Organisational Services
Organisational Services Monthly Review > March 2020
Contents
1. EXECUTIVE SUMMARY ..................................................................................................................................... 1
2. SAFETY ............................................................................................................................................................ 2
2.1 Incidents and Injuries ....................................................................................................................................... 2
2.2 Lost Time Injuries & Days Lost .......................................................................................................................... 3
2.3 Key Activities ................................................................................................................................................... 3
3. CUSTOMER SERVICE ....................................................................................................................................... 4
3.1 External Customer Services ............................................................................................................................. 4
3.2 Aquatic Facilities .............................................................................................................................................. 8
3.3 IT Support ...................................................................................................................................................... 12
3.4 Procurement Services .................................................................................................................................... 15
3.5 Property Services........................................................................................................................................... 16
4. PEOPLE AND CULTURE ................................................................................................................................. 17
4.1 Key Activities ................................................................................................................................................. 17
4.2 Staff Contingent ............................................................................................................................................. 18
4.3 Key Activities ................................................................................................................................................. 21
4.4 Program Financial Position ............................................................................................................................. 22
5. PERFORMANCE & RISK.................................................................................................................................. 25
5.1 Corporate Performance Planning & Reporting ...................................................................................................... 25
5.2 Enterprise Risk Management ............................................................................................................................. 25
6. BUSINESS IMPROVEMENT ............................................................................................................................. 25
6.1 Business Improvements .................................................................................................................................... 25
7. REGULATORY COMPLIANCE.......................................................................................................................... 27
7.1 Financial Compliance ..................................................................................................................................... 27
7.2 Corporate Governance ................................................................................................................................... 27
7.3 Internal Audit ................................................................................................................................................. 29
8. LAND & BUILDINGS ....................................................................................................................................... 30
9.1 Building Maintenance ..................................................................................................................................... 30
9.2 Land & Tenure ................................................................................................................................................ 30
Organisational Services Monthly Review > March 2020
1
1. EXECUTIVE SUMMARY
This report is for the Organisational Services Department for the month of March 2020.
• Safety continues to be a focus of the Department with no LTI’s reported since 2017/18.
• Progressed COVID-19 preparedness and response through activation of management response team and business continuity plans.
• All aquatic facilities were closed under the COVID-19 government directive as at midnight 25 March 2020.
• Information Services delivered critical support to the organisation by providing a variety of accessibility options and working environments for employees who have been impacted by the MRC COVID-19 response.
• In March, 16 new apprentices and trainees were welcomed to MRC.
• People and Culture coordinated the COVID-19 redeployment activities ensuring that displaced MRC employees were provided the opportunity for alternative employment within the organisation.
• Corporate Governance completed the Authorised Person Project with all identified positions being issued with new Authorised Person ID Cards.
• Call Centre staff continue to achieve high external customer satisfaction levels of 98% as measured in customer surveys.
Kylie Lamb Director Organisational Services
Organisational Services Monthly Review > March 2020
2
2. SAFETY
2.1 Incidents and Injuries
The following injuries to an MRC employee were reported in March:
• Foreign object in eye.
• Sideboard from truck fell and hit head after being pulled on.
• Back pain after slipping while walking down stairs.
The following incident involving a member of the public was reported in March:
• A pool patron was found unresponsive under an umbrella. An ambulance attended.
The following incident involving a contractor was reported in March:
• Ankle strain when exiting vehicle.
Each incident is investigated, and appropriate corrective measures implemented to reduce future risks.
Organisational Services Monthly Review > March 2020
3
2.2 Lost Time Injuries & Days Lost
Department
2015-16 2016-17 2017-18 2018-19 2019-20
LTI Days Lost LTI
Days Lost LTI
Days Lost LTI
Days Lost LTI
Days Lost
Finance
Information Services
Shared Services 1 4
People & Culture
Procurement & Plant
1 17
Property Services
Governance & Safety
1 8
Office of the Mayor & CEO
Organisational Services Total 1 4 0 0 2 25 0 0 0 0
2.3 Key Activities
Safety activities conducted during March included:
• A review of duress alarm arrangements was undertaken for various locations.
• Developed and implemented tools to verify current competency of selected operators of small plant.
Organisational Services Monthly Review > March 2020
4
• Investigated and reported on critical incidents including identifying appropriate corrective actions for implementation.
• Reviewed and developed new procedures to support the safety management system.
• Attendance by WHS Team members at local safety networking meetings hosted by Resource Industry Network and WHS Queensland.
• Attendance by WHS Team members at the Central Queensland Regional Safety Exchange – a meeting of Council safety teams from across the region – hosted by Livingstone Shire Council.
• Undertook a traffic management audit and development of a traffic management plan for Paget Depot.
• Continued detailed analysis of recordable injuries and vehicle incidents
• Developed new working-from-home WHS checklist to support COVID-19 management response arrangements
• Other activities include internal audit, procedure reviews, safety observations and interactions, health and safety committee meetings, and pre-start meetings and toolbox talks.
3. CUSTOMER SERVICE
3.1 External Customer Services
KPI KPI Description
Target
Result Red
(Under KPI)
Green
(Met KPI)
Blue
(Exceed KPI)
First Contact
Resolution (FCR)
The percentage of external
customer enquiries that are
resolved at the first point of
contact.
