACCESS MANAGEMENT (LFT TURN LNS)
Type Impv: ACCESS MANAGEMENT, LEFT TURN LANES AND U-TURNS
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION US 167 080-01 STPFLEX 248 SAFETY 3-DESIGN/DEVELOPMENT
LAFAYETTE US 167 080-02 NHPP 3,352 SAFETY
Project: H.010867 - JUDE & PLACIDE ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION 000-57 FBROFF 308 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
VERMILION 000-57 FBROFF 300 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 178 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: VERMILION
Project: H.011582 - LA 92: S JCT LA 700 - CSLM 6.56
Type Impv: COLD PLANE, PATCH, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 92 213-03 STPFLEX 4,500 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011591 - LA 330: CSLM 0.43 - LA 690
Type Impv: COLD PLANE, PATCH, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 330 397-01 STPFLEX 3,750 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011592 - LA 330: LA 690 - LA 685
Type Impv: COLD PLANE, PATCH, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 330 397-02 STPFLEX 2,800 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011593 - LA 330: LA 685 - CSLM 2.45
Type Impv: COLD PLANE, PATCH, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 330 397-03 STPFLEX 1,700 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011789 - LA 14 BYP: RIGHT TURN LANE AT US 167
Type Impv: INSTALL A RIGHT TURN LANE ON THE WB APPROACH
Project Manager: DOMINGUE, CHRISTOPHER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 14-B 055-30 HSIP 425 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.002148 - JCT LA 35 - JCT LA 700
Type Impv: STABILIZE BASE AND OVERLAY
Project Manager: RAY, JARED
Remarks: 214-01-0013;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 699 214-01 STPFLEX 4,220 SUSTAINABILITYNON-INTERSTATE
2-WAITING FOR FUNDING
Project: H.009627 - LA 35: LA 335 - LA 14
Type Impv: COLD PLANE, PATCH & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 35 207-02 STPFLEX 2,234 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010226 - LA 82: LA 35 - LA 333
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERMILION LA 82 215-01 STPFLEX 5,383 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 179 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: VERNON
Project: H.006618 - SIDEWALK ON HIGH SCHOOL DRIVE
Type Impv: SIDEWALK INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-58-0001;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON 000-58 HRRR 96 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
VERNON 000-58 LOCAL 8 SAFETYLOCAL ROADS SAFETY
Project: H.006619 - SIDEWALK ON LOUISIANA AVENUE
Type Impv: SIDEWALK INSTALLATION
Project Manager: HOLM, RICK
Remarks: 737-58-0002;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON 000-58 HRRR 134 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
VERNON 000-58 LOCAL 13 SAFETYLOCAL ROADS SAFETY
Project: H.011027 - LA 111 SOUTH OF EVANS - ADD CROSS DRAIN
Type Impv: REPLACE 4 EXISTING PIPE WITH 5 - 48" RCPAS AND ELEVATE ROAD
Project Manager: RACHAL, JASON
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 111 132-02 STPFLEX 341 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010599 - WELCOME CEMETERY ROAD / MENACE CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON 000-58 FBROFF 316 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.011404 - US 171: ADD ACCELERATION LANE CRYER RD
Type Impv: CONSTRUCT ACCELERATION LANE SOUTH OF CRYER CEMETERY RD
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON US 171 024-06 NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011585 - LA 473: SABINE PARISH LINE TO LA 392
Type Impv: PATCHING AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 473 357-02 STPFLEX 273 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011588 - LA 121: LA 28 -400' E OF RED CUT HILL RD
Type Impv: PATCHING, COLD PLANING, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 121 029-04 STPFLEX 1,440 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011589 - LA 121 400' E RED CUT HILL RD-RAPIDES PL
Type Impv: PATCHING, COLD PLANING, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 121 029-04 STPFLEX 2,495 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.001883 - LA 8 - LA 28
Type Impv: CHIP SEAL
Project Manager: RAY, JARED
Remarks: 137-02-0017;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 465 137-02 NFA 336 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
2-WAITING FOR FUNDING
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 180 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: VERNON
Project: H.000986 - SABINE RIVER BR (BURR FERRY)
Type Impv: BRIDGE REPLACEMENT
Project Manager: BROWN, JEFF
Remarks: 029-01-0004;ADMIN. BY TEXAS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 8 029-01 STPFLEX 12,700 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001881 - LA 392 BRIDGES NEAR HORNBECK
Type Impv: BRIDGE REPLACEMENT
Project Manager: GAUDRY, CARL
Remarks: 135-02-0009;2 BRIDGES; USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 392 135-02 FBROFF 3,560 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.005083 - VERNON PARISH TRANSPORTATION PLAN
Type Impv: INCLUDES US 171 IMPROVEMENT STUDY
Project Manager: BARTKIEWICZ, THOMAS
Remarks: 700-58-0140;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON 000-58 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009955 - LA 111: BEAUREGARD LINE - C DAVIS LOOP
Type Impv: CTB AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 111 132-02 STPFLEX 4,167 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010339 - LA 10: LOOK OUT RD - 850' E BAILEY RD
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 10 066-02 NHPP 1,226 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010348 - LA 8: LA 464 - US 171
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 8 029-02 STPFLEX 4,661 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010354 - LA 111: US 171 - LA 117
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 111 133-03 STPFLEX 1,898 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010358 - LA 3226: BEAUREGARD P/L - US 171
Type Impv: PATCH. COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
VERNON LA 3226 858-11 STPFLEX 2,329 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 181 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: WASHINGTON
Project: H.010260 - LA 21 VARNADO DRAINAGE IMPROVEMENTS
Type Impv: ADDING A SUBSURFACE DRAINAGE SYSTEM
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 21 030-04 STPFLEX 83 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011202 - FRANKLINTON SRTS PROJECT - FJHS
Type Impv: SIDEWALKS STRIPING AND SIGNAGE
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON 000-59 SR2S 178 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED IN CURRENT FY 14-15
WASHINGTON 000-59 SATRANS 28 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.010106 - BOGALUSA SRTS PROJECT - COLUMBIA AVE
Type Impv: SIDEWALK IMPROVMENTS, STRIPING, ENCOURAGMENT AND EDUCAT
Project Manager: GROS, SCOTT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON 000-59 SR2S 195 SAFETYSAFE ROUTES TO SCHOOLS
4-SCHEDULED FOR LETTING FY 15-16
WASHINGTON 000-59 SATRANS 27 SAFETYSAFE ROUTES TO SCHOOLS
Project: H.011715 - LA 3124: LA 21 - LA 10
