Paul Visee – Project ManagerPaul Visee – Project ManagerKristofer Kieca – Civil Engineer / EstimatorKristofer Kieca – Civil Engineer / Estimator
Erik Jalowy – Designer / Assistant PMErik Jalowy – Designer / Assistant PMNeil A. Cellini – LEED APNeil A. Cellini – LEED AP
Design and Drafting Capstone ProjectCD 331March 8, 2011Instructor: Mr. Falco
Scope
30 years from now there will be an expected 70 million more U.S. Citizens. 30 years, is tomorrow morning in transportation terms. We need to make sure we are accommodating to the needs of the future generation in the cleanest way possible.
2Silver Bullet Rail Deisgn
Group
The Future of High Speed Rail
3Silver Bullet Rail Deisgn
Group
http://www.midwesthsr.org/splash.html
Click on link below to view short video clip on the future of high speed rail
The Future of High Speed Rail
Silver Bullet Rail Deisgn Group
4
Midwest High Speed Rail
5Silver Bullet Rail Deisgn
Group
300 Miles of upgraded track
Supports high speed trains going 220-mph
Michigan secured over $40 million in stimulus money
Jobs And High Speed Rail
Creates construction and permanent jobs.
The high-speed train system in California will generate 600,000 construction-related jobs over the life of the project.
6Silver Bullet Rail Deisgn
Group
Safety of High Speed Rail
Offers SAFE, and GREEN transportation.
In 2009 36,000 Americans died in car accidents.
Train fatalities in 2009---700
Silver Bullet Rail Deisgn Group
7
2030 Challenge
The overall result is equivalent 1 gallon of gas for 720 miles per person – reduced energy consumption and reduced CO2 emissions that also benefit our environment.
8Silver Bullet Rail Deisgn
Group
Design Goal Our groups design goal is to build a station hub that
will accommodate the future Midwest high speed rail.
We have taken ideas for our design from various existing hubs around the world.
Customer: City of Kalamazoo, MI
9Silver Bullet Rail Deisgn
Group
Railway Hub Design Ideas
Anaheim, California Naples, Italy
10Silver Bullet Rail Deisgn
Group
• Below grade train lines• Green technology• Open floor plan
• Modern design• Site orientation• Highly reflective building materials
Location-Kalamazoo MI
• Hub between Chicago & Detroit
• Located near major highways & local airport
• Utilizing existing railway
11Silver Bullet Rail Design
Group
Kalamazoo Hub
Detroit
Chicago
Site Location
Silver Bullet Rail Deisgn Group
12
•Existing out of date station•Undersized property
Site Location
Silver Bullet Rail Deisgn Group
13
New site location
Site Plan Layout
Silver Bullet Rail Deisgn Group
14
Site Plan Layout
Silver Bullet Rail Deisgn Group
15
Southwest View
Silver Bullet Rail Deisgn Group
16
Northwest View
Silver Bullet Rail Deisgn Group
17
Building Plan
18Silver Bullet Rail Deisgn
Group
Building Sections
19Silver Bullet Rail Deisgn
Group
Building Sections
20Silver Bullet Rail Deisgn
Group
Interior Views
21Silver Bullet Rail Deisgn
Group
Interior Views
22Silver Bullet Rail Deisgn
Group
Interior Views
23Silver Bullet Rail Deisgn
Group
Building Materials
Silver Bullet Rail Deisgn Group
24
Lumeta PowerPly Solar Panels•Minimized Roof Load•No Roof Penetrations•Reduces installation labor by 60%•400 watts per panel
Building Materials
Silver Bullet Rail Deisgn Group
25
Englert Metal Roof System•Lightweight•Reflects 75%-80% of the Suns energy•Roof wont rot, crack, crumble, or burn•Made from 100% recycled material•Great for water harvesting
Building Materials
Silver Bullet Rail Deisgn Group
26
Porous Asphalt•Provides flood control•Reduces stormwater infrastructure•Suitable for cold climates (reduced freeze-thaw)•Maintains traction when wet
Building Materials
Silver Bullet Rail Deisgn Group
27
Low – E Glass•Provides passive solar heating•Cuts cooling and heating costs•Reduces harmful UV rays•Enhanced insulation performance
Summer Solar Study
Silver Bullet Rail Deisgn Group
28
Click on link below to view short video clip of the summer solar
study
http://www.youtube.com/watch?v=_nyAesZcTpE
Winter Solar Study
Silver Bullet Rail Deisgn Group
29
Click on link below to view short video clip of the Winter solar study
http://www.youtube.com/watch?v=DJAVY1sQpg8
Silver Bullet Rail Deisgn Group
30
LEED Energy Efficiency
47% Reduction over Baseline
Silver Bullet Rail Deisgn Group
31
LEED Water Efficiency
20% Water Reduction
33% Water Reduction
87% Water Reduction
47% Reduction over Baseline
LEED Checklist for Kalamazoo HSR Station
Silver Bullet Rail Deisgn Group
32
LEED Goal: 40 pts Estimated LEED Points: 62 pts,
Gold Rating
Construction Budget Site Construction $6,114,386
Road Construction $6,548,850
Building Construction $7,336,764
Total Cost: $20,000,000
Silver Bullet Rail Deisgn Group
33
Animation
Silver Bullet Rail Deisgn Group
34
Click on link below to view an animation of the rail station
http://www.youtube.com/watch?v=oEPACQTf9hs
Q & A Session