< 50% 50-60% > 60% 53%
Grade of Service
(GOS)
The percentage of customer
calls that are answered
within 60 seconds across the
Shared Services team.
< 80% 80-85% > 85% 77%
Abandoned Calls
The percentage of customers
that abandon their call before
being served.
> 6% 4.5-6% < 4.5% 5.2%
External
Customer
Satisfaction
A measure of customer
satisfaction as reported by
the end of call survey
< 80% 80-85% > 85% 98%
Customer
Request
Completion
Service requests resolved
within corporate standard
timeframes
< 80% 80-85% > 85% 82%
(Note: GOS has been affected by staff vacancies in the call centres. Whilst the result is under target, the Shared Services team have been working in challenging conditions which has resulted in an increased number of calls from the community.)
Organisational Services Monthly Review > March 2020
5
KPI Graphs and Commentary
Calls Received: A total of 9,608 calls were received in the March reporting period, averaging 436 calls per day. It is notable that this figure represents an increase of 1,000 calls when compared to the same time last year.
Contributing factors include local government election and COVID-19 enquiries, issuing of rates and the running of a ‘Does your bin need repair’ campaign on Facebook.
First Contact Resolution (FCR): FCR results showed that 53% of customer queries were resolved at first contact in March.
While this result represents a satisfactory achievement, the factors contributing to increased numbers of calls were of a nature that negated the call centre’s ability to resolve at first contact.
0
2000
4000
6000
8000
10000
12000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Calls Received
FY 19-20 3 year av
40%
45%
50%
55%
60%
65%
70%
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
First Contact Resolution
FY 19-20 3 year av Satisfactory Exceeded
Organisational Services Monthly Review > March 2020
6
Grade of Service: During the month of March, the call centres were operating with four vacancies coupled with scheduled leave of other staff members. Despite these challenges the result is a mere 3% shy of a satisfactory result.
Abandoned Calls: Abandoned calls decreased slightly to 5.2%, this result is driven by the increased number of
calls received during March.
60%
65%
70%
75%
80%
85%
90%
95%
100%
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Grade of Service
3 year av Satisfactory Exceeded FY 19-20
0.00%
1.00%
2.00%
3.00%
4.00%
5.00%
6.00%
7.00%
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Abandoned Calls
FY 19-20 3 year av Satisfactory Exceeded
Organisational Services Monthly Review > March 2020
7
External Customer Satisfaction: Satisfaction levels remain high at 98%. Completed surveys for March
represent 9.6% (853 calls) of the eligible contact centre calls received.
Customer Request Completion:
70%
75%
80%
85%
90%
95%
100%
105%
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Customer Satisfaction Survey
FY19-29 3 year av Satisfactory Exceeded
Lodged Resolved within SLA
SSC 954 92%
MRC Total 3475 78%
MRC Top 5 Pathway requests Lodged March 2020
Volume % of total requests
Phone Message 546 12.3%
Replace wheelie bin 291 6.6%
Change of mailing address 229 5.2%
Repair wheelie bin 213 4.8%
Roads - General 201 4.5%
Organisational Services Monthly Review > March 2020
8
3.2 Aquatic Facilities Attendance Figures:
Note:
• All aquatic facilities were closed under the COVID19 government directive as at midnight 25 March 2020.
Sum of BWLSum of
Memorial SwimCentre
Sum of PioneerSwim Centre
Sum of SarinaPool
Sum of MiraniPool
Sum of MARC
2020 94696 10583 15165 5263 3481 21669
2019 290572 26174 38258 27476 20848 39029
0
50000
100000
150000
200000
250000
300000
350000
Att
end
ance
s
Mackay Regional Council Aquatic Facility Attendances 2019 and 2020
Facility February 2020 March 2020
Bluewater Lagoon 31589 14882
Mackay Aquatic Recreation Complex 8389 6284
Memorial Pool 4806 3411
Pioneer Pool 7913 3701
Mirani Pool 1242 857
Sarina Pool Not provided 2012
Organisational Services Monthly Review > March 2020
9
Attendances January to December - Monthly and Yearly Attendance Comparison
Note:
• Annual maintenance closure was in place from 14 July to 31 August 2019.
Note:
• Memorial Pool was closed from 1 May to 14 June 2019.
• Heating was operational from Saturday 15 June 2019.
• Memorial Pool was closed for urgent unplanned maintenance 12 to 18 August 2019.
Sum ofJan
Sum ofFeb
Sum ofMar
Sum ofApr
Sum ofMay
Sum ofJun
Sum ofJul
Sum ofAug
Sum ofSept
Sum ofOct
Sum ofNov
Sum ofDec
BWL 2019 32878 26008 27605 24035 6554 5510 4919 0 30945 40145 42576 49397
BWL 2020 48225 31589 14882
0
10000
20000
30000
40000
50000
60000
Att
end
ance
s
Bluewater Lagoon Attendances 2019 and 2020
Sum ofJan
Sum ofFeb
Sum ofMar
Sum ofApr
Sum ofMay
Sum ofJun
Sum ofJul
Sum ofAug
Sum ofSept
Sum ofOct
Sum ofNov
Sum ofDec
MSC 2019 3084 5220 5428 898 84 584 1330 475 1298 2034 2797 2942
MSC 2020 2366 4806 3411
0
1000
2000
3000
4000
5000
6000
Att
end
ance
s
Memorial Swim Centre Attendances 2019 and 2020
Organisational Services Monthly Review > March 2020
10
Note:
• Sarina Pool closed on Thursday 18 April 2019 and re-opened Tuesday 01 October 2019.