Type Impv: PATCHING, COLD PLANING, OVERLAY & STRIPING
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 3124 030-32 STPFLEX 1,307 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011755 - LA 3111&LA 3171:WASHINGTON ROAD TRANSFER
Type Impv: STABILIZE BASE, COLD PLANE, OVERLAY, STRIPING & RELATED WO
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 3111 870-07 NFA 1,100 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 15-16
WASHINGTON LA 3171 870-08 NFA 600 ROAD TRANSFER
Project: H.010608 - PLEASANT HILL RD & LAWRENCE CK RD BRDGS
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON 000-59 FBROFF 447 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
WASHINGTON 000-59 FBROFF 655 SUSTAINABILITYBRIDGE (OFF SYSTEM)
WASHINGTON 000-59 FBROFF 739 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010980 - LA 10:CUMBERLAND ST- AUSTIN ST(BOGALUSA)
Type Impv: LANE CONFIGURATION MODIFICATION
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 10 047-04 NHPP 150 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011782 - LA 438: LA 21 - OLD COLUMBIA RD
Type Impv: IN PLACE STABILIZE, OVERLAY, AGGREGATE SHOULDERS & STRIPIN
Project Manager: BRANTON, JENNIFER
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 438 859-02 NFA 1,500 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 182 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: WASHINGTON
Project: H.011835 - LA25: WASHINGTON PARISH SEG A, B & C, SW
Type Impv: SIDEWALKS
Project Manager: RIGGS, LAURA
Remarks: MATCH PROVIDED BY WASHINGTON PARISH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 25 059-04 TAPFLEX 276 ENHANCEMENTS 3-DESIGN/DEVELOPMENT
WASHINGTON 000-59 TAPFLEX 69 ENHANCEMENTS
Project: H.008449 - DRAIN BRIDGE NEAR STONEY POINT
Type Impv: BRIDGE REPLACEMENT
Project Manager: MOORE, DARRELL
Remarks: 859-04-0010;USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 450 859-04 FBROFF 1,093 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010376 - LA 25: ST. TAMMANY P/L - S JCT. LA 16
Type Impv: COLD PLANE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 25 059-03 STPFLEX 3,504 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010381 - LA 436: LA 62 - N. JCT. LA 21
Type Impv: COLD PLANE, BASE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks: USE NFA AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 436 859-08 STPFLEX 7,618 SUSTAINABILITYNON-INTERSTATE NFA
1-PLANNING/ENVIRONMENTAL
Project: H.011280 - LA 10 IMPROVEMENTS IN BOGALUSA
Type Impv: STAGE 0/FEASIBILITY STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON LA 10 047-04 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
Project: H.011685 - WILLIS AVENUE EXTENSION: LA 3124 - LA 21
Type Impv: NEW ROADWAY EXTENSION/CONNECTOR.
Project Manager: WAGUESPACK, BRENT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WASHINGTON 000-59 0 ROAD TRANSFER 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 183 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: WEBSTER
Project: H.009466 - VARIOUS ROADS:SIGNING (WEBSTER)
Type Impv: SIGNAGE
Project Manager: HOLM, RICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER 000-60 SATRANS 12 SAFETYLOCAL ROADS SAFETY
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010024 - SMITHVILLE ROAD / BRALY CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER 000-60 FBROFF 354 SUSTAINABILITYBRIDGE (OFF SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010480 - I-20: 0.4 MI W LA 531 TO BIENVILLE P/L
Type Impv: COLD PLANE AND ASPHALTIC OVERLAY
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER I-20 451-03 NHPP 12,480 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010008 - LA 532 OVER I-20 BRIDGE REPLACEMENT
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 532 860-07 FBROFF 3,517 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.010974 - US 79: NB LEFT TURN LANE AT MILLER ROAD
Type Impv: ADDING LEFT TURN LANE AT MILLER ROAD (WEBSTER PARISH)
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER US 79 027-04 STPFLEX 350 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
3-DESIGN/DEVELOPMENT
Project: H.011539 - PERCY BURNS ROAD / LITTLE CROOKED CREEK
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER 000-60 FBROFF 601 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.001838 - BOSSIER PARISH LINE - LA 163
Type Impv: MILL. OVERLAY
Project Manager: OSTUNO, BARBARA
Remarks: 122-02-0009;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 164 122-02 STPFLEX 813 SUSTAINABILITYNON-INTERSTATE
2-WAITING FOR FUNDING
Project: H.001666 - DORCHEAT BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BRAUNER, KURT
Remarks: 085-05-0029;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 160 085-05 FBROFF 4,100 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.001798 - PARMERS CREEK BRIDGE
Type Impv: NEW BRIDGE
Project Manager: BUCCI, MARK
Remarks: 111-01-0018;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 531 111-01 STPFLEX 1,843 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 184 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: WEBSTER
Project: H.001799 - LA 531 OVERPASS
Type Impv: NEW INTERCHANGE
Project Manager: OLIVIER, NICHOLAS
Remarks: 451-03-0047;GEOM. STUDY UNDERWAY (E)
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 531 111-02 STPFLEX 20,000 CAPACITY 1-PLANNING/ENVIRONMENTAL
WEBSTER I-20 451-03 NHPP 0 CAPACITY
Project: H.009513 - LA 164: JCT. LA 163 TO JCT. US 371
Type Impv: ASPHALT OVERLAY, DRAINAGE, PAVEMENT STRIPING & RLEATED W
Project Manager: OSTUNO, BARBARA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER LA 164 122-03 STPFLEX 3,114 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.011282 - US 80: CORRIDOR IMPROVEMENTS
Type Impv: FEASIBILITY STUDY FOR CORRIDOR IMPROVEMENTS TO US 80
Project Manager: HOYT, RYAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER US 80 001-04 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
BOSSIER US 80 001-03 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: H.011288 - LA 531 AT US 79 INTERSECTION IMPROVEMENT
Type Impv: INTERSECTION IMPROVEMENTS AT US 79 AND LA 531
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WEBSTER US 79 027-04 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
1-PLANNING/ENVIRONMENTAL
WEBSTER LA 531 111-02 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
WEBSTER 000-60 0 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 185 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: W BATON ROUGE
Project: H.011610 - CHOCTAW TRAIL (WEST BATON ROUGE)
Type Impv: CHOCTAW TRAIL ENVIRONMENTAL PHASE
Project Manager: HANKS, ANNA
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 0 CONGESTION MITIGATION 4-SCHEDULED IN CURRENT FY 14-15
Project: H.011619 - CNG FUELING STATION (WEST BATON ROUGE)
Type Impv: CONSTRUCT CNG FUELING STATION
Project Manager: CARNEY, JAMES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 CM 625 CONGESTION MITIGATION 4-SCHEDULED IN CURRENT FY 14-15
W BATON ROUGE 000-61 LOCAL 910 CONGESTION MITIGATION
Project: H.011736 - US 190 TREE TRIMMING
Type Impv: TREE TRIMMING
Project Manager: NGO, DUC
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE US 190 008-01 STCASH 90 OTHER / MISCELLANEOUS 4-SCHEDULED IN CURRENT FY 14-15
E BATON ROUGE US 190 007-90 STCASH 10 OTHER / MISCELLANEOUS
Project: H.010069 - UP (W. BATON ROUGE) WINTERVILLE RD.
Type Impv: RAILROAD SIGNALIZATION
Project Manager: SHREWSBERRY,BILL
Remarks: 714-61-0006
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 RAIL PD 300 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010653 - LA 986 SIDEWALKS
Type Impv: INSTALLATION OF SIDEWALKS
Project Manager: LACOMBE, JASON
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 986 228-07 STP>200K 658 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010654 - LA 415:I-10 TO APPROXIMATELY 0.41M NORTH
Type Impv: PAVEMENT REHABILITATION
Project Manager: LACOMBE, JASON
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 415 861-22 STP>200K 530 URBAN SYSTEMS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010680 - I-10: CABLE BARRIER IN WBR & IBERVILLE
Type Impv: INSTALL MEDIAN CABLE BARRIER
Project Manager: KELLEY, MARK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE I-10 450-08 HSIPPEN 950 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
IBERVILLE I-10 450-07 HSIPPEN 750 SAFETY
W BATON ROUGE I-10 450-08 NHPP 750 SUSTAINABILITYINTERSTATE
Project: H.010768 - MULTI-USE TRAILS, PHASE I-B (WBR)
Type Impv: 3 MILES OF LEVEE-TOP TRAIL IN WBR
Project Manager: RIGGS, LAURA
Remarks: USE WBR AS 20% MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 CM 700 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 186 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: W BATON ROUGE
Project: H.011551 - CNG VEHICLES-CONVERT AND PURCHASE (WBR)
Type Impv: CONVERT EXISTING VEHICLES TO CNG & PURCHASE NEW CNG VEHIC
Project Manager: CARNEY, JAMES
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 CM 355 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011558 - ACADIAN TRAIL (WEST BATON ROUGE)
Type Impv: CONSTRUCT ACADIAN TRAIL
Project Manager: HANKS, ANNA
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 CM 373 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 15-16
Project: H.000358 - US 190 @ LA 415: LOBDELL INTERCHANGE
Type Impv: NEW BRIDGE
Project Manager: PAINE, PEGGY JO
Remarks: 008-01-0051;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE US 190 008-01 NHPP 55,866 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009288 - LA 1:NEW RR BRIDGE@DOW SPUR XING (WBR)
Type Impv: GRADE SEPARATE EXISTING AT-GRADE CROSSING
Project Manager: LACOMBE, JASON
Remarks: H.011133 MUST LET BEFORE H.009288
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 NHPP 20,000 RAILROADSGRADE SEPARATION
3-DESIGN/DEVELOPMENT
Project: H.010075 - UP (ADDIS) SEVERAL RR-X-INGS
Type Impv: RAILROAD SIGNALIZATION
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 RAIL PD 1,200 RAILROADS 3-DESIGN/DEVELOPMENT
Project: H.010656 - LA 1 @ LA 76 INTERSECTION IMPROVEMENTS
Type Impv: TURN LANES
Project Manager:
Remarks: USE LOCAL AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 STP>200K 214 URBAN SYSTEMS 3-DESIGN/DEVELOPMENT
W BATON ROUGE LA 76 013-01 STP>200K 214 URBAN SYSTEMS
Project: H.011266 - LA 989-1: GEOMETRIC IMPROVEMENTS
Type Impv: CURVE WIDEN
Project Manager: TONEY, PATRICK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 989-1 861-08 HSIPPEN 1,200 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.011576 - LA 415 & LA 965: STABILIZE & OVERLAY
Type Impv: STABILIZE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 415 225-01 STPFLEX 2,400 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
W FELICIANA LA 965 863-06 STPFLEX 1,600 SUSTAINABILITYNON-INTERSTATE NFA
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 187 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: W BATON ROUGE
Project: H.011788 - OAK STREET / OVER POYDRAS BAYOU
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 FBROFF 232 ROAD TRANSFER 3-DESIGN/DEVELOPMENT
W BATON ROUGE 000-61 LOCAL 14 OTHER / MISCELLANEOUS
Project: H.009421 - LA 1: J-TURNS @ SUGAR MILL PARKWAY
Type Impv: FULL J-TURN & J-TURN BETWEEN TWO U-TURNS
Project Manager: BEAUVAIS, HEWITT
Remarks: 050-07
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 SATRANS 900 SAFETY 2-WAITING FOR FUNDING
Project: H.001234 - PORT ALLEN CANAL BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: DELATTE, BRIAN
Remarks: 050-07-0066;2 STRUCTURES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 NHPP 60,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.005121 - LA 1 - I-10 CONNECTOR
Type Impv: FEDERAL EARMARK FOR STUDY
Project Manager: KENDRICK, BRIAN
Remarks: 700-61-0113;STAGE 0 COMPLETED
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE 000-61 STGEN 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.009905 - LA 415 CORRIDOR STUDY
Type Impv: EFFICIENCY AS DETOUR ROUTE
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 415-S 013-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
W BATON ROUGE LA 415 225-01 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
W BATON ROUGE LA 415 861-22 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: H.011133 - LA 1: UP RR XING (WEST BATON ROUGE)
Type Impv: REMOVE CROSSING
Project Manager: LUKE, SHAWN
Remarks: H.011133 MUST LET BEFORE H.009288
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W BATON ROUGE LA 1 050-07 RAIL HE 300 RAILROADS 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 188 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: W CARROLL
Project: H.011626 - LA 577: DRAINAGE IMPROV 0.7 MI N LA 134
Type Impv: REMOVE AND REPLACE EXISTING CROSS DRAIN W/ LARGER STRUCT
Project Manager: GOLZ, SARAH
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL LA 577 862-17 NFA 400 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
4-SCHEDULED IN CURRENT FY 14-15
Project: H.010394 - LA 585: LA 879 - SANDERS ROAD
Type Impv: STABILIZE BASE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL LA 585 332-02 STPFLEX 2,500 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.008469 - LA 835: BOEUF RIVER BRIDGE NEAR CONCORD
Type Impv: NEW BRIDGE
Project Manager: BALLMER, SARAH
Remarks: 862-22-0006;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL LA 835 862-22 STPFLEX 3,551 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
Project: H.009981 - SKINNER LANE & ODIS WADE ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL 000-62 FBROFF 447 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
W CARROLL 000-62 FBROFF 300 SUSTAINABILITYBRIDGE (OFF SYSTEM)
W CARROLL 000-62 FBROFF 231 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011529 - MITCHINER ROAD & GUNTER LOOP BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL 000-62 FBROFF 454 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
W CARROLL 000-62 FBROFF 308 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.011605 - LA 585: LA 577 TO LA 2
Type Impv: ASPHALT OVERLAY OVER IN PLACE CEMENT TREATED BASE
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL LA 585 334-01 STPFLEX 5,744 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.011608 - LA 586: LA 585 TO LA 17
Type Impv: ASPHALT OVERLAY OF ASPHALT PAVEMENT
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL LA 586 862-09 STPFLEX 2,450 SUSTAINABILITYNON-INTERSTATE NFA
3-DESIGN/DEVELOPMENT
Project: H.010393 - LA 582: JCT LA 17 TO EAST CARROLL LINE
Type Impv: STABILIZED BASE & OVERLAY
Project Manager: DEVILLE, JACQUES
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W CARROLL LA 582 333-02 STPFLEX 3,000 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 189 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: W FELICIANA
Project: H.002281 - LA 66: BIG BAYOU SARA BRIDGE REHAB.