• No data provided for February 2020.
Sum ofJan
Sum ofFeb
Sum ofMar
Sum ofApr
Sum ofMay
Sum ofJun
Sum ofJul
Sum ofAug
Sum ofSept
Sum ofOct
Sum ofNov
Sum ofDec
PSC 2019 3850 6487 7481 1169 1834 730 494 899 2141 2583 5803 4787
PSC 2020 3551 7913 3701
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
Att
end
ance
s
Pioneer Swim Centre Attendances 2019 and 2020
Sum ofJan
Sum ofFeb
Sum ofMar
Sum ofApr
Sum ofMay
Sum ofJun
Sum ofJul
Sum ofAug
Sum ofSept
Sum ofOct
Sum ofNov
Sum ofDec
Sarina Pool 2019 3330 3072 3412 532 0 0 0 0 0 5495 7508 4127
Sarina Pool 2020 3251 2012
0
1000
2000
3000
4000
5000
6000
7000
8000
Att
end
ance
s
Sarina Pool Attendances 2019 and 2020
Organisational Services Monthly Review > March 2020
11
Note:
• Mirani Pool closed Thursday 18 April 2019 and reopened 16 September 2019.
Mackay Aquatic and Recreational Complex (MARC) Attendance figures
Note:
• MARC commenced operation in March 2019.
Sum ofJan
Sum ofFeb
Sum ofMar
Sum ofApr
Sum ofMay
Sum ofJun
Sum ofJul
Sum ofAug
Sum ofSept
Sum ofOct
Sum ofNov
Sum ofDec
Mirani Pool 2019 1551 3994 3785 128 0 0 0 0 414 4107 4722 2147
Mirani Pool 2020 1382 1242 857
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
Att
end
ance
sMirani Pool Attendances 2019 and 2020
Sumof Jan
Sumof Feb
Sumof Mar
Sumof Apr
Sumof
May
Sumof Jun
Sumof Jul
Sumof Aug
Sumof
Sept
Sumof Oct
Sumof Nov
Sumof Dec
MARC Aquatics 2019 TOTAL 6303 2853 3125 2357 2108 2449 3722 5458 5822 4832
MARC Aquatics 2020 TOTAL 6996 8389 6284
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
Att
end
ance
s
MARC Aquatics Attendances 2019 and 2020
Organisational Services Monthly Review > March 2020
12
Note:
• MARC commenced operation in March 2019.
February 2020 March 2020
MARC Aquatic Attendances 8389 6284
MARC Athletic Attendances 486 258
MARC Total Attendances (Aquatics and Athletics) 8875 6542
3.3 IT Support
Internal Service Metrics
KPI KPI Description
Target
Result Red
(Under KPI)
Green
(Met KPI)
Blue
(Exceed KPI)
Incident
Resolution
Percentage of incidents
resolved within corporate
standard timeframes
<80% 80-85% >85% 82%
Service Request
Resolution
Percentage of service
requests resolved within
corporate standard
timeframes
<80% 80-85% >85% 89%
Internal Customer
Satisfaction
Survey
IT email survey - % of
customers whose
experience met or exceeded
expectations
<75% 75-84% >85% 99.6%
Sum ofJan
Sum ofFeb
Sum ofMar
Sum ofApr
Sum ofMay
Sum ofJun
Sum ofJul
Sum ofAug
Sum ofSept
Sum ofOct
Sum ofNov
Sum ofDec
MARC Athletics 2019 TOTAL 381 719 4479 2574 2119 1396 2018 456 310 232
MARC Athletics 2020 TOTAL 1137 486 258
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000A
tten
dan
ces
MARC Athletics Attendances 2019 and 2020
Organisational Services Monthly Review > March 2020
13
Notes:
These are again encouraging results for Information Services. This has been achieved whilst operating with reduced resources due to recruitment activity. The roles under recruitment are highly skilled and therefore tend to attract individuals requiring training to become proficient. This has a knock-on impact with other staff required to support operational activities away from strategic aligned project delivery. Further comments as follows:
• COVID-19 impacts on IS are placing pressure on the team to support the wider range of working environments and pace at which these are required. In saying this, the IS team have been very innovative in preparing and delivering behind the scenes improved remote accessibility options.
• The survey request resolution and internal customer satisfaction survey results for March 2020 are again very satisfying.
• Obtaining skilled resources within the Mackay region is a continuing challenge and one that we need to explore further on recruitment techniques to attract skilled people to permanently locate themselves in Mackay. Strategies are continuing to be explored to work in partnership with educational facilities and other key organisations recruiting IT skill sets in the region to build and foster a local resource pool.
Information Services Satisfaction Survey – March 2020
March 2020 Survey Rating %
1 How would you rate the level of customer service received? (Timely updates, follow through, helpfulness, communication skills)
91%
2 Was your request completed within a reasonable timeframe? (If not please state expectation in comments section please.)
90%
3 Was your support request completed to your satisfaction? 87%
March 2020 Survey Results
Below Expectations
Met Expectations
Exceeded Expectations
Not Assigned*
Totals
# of Responses 2 154 341 0 497 * Not assigned excluded
Overall Rating 0.4% 31% 68.6% N/A 99.6%
Applications Availability
KPI KPI Description
Target
Result Red
(Under KPI)
Green
(Met KPI)
Blue
(Exceed KPI)
Tier 1 Systems Refer to the table under
‘KPI Commentary’
section below for detail
on which systems are
included in each tier.
< 98% 98-99% > 99% 100%
Tier 2 Systems < 98% 98-99% > 99% 100%
Tier 3 Systems < 98% 98-99% > 99% 100%
Organisational Services Monthly Review > March 2020
14
Applications Availability: The below table shows which corporate applications are considered tier 1 and 2. All other systems not specifically noted are considered tier 3.
Tier 1 Tier 2 Tier 3
ECM Finance One
Email GIS
Internet
Kiosk_Chris21
Pathway
Assetic
Aurora Bruce Mandalay
Manage Engine
KPI Commentary Incident and Service Request Metrics: The volume of incident and service requests has slightly increased this month, from 851 in February to 909 in March. Information Services continues to deliver significant infrastructure and application improvements (both functional and technical including security) whilst maintaining this quality. The below graph identifies the Raised Vs Closed and Pending requests, along with WIP and backlog.
Definitions:
WIP – complex support requests that are within service level agreements and simple support requests open on day of raising.
Backlog – complex support requests that have exceeded service level agreements and simple support requests remaining unresolved after day of raising.
Organisational Services Monthly Review > March 2020
15
3.4 Procurement Services
Activity March 2019 March 2020
Purchase Orders (PO) Raised 817 1172
Line Items in POs 2183 2531
POs Received 886 1183
Line Items in POs Received 3435 3609
Invoices Processed 2935 3553
Request for Quotes Issued 11 12
Request for Tenders Issued 7 3
Tenders Awarded 3 3
Quotes Awarded 3 9
Area Monthly Amount
March 2020 Monthly %
March 2020
FYTD Amount
FYTD %
Local Spend (Mackay region) $6,410,053 66% $101,887,535 73%
Regional Spend (WROC area) $40,853 1% $707,905 1%
External Spend $3,168,453.96 33% $36,735,831 26%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20
72%
56% 58%
83%
71%63%
81%
71%66%
27%
43% 41%
16%28%
36%
18%
28%33%
1% 1% 1% 1% 1% 1% 1% 1% 1%
Area Monthly Spend %
Local Spend (Mackay Region) External Spend % Regional Spend (WROC Area)
Organisational Services Monthly Review > March 2020
16
3.5 Property Services
0
50
100
150
200
250
300
350
400
450
Building Maintenance Requests Security Access Requests
Key & Padlock Requests Pathways Requests
Actioned Property Services Requests
Breakdown of Building Maintenance Requests Actioned – March 2020
Volume % of total requests
Miscellaneous 102 35.42%
Electrical 59 20.49%
Repairs 49 17.01%
Plumbing 43 14.93%
Air Conditioning 21 7.29%
Safety & Legislation 13 4.51%
Scheduled Maintenance 1 0.35%
Of the total number of Building Maintenance Requests received for the month of March (288), the top 3 requests related to:
1. Miscellaneous (majority including Other, furniture, consumables, cleaning and security) 2. Electrical 3. Repairs (majority including doors, locks and hardware, fixtures and fittings).
Organisational Services Monthly Review > March 2020
17
4. PEOPLE AND CULTURE 4.1 Key Activities
Activity Comments
Organisational Culture
• The Job Evaluation Framework commenced with a roll out to Directors and Program Managers. This is currently on hold due to the COVID-19 situation.
• Employee engagement survey analysis has been completed with action plans being scheduled for presentation with Manager People and Culture.
Diversity and Inclusion
• MRC participated in the Australia Workplace Equality Index (AWEI) for the second year. The Australian Workplace Equality Index (AWEI) is the definitive national benchmark on LGBTQ workplace inclusion. The Index drives best practice in Australia and sets a comparative benchmark for Australian employers across all sectors. MRC is the only Queensland Council, and only regional Council that has provided a submission to the Index.
Workforce Relations
• With the emergence of COVID-19, it was agreed by the Bargaining Unit that bargaining for a new Certified Agreement would be temporarily postponed and would reassess the position on 30 April 2020.
Leadership Development
• The review of the second module of Elev8 Operational Leader continues but currently seeking flexible learning options for delivery. Directors and their management teams completed the Empowering module March 2020.
Learning and Development
• MRC welcomed 16 new Apprentices and Trainees following a very successful pilot of Assessments Centres.
• Activities in March for Learning and Development team: o Facilitated 3 inductions with 28 new employees commenced. o 108 MRC Courses and 42 Skill Soft Courses completion of a total of 150.
Water Industry Worker (WIW) Pilot Program
• The WIW participants are on track for a mid-year finish. Round 3 of the face to face training was completed in Cairns in February.
• In response to the COVID 19 restrictions work is being undertaken with the RTO to complete the Block 4 training in June and combine the final assessments into one face to face assessment in July.