Type Impv: BRIDGE REHABILITATION
Project Manager: DELATTE, BRIAN
Remarks: 251-01-0018;STAGE 0 FEASIBILITY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W FELICIANA LA 66 251-01 STPFLEX 4,106 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011674 - LA 1263 & LA 3057: PATCH & OVERLAY
Type Impv: COLD PLANE & OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W FELICIANA LA 1263 061-04 STPFLEX 289 ROAD TRANSFER 4-SCHEDULED FOR LETTING FY 15-16
W FELICIANA LA 1263 061-04 STPFLEX 114 ROAD TRANSFER
W FELICIANA LA 3057 863-13 NFA 279 ROAD TRANSFER
W FELICIANA LA 3057 863-14 NFA 258 ROAD TRANSFER
W FELICIANA LA 1263 061-04 STPFLEX 93 ROAD TRANSFER
Project: H.010596 - PETERSON ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W FELICIANA 000-63 FBROFF 385 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
W FELICIANA 000-63 FBROFF 616 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: H.010597 - SLIGO ROAD BRIDGES
Type Impv: BRIDGE REPLACEMENT
Project Manager: PENTEK, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
W FELICIANA 000-63 FBROFF 3,388 SUSTAINABILITYBRIDGE (OFF SYSTEM)
3-DESIGN/DEVELOPMENT
W FELICIANA 000-63 FBROFF 747 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 190 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: WINN
Project: H.010013 - US 84: LAS RAILROAD OVERPASS BR REHAB
Type Impv: REHABILITATION OF RAILROAD BRIDGE OVERPASS
Project Manager: HERATH, ANANDA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN US 84 022-02 NHPP 989 SUSTAINABILITYBRIDGE (ON SYSTEM)
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011579 - LA 127: LA 1238 TO LA 126
Type Impv: STABILZE AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN LA 127 127-05 NFA 3,542 SUSTAINABILITYNON-INTERSTATE NFA
4-SCHEDULED FOR LETTING FY 15-16
Project: H.000382 - SALINE BAYOU BRIDGE
Type Impv: BRIDGE REPLACEMENT
Project Manager: BUCCI, MARK
Remarks: 009-04-0010;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN US 71 009-04 STPFLEX 3,441 SUSTAINABILITYBRIDGE (ON SYSTEM)
3-DESIGN/DEVELOPMENT
NATCHITOCHES US 71 009-05 0 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: H.001711 - SALINE BAYOU RELIEF & MILL CR. BRS.
Type Impv: NEW BRIDGES
Project Manager: YANG, LI
Remarks: 091-05-0014;2 BRIDGES
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN LA 126 091-05 STPFLEX 3,023 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.009153 - US HWY 84 IMPROVEMENTS
Type Impv: MAJOR WIDENING
Project Manager: BROADBENT, RONALD
Remarks: STBONDS AS MATCH; $1.5M IN CLOC PRIORITY 1 AVAILABLE
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN US 84 022-02 NFI 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
WINN US 84 022-03 NFI 0 DEMO / HIGH PRIORITY
Project: H.010081 - LA 156 IMPROVEMENTS (CALVIN TO US 167)
Type Impv: FEASIBILITY STUDY
Project Manager: PORTER BETTS, CONNIE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN LA 156 092-03 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
Project: H.010356 - LA 126: JCT LA 34 - NW JCT LA 499
Type Impv: CTB AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN LA 126 091-07 STPFLEX 2,733 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010361 - US 84: LA 477 TO WOLF CREEK
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN US 84 022-02 NHPP 3,790 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Project: H.010363 - LA 34: 1200' S OF LA 1236 TO LA 126
Type Impv: PATCH, COLD PLANE, AND OVERLAY
Project Manager: RAY, JARED
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
WINN LA 34 124-01 STPFLEX 979 SUSTAINABILITYNON-INTERSTATE
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 191 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DISTRICTWIDE 02
Project: H.011407 - DISTRICT 02H CONTROLLER UPGRADE
Type Impv: UPGRADE OF EXISTING SIGNAL CONTROLLERS.
Project Manager: FILLASTRE, ANDRE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 STPFLEX 252 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011625 - PUBLIC EDUC, OUTREACH, PLANNING (NO RPC)
Type Impv: CLEANER TRANSPORTATION FOR THE MARITIME AND ENERGY INDUS
Project Manager: CARNEY, JAMES
Remarks: USE LOCAL AS MATCH; ALL WORK WILL BE IN PHASE 5
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 0 CONGESTION MITIGATION 4-SCHEDULED FOR LETTING FY 15-16
Project: H.009054 - DIST. 02 PAVEMENT MARKING REPLACEMENT II
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MAKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009186 - DIST. 02 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAVISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.011406 - DISTRICT 02BC CONTROLLER UPGRADE
Type Impv: UPGRADE OF EXISTING SIGNAL CONTROLLERS.
Project Manager: LEBLANC, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 STPFLEX 331 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.011535 - NEW ORLEANS TRAVEL TIME (BLUETOOTH)
Type Impv: BLUETOOTH EQUIPMENT IN DISTRICT 02
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
Project: H.005158 - FUTURE I-49 SOUTH (RACELAND TO WESTBANK
Type Impv: UPRGRADING US 90 FOR FUTURE I-49 SOUTH
Project Manager: NGUYEN, WAYNE
Remarks: 700-92-0011; EIS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.005164 - SMART GROWTH STRATEGIES LAND USE
Type Impv: LAND USE STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-92-0017;STAGE O UNDER WAY
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.005167 - LONG-RANGE TRANSPORTATION STRATEGY
Type Impv: GROWTH MANAGEMENT STUDY
Project Manager: NGUYEN, WAYNE
Remarks: 700-92-0020;PRE STAGE 0
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 DEMO 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 192 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DISTRICTWIDE 02
Project: H.005168 - NEW ORLEANS RAIL GATEWAY EIS
Type Impv: EIS
Project Manager: GOODELL, DEAN
Remarks: STATE & RR EACH PUTTING UP 10% OF MATCH FOR DEMO
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Project: H.009731 - L/CNG FUEL FLEETS DISTRICT 02
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Project: H.010170 - SMART GROWTH PLANNING
Type Impv: TRANSPORTATION PLANNING - LAND USE EDUCATION
Project Manager: NGUYEN, WAYNE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 02 000-92 0 DEMO / HIGH PRIORITY 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 193 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DISTRICTWIDE 03
Project: H.011341 - DIST 03 FLASHING YELLOW ARROW UPGRADE
Type Impv: SIGNAL UPGRADES
Project Manager: LEBLANC, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 03 000-93 STPFLEX 3,500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009732 - L/CNG FUEL FLEETS DISTRICT 03
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 03 000-93 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 194 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DISTRICTWIDE 04
Project: H.011405 - DISTRICT 04 CONTROLLER UPGRADE
Type Impv: UPGRADE OF EXISTING SIGNAL CONTROLLERS.