• In preparation for a new round of training, MRC is currently seeking expressions of interest for a second intake which is planned for an August 2020 start. Some minor changes have been made to the course for the second round based on feedback from participants and supervisors.
• The WIW Project Coordinator presented an overview of the MRC journey and learnings at the QLD Water Skills Forum on 5 March in Brisbane. Interest from the participants at the forum was very encouraging with support shown for the program to continue across other regional councils
Organisational Services Monthly Review > March 2020
18
4.2 Staff Contingent
Status OMC ECI DS CCS OS CW TOTAL Prev. Mth.
Full Time 9 290 170 116 181 86 852 838
Part Time 0 9 7 35 35 0 86 90
Apprentice/Trainees 0 2 11 6 13 2 34 22
Temp 0 10 9 12 11 3 45 42
Casual 1 3 12 77 6 3 102 103
TOTAL EMPLOYED 10 314 209 246 246 94 1119 1095
Active Vacant 0 17 9 16 18 10 70 99
TOTAL 10 331 218 262 264 104 1189 1194
*Stats current as of 31 March 2020
Activity Comments
Health and Wellbeing
• Think U Know presentations ran at Mirani and Mackay before remaining presentations scheduled for March were cancelled due to COVID-19.
• Resources were prepared and distributed to all staff regarding dealing with stress and anxiety during uncertain times as well as resources regarding the importance in maintaining good physical and mental health while adhering to social distancing and isolation recommendations.
• Contributed health and wellbeing related information and resources to the ‘Working From Home’ toolkits that were compiled to assist staff who are approved to work from home.
• Planning for employee flu vaccinations clinics (taking place in early May) to be facilitated in a way that meets social distancing restrictions.
Workforce Capability
• Currently undertaking follow up activities with Managers/Directors to finalise the FY19/20 workforce plan.
• COVID-19 redeployment activities underway to ensure that displaced MRC employees have the opportunity to be employed elsewhere in the organisation.
Volunteers • COVID-19 disruptions have impacted MRC volunteers and volunteer programs.
• The MRC webpage for volunteer expression of interest and information has been updated to reflect the suspension of volunteer activities because of COVID-19
PROJECT: Mackay Regional Skills Investment Strategy
• COVID-19 disruptions have caused all face to face training to be ceased in the region.
• RSIS has focused efforts on ensuring local businesses are aware of local and state government supports available during this time.
Organisational Services Monthly Review > March 2020
19
• Total vacant positions: 92
• Total number of positions filled in March: 45
• As of 31 March, there were 70 positions across MRC that were actively being recruited to either through external or internal recruitment and selection processes. The total current vacant positions are 92.
• Total vacant positions may differ from active vacancies due to positions on hold, higher duties/secondments or requisitions yet to be received by Recruitment.
103
85
106112
6771
82
9387
98
8992
82
70
8188
5559
77
90
75
101 99
70
42 4235
40 38 36 36 3642
39 37 36
2016
13 14
28 26 2632
2824
30 31
0
20
40
60
80
100
120
Monthly Position Occupancy
Total Vacancies Advertised Vacancies Secondment Higher Duties
98 9992
2531
45
20 1711
0
20
40
60
80
100
120
Jan-20 Feb-20 Mar-20
Monthly Recruitment Statistics
Total Vacant Positions Positions Filled Departures
Organisational Services Monthly Review > March 2020
20
• 12 month moving average turnover was 16.34% as at 31 March 2020.
• Monthly turnover was 0.97% as at 31 March 2020.
• A total of 11 employees departed MRC in the month of March 2020.
• Comparison data – annual Australian regional employee turnover 19.32% (AHRI 2018)
9
1
1
Separations for March 2020
Resignations (incl left without notice)Contract FinishedRetiredDeath / Invalidity
14.50%
15.00%
15.50%
16.00%
16.50%
17.00%
17.50%
18.00%
18.50%
0.00%
0.20%
0.40%
0.60%
0.80%
1.00%
1.20%
1.40%
1.60%
1.80%
2.00%
Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20
Turnover Monthly(Headcount)
0.84% 0.99% 1.72% 1.55% 1.16% 1.41% 1.33% 1.15% 1.60% 1.17% 1.79% 1.51% 0.97%
Turnover - Rolling Average(Headcount)
16.89% 16.56% 17.72% 17.76% 17.98% 17.49% 17.21% 16.76% 16.76% 16.70% 15.85% 16.21% 16.34%
Turnover
Organisational Services Monthly Review > March 2020
21
4.3 Key Activities
Activity Program Timefra
me Comments
Budgets & LTFF Finance • March monthly reports have been
prepared however the emergence of COVID-19 will require consideration for the remainder of financial year (March Budget Review) and effects of Council stimulus measures and close downs of some part of Council operations have had to be factored in.
• LTFF process discussions are continuing.
Statutory Reporting
Finance • Financial Services continue to work with relevant areas of Council with regards to compliance with new revenue and lease standards.
Organisational Services Monthly Review > March 2020
22
4.4 Program Financial Position
Financial Performance Report % YTD Variance of YTD Budget
Period Covered: 1 July 2019 to 31 March 2020 YTD Variance favourable of budget
YTD Variance unfavourable, between 0% and 5% of YTD Budget
YTD Variance unfavourable, more than 5% of YTD Budget
Revised
Budget
YTD
BudgetActual
YTD
VarianceComments
3.01 - Organisational Services Management 452,068 265,462 296,476 31,014 Wages tracking slightly above budget due to no vacancies.