Project Manager: LEBLANC, GARY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 04 000-94 STPFLEX 389 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011489 - DISTRICT 04 LOW COST SAFETY IMPROV
Type Impv: SIGNING, PAVEMENT MARKINGS, RUMBLE STRIPS, RPMS, AND HFSTS
Project Manager: RENARD, APRIL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 04 000-94 HSIPPEN 1,690 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.009189 - DIST. 04 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 04 000-94 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009733 - L/CNG FUEL FLEETS DISTRICT 04
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 04 000-94 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Project: H.010876 - I-20 & I-49 SPEED STUDY
Type Impv: CONDUCT SPEED STUDY ON INTERSTATE 20 AND INTERSTATE 49
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 04 000-94 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
DISTRICTWIDE 05 000-95 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
DISTRICTWIDE 08 000-98 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 195 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DISTRICTWIDE 05
Project: H.009546 - I-20: DIST 05 CRACK & JOINT SEAL & PATCH
Type Impv: CRACK SEAL, JOINT SEAL & PATCHING
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 05 000-95 NHPP 11,198 SUSTAINABILITYINTERSTATE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011766 - DIST 05 BRIDGE PAINTING & MISC REPAIRS
Type Impv: BRIDGE PAINTING, SPALL REPAIRS & DECK JOINT RE-SEALING.
Project Manager: TULLIER, DANNY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 05 000-95 STPFLEX 2,600 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
3-DESIGN/DEVELOPMENT
Project: H.009191 - DIST. 05 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 05 000-95 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.009734 - L/CNG FUEL FLEETS DISTRICT 05
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 05 000-95 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 196 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DISTRICTWIDE 07
Project: H.009056 - DIST 07. PAVEMENT MARKING REPLACEMENT II
Type Impv: PLASTIC PAVEMENT STIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 07 000-97 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009193 - DIST. 07 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 07 000-97 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.009735 - L/CNG FUEL FLEETS DISTRICT 07
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 07 000-97 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 197 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DISTRICTWIDE 08
Project: H.000792 - DIST 08 BRIDGE DK OVERLAYS & PAINTING
Type Impv: BRIDGE DECK EPOXY OVERLAYS & PAINTING
Project Manager: TULLIER, DANNY
Remarks: 023-01-0073;BRPM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 08 000-98 STPFLEX 10,600 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED IN CURRENT FY 14-15
Project: H.009194 - DIST. 08 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 08 000-98 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009736 - L/CNG FUEL FLEETS DISTRICT 08
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 08 000-98 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 198 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DISTRICTWIDE 58
Project: H.011764 - DISTRICT 58 GUARDRAIL REPLACEMENT A
Type Impv: GUARDRAIL REPLACEMENT
Project Manager: ZIECKER, MATTHEW
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 58 000-91 HSIP 1,500 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011816 - DISTRICT 58 ASPHALTIC SURFACE TREATMENTS
Type Impv: ASPHALTIC SURFACE TREATMENT
Project Manager: DEVILLE, JACQUES
Remarks: USE TOLL CREDITS AS MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 58 000-91 1,579 SUSTAINABILITYNON-INTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009052 - DIST. 58 PAVEMENT MARKING REPLACEMENT II
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 58 000-91 STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.011765 - DISTRICT 58 GUARDRAIL REPLACEMENT B
Type Impv: GUARDRAIL REPLACEMENT
Project Manager: ZIECKER, MATTHEW
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 58 000-91 HSIP 1,500 SAFETY 3-DESIGN/DEVELOPMENT
Project: H.009197 - DIST. 58 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 58 000-91 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.009737 - L/CNG FUEL FLEETS DISTRICT 58
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 58 000-91 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 199 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DISTRICTWIDE 61
Project: H.000351 - DIST 61 BRIDGE DK JT & MISC REPAIRS
Type Impv: GROUT. REMOVE. REPLACE BEARINGS
Project Manager: TULLIER, DANNY
Remarks: 007-90-0029;BRPM
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 61 000-96 STPFLEX 2,184 SUSTAINABILITYBRIDGE PREVENTIVE MAINTENANCE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009199 - DIST. 61 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 61 000-96 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009738 - L/CNG FUEL FLEETS DISTRICT 61
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 61 000-96 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 200 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: DISTRICTWIDE 62
Project: H.009593 - I-10,I-12,I-55,I-59:DISTRICTWIDE SPOT RP
Type Impv: ROADWAY MAINTENANCE RESTORATION & REHAB
Project Manager: THOMAS, BEN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 62 000-90 NHPP 1,500 SUSTAINABILITYINTERSTATE
4-SCHEDULED FOR LETTING FY 15-16
Project: H.009200 - DIST. 62 PAVEMENT MARKING REPLACE III:
Type Impv: PLASTIC PAVEMENT STRIPING AND RAISED PAVEMENT MARKERS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 62 000-90 STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
3-DESIGN/DEVELOPMENT
Project: H.009739 - L/CNG FUEL FLEETS DISTRICT 62
Type Impv: FLEET CONVERSION TO CNG
Project Manager: AMBEAU, JAUBERT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 62 000-90 0 CONGESTION MITIGATION 1-PLANNING/ENVIRONMENTAL
Project: H.010031 - DISTRICT 62 TRAFFIC SIGNAL INVENTORY
Type Impv: INVENTORY TRAFFIC SIGNALS IN DIST 62
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 62 000-90 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.011003 - BR MPO TRAVEL DEMAND MANAGEMENT 2013
Type Impv: PROMOTE COMMUTER CARPOOLING AND VANPOOLING/FLEX TIME
Project Manager: JOHNS, MATT
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
DISTRICTWIDE 62 000-90 0 OTHER / MISCELLANEOUS 1-PLANNING/ENVIRONMENTAL
DISTRICTWIDE 61 000-96 0 OTHER / MISCELLANEOUS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 201 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: STATEWIDE
Project: H.010691 - MV STUMPF: DRY-DOCK: 5 YR EXAM & REPOWER
Type Impv: DRY-DOCK FOR USCG 5 YEAR EXAM & REPOWER
Project Manager: REED, KEVIN
Remarks: FUNDS TRANSFERRED FROM FHWA TO FTA
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 FB DISCR 1,250 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
4-SCHEDULED IN CURRENT FY 14-15
Project: H.011566 - TRAFFIC SIGNAL CONTROL SOFTWARE
Type Impv: REPLACE STREETWISE SOFTWARE WITH ATMS.NOW
Project Manager: FERRIER, CARRYN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 STPFLEX 750 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED IN CURRENT FY 14-15
Project: H.009884 - NOGC (STATEWIDE)
Type Impv: RELOCATING LED CROSSBUCK ASSEMBLIES
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 RAIL HE 250 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.010689 - CCC FERRY VESSEL: TERM/LAND TECH UPGRADE
Type Impv: TECHNOLOGY IMPROVEMENTS TO FERRY VESSELS AND TERMINAL L
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 FB DISCR 200 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.010694 - INSTALL AND MODIFY BARGES AND FERRIES
Type Impv: MODIFICATION, INSTALLATION LANDING BARGE,CONVERSION TO FE
Project Manager: REED, KEVIN
Remarks: FB DISCR FLEXED TO FTA THEREFORE NOT AUTH THROUGH FHW
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 FB DISCR 420 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
4-SCHEDULED FOR LETTING FY 15-16
STATEWIDE 000-99 OTHER 330 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
Project: H.011247 - UPDATES TO GIS HISTORIC SITES DATABASE
Type Impv: UPDATE THE STATE GIS DATABASE FOR HISTORIC SITES
Project Manager: ARDOIN, NOEL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OTHER / MISCELLANEOUS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011325 - IC SEVERAL RR XINGS (STATEWIDE)
Type Impv: INSTALL CBAS AT IC'S PASSIVE PUBLIC CROSSINGS.
Project Manager: SHREWSBERRY,BILL
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 RAIL PD 250 RAILROADS 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011331 - OVERHEAD SIGN TRUSS INVENTORY/INSPECTION
Type Impv: INVENTORY/INSPECTION OF OVERHEAD SIGN TRUSSES
Project Manager: BROWN, HAYLYE
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011473 - BARGE 305-068: DRY-DOCK FOR REPAIRS
Type Impv: DRY-DOCK FERRY LANDING BARGE FOR MAINTENANCE AND REPAIR
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 FB DISCR 200 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
4-SCHEDULED FOR LETTING FY 15-16
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 202 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: STATEWIDE
Project: H.011474 - BARGE 305-069: DRY-DOCK FOR REPAIRS
Type Impv: DRY-DOCK FERRY LANDING BARGE FOR MAINTENANCE AND REPAIR
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 FB DISCR 200 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011475 - M/V NEW ROADS: 5 YEAR DRYDOCK (2016)
Type Impv: DRY-DOCK FERRY FOR 5 YEAR USCG EXAMS, MAINTENANCE & REPA
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 FB DISCR 1,125 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011478 - BARGE 305-008: DRYDOCK FOR REPAIRS
Type Impv: DRYDOCK WORK BARGE 305-008 FOR REPAIRS
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 STCASH 250 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011479 - M/V GRIFFITH: DRYDOCK FOR REPAIRS
Type Impv: DRYDOCK TUGBOAT M/V GRIFFITH FOR REPAIRS
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 STCASH 150 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011480 - M/V GRAND: DRYDOCK FOR REPAIRS
Type Impv: DRYDOCK M/V GRAND FOR REPAIRS.
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 STCASH 150 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011538 - TMC OPERATION/MOTORIST ASSISTANCE PATROL
Type Impv: MOTORIST ASSISTANCE
Project Manager: KIMBENG, LUCY
Remarks: WILL BE FOR SFY 2016, 2017, 2018, 2019
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 NHPP 3,600 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011716 - PLAQ. PAR. FERRY LAND: REPLACE DOLPHINS
Type Impv: REPLACEMENT OF FERRY LANDING DOLPHINS (MOORING STRUCTUR
Project Manager: REED, KEVIN
Remarks: LOCAL ENTITY TO PROVIDE MATCH
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 FB DISCR 950 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
4-SCHEDULED FOR LETTING FY 15-16
Project: H.011735 - LRSP/SRTS ENGINEER SEPT 2015 - SEPT 2018
Type Impv: LRSP/SRTS ENGINEER
Project Manager: PARSONS, BRIAN
Remarks: USE SATRANS FUNDS
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 SAFETY 4-SCHEDULED FOR LETTING FY 15-16
Project: H.011537 - STATEWIDE ITS MAINTENANCE
Type Impv: THIS IS A 3 YEAR MAINTENANCE CONTRACT FOR ITS EQUIPMENT.
Project Manager: SMITH, ERIK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 STPFLEX 3,000 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
STATEWIDE 000-99 STPFLEX 3,000 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
STATEWIDE 000-99 STPFLEX 3,000 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 203 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: STATEWIDE
Project: H.011568 - LADOTD TOLL OPERATIONS BUSINESS PLAN
Type Impv: DEVELOP A BUSINESS PLAN FOR LADOTD TOLL OPERATIONS
Project Manager: FERRIER, CARRYN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
3-DESIGN/DEVELOPMENT
Project: H.007026 - ITS MAINTENANCE - STATEWIDE
Type Impv: ROUTINE & EMERGENCY REPAIR TO ITS STATEWIDE SYSTEM
Project Manager: SMITH, ERIK
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 STPFLEX 1,847 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
2-WAITING FOR FUNDING
STATEWIDE 000-99 STPFLEX 1,617 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
STATEWIDE 000-99 STPFLEX 1,617 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: H.010052 - BR - NO INTERCITY RAIL
Type Impv: FEASIBILITY STUDY
Project Manager: BROUSSARD, DAN
Remarks: NEW ORLEANS MPO TO PROVIDE MATCH TO BTR STP>200K
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 URBAN SYSTEMS 2-WAITING FOR FUNDING
Project: H.010053 - BR - NO INTERCITY RAIL
Type Impv: FEASIBILITY STUDY
Project Manager: BROUSSARD, DAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 URBAN SYSTEMS 2-WAITING FOR FUNDING
Project: H.005734 - LA 447 CORRIDOR STUDY
Type Impv: TRAFFIC ANALYSIS
Project Manager: COLVIN, JODY
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.006881 - WEIGH STATION SEWER TREATMENT EQU.