3.02 - People & Culture 2,872,244 1,870,452 1,632,432 (238,020)
3.03 - Financial Services 2,920,776 2,044,116 1,819,572 (224,545) Some rates related expenses less than budget and salary savings due to vacant positions
3.04 - Procurement & Plant (3,851,488) (3,039,553) (2,378,960) 660,593 Decrease in plant hire revenue of + $500,000. Operating expenses are currently within budget.
3.05 - Information Services 7,796,464 6,322,782 6,290,391 (32,391) Budget on track.
3.06 - Governance & Safety 3,700,026 3,067,399 3,078,930 11,531 Budget on track
3.09 - Shared Services 6,681,791 4,797,578 4,727,246 (70,332) Budget is on track, staff vacancies and reduced staff training activity has operations under budget.
3.11 - Property Services 10,043,626 7,131,273 6,664,775 (466,498)
3.15 - Works For Queensland Funding Project - 6,206 - (6,206) Budget is on track
3.16 - Works For Queensland Round 2 Funding Project - - 35,592 35,592 Operational expenses incurred outside timimg and/or scope of funding.
Operating (surplus) / deficit 30,615,507 22,465,715 22,166,453 (299,262)
Organisational Services
People & Culture continue to operate under budget however there will be additional expenditure in the last
quarter due to timing.
Budget is on track but decreased revenue, increased expenditure and projects brought forward from next budget
due to COVID-19 will impact in last quarter.
Organisational Services Monthly Review > March 2020
23
-
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
30,000,000
35,000,000
July August September October November December January February March April May June
Operating (surplus) / deficit
YTD Budget YTD Actual
Organisational Services Monthly Review > March 2020
25
5. PERFORMANCE & RISK
5.1 Corporate Performance Planning & Reporting
During the month of March, the Performance & Risk team have continued to work with Directors and Program Managers in finalising 2020-2021 Action Plans that will support the 2020-2023 Business Plans and inform the 2020-2021 Operational Plan. A draft version of the 2020-2021 Operational Plan has been reviewed by Directors in preparation for presentation to Council in May 2020. It is likely that the COVID-19 pandemic will have an impact on corporate performance plans for the 2020-2021 financial year. The extent of these impacts is being considered and will continue into April, triggering a review of some priorities moving forward. Given the rapidly changing environment, a further review of priorities is likely in the first half of the 2020-2021 financial year. This month the 3rd Quarter Operational Plan Review Report was compiled that is planned for presentation to Council on 29 April 2020. As part of this review, we have worked with Directors and the Management Team to understand any likely impacts (as a result of the COVID-19 pandemic), on achieving Operational Plan targets for the remainder of the 2019-2020 financial year and of those, how many are to be carried over into the 2020-2021 Operational Plan.
5.2 Enterprise Risk Management
This month the 3rd Quarter Strategic Risk Report was compiled in preparation for presentation to SLPT early in April and presentation to the next Audit Committee meeting on 21 May 2020. The report identified that the COVID-19 pandemic may have an impact on Council’s risk profile and has triggered a strategic risk review that will be undertaken toward the end of the 4th Quarter. The scope of the independent review of the Enterprise Risk Management Framework has been drafted and will be explored at an appropriate time as COVID-19 related restrictions begin to be removed. Business continuity has been a focus this month as per activities of the COVID-19 Management Response Group that was activated early in the month. Whilst a considered review of MRC’s corporate business continuity framework had been scheduled prior to the COVID-19 pandemic, this real-life scenario will be beneficial in informing the review moving forward.
6. BUSINESS IMPROVEMENT
6.1 Business Improvements
Description Program Comments
Safety Systems Streamlining Project G&S
The IS Share Point initiative has continued this month with ongoing work to ensure safety information is available to all staff anytime, anywhere.
Organisational Services Monthly Review > March 2020
26
Description Program Comments
Contractor Safety Management Project
G&S
• The planned focus for this month was on implementation activities. In particular - communication activities. Acknowledging the impacts of COVID-19 restrictions on normal business operations (that may have impacted contractors), it was agreed that implementation activities would be placed on hold temporarily. This decision will be reviewed as COVID-19 restrictions begin to lift.
• In the interim, preparation of supporting processes and tools will continue to be developed in readiness for implementation activities to re-commence.
Business Analysis: Software support for key corporate functions
G&S and IS
• Product demonstrations have now been complete, and the Information Services team have finalised their report on findings and recommendations.
• A key outcome is that software support for safety as a key corporate function is to be explored in the 2020/21 financial year, followed by enterprise risk management and corporate performance planning in 2021/22.
• The report has been presented to stakeholders and a business case submitted to SLPT as part of annual budget deliberations.
• Whilst an outcome on the business case is being finalised, the project, ‘WHSQ Systems Implementation,’ has been initiated and a project plan developed, reviewed and approved by the business owner.
• A project kick-off meeting will take place in April with all stakeholders.
Business Process Management
Shared Services
• Business Process Management (BPM) is a corporate wide initiative that aims to improve efficiency, effectiveness and agility through capturing process knowledge in a central repository. Helping council to understand what it does, how processes deliver for our customers and looks at why we do the things we do. It was introduced in 2016 as a solution to managing the variation in how and where processes were documented.
• BPM has taken a staged roll out approach to programs across the organisation. Each stage structured to deliver an understanding of BPM concepts and process tools, including the process mapping software Promapp.
• In the past 5 years, the Business Process Improvement team has delivered; o BPM to 23 programs, o over 460 users trained in process mapping techniques, o Identification of over 1,100 processes with 53% visible to the
organisation.
• Once the processes have been mapped the BPM journey will focusing on optimising processes using continuous improvement methodologies to enhanced productivity.
Project Review and Optimisation Project
Shared Services
Project Highlights
• All SSC teams have a fully trained Process Champion actively assisting with team process management.
• Shared Services is experiencing heightened team collaboration, including across teams with cross-functional processes
• Natural synergies have been identified between teams, developing further understanding of like functions, customer service groups and areas of opportunity to realise efficiencies.
Project Results to Date
1. Identification of 44 additional processes, bringing the total to 379, 2. Reduction of “Out of Date” process from 124 to 7.
Organisational Services Monthly Review > March 2020
27
\C
7. REGULATORY COMPLIANCE
7.1 Financial Compliance
Description Program Timeframe
Manage capital and operational budgets to achieve the benchmark Local Government financial sustainability ratios, including the operating surplus, net financial liabilities, and asset sustainability ratios.
Measure: Completion of Long-Term Financial Forecast including applicable ratios
Finance
Provide relevant and useful information to Council, stakeholders and clients.
Measure: Production of monthly strategic financial reports
Finance
Provide relevant and useful information to Council, stakeholders and clients.
Measure: Number of high-risk audit issues
Finance
7.2 Corporate Governance
Policies New Policy’s Approved in March 2020
Existing Policies Approved in March 2020
Council Policies Nil Nil.
Administrative Policies Nil
2 Administrative Policies were approved during March:
• Equal Employment Opportunity
• Provision and Use of Recording Devices.
1 Administrative Policy was rescinded:
• Contact between Employees and Councillors Policy
Policy Reviews Commenced
6 policy reviews were commenced.
Policy Consultation 3 management policy consultations were commenced.
Activity Program Comments
Administrative Action Complaints G&S
Corporate Governance has processed 12 Administrative Action Complaints for the month of March. Corporate Governance has also undertaken 2 Prescribed Infringement Notice (PIN) reviews and 1 Insurance Claim review.
Authorised Person Applications Processed
G&S The Authorised Person Project is now complete with all identified positions now being issued with new Authorised Person ID Cards.
Right to Information (RTI) Applications
G&S 1 RTI Application was finalised during March and 1 application was withdrawn.
Organisational Services Monthly Review > March 2020
28
10
6
1
Insurance Claims - March 2020
Motor Vehicle - 10 Public Liability Personal Injury - 0 Public Liability Plant - 6
Public Liability - 1 Theft - 0 Professional Indemnity - 0
Malicious Damage - 0 Other - 0 Water Damage - 0
53
12
45
15 21 1
General Governance Enquiries - March 2020
Insurance Advice - 53 Policies - 12
General Governance Advice -45 Delegation Requests/Authorised Persons -1
SAI Global Standards Requests -5 Administrative Action Complaints -2
RTI/IP General Inquiries - 1 Local Laws - 1
Organisational Services Monthly Review > March 2020
29
7.3 Internal Audit
Inventory / Stores Management and Stocktakes
Completed
Contractor Management In Progress
This review has been outsourced and the contractor engaged. Audit being completed offsite
Public Event Management In Progress
The scope of this audit is being reviewed to reflect and support an initiative being undertaken by CCS and DS to review the internal operating arrangements for event management.
Regulatory / Licensing and Compliance In Progress Fieldwork has been completed and the report drafted.
22
1
1
1
1
0 5 10 15 20 25
Total Received - YTD
No of RTI App Still Current
No of RTI Applications Withdrawn
No. of RTI App Finalised for Month
No. of RTI App Rec'd for Month
Right to Information Applications - March 2020
39
16
77
63
0
14
0 10 20 30 40 50 60 70 80 90
Number of days to process Application
Contact with Applicant
Number of Pages considered per Application
Number of pages released in full
Number of pages released in part
Number of pages refused access
Right to Information Application Statistics - March 2020
Internal Audit Reviews Underway Status Comments
Organisational Services Monthly Review > March 2020
30
Audit Committee
• The final meeting of the audit committee under its old membership was held on 13 February with the meeting minutes going to the 29 April Council meeting. The first meeting with the new membership comprising of external members Peter Tait (new Chair) & Tim Cronin (first meeting); and two Council appointees will be held on 21 May.
8. LAND & BUILDINGS
9.1 Building Maintenance
9.2 Land & Tenure
Other Internal Audit Activity
Comments
Description
• Mirani Administration Building – Rainwater sumps cleared and re-sealed.
• MECC – Convention Centre, large sloping box gutter all joins resealed and symphonic sumps re-sealed.
• Mirani Depot (Office) - New table/bench installed and caged in with lockable doors to house the office building generator securely.
• MECC – Entertainment Centre - Repair large cement sheeting to Fly Tower.
• MECC – Trolley/Cleaning Room, Upgrade plumbing connections and valves to chemical dispenser.