Type Impv: NEW SEWER TREATMENT EQU. STATEWIDE
Project Manager: MCCOY, JANET
Remarks: 737-99-0823;
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 NHPP 350 OPER EFFICIENCY/MOTORIST ASSISTANCEWEIGH STATIONS
1-PLANNING/ENVIRONMENTAL
Project: H.009296 - QUAD BEAM SPECIAL DETAILS
Type Impv: PREPARE QUAD BEAM SPECIAL DETAILS
Project Manager: YAP, KIAN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 SUSTAINABILITYBRIDGE (ON SYSTEM)
1-PLANNING/ENVIRONMENTAL
Project: H.010037 - NEW FERRY BOAT / CAMERON FERRY CROSSING
Type Impv: CONSTRUCT NEW FERRY BOAT
Project Manager: REED, KEVIN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 NFI 12,500 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
1-PLANNING/ENVIRONMENTAL
Project: H.011177 - INTERCHANGE TRAFFIC COUNTS: PHASE 2
Type Impv: ANALYZE INTERCHANGES TO IMPROVE TRAFFIC FLOW &SAFETY @
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 204 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: STATEWIDE
Project: H.011180 - INTERCHANGE TRAFFIC COUNTS: PHASE 1
Type Impv: ANALYZE INTERCHANGES TO IMPROVE TRAFFIC FLOW &SAFETY @
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.011181 - INTERCHANGE TRAFFIC COUNTS: PHASE 3
Type Impv: ANALYZE INTERCHANGES TO IMPROVE TRAFFIC FLOW &SAFETY @
Project Manager: HARROUCH, JOSHUA
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
1-PLANNING/ENVIRONMENTAL
Project: H.011334 - 511 ATIS SYSTEM
Type Impv: DEVELOP CONOPS, FUNC. REQUIREMENTS AND RFP
Project Manager: FERRIER, CARRYN
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
STATEWIDE 000-99 0 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
1-PLANNING/ENVIRONMENTAL
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 205 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: L-PROJECTS
Project: L.000001 - INTERMODAL CONNECTORS PROGRAM
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 3,100 INTERMODAL CONNECTOR STAGES 4, 3, 2, 1, 0
- NHPP 6,200 INTERMODAL CONNECTOR
Project: L.000002 - INTERSTATE PAVEMENT PREVENTIVE MAINT
Type Impv: SURFACE IMP, PM, REPAIR FOR PAVEMENT/EMBANKMENT
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,000 SUSTAINABILITYINTERSTATE
STAGES 4, 3, 2, 1, 0
Project: L.000003 - PREVENTIVE MAINTENANCE NON-INTERSTATE
Type Impv: PREVENTIVE MAINTENANCE/REHABILITATION
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 2,000 SUSTAINABILITYNON-INTERSTATE
STAGES 4, 3, 2, 1, 0
Project: L.000004 - PREVENTIVE MAINT NON-INTERSTATE (NFA)
Type Impv: PREVENTIVE MAINTENANCE/REHABILITATION
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NFA 2,500 SUSTAINABILITYNON-INTERSTATE NFA
STAGES 4, 3, 2, 1, 0
Project: L.000005 - ROAD PREVENTIVE MAINTENANCE
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 4,400 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
STAGES 4, 3, 2, 1, 0
- STCASH 6,000 SUSTAINABILITYROAD PREVENTIVE MAINTENANCE
Project: L.000006 - MOTORIST ASSISTANCE PATROL
Type Impv: MAP
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,200 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
STAGES 4, 3, 2, 1, 0
- STCASH 1 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: L.000007 - TRANSPORTATION SYSTEMS MANAGEMENT
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 250 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
STAGES 4, 3, 2, 1, 0
- STCASH 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRANSPORTATION SYSTEMS MANAGEMENT
Project: L.000008 - URBAN SYSTEM PROJECTS
Type Impv: SELECTED BY MPO'S
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STP>200K 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
- STP<200K 1,000 URBAN SYSTEMS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 206 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: L-PROJECTS
Project: L.000009 - MISC BOND PROJECTS
Type Impv: AS APPROVED BY LEGISLATURE
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STBONDS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000010 - URGENT BRIDGE REPAIR/REPLACEMENT
Type Impv: REIMBURSABLE AND NON-REIMBURSABLE
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- REIMB 5,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
STAGES 4, 3, 2, 1, 0
- NHPP 1,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
- STPFLEX 1,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
- STCASH 1,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: L.000011 - BRIDGE PREVENTIVE MAINTENANCE
Type Impv: MAINTENANCE
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
STAGES 4, 3, 2, 1, 0
- STPFLEX 1,500 SUSTAINABILITYBRIDGE (ON SYSTEM)
- STCASH 1 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: L.000012 - BRIDGE PAINTING PROGRAM
Type Impv: MISC SITES
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 1,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 1 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: L.000013 - MOVABLE BRIDGE PREVENTIVE MAINTENANCE
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 500 OPER EFFICIENCY/MOTORIST ASSISTANCEMOVABLE BRIDGE REHABILITATION
STAGES 4, 3, 2, 1, 0
Project: L.000014 - MISC ECONOMIC DEVELOPMENT INITIATIVES
Type Impv: IN CONJUNCTION WITH DED
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
- STBONDS 500 OTHER / MISCELLANEOUS
Project: L.000015 - MISC FERRY PROJECTS
Type Impv: REHABILITATION/REPAIR
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- OTHER 500 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
STAGES 4, 3, 2, 1, 0
- STCASH 500 OPER EFFICIENCY/MOTORIST ASSISTANCEFERRY PROJECTS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 207 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: L-PROJECTS
Project: L.000016 - FEDERAL SAFETY PROGRAMS
Type Impv: MISC PROJECTS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- HSIP 300 SAFETY STAGES 4, 3, 2, 1, 0
- STPFLEX 200 SAFETY
- STCASH 100 SAFETY
Project: L.000017 - MISC ITS SYSTEMS
Type Impv: ENGINEERING, CONSTRUCTION, MAINTENANCE, OPERATIONS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 300 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
STAGES 4, 3, 2, 1, 0
- DEMO 300 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
- CM 400 OPER EFFICIENCY/MOTORIST ASSISTANCEITS
Project: L.000018 - INTERSTATE LIGHTING PROGRAM
Type Impv: IN ACCORDANCE WITH MAINTENANCE AGREEMENTS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCEINTERSTATE LIGHTING
STAGES 4, 3, 2, 1, 0
- STCASH 100 OPER EFFICIENCY/MOTORIST ASSISTANCEINTERSTATE LIGHTING
Project: L.000019 - STATE PARK ROADS
Type Impv: OVERLAY/REHABILITATION
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STBONDS 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000020 - MISC DRAINAGE PROJECTS
Type Impv: TO ALLEVIATE FLOODING
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
STAGES 4, 3, 2, 1, 0
- STCASH 250 OPER EFFICIENCY/MOTORIST ASSISTANCEROADWAY FLOODING
Project: L.000021 - MISC FEDERAL PROJECTS/PROGRAMS
Type Impv: FEDERAL LANDS HIGHWAYS, ETC.
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- FLH 500 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000022 - RAILROAD CROSSING IMPROVEMENTS
Type Impv: FEDERAL RAILROAD CROSSING IMPROVEMENTS PROGRAM
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- RAIL HE 3,000 RAILROADS STAGES 4, 3, 2, 1, 0
- RAIL PD 3,000 RAILROADS
- STPFLEX 2,000 RAILROADS
- STCASH 200 RAILROADS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 208 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: L-PROJECTS
Project: L.000025 - TOLL FUNDED PROJECTS
Type Impv: ORLEANS AND JEFFERSON PARISHES
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- TOLLS 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000026 - WETLAND MITIGATION BANK
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 1,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
- TIME 1,000 OTHER / MISCELLANEOUS
Project: L.000027 - EMERGENCY RELIEF PROVIDED BY CONGRESS
Type Impv: EMERGENCY RELIEF
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- ER 100 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000028 - MAINTENANCE MATERIALS
Type Impv: HOT MIX, PIPE, BRIDGE MATERIAL, ETC
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 5,000 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000029 - FEDERAL ENHANCEMENT PROGRAM
Type Impv: MISC PROJECTS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- TAPFLEX 1,000 ENHANCEMENTS STAGES 4, 3, 2, 1, 0
Project: L.000030 - CRASH ATTENUATOR REPAIRS
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 200 SAFETY STAGES 4, 3, 2, 1, 0
- STCASH 100 SAFETY
Project: L.000031 - DEMO/HI-PRI/OTHER FEDERAL PROGRAMS
Type Impv: AS DEFINED BY FEDERAL GOVERNMENT
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- DEMO 10,000 DEMO / HIGH PRIORITY STAGES 4, 3, 2, 1, 0
Project: L.000032 - REST AREA REHABILITATION
Type Impv: FACILITY REHABILITATION
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 500 OPER EFFICIENCY/MOTORIST ASSISTANCEREST AREAS
STAGES 4, 3, 2, 1, 0
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 209 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: L-PROJECTS
Project: L.000033 - MISC SIGNS, STRIPING, SIGNALS
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,000 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
STAGES 4, 3, 2, 1, 0
- STPFLEX 500 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
Project: L.000034 - INSTALL RAISED PAVEMENT MARKERS
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 2,000 OPER EFFICIENCY/MOTORIST ASSISTANCETRAFFIC CONTROL DEVICES
STAGES 4, 3, 2, 1, 0
Project: L.000035 - MISC FEDERAL OFF-SYSTEM BRIDGES
Type Impv: BRIDGE REPLACEMENTS/INSPECTIONS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- FBROFF 1,000 SUSTAINABILITYBRIDGE (OFF SYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 200 SUSTAINABILITYBRIDGE (OFF SYSTEM)
Project: L.000036 - WEIGH STATION REHABILITATION/UPGRADE
Type Impv: MISC SITES STATEWIDE
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 1,900 OPER EFFICIENCY/MOTORIST ASSISTANCEWEIGH STATIONS
STAGES 4, 3, 2, 1, 0
Project: L.000037 - HIGHWAY SAFETY IMPROVEMENTS
Type Impv: RUMBLE STRIPS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 2,000 SAFETY STAGES 4, 3, 2, 1, 0
Project: L.000039 - ACCELERATED LOADING FACILITY
Type Impv: CONSTRUCT TEST SECTIONS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 50 OTHER / MISCELLANEOUS STAGES 4, 3, 2, 1, 0
Project: L.000040 - FEDERAL BRIDGE INSPECTION PROGRAMS
Type Impv: INSPECTIONS, RATINGS, LOAD FACTORS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 3,000 SUSTAINABILITYBRIDGE (ON SYSTEM)
STAGES 4, 3, 2, 1, 0
- STCASH 600 SUSTAINABILITYBRIDGE (ON SYSTEM)
Project: L.000041 - CONGESTION MITIGATION PROJECTS
Type Impv: NON-ATTAINMENT AREAS
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 210 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: L-PROJECTS
Project: L.000042 - MISC CONGESTION MITIGATION PROJ - LKC
Type Impv: IN LAKE CHARLES AS APPROVED BY FHWA
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- CM 500 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
Project: L.000043 - MISC CONGESTION MITIGATION PROJ - BTR
Type Impv: IN BATON ROUGE AS APPROVED BY FHWA
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- CM 1,000 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
Project: L.000068 - ACCESS MANAGEMENT PROJECTS
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 2,500 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
STAGES 4, 3, 2, 1, 0
- STPFLEX 2,500 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
- STPFLEX 8,300 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
- STPFLEX 8,100 OPER EFFICIENCY/MOTORIST ASSISTANCEACCESS MANAGEMENT
Project: L.000069 - ROAD TRANSFER PROGRAM
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STCASH 1,000 ROAD TRANSFER STAGES 4, 3, 2, 1, 0
- STPFLEX 1,000 ROAD TRANSFER
Project: L.000093 - STATEWIDE CONGESTION MITIGATION
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- CM 5,500 CONGESTION MITIGATION STAGES 4, 3, 2, 1, 0
Project: L.000094 - URBAN TRANSIT(INCL TRANSFER TO AGENCIES)
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- CM 100 URBAN SYSTEMS STAGES 4, 3, 2, 1, 0
- STP<200K 100 URBAN SYSTEMS
- STPFLEX 100 URBAN SYSTEMS
Project: L.000097 - ADA PROGRAM
Type Impv: ADA PROGRAM
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- STPFLEX 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCEAMERICANS WITH DISABILITIES ACT
STAGES 4, 3, 2, 1, 0
- NHPP 1,500 OPER EFFICIENCY/MOTORIST ASSISTANCEAMERICANS WITH DISABILITIES ACT
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 211 of 212
DOTD HIGHWAY PRIORITY PROGRAM FOR FY 2015 - 16Parish: L-PROJECTS
Project: L.000024 - SOFT SIDE SAFETY
Type Impv: HANDLED THROUGH OPERATIONS BUDGET
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- HSIP 1,000 SAFETY STAGES 2, 1, 0
- STCASH 500 SAFETY
Project: L.000038 - PLANNING, TRAINING AND RESEARCH
Type Impv: HANDLED THROUGH OPERATING BUDGET
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- SPR MAND 7,000 OTHER / MISCELLANEOUS STAGES 2, 1, 0
- SPR OPT 7,000 OTHER / MISCELLANEOUS
Project: L.000023 - SCOPING AND ENVIRONMENTAL STUDIES
Type Impv:
Project Manager:
Remarks:
StageCategory/SubCategoryCon Est x$1000FundCtrl SecRouteParish
- NHPP 400 OTHER / MISCELLANEOUS STAGES 1, 0
- STPFLEX 300 OTHER / MISCELLANEOUS
- STCASH 300 OTHER / MISCELLANEOUS
Report Date: 3/30/2015 4:57:10AMVersion No: 1.15.1Page 212 of 212