• MECC – Entertainment Centre, faulty solenoids replaced in urinals.
• Mirani Community Hall – Install bird proofing to veranda and window flashings.
• Mackay Administration Building - 3.5 kw split system installed in Manager Development Engineering’s office to eliminate AC air flow issues.
• Artspace foyer ceiling re-painted.
• Artspace foyer wall re painted.
• Dudley Denny City Library - major roof rectification works have been completed with 20m. of tray flashing and removal of the old Tenancy 7 exhaust hood.
• All lights replaced in amenities at Celeber Drive Hall – Replaced to LED’s.
Description
Leases:
• Lease renewals:
o Caneola Pty Ltd - cane cultivation
o Reef Catchments - licence renewal
o Qld Health - user agreement for Tommy Webster Memorial Hall
Organisational Services Monthly Review > March 2020
31
o Café Deed for Botanic Gardens Café
o Mackay Croquet - commenced discussions regarding lease renewal
• New leases:
o Public Safety Business Agency - Mirani RFS & SES joint facility
o 3 month residential lease signed for Willis Street
o QCup/Mackay Cutters Deed signed - Stadium Mackay
o Grazing lease documents provided for signing - Eton-Homebush Road
o Mackay Basketball Association
o Assisting Sport & Recreation regarding new leases for Brewers Park
• New Lease enquiries:
o Beautician - Mirani premises
• Lease Inspections:
o Botanic Gardens Café
o 8 River Street, Mackay
o Lifestream Building - Nita Fleming Oval
o Town Hall
• General Lease Matters:
o Mackay Netball - trees
o Citibeach Volleyball - water leak
o LYDDA - car park
o Ashtart - business closed down
o Nita Fleming Oval - surrender of Lifestream and issues between residents and Clubs
o Whitsunday VMX Club - extension to agreement for lease
o Crediton Hall - status update
o Mackay Community Garden - overgrown grass
o Finch Hatton Progress Association - requirements for coffee van
o Regional Social Development Coalition (Town Hall) - request to utilise second room
o Slade Point Rugby Union - rates query
o Mackay & District Senior Citizens Association - new agreement
o Quarry Hill - lease documentation
o Central Qld Blokart Association - general lease enquiry
o Selectability - use of park area for community garden - Wood Street
o Don Daniels on the River - rent discussions
• Lease Compliance:
o Mackay Kennel Club - request for painting and upgrade to fixtures
o ATSICHS Mackay - fire pit
o Mackay Netball - request for Coffee Counter
Organisational Services Monthly Review > March 2020
32
o Whitsunday VMX Club - request to slash overgrown grass
o Dows Creek Hall Committee - request for installation of fans
o Mackay Croquet - consent for bus shelters
o Finch Hatton Progress Association - Heritage exemption for new flooring
o Public Liability Insurance
▪ February- sent out 12 new request, 14 follow-ups, received 17, outstanding 9
▪ March - sent out 12, 5 follow ups, received 5, outstanding 12
• The Dome:
o Tenancy 2 - Travel Associates - lease commenced 01.02.2020, commenced trade 09.03.2020
o Enquiry received from Pharmacist regarding Tenancies 4 & 7
o Walkthrough of Dome with NDIS provider
o Water leaks / air conditioning issues for Tenancies 5, 9, 10 and 11
o Chamber of Commerce vacated Tenancy 7
o RCD testing all tenancies and common area
o Mother's Pantry closed 27.03.2020 due to Covid-19
o One Stop Medical - consent given for isolation zones in car park and screening area at the front of the tenancy
Land Matters:
• Land maintenance:
o Dalrymple Bay Coal Terminal - replacement of fences and bitumen upgrades for weather monitoring enclosures
o Access at the rear of Gordon White Library
o Registered Biosecurity Entities - on Council land
o Ivan Johnson Road - overgrown reserve
o Hamilton Street - tree inspection
o Overgrown grass at Calen property
o Request for tree trimming - Foulden Street
• Freehold Land Sold:
o 110 Cowleys Road went to auction, was passed in, and later sold in March
• Fencing:
o Greenmount Homestead
o Gracie Court, Walkerston
• Encroachments:
o Pollack Street query
o Joseph Court
o Scawfell Street, Slade Point
o Ocean Avenue, Slade Point
Organisational Services Monthly Review > March 2020
33
The Land & Road Use Committee:
• February:
o 3 x land matters
o 3 x road matters
• March:
o 9 x land matters
o 5 x road mattes
o Audited all DNRME applications from 2017
Council Reports:
• Public Safety Business Agency - Mirani RFS & SES joint facility
Miscellaneous:
• Seaforth Community Hall enquiry
• Inspection of new commercial tenancy - 8 River Street
• Enquiry regarding fire training on Council land at Sarina
• Acquired 6 River Street as part of PDA project
• Undertook Land Risk Analysis (budget new initiative)
• Grazing permit to occupy - Delachantos Road, Hampden
• Fence at SES Sarina - Brewers Road
• Pest management and asbestos audits taking place
• Orange Sky agreement
• River Street boats - undertook inspection
• Working with Sport & Recreation Development Officer on a list of Associations in the Mackay region and their registration status
• Optus - unpaid rates - ongoing
• CQU - ongoing issue with rates associated with MARC